Sign in

Siri Nivas

SDR Constructions and Developers · Karimnagar · RERA P02200005674

SIRI NIVAS is a residential apartment project in Theegalaguttapally, Karimnagar mandal, Karimnagar district, developed by Sdr Constructions And Developers. The project occupies 588.63 m² and comprises one residential block with 1 stilt + 5 upper floors and 15 apartments: 10 two-bedroom and 5 three-bedroom units. Its TG-RERA registration number is P02200005674, and the proposed completion date is 05 February 2025.

01What we found

RegisteredTG-RERA
27documents on file - each fact links to its page
9court cases on this project's land (survey 120, Theegalaguttapally)
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameSIRI NIVAS RERA record
Project typeResidential apartment project RERA record
Phase / registered portionPhase not separately identified; the registration concerns the project at Plot Nos. 341 and 344
TG-RERA registrationP02200005674
Registration validity06/01/2023 to 05/02/2025; the certificate records no extension
Registered promoterSdr Constructions And Developers; project filing also gives the name as SDR Constructions and Developers Corporate record
RERA statusRegistration certificate issued under section 5. Current registration status beyond the certificate’s stated end date is not established by the supplied record

Land and geographic identity

FieldRecord
Locality / plot identifiersTheegalaguttapally; Plot Nos. 341 and 344
Revenue villageTheegalaguttapally, identified in the building approval and plans as Arepally Revenue Village
Mandal / district / PINKarimnagar mandal / Karimnagar district / 500083
Project survey numberSy. No. 120/7 (also recorded as S.y.no.120/7)
Site extent588.63 m²; approved plan records net plot area as 588.63 and vacant plot area as 282.46
BoundariesEast: Plot No. 340; West: land of society; North: 40 feet wide road; South: Plot Nos. 342 and 343 RERA filing

Development identity

FieldRecord
Sanctioning authorityKarimnagar Municipal Corporation
Principal building approval0011/BP/3011/2022, approved 05 February 2022
Approved residential area1,434.80 m² (recorded as residential area / net BUA); the plan separately lists built-up area as 1,480.29
Building count and configurationOne residential block; 1 stilt + 5 upper floors
HeightApproval records 15 m; the plan also records 20.45 m total height and 15.00 m excluding stilt
Cellar / stiltCellar: 0.00 m²; stilt: 271.71 m²
Units15 units shown in the plan and RERA filing: 10 two-bedroom and 5 three-bedroom apartments RERA unit table
ParkingPlan records “PROPOSED NUMBER OF PARKINGS 1” and lists visitors’ parking; the available record does not establish a complete parking count or unit-wise allocations

Offering and status

FieldRecord
RERA-filed configurations2BHK (“DOUBLE BEDROOM”): 10 units; 3BHK (“TRIPLE BEDROOM”): 5 units RERA unit table
RERA-filed saleable areas2BHK: 97.08 m²; 3BHK: 136.1 m² RERA unit table
Booked / available2BHK: 0 booked / 10 available; 3BHK: 0 booked / 5 available. Portal counts are indicative; the source provides no as-of date RERA unit table
Construction stageCurrent physical construction progress is not established by the supplied evidence. RERA amenity/infrastructure entries show 0% progress for the listed items RERA amenities
Completion datesRERA registration certificate ends 05/02/2025; the building approval and Form B declaration give 05 February 2025 as the completion deadline
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied documents; the building approval requires an occupancy certificate before possession

2. The project story

SIRI NIVAS is registered as a residential apartment project on Plot Nos. 341 and 344 in Sy. No. 120/7, at Theegalaguttapally in Arepally Revenue Village, Karimnagar. Its approved form is a single block with a stilt floor and five upper floors, intended for residential use. The filed inventory consists of 10 two-bedroom and 5 three-bedroom apartments. RERA unit table

The sanctioned building record gives a 588.63 m² site and 1,434.80 m² residential area. The RERA filing’s unit counts and availability are portal-recorded, not evidence of current sales or physical completion. No independently verified construction update or occupancy certificate is supplied, so the project’s present on-site stage and any completed or occupied portion cannot be stated. RERA amenities RERA unit table

3. Master plan, architecture & building design

The building-permit documents describe one residential block on a 588.63 m² site, with one stilt and five upper floors. The approval lists a residential area of 1,434.80 m²; the plan separately identifies 1,480.29 as “BUILT UP AREA,” 306.17 m² as proposed coverage, and 282.46 m² as vacant plot area. These are distinct figures as labelled in the supplied plan and should not be treated as interchangeable area measures.

