Sign in

Amogha Western Heights

J L SATHGURU DEVELOPERS AND CONSTRUCTIONS · Rangareddy · RERA P02400003100

AMOGHA WESTERN HEIGHTS is a residential apartment project in Adibatla, Ibrahimpatnam mandal, Ranga Reddy district, developed by J L SATHGURU DEVELOPERS AND CONSTRUCTIONS. It is on 6,280.99 sq. m. and comprises one building with 1 Cellar + 1 Stilt + 5 Upper floors and 125 apartments: 105 2BHK and 20 3BHK. The project is registered under TG-RERA P02400003100, with a proposed completion date of 26/11/2024.

01What we found

Period endedTG-RERA registration ran to 26 Nov 2024 - check its extension on TG-RERA
10documents on file - each fact links to its page
2court cases on this project's land (survey 74, Adibatla)
10items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameAMOGHA WESTERN HEIGHTS RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; the registration and sanction refer to the project/building. RERA record
TG-RERA registrationP02400003100
Registration validity24/07/2021 to 26/11/2024, as stated on the certificate. The supplied registration record shows no extension. Approvals record
Registered promoterJ L SATHGURU DEVELOPERS AND CONSTRUCTIONS; entity type recorded as partnership. RERA filing Parties record
RERA statusListed as “On-Going Project”; registration validity ended 26/11/2024 in the supplied record. RERA filing

Land and geographic identity

ItemProject record
LocalityAdibatla RERA record RERA filing
Revenue villageAdibatla RERA record Land records
Mandal / district / PINIbrahimpatnam / Ranga Reddy / 501510 RERA record RERA filing
Project survey number and subdivision74/P RERA record Land records
Registered site extent6,280.99 sq. m. RERA filing
Total / net areaTotal area 6,280.99 sq. m.; net area 6,280.99 sq. m.; recorded affected area 0 sq. m. RERA filing
Boundaries recorded in the RERA filingEast: neighbouring land Sy. No. 74 Part; West: 30 ft wide road; North: neighbouring land Sy. No. 74 Part; South: owners’ land. RERA filing

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA)
Principal technical approval024596/ZOA/R1/U6/HMDA/12062019, approved 26/11/2019 Approvals record
Building configuration in approval1 Cellar + 1 Stilt + 5 Upper floors
Approved built-up areaThe technical approval extraction separately records 14,646.45 as “Built up Area” and 17,927.94 as “Total Built up Area”; the supplied record does not further define the relationship between those figures.
Building countOne building/unit is recorded in the RERA land and building details. RERA filing RERA unit table
Approved versus RERA-declared homesRERA records 1 proposed building unit and 125 apartment units across the filed configurations. The supplied approval extract does not state a total apartment count. RERA filing RERA unit table
Parking configurationCellar and stilt are approved for vehicle parking; a parking-space count is not supplied.

Offering and status

ItemProject record
Configurations2BHK and 3BHK RERA unit table
RERA-filed saleable area2BHK: 35.15 sq. m.; 3BHK: 43.53 sq. m. RERA unit table
Booked / available2BHK: 0 booked / 105 available; 3BHK: 0 booked / 20 available. These portal counts have no supplied “as of” date and are indicative. RERA unit table
Construction stageThe project is recorded at 90% completeness in the shared project record; this is a recorded progress figure, not independent site verification. RERA record
Completion datesOriginal and revised proposed completion date: 26/11/2024 RERA filing
Occupancy / completion certificateNo occupancy or completion certificate is supplied in the reviewed project documents. The HMDA technical approval states that an Occupancy Certificate is compulsory before occupation. Document index

2. The project story

AMOGHA WESTERN HEIGHTS is registered as a residential apartment project on 6,280.99 sq. m. in Survey No. 74/P, Adibatla village, Ibrahimpatnam mandal, Ranga Reddy district. The filed land record identifies one building, and the HMDA technical approval describes a residential building with one cellar, one stilt and five upper floors. RERA record RERA filing

The RERA filing lists 125 apartments: 105 2BHK and 20 3BHK. The project record reports 90% completeness, while the promoter’s Form B undertaking set 26/11/2024 as the completion date. The supplied evidence does not establish independent site progress or provide an occupancy/completion certificate, so the recorded progress figure should not be read as confirmation that the building is complete or occupied. RERA unit table RERA record Document index

3. Master plan, architecture & building design

The HMDA technical approval describes one proposed residential building with 1 Cellar + 1 Stilt + 5 Upper floors on a site of 6,280.99 sq. m. It records “Built up Area 14646.45” and “Total Built up Area 17927.94”; these are retained as separately labelled figures because the supplied extraction does not explain their distinction.

The RERA filing records one building and one proposed building unit. The approval extract identifies a tot-lot and requires rainwater-harvesting structures, a transformer and a garbage house within the premises. It does not provide a building footprint, floor-by-floor apartment layout, flats per floor, lift or stair details, internal-road layout, landscaping plan, or residential/common-area schedule in the supplied material. RERA filing

The cellar and stilt are designated for parking and are stated in the approval conditions to be used exclusively for vehicle parking, without partition walls or rolling shutters.

