Bhavyas Tulasivanam Avani
Bhavya constructions Pvt Ltd · Medchal-Malkajgiri · RERA P02200004672
BHAVYAS TULASIVANAM AVANI is a residential apartment project in Kukatpally, Balanagar, Medchal-Malkajgiri. The registered promoter is Bhavya Constructions Pvt Ltd. The project filing records a total area of 62496.67 sq. m, 10 building units (9 homes blocks and 1 amenity block), and 2,099 total units; the RERA-filed configurations are 654 2BHK and 1,441 3BHK homes. It is registered under TG-RERA number P02200004672, and the promoter’s Form B undertakes completion by 31 March 2027.
More from Bhavya constructions Pvt Ltd · 5 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | BHAVYAS TULASIVANAM AVANI RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | No separate phase name is disclosed. The registration is for this project; the filed registration certificate lists the project surveys below. |
| TG-RERA registration | P02200004672, issued 27 June 2022; registration validity stated as 27 June 2022–31 March 2027. RERA record |
| Registered promoter | Bhavya Constructions Pvt Ltd (also styled “M/s. Bhavya Constructions Private Limited” in filed documents). RERA record |
| RERA status | The supplied registration record shows the registration valid through 31 March 2027. This is the registration validity date, not the building-permit completion date or the status of occupancy certification. RERA record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | Kukatpally RERA record |
| Revenue village | The RERA certificate records Kukatpally as locality and does not state a revenue village. Building-permit and occupancy documents identify Baghameer and Kukatpally in their respective records; the revenue-village identity for the registered parcel is therefore not independently verified here. |
| Mandal | Balanagar in the project header; the permit documents record Kukatpally. The revenue mandal for the registered parcel is not independently verified here. RERA record |
| District / PIN | Medchal-Malkajgiri; 500072 RERA record |
| All survey numbers and subdivisions listed on the RERA certificate | 282 TO 285, 287, 288 P, 289, 290, 291 P, 296 P, 297 P, 299, 300 P, 315 P and 316 P |
| Additional survey numbers appearing in building-permit records | 282, 283, 284, 285, 287, 288 P, 289, 290, 291P, 292, 293, 294, 295P, 296P, 297P, 299, 300P, 315P and 316P in the 12 April 2022 permit; the 8 September 2022 revised permit additionally lists 317 and 318. These are identifiers recorded in those permit documents, not a replacement for the RERA certificate’s survey list. |
| Site area | The project filing records total area 62496.67 sq. m, affected area 10343.48 sq. m and net area 52153.19 sq. m. RERA filing |
| Boundaries | North: OTHERS LAND; South: OTHERS LAND; East: OTHRS LAND; West: OTHERS LAND. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building permit | Permit 2427/GHMC/KPL/2022-BP, dated 12 April 2022 Approvals record |
| Revised building permit | 3097/GHMC/KPL/2022-BP, dated 8 September 2022 Approvals record |
| Approved built-up area | The supplied project filing records 350888 sq. m as “Approved Built up Area.” The partial OC separately records built-up areas for its covered blocks. These are distinct record fields and are not added together here. RERA filing |
| Building count / organization | The project filing records 10 total building units (9 homes blocks and 1 amenity block). The revised permit describes residential Blocks A–L, including J, K and L, and two amenity buildings; the partial OC covers seven residential blocks. RERA filing RERA filing |
| Sanctioned floor configuration | The 12 April 2022 permit records Block A as 3 Cellar + 1 Ground + 22 upper floors, Blocks B and C and Blocks D–I as 1 Ground + 22 upper floors, and an amenities building as 1 Ground + 3 upper floors. The 8 September 2022 revised permit records Block A as 3 Cellar + 1 Stilt + 33 upper floors; Blocks B–I and K–L as 1 Stilt + 33 upper floors; Block J as 1 Stilt + 11 upper floors; and two amenity buildings as 1 Ground + 4 upper floors and 1 Ground + 2 upper floors. |
