Suguna Sapphire
SUGUNA DEVELOPERS LLP · Karimnagar · RERA P02700008531
SUGUNA SAPPHIRE is a residential apartment project in THEEGALAGULLAPALLI,WARD 1, Karimnagar -I, Karimnagar. The registered promoter developing it is SUGUNA DEVELOPERS LLP. The project covers 475.43 sq.m and comprises one residential building, Building A (B), with 1 stilt + 5 upper floors and 10 3BHK units. Its TG-RERA registration number is P02700008531, and the project header records a proposed completion date of 27/09/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SUGUNA SAPPHIRE RERA record |
| Project type / status | Residential apartment project; TG-RERA record labels it “New Project” RERA record RERA filing |
| Registered portion / phase | One registered project; no separate phase name or phase number is disclosed RERA record |
| TG-RERA registration | P02700008531; registration valid from 27 July 2024 to 27 May 2027, unless extended by the Authority RERA record |
| Registered promoter | SUGUNA DEVELOPERS LLP RERA record Corporate record |
| RERA status | Registration certificate is on file. The supplied record does not establish a current construction-progress stage or occupancy certification Document index |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | THEEGALAGULLAPALLI,WARD 1; the filed approval also describes THEEGALAGUTTAPALLI LOCALITY RERA filing |
| Revenue village(s) stated in records | Theegalaguttapally (TG-RERA registration and land record); Theegalaguttapalli / THEEGALAGUTTAPALLI (approval documents). The title materials also refer to Arepally Revenue Village for the project land. These are the supplied descriptions; no independent village-identity resolution is recorded |
| Mandal / district / PIN | Karimnagar -I / Karimnagar / 505001 RERA record RERA filing |
| Project survey number(s) | Survey No. 298; the filed building permission identifies Plot Nos. 16, 17 in Survey No. 298. No subdivision is stated for the project parcel RERA filing |
| Registered site extent | 475.43 sq.m; filed as both total and net area RERA filing |
| Boundaries in TG-RERA record | North: WIDE ROAD 9 MT; South: OPEN LAND OF OTERS; East: OPEN PLOT OF OTHERS; West: HOUSE OF OTHERS RERA filing |
| Parcel record | Survey No. 298; total/net area 475.43 sq.m; road-widening/FTL/nala-affected area recorded as 0 Land records |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Karimnagar Municipal Corporation Approvals record |
| Principal building permission | 0054/BP/3011/2024, approved 28 May 2024; file no. 005273/BP/DTCP/3011/0089/2024 Approvals record |
| Other approval reference | TS/026555/2024 appears as an LTP licence reference in the filed drawing Approvals record |
| Approved built-up area | The filed plan records 1,338.45 sq.m proposed built-up area excluding parking, 1,606.15 sq.m including parking, and separately states Total BUA: 1,612.15 sq.m, deductions 6.00 sq.m, and net BUA 1,338.45 sq.m. These are the labels and figures in the supplied approval extraction |
| Building and floors | One residential building, identified as Building A (B); 1 stilt + 5 upper floors; height 14.99 MT. The filed plan also states total height 20.43 mt |
| Parking provision in approval | Stilt area is recorded as 253.32 sq.m in the commencement approval extraction; the filed layout records parking area 267.70 sq.m. A sanctioned parking-space count is not supplied |
| Units | 10 units in the RERA unit record; the building-plan extraction also records 10 dwelling units RERA unit table |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configuration | 3BHK, 10 units RERA unit table RERA unit details |
| RERA-filed saleable area | 76.66 sq.m per filed unit configuration RERA unit table RERA unit details |
| Booked / available | 0 booked / 10 available in the portal-derived unit record. The portal record has no as-of date, so these counts are indicative RERA unit table RERA unit details |
| Completion dates | The Form B declaration undertakes completion by 27/05/2027; the project header records proposed completion 27/09/2027. These dates are reproduced as recorded; the evidence does not explain the difference RERA record |
| Construction stage | No independently verified site-progress evidence or construction-stage percentage is supplied. The amenity schedule shows 0% against each listed item RERA amenities |
| OC / completion certificate | No occupancy or completion certificate is supplied in the reviewed project documents. The building permission requires an occupancy certificate before occupation Document index |
