ONE SQUARE FOOT CONSTRUCTIONS · Mahabubabad · RERA P00700007715
SRSS ENCLAVE is a plotted development in MAHABUBABAD, MAHABUBABAD Mandal, Mahabubabad District, developed by the registered promoter ONE SQUARE FOOT CONSTRUCTIONS. The RERA land record states a total area of 16178.23 sqmts and a net area of 15618.78 sqmts; the layout provides for 54 residential plots, with plot sizes of 87.33–264.16 sqm. The project is registered under TG-RERA number P00700007715, with a proposed completion date of 11/10/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SRSS ENCLAVE RERA record |
| Project type | Plotted development / residential open-plot layout RERA filing |
| Phase / registered portion | Phase not separately identified; registration is for the project covering the listed survey numbers |
| TG-RERA registration | P00700007715 Approvals record |
| Registration validity | Certificate states 11/10/2023 to 11/10/2025. Registration validity is distinct from the project completion deadline and from final-layout or occupancy status. |
| Registered promoter | ONE SQUARE FOOT CONSTRUCTIONS, identified in the RERA record as a partnership RERA filing Parties record |
| RERA status in supplied record | The registration certificate records the registration; the supplied certificate does not record an extension. A later issue date printed on the certificate is 22/01/2026. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | MAHABUBABAD; the layout documents identify MAHABUBABAD REVENUE VILLAGE RERA record |
| Mandal | MAHABUBABAD |
| District | Mahabubabad RERA record |
| PIN | 506101 RERA record |
| Project survey numbers and subdivisions | 334/2/2, 335, 471/1/B, 471/2, 471/1/A, 473/2/1/2 Land records |
| Registered site area | RERA land record: Total Area 16178.23 sqmts, Area affected in Road widening/FTL of Tanks/Nala Widening 559.45 sqmts, and Net Area 15618.78 sqmts. RERA filing |
| Layout-plan area statement | The revised layout plan states 16177.72 sq.mt. area, 559.45 road-affected / widening area and 15618.25 total net layout; its sanctioned-parameter text also states 15618.26 net area. |
| Boundaries | East: LAND OF OTHERS; West: 12M ROAD; North: LAND OF OTHERS; South: LAND OF OTHERS RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Mahabubabad Municipality / Municipal Corporation for the tentative layout approval; the prior layout plan identifies TS-DTCP and delegation to Mahabubabad Municipality. Approvals record |
| Principal tentative layout approval | 0016/LO/3003/2023, dated 28/10/2023 in the final proceedings’ reference; the tentative approval document identifies the same approval number. Approvals record |
| Prior layout reference | T.L.P.No:0003/LO/3003/2023, approved 09/05/2023 Approvals record |
| Final layout proceeding | 0007/MAHD/SWFL/2025, approved 22/11/2025 Approvals record |
| Approved built-up area | RERA project information records 9798.58 sqmts approved built-up area; this is not a plot area or individual plot saleable area. RERA filing |
| Layout scale | 54 plots are stated in the layout documents. Building count, floors, parking levels and apartment unit counts are not applicable to this plotted-layout record / not disclosed. Layout record |
| Individual building permissions | The final layout proceedings state that individual building permission is to be considered separately under the applicable building rules. |
Offering and status
| Field | Record |
|---|---|
| Offering | 54 residential plots Layout record |
| Plot-size range | Software-measured from the approved layout drawing: 87.33–264.16 sqm (104.4–315.9 sq yd); verify dimensions against the drawing. Layout record |
| RERA proposed completion date | 11/10/2025, as undertaken in the Form B declaration |
| Final layout / completion evidence | Final layout proceeding 0007/MAHD/SWFL/2025 is dated 22/11/2025; the related architect’s certificate is recorded as completion-certified and refers to an occupancy certificate issued by Mahabubabad Municipality. |
| OC scope | The supplied extraction refers to an occupancy certificate for the registered project/layout, but does not provide its number, issue date or a more specific scope. |
| Booked / available plots | Counts are not supplied. Layout record |
2. The project story
SRSS ENCLAVE is recorded as a residential plotted layout in Mahabubabad Revenue Village, Mahabubabad Mandal and District, across survey numbers 334/2/2, 335, 471/1/B, 471/2, 471/1/A and 473/2/1/2. The layout documents provide for 54 plots, internal roads, park/open space, utility land and social-infrastructure land. The final layout proceedings specify residential dwelling use, including detached, single-family dwellings; individual building permissions are to be considered separately. RERA record Land records
The promoter’s RERA-filed Form B undertakes completion by 11/10/2025. The supplied record also includes a final layout proceeding dated 22/11/2025 and a related architect’s completion certificate referring to a municipal occupancy certificate. These are distinct record events; the available extraction does not state the occupancy certificate’s number, date or detailed scope. No independent site inspection or verification of physical construction progress is supplied.
