Ss Saanvi
SRI SUKHADAH · Rangareddy · RERA P02400000622
SS SAANVI is a residential apartment project in Adibatla, Ibrahimpatnam Mandal, Ranga Reddy District, developed by SRI SUKHADAH, a partnership. The registered site extent is 731.50 sq. m., and the development comprises one residential building with 1 stilt + 5 upper floors and 20 2BHK apartments, each with a RERA-filed saleable area of 106.83 sq. m. Its TG-RERA registration number is P02400000622, and the promoter-declared completion date is 28/02/2019.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | SS SAANVI RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | No phase name is disclosed. The registration identifies Survey No. 21 and the specified plots/partial plots below. |
| TG-RERA registration | P02400000622 |
| Registration validity | Certificate states commencement on 18/04/2019 and expiry on 28/02/2019, and records a validity period of “0 years.” |
| Registered promoter | SRI SUKHADAH, a partnership RERA filing |
| RERA status | The supplied project record labels the project “On-Going Project.” Registration-certificate validity is reported separately above. RERA filing |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | Adibatla / Adibatla Village RERA record RERA filing |
| Mandal / district / PIN | Ibrahimpatnam / Ranga Reddy / 501510 RERA record |
| Survey number | Survey No. 21; no project-specific subdivision is stated in the registration. |
| Plot identifiers | 13, 14, 26, 27, 12 northern part and 28 northern part |
| Registered site extent | 731.50 sq. m. |
| Total / net area | Both are recorded as 731.50 sq. m.; affected area is recorded as 0 sq. m. RERA filing |
| Boundaries | East and west: 30 feet road; north: plot Nos. 15 and 25; south: southern parts of plot Nos. 12 and 28. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Technical sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) |
| Principal technical approval | 000665/SMD/R1/U6/HMDA/28032017, dated 01/06/2017 Approvals record |
| Building configuration | One residential building: 1 stilt + 5 upper floors |
| Approved built-up area | 1,811.25 sq. m. RERA filing |
| Other area figure in approval | The approval records “Proposed Built-up Area 2215.66”; its area basis is not specified in the supplied extraction. |
| Building / tower count | One building; the RERA unit record also identifies one block/tower. RERA unit table |
| Parking-level design | The technical approval requires the stilt/cellar parking area to be used exclusively for vehicle parking. The supplied record does not establish the number of bays or a separate basement level. |
| Unit count | 1 total building unit in the land-details filing; the unit inventory records 20 apartments. The supplied material does not explain the “building unit” field’s relationship to the apartment count. RERA filing RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configuration | 2BHK RERA unit table |
| RERA-filed saleable area | 106.83 sq. m. per unit RERA unit table |
| Booked / available | 3 booked and 17 available, as last read from the TG-RERA portal; the record gives no as-of date, so counts are indicative. RERA unit table |
| Promoter-declared completion date | 28/02/2019; the Form B declaration states the project was to be completed by that date. |
| RERA certificate completion date | 28/02/2019; shown in the registration certificate as the expiry date, not as a separate confirmation of completion. |
| Occupancy certificate | Architect’s completion certificate records OC No. 017157/SMD/OC/U6/HMDA/11112018, dated 25/01/2019. Its stated project identity is SS SAANVI and its RERA number is P02400000622. |
| Construction stage | The supplied RERA amenity-progress record reports 70% for water supply, sewerage, green strip/park and rainwater harvesting; many other listed infrastructure items are at 0%. These are filed progress figures, not independent site verification. RERA amenities |
2. The project story
SS SAANVI is registered as a residential apartment project in Adibatla Village, Ibrahimpatnam Mandal, Ranga Reddy District. Its registered site is identified by Survey No. 21 and plot Nos. 13, 14, 26, 27, the northern part of plot 12 and the northern part of plot 28, with a stated extent of 731.50 sq. m. The land record gives net area as 731.50 sq. m. and affected area as 0 sq. m.; east and west boundaries are 30 feet roads, the north boundary is plot Nos. 15 and 25, and the south boundary is the southern parts of plot Nos. 12 and 28. RERA record RERA filing
The HMDA technical approval describes one residential building comprising a stilt and five upper floors. It records approved built-up area of 1,811.25 sq. m. and “Proposed Built-up Area 2215.66,” without a stated area basis in the supplied extraction; the figures are retained under their respective labels rather than treated as interchangeable. RERA filing
The TG-RERA unit record lists 20 2BHK apartments, each with a filed saleable area of 106.83 sq. m.; 3 are shown as booked and 17 as available, with no stated portal “as of” date. The land-details filing records 1 total building unit, and the supplied material does not explain its relationship to the apartment count. RERA unit table RERA filing
The project’s completion timeline and occupancy record are distinct: the promoter’s Form B gave 28/02/2019 as the completion date, while an architect’s certificate states that the project was completed in all aspects and records an occupancy certificate dated 25/01/2019. These documents are supplied as project filings; no independent site inspection or current occupancy verification is provided here.
