Sri Vasudeva Residency
SUNSHINE INFRA DEVELOPERS · Medchal-Malkajgiri · RERA P02200006132
SRI VASUDEVA RESIDENCY is a residential apartment project in Kukatpally, Balanagar mandal, Medchal-Malkajgiri district. It is being developed by registered promoter SUNSHINE INFRA DEVELOPERS, recorded as a partnership. The project covers 520.25 sq. m and comprises one residential building with 1 Stilt + 5 upper floors and 20 homes: 10 1BHK units of 32.05 sq. m saleable area each and 10 2BHK units of 44.59 sq. m saleable area each. Its TG-RERA registration number is P02200006132, and its proposed completion date is 21/06/2025.
More from Sunshine Infra Developers · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project | SRI VASUDEVA RESIDENCY; residential apartment project. RERA record |
| Phase / registered portion | The record identifies one building and does not name a separate phase; the registration’s scope is the project registered as P02200006132. RERA filing |
| TG-RERA registration | P02200006132; issued 24/04/2023, stated valid through 21/06/2025. The supplied record shows no extension. Registration validity is distinct from the completion date. RERA record |
| Registered promoter | SUNSHINE INFRA DEVELOPERS, recorded as a partnership. RERA record RERA filing |
| RERA status | The project is registered. The supplied registration certificate states validity through 21/06/2025; the current registration status is not established by the supplied material. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Kukatpally; the permit and title material refer to Kukatpally Village. RERA record |
| Mandal / district / PIN | Balanagar mandal; Medchal-Malkajgiri district; PIN 500072. RERA record |
| Project survey numbers | 437, 438 and 439. The title deeds describe Survey Nos. 437, 438 & 439 (Part); the subdivision/part boundary is not further specified in the supplied identity record. RERA record Land records |
| Registered site extent | The RERA and building-permit records state 520.25 sq. m site/plot area. The title deed describes 706.5 sq. yards or 590.63 sq. m; the project’s registered land area is stated above. RERA filing |
| Net / total area | RERA records total and net area as 520.25 sq. m; the permit also states net plot area 520.25 sq. m. RERA filing |
| Boundaries | North: ROAD; south, east and west: OTHERS LAND. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC), Kukatpally Zone. Approvals record |
| Principal building approval | Permit 1967/GHMC/KPL/2022-BP, approved 21 June 2022; file no. 001038/GHMC/0550/KPL2/2022-BP. Approvals record |
| Approved built-up area | 1,278.10 sq. m for residential upper floors; the permit separately records 255.6 sq. m for the stilt and total parking area 255.6 sq. m. RERA filing |
| Building count and sanctioned floors | One residential building; 1 Stilt + 5 upper floors. The permit records building height as 14.99; the supplied extract does not state a unit for that figure. RERA filing |
| Parking level | Stilt parking is shown in the permit; the permit’s conditions say approved stilt/cellar areas are to be used exclusively for vehicle parking. A cellar is not identified in the stated floor configuration. |
| Unit count | 20 units in the RERA unit record; the permit condition says sanctioned unit numbers may not be increased without prior GHMC approval. The supplied permit extract does not state a separate total sanctioned-unit count. RERA unit table |
Offering and status
| Item | Record |
|---|---|
| RERA-filed configurations | 1BHK: 10 units, saleable area 32.05 sq. m each; 2BHK: 10 units, saleable area 44.59 sq. m each. RERA unit table RERA unit table |
| Booked / available | The portal-derived unit record shows 0 booked and 10 available for each configuration, or 20 available in total. The record has no as-of date, so counts are indicative. RERA unit table |
| Completion deadline | Promoter’s stated proposed completion date: 21/06/2025. This is separate from the registration-validity date. RERA record RERA filing |
| Construction stage | No independently verified or dated construction-progress evidence is supplied. The amenity progress fields shown are 0%; they do not establish overall building completion. RERA amenities |
| OC / completion certificate | No occupancy or completion certificate is included in the supplied project documents; whether one has since been issued is not established. Document index |
2. The project story
Sri Vasudeva Residency is recorded with TG-RERA as a residential apartment project at Kukatpally, Balanagar mandal, Medchal-Malkajgiri district, on land identified as Survey Nos. 437, 438 and 439. The filed and sanctioned development is a single building, rather than a multi-tower or plotted scheme. RERA record Land records
GHMC’s building permit describes 1 Stilt + 5 upper floors and residential upper-floor area of 1,278.10 sq. m. The RERA unit schedule lists 20 homes: ten 1BHK and ten 2BHK. The registration certificate states a proposed completion date of 21/06/2025, but the supplied evidence does not establish the construction stage through an independent site inspection or confirm an occupancy certificate. RERA unit table
3. Master plan, architecture & building design
The sanctioned scheme is one residential building with 1 Stilt + 5 upper floors on a stated net plot area of 520.25 sq. m. GHMC records 1,278.10 sq. m for residential upper floors and 255.6 sq. m for the stilt. These are permit figures; the record does not provide a separate FSI-counted-area calculation.