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey apartment scheme. The revised layout drawing identifies 54 plots and internal road widths of 9.14 mt., 10.00 mt., 12.00 MT and 18.00 MT. It designates 9798.24 sqm (62.74%) as plotted area, 3860.29 sqm (24.72%) as roads, 1405.65 sqm (9.00%) as organized open space/park, 397.88 sqm (2.55%) as social infrastructure and 156.19 sqm (1.00%) as utility area. These are drawing-stated land-use figures, not measurements of building or home areas. Layout record
The drawing states a total net layout area of 15618.25; the same drawing’s sanctioned-parameter text gives 15618.26. The RERA land-details record gives 15618.78 sqmts net area. The Overview records these figures in their respective source contexts without resolving them. RERA filing
The tentative approval requires infrastructure development and handover of reserved open space, utilities and roads, and states that the layout applicant is responsible for development works. The supplied records do not specify apartment buildings, floors, building footprints, lifts, stairs or building-level circulation.
4. Homes, configurations & floor plans
There are 54 plots in the layout schedule. Plot areas below are software-measured from the approved layout drawing; they are not RERA-filed carpet or apartment saleable areas. The drawing-derived size distribution is: Layout record
| Plot-size band | Plots |
|---|---|
| 100–150 sq yd (84–125 sqm) | 3 |
| 150–200 sq yd (125–167 sqm) | 19 |
| 200–250 sq yd (167–209 sqm) | 17 |
| 250–300 sq yd (209–251 sqm) | 14 |
| 300–400 sq yd (251–334 sqm) | 1 |
The software-measured smallest, median and largest plot areas are 87.33 sqm, 178.51 sqm and 264.16 sqm, respectively (equivalent figures in the supplied data: 104.4 sq yd, 213.5 sq yd and 315.9 sq yd). The source describes drawing measurements as software-derived and says they should be checked against the drawing. No RERA-filed booked/available plot counts or plot-wise buyer allocation are supplied. Layout record
Apartment configurations, carpet-area measurements, balcony areas and loading figures do not apply to the plotted offering and are not provided. The final layout proceedings specify dwelling-unit use for building sites and detached, single-family dwelling use; actual house designs and permissions are not established by the layout record.
5. Parking & vehicle circulation
The revised layout plan reports Common Parking Area: 0.00. The vendor record lists “Open Parking,” but the supplied RERA-filed layout evidence does not establish a count of parking spaces, visitor or accessible spaces, or plot-specific parking allocation. Promoter website
The layout drawing shows internal roads with stated widths of 9.14 mt., 10.00 mt., 12.00 MT and 18.00 MT. The tentative approval requires roads to remain open for access to neighbouring sites; the final layout proceedings also state that internal roads should remain open to provide access to neighbouring lands. No separate vehicle-entry/exit design, pedestrian separation or EV provision is specified in the supplied record.
6. Amenities, recreation & open spaces
The layout approval allocates land for open space, social infrastructure and utilities. The amenity table below distinguishes drawing/approval designations from the RERA amenities record; no independent site verification is supplied. RERA amenities
| Description / size | 1405.65 sqm (9.00%) in revised layout area statement; tentative approval also records open space at 9%. |
|---|---|
| Declared progress / verified status | Shown / reserved in layout records; physical completion not independently verified. |
| Description / size | RERA amenities record lists Green Strip/TOT LOT/Park at 100%; layout identifies a “Tot-lot.” No separate size is supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-declared at 100%; not independently verified. |
| Description / size | 397.88 sqm (2.55%) in revised layout area statement. |
|---|---|
| Declared progress / verified status | Land is designated; facility construction or operation is not independently verified. |
| Description / size | 156.19 sqm (1.00%) in revised layout area statement. |
|---|---|
| Declared progress / verified status | Land is designated; site-utility details appear below. |
| Description / size | No area stated; amenities record shows 0%. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | No completion claim recorded. |
The tentative layout approval requires the reserved open space, utilities and roads to be handed over to the municipality by registered gift deed before release of the tentative layout; the supplied evidence does not independently verify the handover.