3. Master plan, architecture & building design
The technical-approval extraction includes a building height of 14.89, but does not state a unit in the supplied structured detail. No reliable figures are supplied for flats per floor, lifts, stairs, building footprint, open-space area, internal roads or residential/common-area distribution. The approved floor-plan document is identified in the record, but its drawing content is not fully extracted here. Document index
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 3 | 17 | 106.83 sq. m. | 64.6–67.3 sq. m.; median 66.2 sq. m. | 38% |
The carpet-area figures are software measurements from the approved floor-plan drawing geometry, not RERA-filed areas: eight flat designs were measured, and the supplied measurement record says the results need review. Floor plans
A measured typical plan identifies two bedrooms, hall, dining, kitchen, two toilets and a balcony. The balcony is excluded from the measured carpet area. The RERA saleable area and drawing-measured carpet area are different area concepts; the supplied drawing-measurement caveat says saleable area also counts the home’s share of common areas. RERA unit details Floor plans
5. Parking & vehicle circulation
The HMDA technical approval requires the stilt/cellar area to be used exclusively for vehicle parking, without partition walls or rolling shutters. It also specifies one entry and one exit, each with a minimum width of 4.5 metres and height clearance of 5 metres. These are approval requirements, not confirmation of the current site layout or completion.
The RERA project data does not establish the sanctioned number of car or two-wheeler spaces, visitor or accessible spaces, or unit-wise parking allocations. The vendor record mentions closed/covered car parking, but provides no count or allocation details. Promoter website
6. Amenities, recreation & open spaces
| Description / size | RERA amenities record says available; HMDA approval specifies a separate underground static water-storage tank with 25,000-litre capacity. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-filed progress: 70%; not independently verified. |
| Description / size | Approval describes septic-tank treatment and sewerage-disposal requirements; RERA amenities record lists sewerage as available. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-filed progress: 70%; not independently verified. |
| Description / size | Facility listed in RERA progress record; no size supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-filed progress: 70%; not independently verified. |
| Description / size | RERA-listed and required by the technical approval. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-filed progress: 70%; not independently verified. |
| Description / size | Vendor-listed; no size supplied in the RERA material provided. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Promoter-marketed/vendor description; delivered status not established. |
| Description / size | Vendor-listed; no size supplied. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Promoter-marketed/vendor description; delivered status not established. |
| Description / size | Vendor-listed; no sizes or capacities supplied. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Promoter-marketed/vendor description; delivered status not established. |
The RERA progress schedule records 0% for internal roads and footpaths, storm-water drains, street lighting, community buildings, sewage/sullage treatment and disposal, solid-waste management, energy management, fire-protection/fire-safety requirements, electrical meter room/sub-station/receiving station, and aggregate recreational open space. These are recorded progress percentages, not an independent inspection. RERA amenities
7. Utilities, building services & safety
The HMDA technical approval specifies a generator as an alternate electricity source, a transformer and a garbage house. It also contains requirements concerning water-source and sewerage-disposal siting, water disinfection, septic-tank treatment and sewerage disposal. These are approval provisions; the supplied evidence does not independently confirm installation or operation.