| Parking / sanctioned provision | The revised permit records Total Parking Area 169445.48 and 3 Cellar levels for Block A and 1 Stilt for other residential blocks. A number of parking spaces is not supplied in the extracted record. |
| Approved versus RERA-declared units | RERA filing: 2,099 total units, comprising 2,095 apartment units and four club-house entries that are not homes for sale. The supplied record also states 10 building units as per approved plan and 10 proposed building units as per agreement; an approved apartment-unit total is not separately supplied. RERA filing RERA unit table |
Offering and status
| Item | Record |
|---|---|
| RERA-filed configurations | 2BHK: 654; 3BHK: 1,441. RERA unit table RERA unit details |
| Filed saleable area | 2BHK: 127.88 sq. m; 3BHK: 174.94 sq. m. RERA unit table RERA unit details |
| Booked / available counts | 2BHK: 183 booked / 471 available; 3BHK: 600 booked / 841 available. Portal counts are indicative; the supplied record has no as-of date. RERA unit table RERA unit details |
| Construction stage | The RERA amenity-progress record reports percentages for listed works; it is not an independent site inspection. A partial occupancy certificate is recorded for Blocks A, B, C, D, G, H and I. RERA amenities |
| Completion dates | Promoter’s Form B undertakes completion by 31 March 2027. The building-permit record separately states construction to be completed before 12 April 2028 in the original permit and 8 September 2028 in the revised permit. |
| Occupancy certificate | Partial Occupancy Certificate 014111/GHMC/06510/SWOC/KPL1/2026, issued 1 May 2026, covers Blocks A, B, C, D, G, H and I. It is not an overall OC for every building in the project. |
2. The project story
BHAVYAS TULASIVANAM AVANI is a registered residential apartment development in Kukatpally, with a project-filed site area of 62496.67 sq. m and a net area of 52153.19 sq. m. Its residential organization is recorded as multiple blocks, alongside amenity buildings; the revised GHMC permit describes blocks with configurations ranging from a stilt and 11 upper floors to a stilt and 33 upper floors, with Block A having three cellar levels. RERA filing
The RERA filing lists 2BHK and 3BHK homes, with 783 booked units and 1,312 available units at the last portal read supplied. These counts have no recorded as-of date, so they should be treated as indicative rather than current inventory. The project unit table also contains four “CLUB HOUSE” entries; these are not apartments offered for sale. RERA unit table RERA unit details
The project is not simply at a proposed stage: a partial OC dated 1 May 2026 covers seven blocks—A, B, C, D, G, H and I—and an architect’s certificate records those same blocks as completed. The available evidence does not establish OC coverage for the remaining buildings. Separately, the promoter’s Form B gives a completion undertaking to 31 March 2027. These records describe different matters: the promoter’s project completion commitment and occupancy certification for a specified part of the development.
3. Master plan, architecture & building design
The RERA project information records 10 total building units, comprising nine residential blocks and one amenity block. The revised GHMC permit’s building schedule describes residential Blocks A–L and two amenity buildings. The supplied permit extraction does not provide a complete drawing-based account of building footprints, internal-road layout, floor-by-floor dwelling distribution, lifts, stairs, entries or exits. RERA filing RERA filing
The revised permit records total plot area 66327.27 sq. m, road-affected area 2812.47 sq. m, nala-affected area 0.0 sq. m and net plot area 63514.79 sq. m. The RERA project filing separately records total area 62496.67 sq. m, affected area 10343.48 sq. m and net area 52153.19 sq. m. These are reproduced as recorded in their respective documents; no reconciliation is attempted in this Overview. RERA filing
The permit’s extracted building schedule gives the following configuration: Block A, 3 Cellar + 1 Stilt + 33 upper floors; Blocks B–I and K–L, 1 Stilt + 33 upper floors; Block J, 1 Stilt + 11 upper floors; and two amenity buildings, 1 Ground + 4 upper floors and 1 Ground + 2 upper floors.