7. Utilities, building services & safety
The tentative layout approval lists development works including internal water-supply pipelines, an overhead tank and assured water source; underground drainage and a common septic tank / STP; storm-water drains; electrical lines, street lights and a transformer; avenue planting, park development and rainwater-harvesting pits. It also lists solid-waste management among the utilities. These are approval conditions / stated infrastructure requirements, not independently verified operational facilities.
| Service | Supplied evidence |
|---|---|
| Water | Approval lists internal water-supply pipelines, overhead tank and an assured water-supply source. No storage capacity or source details are supplied. |
| Sewerage / drainage | Approval lists underground drainage lines and a common septic tank / STP; the RERA amenities record lists sewerage chambers, lines, septic tank and STP at 100%, and storm-water drains at 100%. The percentages are promoter/RERA-record declarations, not independent verification. RERA amenities |
| Electrical | Approval lists electrical supply lines, street lights and transformer; the amenities record lists the electrical meter room/sub-station/receiving station at 100%. Capacities and operational status are not supplied. RERA amenities |
| Rainwater | Approval requires rainwater-harvesting pits; the RERA amenities record lists water conservation/rainwater harvesting at 100%. Independent completion verification is not supplied. RERA amenities |
| Waste | Approval lists solid-waste management; the RERA amenities record shows solid-waste management and disposal at 0%. The supplied records do not establish an operating waste system. RERA amenities |
| Fire and vertical transport | Fire protection/safety is recorded at 0% in the RERA amenities record. Lifts and service lifts are not applicable to the plotted-layout information supplied. RERA amenities |
| Accessibility / safety | Approval conditions require roads to remain open for access and address safety during development; no specific accessible-route or ramp design is supplied. |
8. Location, access & connectivity
The project’s RERA and layout records place it in Mahabubabad Revenue Village, Mahabubabad Mandal, Mahabubabad District, Telangana, PIN 506101. The registered west boundary is a 12M ROAD; the approved layout drawing also identifies internal roads of 9.14 mt., 10.00 mt., 12.00 MT and 18.00 MT. The supplied evidence gives no verified public-transport details, nearby landmark distances or travel times. RERA record RERA filing
The location dataset supplies a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and a stated distance of 1.2 km to Financial District (Nanakramguda); the record labels this as an anchor distance, not an independently established route or travel time. Location record
9. Developer & development status
The registered promoter is ONE SQUARE FOOT CONSTRUCTIONS, identified in the RERA record as a Partnership with GSTIN 36AAFFO5860R1ZH. The supplied documents identify the firm as developer and name SUDHEER KUMAR THUMMALA as an authorized signatory. The firm’s registered office/contact details are recorded as SRI NILAYAM, RAMNAGAR, MAIN ROAD, MAHABUBAD, Mahabubabad, 506101. RERA filing Corporate record Parties record
The promoter’s Form B declares a completion date of 11/10/2025. The supplied final-layout proceeding is dated 22/11/2025, and the related architect’s certificate is marked completion-certified and refers to a municipal occupancy certificate. The extraction does not supply the certificate number, date or detailed scope, and no independent site inspection is provided.
10. Approvals, official records & documents
| Identifier / date | P00700007715; validity 11/10/2023–11/10/2025 |
|---|---|
| What the supplied record establishes | Form ‘C’ registration record for SRSS ENCLAVE; certificate issue date shown as 22/01/2026. |
| Identifier / date | 0016/LO/3003/2023; dated 28/10/2023 in final-proceeding reference |
|---|---|
| What the supplied record establishes | Mahabubabad Municipality / Municipal Corporation approval for a 54-plot tentative layout over the project survey numbers. |
| Identifier / date | T.L.P.No:0003/LO/3003/2023, approved 09/05/2023 |
|---|---|
| What the supplied record establishes | Referenced in the revised layout plan. |
| Identifier / date | 0007/MAHD/SWFL/2025; 22/11/2025 |
|---|---|
| What the supplied record establishes | Mahabubabad Municipality final layout proceeding for the residential plotted layout; records 54 plots. |
| Identifier / date | 003973/MAHD/00007/SWFL/2025 |
|---|---|
| What the supplied record establishes | Application number printed in the final-layout document. |
| Identifier / date | 005224/LO/DTCP/3003/0017/2023 |
|---|---|
| What the supplied record establishes | Application number printed in the approval records. |
| Identifier / date | Architect’s certificate within document 635082 |
|---|---|
| What the supplied record establishes | Extraction states the project is completion-certified and identifies a municipal occupancy certificate; certificate number, issue date and detailed scope are not supplied. |
| Identifier / date | Form B, document 380463 |
|---|---|
| What the supplied record establishes | Promoter declaration covering title, encumbrances, separate-account obligations, approvals and completion undertaking. |
1. Project at a glance
Project identity
Registered project name: SRSS ENCLAVE
Project type: Plotted development / residential open-plot layout
Phase / registered portion: Phase not separately identified; registration is for the project covering the listed survey numbers
TG-RERA registration: P00700007715
Registration validity: Certificate states 11/10/2023 to 11/10/2025. Registration validity is distinct from the project completion deadline and from final-layout or occupancy status.