The technical approval requires fire-safety provisions in accordance with the National Building Code, 2005, calls for clearance from the fire-services department, and specifies fire-resistant swing doors for collapsible lifts. The supplied materials do not establish the number or capacity of lifts, fire-equipment inventory, fire clearance, accessibility provisions, CCTV coverage, waste-segregation arrangements or security systems. Promoter website
8. Location, access & connectivity
The location record gives an approximate distance of 0.9 km to the nearest sampled Outer Ring Road interchange. Location record
No public-transport details or other independently verified landmark distances are supplied. The vendor record contains separate connectivity claims, but those are vendor-supplied rather than RERA-filed location measurements. Promoter website
9. Developer & development status
The registered promoter is SRI SUKHADAH, recorded as a partnership, with GSTIN 36ADEFS5785M1ZA. The supplied promoter address is Rajapushpa Regalia, Kokapet, BMR Town Ship, Adibatla, Ibrahimpatnam, Ranga Reddy, 501510. The record names Ramanamma S as partner and Chandrahasa Reddy S as authorized signatory. RERA filing Corporate record Parties record
The promoter’s Form B affidavit gives 28/02/2019 as the intended completion date. The project record also contains an architect’s certificate stating completion in all aspects and identifying an occupancy certificate dated 25/01/2019. The materials provided do not include a current site inspection or independently verified construction-progress assessment.
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for SS SAANVI, registration No. P02400000622; identifies Survey No. 21 and the listed plots/partial plots. |
| HMDA technical building approval | Approval No. 000665/SMD/R1/U6/HMDA/28032017, dated 01/06/2017; describes a residential building of 1 stilt + 5 upper floors on 731.50 sq. m. in Adibatla. |
| Approved drawing record | Floor-plan drawing record identified as document 28563; software measurements from it are expressly not RERA disclosures and need review. Floor plans |
| Architect’s completion / OC record | Architect’s certificate states project completion in all aspects and records OC No. 017157/SMD/OC/U6/HMDA/11112018, dated 25/01/2019. |
| Promoter declaration | Form B affidavit by S. Chandrahasa Reddy, Managing Partner, addressing title, encumbrances, completion undertaking and project-account obligations; verified in Hyderabad in November 2018. |
| Title report | Advocate’s title report is included in the RERA-filed document set for the project land. |
| Encumbrance statement | Project-filed encumbrance statement covers 01-01-1989 to 05-11-2018. |
The supplied record does not include a fully extracted local-authority plan-sanction instrument or an independent confirmation of the current status of the approved drawings and occupancy record.
1. Project at a glance
Project identity
Registered name: SS SAANVI
Project type: Residential apartment project
Phase / registered portion: No phase name is disclosed. The registration identifies Survey No. 21 and the specified plots/partial plots below.
TG-RERA registration: P02400000622
Registration validity: Certificate states commencement on 18/04/2019 and expiry on 28/02/2019, and records a validity period of “0 years.”
Registered promoter: SRI SUKHADAH, a partnership
RERA status: The supplied project record labels the project “On-Going Project.” Registration-certificate validity is reported separately above.
Land and geographic identity
Locality / revenue village: Adibatla / Adibatla Village
Mandal / district / PIN: Ibrahimpatnam / Ranga Reddy / 501510
Survey number: Survey No. 21; no project-specific subdivision is stated in the registration.
Plot identifiers: 13, 14, 26, 27, 12 northern part and 28 northern part
Registered site extent: 731.50 sq. m.
Total / net area: Both are recorded as 731.50 sq. m.; affected area is recorded as 0 sq. m.
Boundaries: East and west: 30 feet road; north: plot Nos. 15 and 25; south: southern parts of plot Nos. 12 and 28.
Development identity
Technical sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal technical approval: 000665/SMD/R1/U6/HMDA/28032017, dated 01/06/2017
Building configuration: One residential building: 1 stilt + 5 upper floors
Approved built-up area: 1,811.25 sq. m.
Other area figure in approval: The approval records “Proposed Built-up Area 2215.66”; its area basis is not specified in the supplied extraction.
Building / tower count: One building; the RERA unit record also identifies one block/tower.
Parking-level design: The technical approval requires the stilt/cellar parking area to be used exclusively for vehicle parking. The supplied record does not establish the number of bays or a separate basement level.
Unit count: 1 total building unit in the land-details filing; the unit inventory records 20 apartments. The supplied material does not explain the “building unit” field’s relationship to the apartment count.
Offering and status
RERA-filed configuration: 2BHK
RERA-filed saleable area: 106.83 sq. m. per unit
Booked / available: 3 booked and 17 available, as last read from the TG-RERA portal; the record gives no as-of date, so counts are indicative.