The permit extract does not provide floor-by-floor apartment arrangements, footprint dimensions, lift or stair details, internal circulation plans, landscaping/open-space drawings, or a phase layout. Its recorded setbacks are Front 3.5 m, Rear 3.5 m, Side I 3.5 m and Side II 3.5 m.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 1BHK | 10 | 0 | 10 | 32.05 sq. m | Not available | Not supplied |
| 2BHK | 10 | 0 | 10 | 44.59 sq. m | Not available | Not supplied |
RERA saleable areas and unit counts are from the project’s unit record; booked and available counts are undated portal figures and should be treated as indicative. RERA unit table RERA unit table
Two floor-plan drawings were processed, but the supplied drawing record contains no usable measurements matched to the RERA-filed 1BHK or 2BHK configurations. It records a 3BHK measurement entry that is not matched to the RERA configurations and has been held back as implausible; it is not evidence of a 3BHK offering. No software-measured carpet area is therefore reported. Floor plans RERA unit details
The RERA-filed saleable area is not presented as carpet area. No supplied record provides a carpet-area figure or loading calculation for these units.
5. Parking & vehicle circulation
The GHMC permit records 255.6 sq. m total parking area and states that approved stilt/cellar areas are to be used exclusively for vehicle parking. The building configuration specifies a stilt; the supplied extract does not identify a cellar as part of the configuration.
The available material does not state a sanctioned parking-space count, visitor or accessible parking provision, parking allocation by unit, or vehicle-entry, ramp and driveway arrangements. A parking area in a permit does not itself establish exclusive parking ownership or an allocation to a particular apartment. RERA amenities
6. Amenities, recreation & open spaces
The project record contains infrastructure and amenity fields, but the supplied evidence does not establish the delivery or independent completion of these facilities. The RERA-derived progress fields are 0% where recorded. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | No size or detail supplied | RERA amenities | 0% in record; not independently verified |
| Green strip / tot lot / park | No size or detail supplied | RERA amenities | 0% in record; not independently verified |
| Community buildings | No size or detail supplied | RERA amenities | 0% in record; not independently verified |
| Aggregate recreational open space | No area supplied | RERA amenities | 0% in record; not independently verified |
No clubhouse, indoor recreation or sports facility is identified in the supplied RERA-derived amenity records. Marketing-source amenity claims are not used here as evidence of sanctioned or delivered facilities.
7. Utilities, building services & safety
The GHMC permit lists a rainwater-harvesting structure, space for a transformer and a garbage house; it specifies 2 Rain Water Harvesting Pits. The permit also requires a rainwater-harvesting structure and transformer space. These are permit provisions, not confirmation of installation or operation.