Registered promoter: ONE SQUARE FOOT CONSTRUCTIONS, identified in the RERA record as a partnership
RERA status in supplied record: The registration certificate records the registration; the supplied certificate does not record an extension. A later issue date printed on the certificate is 22/01/2026.
Land and geographic identity
Locality / revenue village: MAHABUBABAD; the layout documents identify MAHABUBABAD REVENUE VILLAGE
Mandal: MAHABUBABAD
District: Mahabubabad
PIN: 506101
Project survey numbers and subdivisions: 334/2/2, 335, 471/1/B, 471/2, 471/1/A, 473/2/1/2
Registered site area: RERA land record: Total Area 16178.23 sqmts, Area affected in Road widening/FTL of Tanks/Nala Widening 559.45 sqmts, and Net Area 15618.78 sqmts.
Layout-plan area statement: The revised layout plan states 16177.72 sq.mt. area, 559.45 road-affected / widening area and 15618.25 total net layout; its sanctioned-parameter text also states 15618.26 net area.
Boundaries: East: LAND OF OTHERS; West: 12M ROAD; North: LAND OF OTHERS; South: LAND OF OTHERS
Development identity
Sanctioning authority: Mahabubabad Municipality / Municipal Corporation for the tentative layout approval; the prior layout plan identifies TS-DTCP and delegation to Mahabubabad Municipality.
Principal tentative layout approval: 0016/LO/3003/2023, dated 28/10/2023 in the final proceedings’ reference; the tentative approval document identifies the same approval number.
Prior layout reference: T.L.P.No:0003/LO/3003/2023, approved 09/05/2023
Final layout proceeding: 0007/MAHD/SWFL/2025, approved 22/11/2025
Approved built-up area: RERA project information records 9798.58 sqmts approved built-up area; this is not a plot area or individual plot saleable area.
Layout scale: 54 plots are stated in the layout documents. Building count, floors, parking levels and apartment unit counts are not applicable to this plotted-layout record / not disclosed.
Individual building permissions: The final layout proceedings state that individual building permission is to be considered separately under the applicable building rules.
Offering and status
Offering: 54 residential plots
Plot-size range: Software-measured from the approved layout drawing: 87.33–264.16 sqm (104.4–315.9 sq yd); verify dimensions against the drawing.
RERA proposed completion date: 11/10/2025, as undertaken in the Form B declaration
Final layout / completion evidence: Final layout proceeding 0007/MAHD/SWFL/2025 is dated 22/11/2025; the related architect’s certificate is recorded as completion-certified and refers to an occupancy certificate issued by Mahabubabad Municipality.
OC scope: The supplied extraction refers to an occupancy certificate for the registered project/layout, but does not provide its number, issue date or a more specific scope.
Booked / available plots: Counts are not supplied.
2. The project story
SRSS ENCLAVE is recorded as a residential plotted layout in Mahabubabad Revenue Village, Mahabubabad Mandal and District, across survey numbers 334/2/2, 335, 471/1/B, 471/2, 471/1/A and 473/2/1/2. The layout documents provide for 54 plots, internal roads, park/open space, utility land and social-infrastructure land. The final layout proceedings specify residential dwelling use, including detached, single-family dwellings; individual building permissions are to be considered separately.
The promoter’s RERA-filed Form B undertakes completion by 11/10/2025. The supplied record also includes a final layout proceeding dated 22/11/2025 and a related architect’s completion certificate referring to a municipal occupancy certificate. These are distinct record events; the available extraction does not state the occupancy certificate’s number, date or detailed scope. No independent site inspection or verification of physical construction progress is supplied.
