SUKRITHI AVANTHI PHASE 2 is a plotted development / residential open-plot layout in PATANCHERU, PATANCHERU Mandal, Sangareddy district. The registered promoter is SUBHA GRUHA PROJECTS INDIA PRIVATE LIMITED. The registered site extent is 52678.79 sq.m, and the final-layout documentation states 112 plots; the RERA-filed offering is residential plots, with no plot-size range stated. It is registered under TG-RERA number P01100000268, with 31/05/2018 recorded as the original and revised proposed completion date.

More from Subha Gruha Projects India Pvt Ltd · 8 projects →

01What we found

Period endedTG-RERA registration ran to 31 May 2018 - check its extension on TG-RERA
20documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

ItemRecord
Registered project nameSUKRITHI AVANTHI PHASE 2 RERA record
Project typePlotted development / residential open-plot layout RERA record RERA filing
Phase / registered portionPhase 2; the registration identifies the project as “SUKRITHI AVANTHI PHASE 2.” The registered parcel is described in the layout records as a residential open-plot layout. RERA record
TG-RERA registrationP01100000268 RERA record
Registration validityCertificate states commencement on 01/02/2019 and end on 31/05/2018; this is the validity period recorded on the certificate, not a statement of the project completion date.
Registered promoterSUBHA GRUHA PROJECTS INDIA PRIVATE LIMITED RERA record
RERA statusOn-Going Project, as recorded in the RERA project information. RERA filing

Land and geographic identity

ItemRecord
LocalityPATANCHERU RERA record
Revenue villageNandigaon (also rendered “Nandhigama” in title-report records); the supplied project identity fields name Patancheru but do not specify a revenue village.
Mandal / district / PINPATANCHERU / Sangareddy / 502300 RERA record
Project survey numbers and subdivisions128/P, 129/P, 130/P, 143/P, 144/P and 145/P Land records
Registered site extentRERA land details: total area 52678.79 sq.m; area affected by road widening/FTL of tanks/nala widening 1249.22 sq.m; net area 51429.57 sq.m. RERA filing
BoundariesEast: HMDA LAYOUT; West: NEIGHBOURS LAND; North: ROAD; South: NEIGHBOURS LAND. RERA filing

Development identity

ItemRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA) Approvals record
Principal layout approval000102/LO/Plg/HMDA/2018; HMDA final layout letter dated 14 September, 2019. Approvals record
Approved built-up areaNot disclosed in the supplied RERA fields or layout records; this is a plotted layout, not a building project. RERA filing
Plots in approved layout112 plots, as recorded in the final-layout documentation.
Buildings / floorsNo project building count or floor configuration is disclosed in the supplied layout records. Individual residential building permissions are to be considered separately under the applicable building rules.
Layout road widthsFinal-layout record lists 30.00, 15.24, 12.19m and 9.14m.

Offering and status

ItemRecord
RERA-filed offeringResidential plots; the RERA record does not provide a plot-size range or unit inventory in the supplied data. RERA filing
Layout count112 plots stated in the final-layout documentation; no booked or available counts are supplied.
Construction stageRERA status is “On-Going Project.” An architect’s Form–1A record states the layout project was completed in all aspects and gives completion date 10.10.2019; that is a document-recorded certification, not an independent site inspection. RERA filing
Original / revised completion dateRERA fields state 31/05/2018 for both original and revised proposed completion. RERA filing
Occupancy / completion certificate statusNo building-level OC is supplied. The file includes an HMDA final-layout letter and an architect’s completion certification for the layout; these should not be read as an occupancy certificate for individual houses.