The project amenity record marks water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as available, but records 0% progress for the listed facilities. It does not provide system capacities, water source or storage details, STP or reuse specifications, electrical backup, lift details, fire-system design, security/access-control details or accessibility features. RERA amenities
The permit states that an occupancy fire NOC is to be obtained from the Director (EV&DM) before issue of an occupancy certificate, and that an occupancy certificate is compulsory before occupation. The supplied documents do not establish that these later-stage requirements have been completed.
8. Location, access & connectivity
The registered location is Kukatpally Village, Balanagar mandal, Medchal-Malkajgiri district, Telangana, PIN 500072. The building permit identifies the north boundary as a road and records an 18 mt. road width; it does not name that road in the supplied extract. RERA record RERA filing
The supplied location record includes a parcel-centroid coordinate of 17.41528, 78.35459 and identifies Financial District (Nanakramguda) at 1.2 km. This is an anchor-distance entry; no route, travel time or independent access measurement is supplied. Location record
9. Developer & development status
The registered promoter is SUNSHINE INFRA DEVELOPERS, recorded as a partnership, with GSTIN 36AEJFS2000M1Z1. The project record names M SATISH REDDY as authorised signatory and SRINIVAS RAO BETHAPUDI as partner. The supplied evidence does not include a verified registered-office address or official contact details. RERA record RERA filing Corporate record Parties record
The RERA record states proposed completion by 21/06/2025. No reliable construction-progress update or occupancy/completion certificate is supplied, so current completion and occupancy status cannot be confirmed from this overview’s evidence. RERA filing RERA amenities Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C registration certificate for SRI VASUDEVA RESIDENCY, registration P02200006132, issued 24/04/2023 and stated valid through 21/06/2025. |
| GHMC building permit | Permit 1967/GHMC/KPL/2022-BP, approved 21 June 2022; file no. 001038/GHMC/0550/KPL2/2022-BP. The permit extract describes one building with 1 Stilt + 5 upper floors. |
| Title and site records filed with RERA | Title-report documents include the 1995, 2019 and 2022 sale-deed chain; the project identity lists Survey Nos. 437, 438 and 439. Land records |
| Encumbrance statements | Two encumbrance-statement documents are listed: 308736 and 317568. |
| Layout plan | A layout-plan document is listed, but its contents were not extracted. |
| Occupancy/completion evidence | No occupancy or completion certificate is listed in the supplied project documents. Document index |
| Other RERA-filed material | A partially completed Agreement for Sale template is listed as document 308737. |
1. Project at a glance
Project identity
Registered project: SRI VASUDEVA RESIDENCY; residential apartment project.
Phase / registered portion: The record identifies one building and does not name a separate phase; the registration’s scope is the project registered as P02200006132.
TG-RERA registration: P02200006132; issued 24/04/2023, stated valid through 21/06/2025. The supplied record shows no extension. Registration validity is distinct from the completion date.
Registered promoter: SUNSHINE INFRA DEVELOPERS, recorded as a partnership.
RERA status: The project is registered. The supplied registration certificate states validity through 21/06/2025; the current registration status is not established by the supplied material.
Land and geographic identity
Locality / revenue village: Kukatpally; the permit and title material refer to Kukatpally Village.
Mandal / district / PIN: Balanagar mandal; Medchal-Malkajgiri district; PIN 500072.
Project survey numbers: 437, 438 and 439. The title deeds describe Survey Nos. 437, 438 & 439 (Part); the subdivision/part boundary is not further specified in the supplied identity record.
Registered site extent: The RERA and building-permit records state 520.25 sq. m site/plot area. The title deed describes 706.5 sq. yards or 590.63 sq. m; the project’s registered land area is stated above.
Net / total area: RERA records total and net area as 520.25 sq. m; the permit also states net plot area 520.25 sq. m.
Boundaries: North: ROAD; south, east and west: OTHERS LAND.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC), Kukatpally Zone.
Principal building approval: Permit 1967/GHMC/KPL/2022-BP, approved 21 June 2022; file no. 001038/GHMC/0550/KPL2/2022-BP.
Approved built-up area: 1,278.10 sq. m for residential upper floors; the permit separately records 255.6 sq. m for the stilt and total parking area 255.6 sq. m.