2. The project story
SUGUNA SAPPHIRE is a single-building residential apartment project registered with TG-RERA on land identified in the project record as Survey No. 298, Plot Nos. 16 and 17, in the Theegalaguttapally / Theegalaguttapalli area of Karimnagar. The supplied records variously describe the revenue-village location as Theegalaguttapally and Arepally Revenue Village; the overview preserves those recorded descriptions rather than resolving them independently. RERA record Land records
The approved building is described as Building A (B), with a stilt and five upper floors, for residential use. The RERA unit filing lists ten 3BHK apartments, all shown as available in the portal-derived snapshot; no as-of date accompanies that inventory. The evidence does not establish how much construction has been completed: the registration and approval documents describe the project and its proposed works, but no independent site-progress report is supplied. The amenity schedule records 0% progress for its listed entries. RERA unit table RERA amenities
The project’s TG-RERA registration validity, promoter-declared completion undertaking, proposed completion date in the project record, and occupancy-certificate status are separate matters. The registration certificate runs to 27 May 2027 unless extended; the supplied completion dates are 27 May 2027 in Form B and 27 September 2027 in the project header; and no OC or completion certificate is on file in the supplied evidence. RERA record Document index
3. Master plan, architecture & building design
The filed building permission concerns a new residential building on a 475.43 sq.m site in Survey No. 298, Plot Nos. 16 and 17. It describes one building, A (B), as 1 stilt + 5 upper floors, with a stated building height of 14.99 MT. The approval extraction also records a total height of 20.43 mt and a 6.00 sq.m terrace-floor figure. No separate tower arrangement, flat-per-floor schedule, lift count, stair details, or detailed circulation plan is present in the supplied extracts.
The approval extraction gives 1,338.45 sq.m as proposed built-up area excluding parking and 1,606.15 sq.m including parking, while also listing total BUA of 1,612.15 sq.m, deductions of 6.00 sq.m, and net BUA of 1,338.45 sq.m. These figures are reported under the labels used in the filed plan; no FSI-counted area, carpet-area total, or independently measured building area is supplied.
The filed plan identifies setbacks of Front 3.00 m, Rear 2.50 m, Side I 2.50 m and Side II 2.50 m. It records a vacant-plot area of 207.74 sq.m, a parking area of 267.70 sq.m, and a 1.5 M height compound wall. The extracts do not provide a full floor-by-floor architectural schedule, landscape/open-space plan, or detailed common-area distribution.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 76.66 sq.m | Not supplied | Not supplied |
The configuration, unit count, booking status and saleable area are from the TG-RERA-derived unit record; the available-unit count has no stated as-of date and is indicative. The drawing review contains two drawings, but no 3BHK flat design was measured for carpet area. Accordingly, no software-measured carpet or room dimensions are reported. RERA unit table RERA unit details Floor plans
RERA-filed saleable area is not a carpet-area measurement: saleable area may include the home’s share of common areas, while carpet area measures the apartment’s internal floor area under the applicable definition. The supplied evidence does not provide a measured carpet area, balcony or utility area, or loading figure for these units. RERA unit details Floor plans
5. Parking & vehicle circulation
The sanctioned records identify parking at stilt level. The commencement approval lists a stilt area of 253.32 sq.m, and the filed layout extraction states 267.70 sq.m parking area. The supplied records do not establish the number of car or two-wheeler spaces, visitor or accessible spaces, mechanical parking, ramp configuration, EV-charger count, or unit-specific parking allocation.
The building permission states that the cellar and stilts approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters, and requires parking places to be provided with electric-vehicle charging infrastructure. These are approval conditions; the evidence does not confirm their installation or completion. A parking bay shown or area recorded in the plan does not, by itself, establish exclusive ownership or allocation to a particular apartment.