The drawing-derived plan identifies a 4.5 m-wide driveway and roads labelled 12.00 m and 40 feet wide. It also marks a lift and staircase. The available extract does not establish the number of apartments per floor, lift capacity, detailed entry/exit arrangement, or a measured landscape/open-space design.

The supplied record describes the project as a single residential block; it does not provide a phase-wise building breakdown. The building approval’s stated conditions include adherence to the sanctioned plan, separate approval for modifications, and obtaining an occupancy certificate before handing over possession.

4. Homes, configurations & floor plans

RERA records 15 apartments: 10 “DOUBLE BEDROOM” units and 5 “TRIPLE BEDROOM” units. The saleable areas below are RERA-filed. Carpet-area figures are software-measured from the approved floor-plan drawing, not RERA disclosures; the drawing measurements are flagged for review where indicated in the source. RERA unit table Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1001097.08 m²Median 65.4 m²; range 60.2–66.0 m²33%
3BHK505136.1 m²Median 85.5 m²; range 85.4–85.5 m²37%

The software measurements use the floor-plan drawing’s geometry and are not a substitute for the RERA-filed saleable area. Carpet area describes the measured apartment interior; saleable area is a separate filed measure and includes the home’s share of common areas. The supplied measurement record says the drawing-derived carpet measurements need review. Floor plans

The typical floor-plan extract labels living/drawing room, dining, kitchen, bedrooms, toilets and wash areas. It gives room dimensions for one illustrated 2BHK and one illustrated 3BHK; the record does not establish that those room dimensions apply to every unit of the same configuration. RERA unit details

5. Parking & vehicle circulation

The building-plan extract records “PROPOSED NUMBER OF PARKINGS 1,” lists visitors’ parking, and shows a 4.5 m-wide driveway. The building approval states that approved stilt/cellar parking is to be used exclusively for vehicle parking, but its sanctioned parameters record a cellar area of 0.00 m².

The supplied material does not establish the total sanctioned number of resident, visitor or accessible spaces, the number of two-wheeler bays, EV charging provision, or unit-wise parking allocations. A drawn parking label does not by itself establish exclusive allocation to a particular apartment.

6. Amenities, recreation & open spaces

The RERA amenity record lists 14 infrastructure/facility categories, but records 0% progress for each. The building approval also specifies certain site provisions. These are records of declared or required provision, not confirmation that the items have been completed or independently inspected. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Community buildingsListed in RERA amenities; no size suppliedRERA amenities0%; completion not independently verified
Tot-lot / green stripApproval requires a fenced tot-lot maintained as greenery; no size suppliedRERA green strip/tot-lot/park entry: 0%; not independently verified
Aggregate recreational open spaceListed in RERA amenities; no area suppliedRERA amenities0%; completion not independently verified
Internal roads and footpathsListed in RERA amenities; no dimensions supplied in that entryRERA amenities0%; completion not independently verified
Street lightingListed in RERA amenitiesRERA amenities0%; completion not independently verified
Visitors’ parkingShown in the plan; no count beyond the plan’s separate “PROPOSED NUMBER OF PARKINGS 1” entryNot independently verified
Garbage house / binApproval requires a garbage house with dry/wet segregation; plan lists a garbage binRERA solid-waste entry: 0%; not independently verified

7. Utilities, building services & safety

The RERA amenities record marks water supply and sewerage as available (“YES”) but records 0% progress for those entries. The building-plan extract labels a sump, septic tank and rainwater harvesting (“RWH”); the approval also requires 11 rainwater-harvesting pits. These are filed or plan-recorded provisions, not evidence of completed, operating systems. RERA amenities