Building count and sanctioned floors: One residential building; 1 Stilt + 5 upper floors. The permit records building height as 14.99; the supplied extract does not state a unit for that figure.
Parking level: Stilt parking is shown in the permit; the permit’s conditions say approved stilt/cellar areas are to be used exclusively for vehicle parking. A cellar is not identified in the stated floor configuration.
Unit count: 20 units in the RERA unit record; the permit condition says sanctioned unit numbers may not be increased without prior GHMC approval. The supplied permit extract does not state a separate total sanctioned-unit count.
Offering and status
RERA-filed configurations: 1BHK: 10 units, saleable area 32.05 sq. m each; 2BHK: 10 units, saleable area 44.59 sq. m each.
Booked / available: The portal-derived unit record shows 0 booked and 10 available for each configuration, or 20 available in total. The record has no as-of date, so counts are indicative.
Completion deadline: Promoter’s stated proposed completion date: 21/06/2025. This is separate from the registration-validity date.
Construction stage: No independently verified or dated construction-progress evidence is supplied. The amenity progress fields shown are 0%; they do not establish overall building completion.
OC / completion certificate: No occupancy or completion certificate is included in the supplied project documents; whether one has since been issued is not established.
2. The project story
Sri Vasudeva Residency is recorded with TG-RERA as a residential apartment project at Kukatpally, Balanagar mandal, Medchal-Malkajgiri district, on land identified as Survey Nos. 437, 438 and 439. The filed and sanctioned development is a single building, rather than a multi-tower or plotted scheme.
GHMC’s building permit describes 1 Stilt + 5 upper floors and residential upper-floor area of 1,278.10 sq. m. The RERA unit schedule lists 20 homes: ten 1BHK and ten 2BHK. The registration certificate states a proposed completion date of 21/06/2025, but the supplied evidence does not establish the construction stage through an independent site inspection or confirm an occupancy certificate.
3. Master plan, architecture & building design
The sanctioned scheme is one residential building with 1 Stilt + 5 upper floors on a stated net plot area of 520.25 sq. m. GHMC records 1,278.10 sq. m for residential upper floors and 255.6 sq. m for the stilt. These are permit figures; the record does not provide a separate FSI-counted-area calculation.
The permit extract does not provide floor-by-floor apartment arrangements, footprint dimensions, lift or stair details, internal circulation plans, landscaping/open-space drawings, or a phase layout. Its recorded setbacks are Front 3.5 m, Rear 3.5 m, Side I 3.5 m and Side II 3.5 m.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 1BHK | 10 | 0 | 10 | 32.05 sq. m | Not available | Not supplied |
| 2BHK | 10 | 0 | 10 | 44.59 sq. m | Not available | Not supplied |
RERA saleable areas and unit counts are from the project’s unit record; booked and available counts are undated portal figures and should be treated as indicative.
Two floor-plan drawings were processed, but the supplied drawing record contains no usable measurements matched to the RERA-filed 1BHK or 2BHK configurations. It records a 3BHK measurement entry that is not matched to the RERA configurations and has been held back as implausible; it is not evidence of a 3BHK offering. No software-measured carpet area is therefore reported.
The RERA-filed saleable area is not presented as carpet area. No supplied record provides a carpet-area figure or loading calculation for these units.
5. Parking & vehicle circulation
The GHMC permit records 255.6 sq. m total parking area and states that approved stilt/cellar areas are to be used exclusively for vehicle parking. The building configuration specifies a stilt; the supplied extract does not identify a cellar as part of the configuration.
The available material does not state a sanctioned parking-space count, visitor or accessible parking provision, parking allocation by unit, or vehicle-entry, ramp and driveway arrangements. A parking area in a permit does not itself establish exclusive parking ownership or an allocation to a particular apartment.