6. Amenities, recreation & open spaces
The TG-RERA amenity schedule lists 14 infrastructure and facility categories. Each has a recorded progress figure of 0%; “YES” denotes availability as recorded in that schedule, not independent verification of installation or completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | No size supplied | RERA amenities | 0%; completion not independently verified |
| Water Supply | Marked “YES”; details not supplied | RERA amenities | 0%; completion not independently verified |
| Sewerage (Chamber, Lines, Septic Tank, STP) | Marked “YES”; specific system details not supplied | RERA amenities | 0%; completion not independently verified |
| Storm Water Drains | No details supplied | RERA amenities | 0%; completion not independently verified |
| Green Strip / TOT LOT / Park | No size or quantity supplied | RERA amenities | 0%; approval condition requires a fenced tot-lot and maintained greenery before OC; completion not verified |
| Street Lighting | No details supplied | RERA amenities | 0%; completion not independently verified |
| Community Buildings | No details supplied | RERA amenities | 0%; completion not independently verified |
| Treatment and Disposal of Sewage and Sullage Water | No system or capacity supplied | RERA amenities | 0%; completion not independently verified |
| Solid Waste Management and Disposal | No system details supplied | RERA amenities | 0%; completion not independently verified |
| Water Conservation / Rainwater Harvesting | Marked “YES”; approval also specifies a rainwater-harvesting structure/percolation pit | RERA amenities | 0% in schedule; installation not independently verified |
| Energy management | No details supplied | RERA amenities | 0%; completion not independently verified |
| Fire Protection and Fire Safety Requirements | No system details supplied | RERA amenities | 0%; completion not independently verified |
| Electrical Meter Room / Sub-Station / Receiving Station | Marked “YES”; approval requires transformer space | RERA amenities | 0%; completion not independently verified |
| Aggregate area of recreational open space | No area supplied | RERA amenities | 0%; completion not independently verified |
No clubhouse, indoor recreation facility, sports facility, or facility capacity is evidenced in the supplied records. The approval also requires tree planting along the site periphery and in front of the premises, and maintenance of the greenery strip.
7. Utilities, building services & safety
The filed approval identifies a rainwater-harvesting structure/percolation pit, transformer space, garbage house, water sump and lift. The plan extraction also lists a septic tank; it does not state an STP or WTP. These are document-listed provisions, not evidence of completed or commissioned systems.
The amenity schedule marks water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as available, but records 0% progress for each listed item. No water source, storage capacity, treatment capacity, sewerage capacity, backup-power provision, lift capacity or count, or waste-processing capacity is supplied. RERA amenities
The building permission requires an occupancy certificate before occupation, refers to fire-safety requirements, and requires services including sanitation, plumbing, fire safety, lifts and electrical installations to be carried out under qualified technical personnel. It also requires rainwater harvesting and a fenced, maintained tot-lot before the OC, and requires EV-charging infrastructure at parking places. The supplied evidence does not establish completion or independent inspection of these measures.