The RERA filing’s approved built-up-area field is 350888 sq. m. The partial OC gives separate total built-up areas for its seven covered blocks: A 41810.67 sq. metres; B 38052.63 sq. metres; C 32806.16 sq. metres; D 32850.93 sq. metres; G 32850.93 sq. metres; H 38502.63 sq. metres; and I 41810.67 sq. metres. These figures are reported in their source categories and should not be treated as carpet or saleable area. RERA filing
4. Homes, configurations & floor plans
The RERA filing lists 654 2BHK units and 1,441 3BHK units. Saleable area is the filed unit-area figure; the separate carpet-area figures below are software measurements from the approved floor-plan drawing geometry, not RERA disclosures. Software measurements need review against the drawing. Saleable area includes the home’s share of common areas and is not interchangeable with carpet area. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 654 | 183 | 471 | 127.88 sq. m | 72.7–114.0 sq. m; median 78.2 sq. m | 39% |
| 3BHK | 1,441 | 600 | 841 | 174.94 sq. m | 89.2–142.1 sq. m; median 113.1 sq. m | 35% |
The drawings include a 2BHK example with two bedrooms, living/dining, kitchen, two toilets and a balcony recorded as 1.53 M. WIDE BALC. A measured 3BHK example shows bedrooms, living/dining, kitchen, toilets and a utility area; the utility and balcony are excluded from the software-measured carpet area where identified by the drawing extraction. Room dimensions and extracted areas are drawing-based software measurements, not RERA-filed specifications. RERA unit details
The RERA unit table also lists four CLUB HOUSE entries of 1278.85 sq. m each. These are not counted as homes or as saleable residential configurations. RERA unit table RERA unit table
5. Parking & vehicle circulation
The revised GHMC permit records Total Parking Area 169445.48 and provides cellar/stilt parking levels in the building schedule. It does not state a number of parking spaces in the supplied extraction. The permit requires the approved cellar and stilt areas to be used exclusively for vehicle parking, without partition walls or rolling shutters.
The available records do not establish resident-versus-visitor allocation, accessible spaces, two-wheeler counts, mechanical parking, EV charging, ramp or driveway arrangements, pedestrian separation, or parking allotment for an individual unit. A stated parking area alone does not establish an exclusive parking right for a buyer.
6. Amenities, recreation & open spaces
The RERA progress record marks the listed facilities as available, but its percentage fields indicate reported progress rather than independent verification of completion. The revised building permit records tot-lot area 6778.26, 31 rain-water-harvesting pits, transformer space and a garbage house. RERA amenities
| Description / size | Amenity buildings are included in the revised permit; RERA unit table records four club-house entries of 1278.85 sq. m each. RERA unit table |
|---|---|
| Evidence source | GHMC permit; RERA unit filing |
| Declared progress / verified status | RERA reports community buildings at 75%; completion not independently verified. RERA amenities |
| Description / size | Revised permit records Tot Lot 6778.26. The original permit records Tot Lot 5568.03. |
|---|---|
| Evidence source | GHMC permit records |
| Declared progress / verified status | RERA reports 20%; completion not independently verified. RERA amenities |
| Description / size | No dimensions or detailed layout measurements supplied. RERA amenities |
|---|---|
| Evidence source | RERA progress record |
| Declared progress / verified status | 25% reported. RERA amenities |
| Description / size | No capacity or detailed system specification supplied. RERA amenities |
|---|---|
| Evidence source | RERA progress record |
| Declared progress / verified status | 15% reported. RERA amenities |
| Description / size | Permit conditions refer to fire-safety requirements and an occupancy Fire NOC before issue of an OC. |
|---|---|
| Evidence source | GHMC permit and RERA progress record |
| Declared progress / verified status | 50% reported; no project-wide completion verification supplied. RERA amenities |
| Description / size | Water supply, sewerage, street lighting, sewage/sullage treatment and disposal, solid-waste management, water conservation/rainwater harvesting, energy management, electrical meter room/sub-station/receiving station and aggregate recreational open space. RERA amenities |
|---|---|
| Evidence source | RERA progress record |
| Declared progress / verified status | Each is marked “YES” in the filing; each has 0% reported progress. This does not establish completed provision. RERA amenities |
7. Utilities, building services & safety
The building permit requires a rain-water-harvesting structure, transformer space and a garbage house; the revised permit records 31 rain-water-harvesting pits. The RERA progress filing lists water supply, sewerage/STP, storm-water drains, sewage treatment and disposal, solid-waste management, energy management and electrical meter room/sub-station/receiving station, but reports progress at 0% for those listed services. The supplied records do not establish capacities, water source or treatment details, STP reuse arrangements, electrical supply or backup capacity. RERA amenities
The permit requires sanitation, plumbing, fire safety, lifts and electrical installations to be carried out under qualified technical supervision. It also requires an occupancy Fire NOC before issue of an occupancy certificate. These are permit conditions, not evidence that every service or clearance has been completed across the whole project.
The supplied project records do not establish lift numbers or capacities, fire-system specifications, escape-stair arrangements, CCTV or access-control systems, accessibility routes or ramps. The partial OC and architect’s certificate support occupancy certification for their stated seven-block scope only.