ServiceEvidence in the supplied record
WaterRERA lists water supply as available; plan shows a sump. No source, storage capacity or treatment capacity is supplied. RERA amenities
Sewerage and drainageRERA lists sewerage (including chamber, lines and septic tank/STP) and sewage/sullage treatment and disposal; plan labels a septic tank. No STP capacity or operating status is supplied. RERA amenities
Storm water / conservationStorm-water drains and water conservation/rainwater harvesting are RERA-listed; the plan labels RWH and the approval requires 11 harvesting pits. No completion evidence or capacity is supplied. RERA amenities
ElectricalRERA lists an electrical meter room/sub-station/receiving station; the plan labels a distribution transformer and the approval requires transformer space. Supply capacity and backup arrangements are not supplied. RERA amenities
Vertical transportationPlan labels a lift and staircase; lift count, capacity and service-lift provision are not stated.
Fire and life safetyFire protection and fire-safety requirements are listed in RERA amenities. The approval places responsibility for fire-safety provision on the project parties; no fire clearance or completed-system evidence is supplied. RERA amenities
WasteThe approval requires a garbage house with dry/wet segregation; RERA lists solid-waste management and disposal. The RERA progress entry is 0%. RERA amenities
Security and accessibilityThe plan labels a security guard booth. The approval states that public and semi-public buildings must provide facilities for physically handicapped persons; project-specific accessible routes or completed accessibility works are not documented.

8. Location, access & connectivity

The registered project location is Theegalaguttapally, identified as Arepally Revenue Village, Karimnagar mandal and Karimnagar district, PIN 500083. The plan describes the site in relation to Plot Nos. 341 and 344, Sy. No. 120/7, and labels a 40-foot-wide road and a 4.5 m-wide driveway.

The supplied location record gives the nearest sampled Outer Ring Road interchange as approximately 18.2 km. This is a dataset distance, not a stated travel time; no public-transport information or project-specific landmark distances are supplied in the official project records. Location record

9. Developer & development status

The RERA certificate names the promoter as Sdr Constructions And Developers; the project records also use SDR Constructions and Developers. The filing identifies the organization type as Partnership and gives GSTIN 36AEKFS2973L1ZC. The supplied record does not establish a company-registration number or provide a verified promoter contact or official website. Corporate record RERA filing

The RERA registration was stated to run from 06/01/2023 through 05/02/2025, and the filed completion undertaking states 05 February 2025. No extension order, current construction-progress certificate or occupancy certificate is supplied here. Accordingly, the project’s present completion stage and current registration status cannot be confirmed from these records. RERA amenities

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200005674; issued 06/01/2023; valid through 05/02/2025 as stated
What the supplied document establishesRegistration of SIRI NIVAS under section 5 and stated registration conditions
Building construction approval
Identifier / date0011/BP/3011/2022; Karimnagar Municipal Corporation; 05 February 2022
What the supplied document establishesApproval for one residential building on Sy. No. 120/7, with 1 stilt + 5 upper floors
Building-plan extracts
Identifier / dateApplication TS/052577/2021; plan extract
What the supplied document establishesShows the proposed single block, plan-labelled site areas and services, and 15 units
Form B declaration
Identifier / dateAuthorization stated as dated 20/10/2022; completion undertaking 05 February 2025
What the supplied document establishesPromoter’s filed declarations concerning the project, title basis, project account and completion undertaking
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied document establishesThe approval requires an occupancy certificate before possession; no certificate is present in the supplied documents

The master-plan zoning sheet is identified for the wider area, but it is image-only and the supplied record does not establish the exact zone at this survey parcel. HMDA No occupancy certificate or current project-progress certification is included in the available evidence.

Frequently asked questions

Is SIRI NIVAS registered with Telangana RERA?

Yes. SIRI NIVAS is registered with the Telangana Real Estate Regulatory Authority as P02200005674; the registration status is New Project.

Who is the developer of SIRI NIVAS?

The promoter named in the RERA registration is SDR Constructions and Developers.

Where is SIRI NIVAS located?

SIRI NIVAS is in Medchal, Theegalaguttapally, Karimnagar -I, Karimnagar, Telangana (500083).

When will SIRI NIVAS be completed?

The promoter's proposed date of completion filed with RERA is 05/02/2025. This is the promoter's declaration, not a guarantee.

More projects in Theegalaguttapally