8. Location, access & connectivity
The registered location is Theegalaguttapally, Karimnagar-I, Karimnagar, 505001. The project record further identifies THEEGALAGULLAPALLI,WARD 1, while the approval describes THEEGALAGUTTAPALLI LOCALITY. The title materials also refer to Arepally Revenue Village in describing the land. RERA filing
The project boundary record identifies a 9 MT wide road to the north. The filed drawing extraction also lists road-width references of 9.00MT WIDE MAINROAD, 60' WIDE ROAD, 30' WIDE ROAD, 4.5 M WIDE DRIVE WAY and 2.50 M. WIDE PASSAGE; the available extract does not map each width to a particular road segment or establish public-road connectivity. RERA filing
The supplied location data lists the nearest sampled Outer Ring Road interchange at approximately 18.2 km. This is a sampled distance, not a travel-time estimate. No public-transport details or additional verified landmark distances are supplied. Location record
9. Developer & development status
The registered promoter is SUGUNA DEVELOPERS LLP, an LLP, with GSTIN 36AFGFS3043A1ZE. The promoter address recorded in the project data is B, JAFRI ROAD, SHRI SARASWATHI NAGAR RD NUMBER 3/A, THEEGALAGULLAPALLI,WARD 1, Karimnagar -I, Karimnagar, 505001. The supplied contact details do not include a phone number, email address or official website. Corporate record Parties record
The project record identifies SONEE AVINASH KUMAR as a partner and SONEE ARUN PRAKASH as an authorized signatory. The project’s Form B declaration, signed by SONEE ARUN PRAKASH as authorized signatory, undertakes completion by 27/05/2027. The project header separately records a proposed completion date of 27/09/2027. No construction-progress percentage or independently verified stage is supplied. Parties record RERA record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for SUGUNA SAPPHIRE, registration P02700008531; validity recorded as 27/07/2024–27/05/2027, unless extended |
| Principal building permission | Karimnagar Municipal Corporation building permission 0054/BP/3011/2024, dated 28 May 2024, for a residential building on Survey No. 298 |
| Building-plan / drawing filing | Filed layout/building-plan document records Plot Nos. 16, 17, site extent 475.43 sq.m, one residential building, and stilt + 5 upper floors |
| Commencement / approval record | Approval document identifies the project building and conditions, including commencement notice and the requirement to obtain an OC before occupation. The supplied extraction does not establish a separate, issued occupancy certificate |
| Promoter declaration | Form B affidavit-cum-declaration by SONEE ARUN PRAKASH for SUGUNA DEVELOPERS LLP; records the promoter’s completion undertaking of 27/05/2027 |
| Title and encumbrance materials filed with RERA | Advocate’s title scrutiny report; title-chain documents include sale and partition material; mortgage deed material; encumbrance statement 159905764 |
| Agreement / allotment forms | Partially filled agreement-for-sale form and allotment-letter form; these are forms with unit/allottee particulars not completed in the supplied extracts |
| Other filed project record | Authorized-signatory board resolution dated 4 July 2024 |
The approval document states that the permission does not itself confer ownership rights and requires an occupancy certificate before occupation. No occupancy or completion certificate is included in the supplied documents.
1. Project at a glance
Project identity
Registered project name: SUGUNA SAPPHIRE
Project type / status: Residential apartment project; TG-RERA record labels it “New Project”
Registered portion / phase: One registered project; no separate phase name or phase number is disclosed
TG-RERA registration: P02700008531; registration valid from 27 July 2024 to 27 May 2027, unless extended by the Authority
Registered promoter: SUGUNA DEVELOPERS LLP
RERA status: Registration certificate is on file. The supplied record does not establish a current construction-progress stage or occupancy certification
Land and geographic identity
Locality: THEEGALAGULLAPALLI,WARD 1; the filed approval also describes THEEGALAGUTTAPALLI LOCALITY
Revenue village(s) stated in records: Theegalaguttapally (TG-RERA registration and land record); Theegalaguttapalli / THEEGALAGUTTAPALLI (approval documents). The title materials also refer to Arepally Revenue Village for the project land. These are the supplied descriptions; no independent village-identity resolution is recorded
Mandal / district / PIN: Karimnagar -I / Karimnagar / 505001
Project survey number(s): Survey No. 298; the filed building permission identifies Plot Nos. 16, 17 in Survey No. 298. No subdivision is stated for the project parcel