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey apartment scheme. The revised layout drawing identifies 54 plots and internal road widths of 9.14 mt., 10.00 mt., 12.00 MT and 18.00 MT. It designates 9798.24 sqm (62.74%) as plotted area, 3860.29 sqm (24.72%) as roads, 1405.65 sqm (9.00%) as organized open space/park, 397.88 sqm (2.55%) as social infrastructure and 156.19 sqm (1.00%) as utility area. These are drawing-stated land-use figures, not measurements of building or home areas.
The drawing states a total net layout area of 15618.25; the same drawing’s sanctioned-parameter text gives 15618.26. The RERA land-details record gives 15618.78 sqmts net area. The Overview records these figures in their respective source contexts without resolving them.
The tentative approval requires infrastructure development and handover of reserved open space, utilities and roads, and states that the layout applicant is responsible for development works. The supplied records do not specify apartment buildings, floors, building footprints, lifts, stairs or building-level circulation.
4. Homes, configurations & floor plans
There are 54 plots in the layout schedule. Plot areas below are software-measured from the approved layout drawing; they are not RERA-filed carpet or apartment saleable areas. The drawing-derived size distribution is:
100–150 sq yd (84–125 sqm): 3
150–200 sq yd (125–167 sqm): 19
200–250 sq yd (167–209 sqm): 17
250–300 sq yd (209–251 sqm): 14
300–400 sq yd (251–334 sqm): 1
The software-measured smallest, median and largest plot areas are 87.33 sqm, 178.51 sqm and 264.16 sqm, respectively (equivalent figures in the supplied data: 104.4 sq yd, 213.5 sq yd and 315.9 sq yd). The source describes drawing measurements as software-derived and says they should be checked against the drawing. No RERA-filed booked/available plot counts or plot-wise buyer allocation are supplied.
Apartment configurations, carpet-area measurements, balcony areas and loading figures do not apply to the plotted offering and are not provided. The final layout proceedings specify dwelling-unit use for building sites and detached, single-family dwelling use; actual house designs and permissions are not established by the layout record.
5. Parking & vehicle circulation
The revised layout plan reports Common Parking Area: 0.00. The vendor record lists “Open Parking,” but the supplied RERA-filed layout evidence does not establish a count of parking spaces, visitor or accessible spaces, or plot-specific parking allocation.
The layout drawing shows internal roads with stated widths of 9.14 mt., 10.00 mt., 12.00 MT and 18.00 MT. The tentative approval requires roads to remain open for access to neighbouring sites; the final layout proceedings also state that internal roads should remain open to provide access to neighbouring lands. No separate vehicle-entry/exit design, pedestrian separation or EV provision is specified in the supplied record.
6. Amenities, recreation & open spaces
The layout approval allocates land for open space, social infrastructure and utilities. The amenity table below distinguishes drawing/approval designations from the RERA amenities record; no independent site verification is supplied.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 1405.65 sqm (9.00%) in revised layout area statement; tentative approval also records open space at 9%. | Shown / reserved in layout records; physical completion not independently verified. | |
| Tot-lot / green strip / park | RERA amenities record lists Green Strip/TOT LOT/Park at 100%; layout identifies a “Tot-lot.” No separate size is supplied. | RERA-declared at 100%; not independently verified. | |
| Social infrastructure | 397.88 sqm (2.55%) in revised layout area statement. | Land is designated; facility construction or operation is not independently verified. | |
| Utility area | 156.19 sqm (1.00%) in revised layout area statement. | Land is designated; site-utility details appear below. | |
| Community buildings | No area stated; amenities record shows 0%. | No completion claim recorded. |
The tentative layout approval requires the reserved open space, utilities and roads to be handed over to the municipality by registered gift deed before release of the tentative layout; the supplied evidence does not independently verify the handover.
7. Utilities, building services & safety
The tentative layout approval lists development works including internal water-supply pipelines, an overhead tank and assured water source; underground drainage and a common septic tank / STP; storm-water drains; electrical lines, street lights and a transformer; avenue planting, park development and rainwater-harvesting pits. It also lists solid-waste management among the utilities. These are approval conditions / stated infrastructure requirements, not independently verified operational facilities.
Water: Approval lists internal water-supply pipelines, overhead tank and an assured water-supply source. No storage capacity or source details are supplied.
Sewerage / drainage: Approval lists underground drainage lines and a common septic tank / STP; the RERA amenities record lists sewerage chambers, lines, septic tank and STP at 100%, and storm-water drains at 100%. The percentages are promoter/RERA-record declarations, not independent verification.