4. Homes, configurations & floor plans

The RERA filing lists two apartment configurations. The recorded booked and available counts are portal figures without a supplied as-of date; treat them as indicative. RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK105010535.15 sq. m.Not available as a usable measured resultNot supplied
3BHK2002043.53 sq. m.Not suppliedNot supplied

Two floor-plan drawings were processed, but the supplied drawing data does not provide a usable measured apartment design or room dimensions. The measurement record cautions that software-measured carpet area, where available, is drawing-derived and requires review; it is not the RERA-filed saleable area. Saleable area and carpet area are different measures, and no loading figure is provided here. Floor plans RERA unit details

5. Parking & vehicle circulation

The HMDA technical approval identifies the cellar and stilt as parking levels and requires them to be used exclusively for vehicle parking without partition walls or rolling shutters. The RERA filing lists 125 apartments, but the supplied documents do not state the number of car or two-wheeler spaces, visitor or accessible spaces, parking allocation by apartment, ramp arrangement, or separate vehicle-entry/exit circulation. RERA unit table

The approval records that 10.34% of Built Up Area, an extent of 1514.42 sq. m., is mortgaged on the first floor in favour of the Metropolitan Commissioner, HMDA, under registered mortgage document 32827/2019. This is an approval-recorded mortgage area, not a parking allocation.

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lotRequired/listed in the technical approval; size not statedHMDA technical approvalNo completion evidence supplied
Rainwater harvestingApproval requires rainwater-harvesting structures; RERA amenities record marks water conservation/rainwater harvesting “YES”RERA amenitiesRERA amenities record shows 0% progress; independent completion not verified
Green strip / tot-lot / parkListed in the RERA amenities record; no size suppliedRERA amenities0% recorded
Community buildingsListed in the RERA amenities record; no description or size suppliedRERA amenities0% recorded
Aggregate recreational open spaceListed in the RERA amenities record; area not suppliedRERA amenities0% recorded

The RERA amenities record also lists internal roads and footpaths, water supply, sewerage, storm-water drains, street lighting, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection and safety, and an electrical meter room/sub-station/receiving station. Each is recorded at 0% in that amenities data; no independent completion verification is supplied. RERA amenities

7. Utilities, building services & safety

The HMDA technical approval requires rainwater-harvesting structures and provisions within the premises for a transformer and garbage house. It also states that an Occupancy Certificate is compulsory before occupation.

The RERA amenities record lists water supply, sewerage and sewage/sullage treatment, storm-water drains, solid-waste management, energy management, fire protection, and electrical meter-room/sub-station/receiving-station facilities. These entries are recorded at 0% in the supplied data; capacities, system specifications and independent completion evidence are not provided. No supported details are supplied for water source or storage, STP capacity or reuse, backup power, lift provision, fire-system design, CCTV/access control, or accessible circulation. RERA amenities

8. Location, access & connectivity

The registered project location is Adibatla, Ibrahimpatnam mandal, Ranga Reddy district, PIN 501510. The filed western boundary is a 30FT WIDE ROAD. RERA record RERA filing RERA filing

The supplied location record lists nearby points with distances, but does not establish the measurement method or a specific route:

Listed placeRecorded distance
Financial District (Nanakramguda)1.2 km
IndusInd Bank0.4 km
Unnamed bus station2.2 km
Manuu Polytechnic Hyderabad1.6 km
Sankaraya Eye Hospital1.6 km
ADP0.0 km
South India Shopping Mall2.6 km
Unnamed park1.2 km
Nanakramguda Govt primary school0.5 km

Location record

9. Developer & development status

The registered promoter is J L SATHGURU DEVELOPERS AND CONSTRUCTIONS, recorded as a partnership. The RERA record names GUMMA RAMAKRISHNA as an authorised signatory; the Form B declaration identifies him as the declarant/promoter for this project. The supplied evidence does not provide a verified corporate registration number, registered-office address, official website, or project contact details. RERA filing Parties record Corporate record

The Form B affidavit dated 01/07/2021 declares a title basis for the project land, states that the land is free from encumbrances, and undertakes completion by 26/11/2024. These are promoter declarations. The project record reports 90% completeness, but does not provide independent verification of that figure. RERA record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationFORM ‘C’ for AMOGHA WESTERN HEIGHTS, registration P02400003100, issued 24/07/2021; validity stated through 26/11/2024.
HMDA technical building approvalTechnical approval 024596/ZOA/R1/U6/HMDA/12062019, dated 26/11/2019, for Survey No. 74/P, Adibatla; described as one cellar, one stilt and five upper floors.
Mortgage recorded with approvalMortgage document 32827/2019, dated 14/11/2019; approval extraction records 1514.42 sq. m. of built-up area on the first floor mortgaged in favour of HMDA.
Promoter declarationForm B affidavit by GUMMA RAMAKRISHNA, dated 01/07/2021, including title, encumbrance and completion declarations.
Layout/building plan materialsThe supplied record identifies an HMDA technical approval; a stamped layout plan or full approved drawing set is not included in the reviewed materials. The RERA layout document entry is not extracted. Approvals record
Occupancy/completion certificateNot present in the supplied project documents. Document index

Frequently asked questions

Is AMOGHA WESTERN HEIGHTS registered with Telangana RERA?

Yes. AMOGHA WESTERN HEIGHTS is registered with the Telangana Real Estate Regulatory Authority as P02400003100; the registration status is On-Going Project.

Who is the developer of AMOGHA WESTERN HEIGHTS?

The promoter named in the RERA registration is J L SATHGURU DEVELOPERS AND CONSTRUCTIONS.

Where is AMOGHA WESTERN HEIGHTS located?

AMOGHA WESTERN HEIGHTS is in ADIBATLA, Ibrahimpatnam, Rangareddy, Telangana (501510).

When will AMOGHA WESTERN HEIGHTS be completed?

The promoter's proposed date of completion filed with RERA is 26/11/2024. This is the promoter's declaration, not a guarantee.

More projects in Adibatla