Registered site extent: 475.43 sq.m; filed as both total and net area
Boundaries in TG-RERA record: North: WIDE ROAD 9 MT; South: OPEN LAND OF OTERS; East: OPEN PLOT OF OTHERS; West: HOUSE OF OTHERS
Parcel record: Survey No. 298; total/net area 475.43 sq.m; road-widening/FTL/nala-affected area recorded as 0
Development identity
Sanctioning authority: Karimnagar Municipal Corporation
Principal building permission: 0054/BP/3011/2024, approved 28 May 2024; file no. 005273/BP/DTCP/3011/0089/2024
Other approval reference: TS/026555/2024 appears as an LTP licence reference in the filed drawing
Approved built-up area: The filed plan records 1,338.45 sq.m proposed built-up area excluding parking, 1,606.15 sq.m including parking, and separately states Total BUA: 1,612.15 sq.m, deductions 6.00 sq.m, and net BUA 1,338.45 sq.m. These are the labels and figures in the supplied approval extraction
Building and floors: One residential building, identified as Building A (B); 1 stilt + 5 upper floors; height 14.99 MT. The filed plan also states total height 20.43 mt
Parking provision in approval: Stilt area is recorded as 253.32 sq.m in the commencement approval extraction; the filed layout records parking area 267.70 sq.m. A sanctioned parking-space count is not supplied
Units: 10 units in the RERA unit record; the building-plan extraction also records 10 dwelling units
Offering and status
RERA-filed configuration: 3BHK, 10 units
RERA-filed saleable area: 76.66 sq.m per filed unit configuration
Booked / available: 0 booked / 10 available in the portal-derived unit record. The portal record has no as-of date, so these counts are indicative
Completion dates: The Form B declaration undertakes completion by 27/05/2027; the project header records proposed completion 27/09/2027. These dates are reproduced as recorded; the evidence does not explain the difference
Construction stage: No independently verified site-progress evidence or construction-stage percentage is supplied. The amenity schedule shows 0% against each listed item
OC / completion certificate: No occupancy or completion certificate is supplied in the reviewed project documents. The building permission requires an occupancy certificate before occupation
2. The project story
SUGUNA SAPPHIRE is a single-building residential apartment project registered with TG-RERA on land identified in the project record as Survey No. 298, Plot Nos. 16 and 17, in the Theegalaguttapally / Theegalaguttapalli area of Karimnagar. The supplied records variously describe the revenue-village location as Theegalaguttapally and Arepally Revenue Village; the overview preserves those recorded descriptions rather than resolving them independently.
The approved building is described as Building A (B), with a stilt and five upper floors, for residential use. The RERA unit filing lists ten 3BHK apartments, all shown as available in the portal-derived snapshot; no as-of date accompanies that inventory. The evidence does not establish how much construction has been completed: the registration and approval documents describe the project and its proposed works, but no independent site-progress report is supplied. The amenity schedule records 0% progress for its listed entries.
The project’s TG-RERA registration validity, promoter-declared completion undertaking, proposed completion date in the project record, and occupancy-certificate status are separate matters. The registration certificate runs to 27 May 2027 unless extended; the supplied completion dates are 27 May 2027 in Form B and 27 September 2027 in the project header; and no OC or completion certificate is on file in the supplied evidence.
3. Master plan, architecture & building design
The filed building permission concerns a new residential building on a 475.43 sq.m site in Survey No. 298, Plot Nos. 16 and 17. It describes one building, A (B), as 1 stilt + 5 upper floors, with a stated building height of 14.99 MT. The approval extraction also records a total height of 20.43 mt and a 6.00 sq.m terrace-floor figure. No separate tower arrangement, flat-per-floor schedule, lift count, stair details, or detailed circulation plan is present in the supplied extracts.
The approval extraction gives 1,338.45 sq.m as proposed built-up area excluding parking and 1,606.15 sq.m including parking, while also listing total BUA of 1,612.15 sq.m, deductions of 6.00 sq.m, and net BUA of 1,338.45 sq.m. These figures are reported under the labels used in the filed plan; no FSI-counted area, carpet-area total, or independently measured building area is supplied.