Electrical: Approval lists electrical supply lines, street lights and transformer; the amenities record lists the electrical meter room/sub-station/receiving station at 100%. Capacities and operational status are not supplied.
Rainwater: Approval requires rainwater-harvesting pits; the RERA amenities record lists water conservation/rainwater harvesting at 100%. Independent completion verification is not supplied.
Waste: Approval lists solid-waste management; the RERA amenities record shows solid-waste management and disposal at 0%. The supplied records do not establish an operating waste system.
Fire and vertical transport: Fire protection/safety is recorded at 0% in the RERA amenities record. Lifts and service lifts are not applicable to the plotted-layout information supplied.
Accessibility / safety: Approval conditions require roads to remain open for access and address safety during development; no specific accessible-route or ramp design is supplied.
8. Location, access & connectivity
The project’s RERA and layout records place it in Mahabubabad Revenue Village, Mahabubabad Mandal, Mahabubabad District, Telangana, PIN 506101. The registered west boundary is a 12M ROAD; the approved layout drawing also identifies internal roads of 9.14 mt., 10.00 mt., 12.00 MT and 18.00 MT. The supplied evidence gives no verified public-transport details, nearby landmark distances or travel times.
The location dataset supplies a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and a stated distance of 1.2 km to Financial District (Nanakramguda); the record labels this as an anchor distance, not an independently established route or travel time.
9. Developer & development status
The registered promoter is ONE SQUARE FOOT CONSTRUCTIONS, identified in the RERA record as a Partnership with GSTIN 36AAFFO5860R1ZH. The supplied documents identify the firm as developer and name SUDHEER KUMAR THUMMALA as an authorized signatory. The firm’s registered office/contact details are recorded as SRI NILAYAM, RAMNAGAR, MAIN ROAD, MAHABUBAD, Mahabubabad, 506101.
The promoter’s Form B declares a completion date of 11/10/2025. The supplied final-layout proceeding is dated 22/11/2025, and the related architect’s certificate is marked completion-certified and refers to a municipal occupancy certificate. The extraction does not supply the certificate number, date or detailed scope, and no independent site inspection is provided.
10. Approvals, official records & documents
| Identifier / date | P00700007715; validity 11/10/2023–11/10/2025 |
|---|---|
| What the supplied record establishes | Form ‘C’ registration record for SRSS ENCLAVE; certificate issue date shown as 22/01/2026. |
| Identifier / date | 0016/LO/3003/2023; dated 28/10/2023 in final-proceeding reference |
|---|---|
| What the supplied record establishes | Mahabubabad Municipality / Municipal Corporation approval for a 54-plot tentative layout over the project survey numbers. |
| Identifier / date | T.L.P.No:0003/LO/3003/2023, approved 09/05/2023 |
|---|---|
| What the supplied record establishes | Referenced in the revised layout plan. |
| Identifier / date | 0007/MAHD/SWFL/2025; 22/11/2025 |
|---|---|
| What the supplied record establishes | Mahabubabad Municipality final layout proceeding for the residential plotted layout; records 54 plots. |
| Identifier / date | 003973/MAHD/00007/SWFL/2025 |
|---|---|
| What the supplied record establishes | Application number printed in the final-layout document. |
| Identifier / date | 005224/LO/DTCP/3003/0017/2023 |
|---|---|
| What the supplied record establishes | Application number printed in the approval records. |
| Identifier / date | Architect’s certificate within document 635082 |
|---|---|
| What the supplied record establishes | Extraction states the project is completion-certified and identifies a municipal occupancy certificate; certificate number, issue date and detailed scope are not supplied. |
| Identifier / date | Form B, document 380463 |
|---|---|
| What the supplied record establishes | Promoter declaration covering title, encumbrances, separate-account obligations, approvals and completion undertaking. |
Frequently asked questions
Is SRSS ENCLAVE registered with Telangana RERA?
Yes. SRSS ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P00700007715; the registration status is New Project.
Who is the developer of SRSS ENCLAVE?
The promoter named in the RERA registration is ONE SQUARE FOOT CONSTRUCTIONS.
Where is SRSS ENCLAVE located?
SRSS ENCLAVE is in MAHUBABAD, Mahabubabad, Telangana (506101).
When will SRSS ENCLAVE be completed?
The promoter's proposed date of completion filed with RERA is 11/10/2025. This is the promoter's declaration, not a guarantee.