Promoter-declared completion date: 28/02/2019; the Form B declaration states the project was to be completed by that date.
RERA certificate completion date: 28/02/2019; shown in the registration certificate as the expiry date, not as a separate confirmation of completion.
Occupancy certificate: Architect’s completion certificate records OC No. 017157/SMD/OC/U6/HMDA/11112018, dated 25/01/2019. Its stated project identity is SS SAANVI and its RERA number is P02400000622.
Construction stage: The supplied RERA amenity-progress record reports 70% for water supply, sewerage, green strip/park and rainwater harvesting; many other listed infrastructure items are at 0%. These are filed progress figures, not independent site verification.
2. The project story
SS SAANVI is registered as a residential apartment project in Adibatla Village, Ibrahimpatnam Mandal, Ranga Reddy District. Its registered site is identified by Survey No. 21 and plot Nos. 13, 14, 26, 27, the northern part of plot 12 and the northern part of plot 28, with a stated extent of 731.50 sq. m. The land record gives net area as 731.50 sq. m. and affected area as 0 sq. m.; east and west boundaries are 30 feet roads, the north boundary is plot Nos. 15 and 25, and the south boundary is the southern parts of plot Nos. 12 and 28.
The HMDA technical approval describes one residential building comprising a stilt and five upper floors. It records approved built-up area of 1,811.25 sq. m. and “Proposed Built-up Area 2215.66,” without a stated area basis in the supplied extraction; the figures are retained under their respective labels rather than treated as interchangeable.
The TG-RERA unit record lists 20 2BHK apartments, each with a filed saleable area of 106.83 sq. m.; 3 are shown as booked and 17 as available, with no stated portal “as of” date. The land-details filing records 1 total building unit, and the supplied material does not explain its relationship to the apartment count.
The project’s completion timeline and occupancy record are distinct: the promoter’s Form B gave 28/02/2019 as the completion date, while an architect’s certificate states that the project was completed in all aspects and records an occupancy certificate dated 25/01/2019. These documents are supplied as project filings; no independent site inspection or current occupancy verification is provided here.
3. Master plan, architecture & building design
The technical-approval extraction includes a building height of 14.89, but does not state a unit in the supplied structured detail. No reliable figures are supplied for flats per floor, lifts, stairs, building footprint, open-space area, internal roads or residential/common-area distribution. The approved floor-plan document is identified in the record, but its drawing content is not fully extracted here.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 3 | 17 | 106.83 sq. m. | 64.6–67.3 sq. m.; median 66.2 sq. m. | 38% |
The carpet-area figures are software measurements from the approved floor-plan drawing geometry, not RERA-filed areas: eight flat designs were measured, and the supplied measurement record says the results need review.
A measured typical plan identifies two bedrooms, hall, dining, kitchen, two toilets and a balcony. The balcony is excluded from the measured carpet area. The RERA saleable area and drawing-measured carpet area are different area concepts; the supplied drawing-measurement caveat says saleable area also counts the home’s share of common areas.
5. Parking & vehicle circulation
The HMDA technical approval requires the stilt/cellar area to be used exclusively for vehicle parking, without partition walls or rolling shutters. It also specifies one entry and one exit, each with a minimum width of 4.5 metres and height clearance of 5 metres. These are approval requirements, not confirmation of the current site layout or completion.
The RERA project data does not establish the sanctioned number of car or two-wheeler spaces, visitor or accessible spaces, or unit-wise parking allocations. The vendor record mentions closed/covered car parking, but provides no count or allocation details.