The filed plan identifies setbacks of Front 3.00 m, Rear 2.50 m, Side I 2.50 m and Side II 2.50 m. It records a vacant-plot area of 207.74 sq.m, a parking area of 267.70 sq.m, and a 1.5 M height compound wall. The extracts do not provide a full floor-by-floor architectural schedule, landscape/open-space plan, or detailed common-area distribution.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 76.66 sq.m | Not supplied | Not supplied |
The configuration, unit count, booking status and saleable area are from the TG-RERA-derived unit record; the available-unit count has no stated as-of date and is indicative. The drawing review contains two drawings, but no 3BHK flat design was measured for carpet area. Accordingly, no software-measured carpet or room dimensions are reported.
RERA-filed saleable area is not a carpet-area measurement: saleable area may include the home’s share of common areas, while carpet area measures the apartment’s internal floor area under the applicable definition. The supplied evidence does not provide a measured carpet area, balcony or utility area, or loading figure for these units.
5. Parking & vehicle circulation
The sanctioned records identify parking at stilt level. The commencement approval lists a stilt area of 253.32 sq.m, and the filed layout extraction states 267.70 sq.m parking area. The supplied records do not establish the number of car or two-wheeler spaces, visitor or accessible spaces, mechanical parking, ramp configuration, EV-charger count, or unit-specific parking allocation.
The building permission states that the cellar and stilts approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters, and requires parking places to be provided with electric-vehicle charging infrastructure. These are approval conditions; the evidence does not confirm their installation or completion. A parking bay shown or area recorded in the plan does not, by itself, establish exclusive ownership or allocation to a particular apartment.
6. Amenities, recreation & open spaces
The TG-RERA amenity schedule lists 14 infrastructure and facility categories. Each has a recorded progress figure of 0%; “YES” denotes availability as recorded in that schedule, not independent verification of installation or completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | No size supplied | 0%; completion not independently verified | |
| Water Supply | Marked “YES”; details not supplied | 0%; completion not independently verified | |
| Sewerage (Chamber, Lines, Septic Tank, STP) | Marked “YES”; specific system details not supplied | 0%; completion not independently verified | |
| Storm Water Drains | No details supplied | 0%; completion not independently verified | |
| Green Strip / TOT LOT / Park | No size or quantity supplied | 0%; approval condition requires a fenced tot-lot and maintained greenery before OC; completion not verified | |
| Street Lighting | No details supplied | 0%; completion not independently verified | |
| Community Buildings | No details supplied | 0%; completion not independently verified | |
| Treatment and Disposal of Sewage and Sullage Water | No system or capacity supplied | 0%; completion not independently verified | |
| Solid Waste Management and Disposal | No system details supplied | 0%; completion not independently verified | |
| Water Conservation / Rainwater Harvesting | Marked “YES”; approval also specifies a rainwater-harvesting structure/percolation pit | 0% in schedule; installation not independently verified | |
| Energy management | No details supplied | 0%; completion not independently verified | |
| Fire Protection and Fire Safety Requirements | No system details supplied | 0%; completion not independently verified | |
| Electrical Meter Room / Sub-Station / Receiving Station | Marked “YES”; approval requires transformer space | 0%; completion not independently verified | |
| Aggregate area of recreational open space | No area supplied | 0%; completion not independently verified |
No clubhouse, indoor recreation facility, sports facility, or facility capacity is evidenced in the supplied records. The approval also requires tree planting along the site periphery and in front of the premises, and maintenance of the greenery strip.
7. Utilities, building services & safety
The filed approval identifies a rainwater-harvesting structure/percolation pit, transformer space, garbage house, water sump and lift. The plan extraction also lists a septic tank; it does not state an STP or WTP. These are document-listed provisions, not evidence of completed or commissioned systems.
The amenity schedule marks water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as available, but records 0% progress for each listed item. No water source, storage capacity, treatment capacity, sewerage capacity, backup-power provision, lift capacity or count, or waste-processing capacity is supplied.
The building permission requires an occupancy certificate before occupation, refers to fire-safety requirements, and requires services including sanitation, plumbing, fire safety, lifts and electrical installations to be carried out under qualified technical personnel. It also requires rainwater harvesting and a fenced, maintained tot-lot before the OC, and requires EV-charging infrastructure at parking places. The supplied evidence does not establish completion or independent inspection of these measures.