The project story

SUKRITHI AVANTHI PHASE 2 is registered as a residential plotted development at Patancheru, in the project records associated with Nandigaon/Nandhigama village, Patancheruvu Mandal, Sangareddy district. The RERA-identified land covers Survey Nos. 128/P, 129/P, 130/P, 143/P, 144/P and 145/P. HMDA’s final-layout letter describes a 51,429.57 sq.m net layout with 112 open plots. RERA record Land records

The project is a layout of residential plots, not a set of RERA-registered apartment buildings. The final layout is sanctioned for residential dwelling-house use; the record says individual building permissions are to be considered separately. The RERA status remains “On-Going Project,” while an architect’s Form–1A record states the layout was completed in all aspects on 10.10.2019. That certification concerns the layout record and does not independently establish present site conditions or the completion/occupancy status of any house built on a plot. RERA filing

Master plan, architecture & building design

This is an open-plot layout. The RERA land figures give a total site area of 52678.79 sq.m, including 1249.22 sq.m recorded as affected by road widening/FTL of tanks/nala widening, and a net area of 51429.57 sq.m. The layout drawing’s area statement allocates the net layout area as follows; these are layout-record figures, not measurements of a building or individual plots. RERA filing Layout record

Layout land useArea
Plotted area31816.54 sq.m
Roads13985.91 sq.m
Organized open space / park / utility area4339.81 sq.m
Social infrastructure area1287.03 sq.m
Amenity area0.00 sq.m

The final-layout record states 112 plots and lists layout road widths of 30.00, 15.24, 12.19m and 9.14m. The drawing-derived layout record likewise reports 112 plots, but does not provide plot-by-plot sizes in the supplied extraction. No building footprints, towers, floor plans or residential floor configurations are established for this plotted development. Layout record

Homes, configurations & floor plans

The RERA-filed offering is residential plots. The supplied RERA data does not give plot-size bands, plot-wise inventory, booked/available counts or saleable area for the plots. The final-layout documentation states a total of 112 plots. RERA filing

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Residential plots112 plots stated in final-layout documentationNot disclosedNot disclosedNot disclosedNot applicable / not suppliedNot supplied

The layout drawing extraction records the plot count but no plot-by-plot sizes. The supplied floor-plan data contains no measured flat plans; it is not a basis for describing individual homes or plot dimensions. Layout record Floor plans

Parking & vehicle circulation

The final-layout documents identify plots 48 to 74 as 27 plots mortgaged in favour of HMDA in the draft-layout record, with an extent of 4905.10 sq.m; the final-layout material records a relinquishment deed concerning the mortgaged plots. No project-wide parking count, visitor or accessible parking provision, parking allocation, or plot-specific parking arrangement is supplied.

The final-layout record lists road widths of 30.00, 15.24, 12.19m and 9.14m and states that roads are to remain open for public access. It does not provide a detailed vehicle-circulation or pedestrian-separation plan in the supplied extracts.

Amenities, recreation & open spaces

The layout records identify open space, park/utility land and social infrastructure land. The HMDA final-layout letter also lists a club house and several site services in its amenities/utility record; the supplied evidence does not establish their present delivery or independent completion status. The layout record’s land-use statement lists amenity area as 0.00 sq.m, so no separate amenity land area is recorded there.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Organized open space / park / utility4339.81 sq.m in the final-layout area statementFinal-layout record; current condition not independently verified
Social infrastructure area1287.03 sq.mFinal-layout record; current condition not independently verified
Club houseListed as a layout amenity; no size suppliedListed in layout documentation; present status not independently verified
Park developmentListed as an amenity/utility item; no separate total size beyond the area statement suppliedDocumented as a layout provision; present status not independently verified

Utilities, building services & safety

The HMDA final-layout documentation lists water supply, sewerage, drainage disposal, street lighting and rainwater-harvesting structures. It also identifies a septic tank, overhead water tank, transformer, sump, water and drainage pipe lines, electrical lines and harvesting pits. The final-layout record specifies one septic tank measuring 6.25 x 13.56 x 3.50m and 56 harvesting pits of 4X4X6. These are documentary provisions; present operation and condition are not independently verified.