6. Amenities, recreation & open spaces
The project record contains infrastructure and amenity fields, but the supplied evidence does not establish the delivery or independent completion of these facilities. The RERA-derived progress fields are 0% where recorded.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | No size or detail supplied | 0% in record; not independently verified | |
| Green strip / tot lot / park | No size or detail supplied | 0% in record; not independently verified | |
| Community buildings | No size or detail supplied | 0% in record; not independently verified | |
| Aggregate recreational open space | No area supplied | 0% in record; not independently verified |
No clubhouse, indoor recreation or sports facility is identified in the supplied RERA-derived amenity records. Marketing-source amenity claims are not used here as evidence of sanctioned or delivered facilities.
7. Utilities, building services & safety
The GHMC permit lists a rainwater-harvesting structure, space for a transformer and a garbage house; it specifies 2 Rain Water Harvesting Pits. The permit also requires a rainwater-harvesting structure and transformer space. These are permit provisions, not confirmation of installation or operation.
The project amenity record marks water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as available, but records 0% progress for the listed facilities. It does not provide system capacities, water source or storage details, STP or reuse specifications, electrical backup, lift details, fire-system design, security/access-control details or accessibility features.
The permit states that an occupancy fire NOC is to be obtained from the Director (EV&DM) before issue of an occupancy certificate, and that an occupancy certificate is compulsory before occupation. The supplied documents do not establish that these later-stage requirements have been completed.
8. Location, access & connectivity
The registered location is Kukatpally Village, Balanagar mandal, Medchal-Malkajgiri district, Telangana, PIN 500072. The building permit identifies the north boundary as a road and records an 18 mt. road width; it does not name that road in the supplied extract.
The supplied location record includes a parcel-centroid coordinate of 17.41528, 78.35459 and identifies Financial District (Nanakramguda) at 1.2 km. This is an anchor-distance entry; no route, travel time or independent access measurement is supplied.
9. Developer & development status
The registered promoter is SUNSHINE INFRA DEVELOPERS, recorded as a partnership, with GSTIN 36AEJFS2000M1Z1. The project record names M SATISH REDDY as authorised signatory and SRINIVAS RAO BETHAPUDI as partner. The supplied evidence does not include a verified registered-office address or official contact details.
The RERA record states proposed completion by 21/06/2025. No reliable construction-progress update or occupancy/completion certificate is supplied, so current completion and occupancy status cannot be confirmed from this overview’s evidence.
10. Approvals, official records & documents
TG-RERA registration: Form C registration certificate for SRI VASUDEVA RESIDENCY, registration P02200006132, issued 24/04/2023 and stated valid through 21/06/2025.
GHMC building permit: Permit 1967/GHMC/KPL/2022-BP, approved 21 June 2022; file no. 001038/GHMC/0550/KPL2/2022-BP. The permit extract describes one building with 1 Stilt + 5 upper floors.
Title and site records filed with RERA: Title-report documents include the 1995, 2019 and 2022 sale-deed chain; the project identity lists Survey Nos. 437, 438 and 439.
Encumbrance statements: Two encumbrance-statement documents are listed: 308736 and 317568.
Layout plan: A layout-plan document is listed, but its contents were not extracted.
Occupancy/completion evidence: No occupancy or completion certificate is listed in the supplied project documents.
Other RERA-filed material: A partially completed Agreement for Sale template is listed as document 308737.
Frequently asked questions
Is SRI VASUDEVA RESIDENCY registered with Telangana RERA?
Yes. SRI VASUDEVA RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02200006132; the registration status is New Project.
Who is the developer of SRI VASUDEVA RESIDENCY?
The promoter named in the RERA registration is SUNSHINE INFRA DEVELOPERS.
Where is SRI VASUDEVA RESIDENCY located?
SRI VASUDEVA RESIDENCY is in KUKATPALLY, Balanagar, Medchal-Malkajgiri, Telangana (500072).
When will SRI VASUDEVA RESIDENCY be completed?
The promoter's proposed date of completion filed with RERA is 21/06/2025. This is the promoter's declaration, not a guarantee.