8. Location, access & connectivity
The registered location is Theegalaguttapally, Karimnagar-I, Karimnagar, 505001. The project record further identifies THEEGALAGULLAPALLI,WARD 1, while the approval describes THEEGALAGUTTAPALLI LOCALITY. The title materials also refer to Arepally Revenue Village in describing the land.
The project boundary record identifies a 9 MT wide road to the north. The filed drawing extraction also lists road-width references of 9.00MT WIDE MAINROAD, 60' WIDE ROAD, 30' WIDE ROAD, 4.5 M WIDE DRIVE WAY and 2.50 M. WIDE PASSAGE; the available extract does not map each width to a particular road segment or establish public-road connectivity.
The supplied location data lists the nearest sampled Outer Ring Road interchange at approximately 18.2 km. This is a sampled distance, not a travel-time estimate. No public-transport details or additional verified landmark distances are supplied.
9. Developer & development status
The registered promoter is SUGUNA DEVELOPERS LLP, an LLP, with GSTIN 36AFGFS3043A1ZE. The promoter address recorded in the project data is B, JAFRI ROAD, SHRI SARASWATHI NAGAR RD NUMBER 3/A, THEEGALAGULLAPALLI,WARD 1, Karimnagar -I, Karimnagar, 505001. The supplied contact details do not include a phone number, email address or official website.
The project record identifies SONEE AVINASH KUMAR as a partner and SONEE ARUN PRAKASH as an authorized signatory. The project’s Form B declaration, signed by SONEE ARUN PRAKASH as authorized signatory, undertakes completion by 27/05/2027. The project header separately records a proposed completion date of 27/09/2027. No construction-progress percentage or independently verified stage is supplied.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for SUGUNA SAPPHIRE, registration P02700008531; validity recorded as 27/07/2024–27/05/2027, unless extended
Principal building permission: Karimnagar Municipal Corporation building permission 0054/BP/3011/2024, dated 28 May 2024, for a residential building on Survey No. 298
Building-plan / drawing filing: Filed layout/building-plan document records Plot Nos. 16, 17, site extent 475.43 sq.m, one residential building, and stilt + 5 upper floors
Commencement / approval record: Approval document identifies the project building and conditions, including commencement notice and the requirement to obtain an OC before occupation. The supplied extraction does not establish a separate, issued occupancy certificate
Promoter declaration: Form B affidavit-cum-declaration by SONEE ARUN PRAKASH for SUGUNA DEVELOPERS LLP; records the promoter’s completion undertaking of 27/05/2027
Title and encumbrance materials filed with RERA: Advocate’s title scrutiny report; title-chain documents include sale and partition material; mortgage deed material; encumbrance statement 159905764
Agreement / allotment forms: Partially filled agreement-for-sale form and allotment-letter form; these are forms with unit/allottee particulars not completed in the supplied extracts
Other filed project record: Authorized-signatory board resolution dated 4 July 2024
The approval document states that the permission does not itself confer ownership rights and requires an occupancy certificate before occupation. No occupancy or completion certificate is included in the supplied documents.
Frequently asked questions
Is SUGUNA SAPPHIRE registered with Telangana RERA?
Yes. SUGUNA SAPPHIRE is registered with the Telangana Real Estate Regulatory Authority as P02700008531; the registration status is New Project.
Who is the developer of SUGUNA SAPPHIRE?
The promoter named in the RERA registration is SUGUNA DEVELOPERS LLP.
Where is SUGUNA SAPPHIRE located?
SUGUNA SAPPHIRE is in THEEGALAGULLAPALLI,WARD 1, Theegalaguttapally, Karimnagar -I, Karimnagar, Telangana (505001).
When will SUGUNA SAPPHIRE be completed?
The promoter's proposed date of completion filed with RERA is 27/09/2027. This is the promoter's declaration, not a guarantee.