ServiceSupplied record
WaterWater supply, water pipelines, sump and overhead water tank are listed; no capacity or source is supplied.
Sewerage and drainageSewerage and drainage-disposal systems, drainage pipelines and septic tank are listed. The septic tank is recorded as 6.25 x 13.56 x 3.50m, 1 No.
Rainwater harvestingRainwater-harvesting structure and 56 harvesting pits of 4X4X6 are listed.
Electrical and lightingTransformer, electrical lines and street lighting are listed; no capacity or backup details are supplied.
Fire/life safety, waste and accessibilityNo project-specific fire system, waste-management arrangement, accessibility provision or related capacities are established in the supplied layout extracts.

Location, access & connectivity

The registered project location is PATANCHERU, Sangareddy district, PIN 502300. Layout approval documents identify the site as Nandigaon village, Patancheruvu Mandal. The supplied location record gives a cadastral parcel-centroid coordinate of 17.41528, 78.35459. RERA record Location record

The final-layout record lists road widths of 30.00, 15.24, 12.19m and 9.14m, and states that roads are to be kept open for free access to the public and neighbouring lands. The supplied structured location data gives Financial District (Nanakramguda) as an anchor at 1.2 km; no travel time or public-transport details are supplied. Location record

Developer & development status

The registered promoter is SUBHA GRUHA PROJECTS INDIA PRIVATE LIMITED, a private limited company. Its supplied corporate identifier is GSTIN 36AAPCS0362R1ZC. The project record gives the promoter’s address as 4TH FLOOR, LUMBINI JEWEL MALL, ROAD NO 2, SHANKARPALLY ROAD, PATANCHERU, PATANCHERU, Sangareddy, 502300. RERA record Corporate record RERA filing

The RERA record labels the project “On-Going Project” and records 31/05/2018 as both original and revised proposed completion date. Separately, the architect’s Form–1A record states completion of the layout in all aspects on 10.10.2019. This is a document-recorded certification; the supplied evidence does not establish current site progress or the OC status of individual residential buildings. RERA filing

Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm ‘C’ registration certificate for SUKRITHI AVANTHI PHASE 2, registration number P01100000268.
HMDA draft layout letterDraft layout letter dated 31 May, 2018, approval number 000102/LO/Plg/HMDA/2018, for Survey Nos. 128/P, 129/P, 130/P, 143/P, 144/P and 145/P.
HMDA final layout letterFinal layout letter dated 14 September, 2019, approval number 000102/LO/Plg/HMDA/2018, for the identified survey numbers and 51,429.57 sq.m net extent.
Architect’s Form–1A / completion recordSupplied record states the layout has 112 plots and that completion was certified, with completion date 10.10.2019.
RERA promoter declarationForm-B affidavit-cum-declaration by J. Srinivas for the promoter, dated 31-10 -2018; it includes promoter declarations about title, encumbrances, approvals and project undertakings.
Layout-plan and infrastructure recordsFinal-layout records list land-use areas, road widths and site-service provisions.

The supplied evidence does not include an occupancy certificate for individual houses or building-level approvals for construction on plots. The final-layout documentation states that individual building permission is to be considered separately.

Other registrations of Sukrithi Avanthi

Frequently asked questions

Is SUKRITHI AVANTHI PHASE 2 registered with Telangana RERA?

Yes. SUKRITHI AVANTHI PHASE 2 is registered with the Telangana Real Estate Regulatory Authority as P01100000268; the registration status is On-Going Project.

Who is the developer of SUKRITHI AVANTHI PHASE 2?

The promoter named in the RERA registration is SUBHA GRUHA PROJECTS INDIA PRIVATE LIMITED.

Where is SUKRITHI AVANTHI PHASE 2 located?

SUKRITHI AVANTHI PHASE 2 is in PATANCHERU, Sangareddy, Telangana (502300).

When will SUKRITHI AVANTHI PHASE 2 be completed?

The promoter's proposed date of completion filed with RERA is 31/05/2018. This is the promoter's declaration, not a guarantee.

More projects in Patancheru