6. Amenities, recreation & open spaces
| Description / size | RERA amenities record says available; HMDA approval specifies a separate underground static water-storage tank with 25,000-litre capacity. |
|---|---|
| Declared progress / verified status | RERA-filed progress: 70%; not independently verified. |
| Description / size | Approval describes septic-tank treatment and sewerage-disposal requirements; RERA amenities record lists sewerage as available. |
|---|---|
| Declared progress / verified status | RERA-filed progress: 70%; not independently verified. |
| Description / size | Facility listed in RERA progress record; no size supplied. |
|---|---|
| Declared progress / verified status | RERA-filed progress: 70%; not independently verified. |
| Description / size | RERA-listed and required by the technical approval. |
|---|---|
| Declared progress / verified status | RERA-filed progress: 70%; not independently verified. |
| Description / size | Vendor-listed; no size supplied in the RERA material provided. |
|---|---|
| Declared progress / verified status | Promoter-marketed/vendor description; delivered status not established. |
| Description / size | Vendor-listed; no size supplied. |
|---|---|
| Declared progress / verified status | Promoter-marketed/vendor description; delivered status not established. |
| Description / size | Vendor-listed; no sizes or capacities supplied. |
|---|---|
| Declared progress / verified status | Promoter-marketed/vendor description; delivered status not established. |
The RERA progress schedule records 0% for internal roads and footpaths, storm-water drains, street lighting, community buildings, sewage/sullage treatment and disposal, solid-waste management, energy management, fire-protection/fire-safety requirements, electrical meter room/sub-station/receiving station, and aggregate recreational open space. These are recorded progress percentages, not an independent inspection.
7. Utilities, building services & safety
The HMDA technical approval specifies a generator as an alternate electricity source, a transformer and a garbage house. It also contains requirements concerning water-source and sewerage-disposal siting, water disinfection, septic-tank treatment and sewerage disposal. These are approval provisions; the supplied evidence does not independently confirm installation or operation.
The technical approval requires fire-safety provisions in accordance with the National Building Code, 2005, calls for clearance from the fire-services department, and specifies fire-resistant swing doors for collapsible lifts. The supplied materials do not establish the number or capacity of lifts, fire-equipment inventory, fire clearance, accessibility provisions, CCTV coverage, waste-segregation arrangements or security systems.
8. Location, access & connectivity
The location record gives an approximate distance of 0.9 km to the nearest sampled Outer Ring Road interchange.
No public-transport details or other independently verified landmark distances are supplied. The vendor record contains separate connectivity claims, but those are vendor-supplied rather than RERA-filed location measurements.
9. Developer & development status
The registered promoter is SRI SUKHADAH, recorded as a partnership, with GSTIN 36ADEFS5785M1ZA. The supplied promoter address is Rajapushpa Regalia, Kokapet, BMR Town Ship, Adibatla, Ibrahimpatnam, Ranga Reddy, 501510. The record names Ramanamma S as partner and Chandrahasa Reddy S as authorized signatory.
The promoter’s Form B affidavit gives 28/02/2019 as the intended completion date. The project record also contains an architect’s certificate stating completion in all aspects and identifying an occupancy certificate dated 25/01/2019. The materials provided do not include a current site inspection or independently verified construction-progress assessment.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for SS SAANVI, registration No. P02400000622; identifies Survey No. 21 and the listed plots/partial plots.
HMDA technical building approval: Approval No. 000665/SMD/R1/U6/HMDA/28032017, dated 01/06/2017; describes a residential building of 1 stilt + 5 upper floors on 731.50 sq. m. in Adibatla.
Approved drawing record: Floor-plan drawing record identified as document 28563; software measurements from it are expressly not RERA disclosures and need review.
Architect’s completion / OC record: Architect’s certificate states project completion in all aspects and records OC No. 017157/SMD/OC/U6/HMDA/11112018, dated 25/01/2019.
Promoter declaration: Form B affidavit by S. Chandrahasa Reddy, Managing Partner, addressing title, encumbrances, completion undertaking and project-account obligations; verified in Hyderabad in November 2018.
Title report: Advocate’s title report is included in the RERA-filed document set for the project land.
Encumbrance statement: Project-filed encumbrance statement covers 01-01-1989 to 05-11-2018.
The supplied record does not include a fully extracted local-authority plan-sanction instrument or an independent confirmation of the current status of the approved drawings and occupancy record.
Frequently asked questions
Is SS SAANVI registered with Telangana RERA?
Yes. SS SAANVI is registered with the Telangana Real Estate Regulatory Authority as P02400000622; the registration status is On-Going Project.
Who is the developer of SS SAANVI?
The promoter named in the RERA registration is SRI SUKHADAH.
Where is SS SAANVI located?
SS SAANVI is in Adibatla, Ibrahimpatnam, Rangareddy, Telangana (501510).
When will SS SAANVI be completed?
The promoter's proposed date of completion filed with RERA is 28/02/2019. This is the promoter's declaration, not a guarantee.
More projects in Adibatla