8. Location, access & connectivity
The project is recorded in Kukatpally, PIN 500072, district Medchal-Malkajgiri. The RERA certificate identifies Kukatpally as locality; its supplied extract does not identify a revenue village. The building-permit documents identify Baghameer, while the partial OC identifies Kukatpally. RERA record
The supplied location record provides a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and one connectivity entry: Financial District (Nanakramguda), 1.2 km. No approach-road description, public-transport details or other independently supported distance measurements are supplied. Location record
9. Developer & development status
The registered promoter is Bhavya Constructions Pvt Ltd, a company, with GSTIN 36AAACB8482C1ZS. The RERA filing gives the promoter’s address as Bhavya’s Spoothi Bhavan, Road no. 92, KUKATPALLY, Balanagar, Medchal-Malkajgiri, 500072. Aditya Venigalla is identified in the supplied records as Managing Director and authorized signatory. Corporate record Parties record RERA record
The promoter’s Form B affidavit, dated 20 April 2022, declares a completion period of five years, ending 31 March 2027, and includes declarations about project funds, approvals and allotment. This is a promoter declaration, not an independent finding of construction progress.
The partial OC issued 1 May 2026 covers Blocks A, B, C, D, G, H and I. An architect’s certificate identifies the same blocks and states completion in all aspects. No corresponding project-wide OC evidence for all buildings is supplied.
10. Approvals, official records & documents
| Reference and scope | P02200004672; BHAVYAS TULASIVANAM AVANI; valid 27 June 2022–31 March 2027. |
|---|---|
| Evidence | TG-RERA Form C registration certificate |
| Reference and scope | 2427/GHMC/KPL/2022-BP, dated 12 April 2022; residential blocks and amenity building. |
|---|---|
| Evidence | Building Permit Order |
| Reference and scope | 3097/GHMC/KPL/2022-BP, dated 8 September 2022; revised building schedule. |
|---|---|
| Evidence | Revised Building Permit Order |
| Reference and scope | 014111/GHMC/06510/SWOC/KPL1/2026, dated 1 May 2026; Blocks A, B, C, D, G, H and I. |
|---|---|
| Evidence | Cyberabad Municipal Corporation Partial Occupancy Certificate |
| Reference and scope | Records the partial OC for Blocks A, B, C, D, G, H and I, dated 1 May 2026. |
|---|---|
| Evidence | Form–1A architect’s certificate |
| Reference and scope | Form B affidavit dated 20 April 2022, signed by Aditya Venigalla for Bhavya Constructions Private Limited. |
|---|---|
| Evidence | TG-RERA Form B |
| Reference and scope | The RERA filing lists layout plan document 235607, but the supplied record identifies it as a layout plan whose extraction is unavailable. Drawing-derived unit measurements are reported separately as software measurements. Floor plans |
|---|---|
| Evidence | RERA-filed layout-plan document |
The approvals and certificates above are the supplied project records. The building permits contain additional conditions; this overview summarizes the building configuration and key records rather than reproducing every condition.
1. Project at a glance
Project identity
Registered project name: BHAVYAS TULASIVANAM AVANI
Project type: Residential apartment project
Phase / registered portion: No separate phase name is disclosed. The registration is for this project; the filed registration certificate lists the project surveys below.
TG-RERA registration: P02200004672, issued 27 June 2022; registration validity stated as 27 June 2022–31 March 2027.
Registered promoter: Bhavya Constructions Pvt Ltd (also styled “M/s. Bhavya Constructions Private Limited” in filed documents).
RERA status: The supplied registration record shows the registration valid through 31 March 2027. This is the registration validity date, not the building-permit completion date or the status of occupancy certification.
Land and geographic identity
Locality: Kukatpally
Revenue village: The RERA certificate records Kukatpally as locality and does not state a revenue village. Building-permit and occupancy documents identify Baghameer and Kukatpally in their respective records; the revenue-village identity for the registered parcel is therefore not independently verified here.
Mandal: Balanagar in the project header; the permit documents record Kukatpally. The revenue mandal for the registered parcel is not independently verified here.
District / PIN: Medchal-Malkajgiri; 500072
All survey numbers and subdivisions listed on the RERA certificate: 282 TO 285, 287, 288 P, 289, 290, 291 P, 296 P, 297 P, 299, 300 P, 315 P and 316 P
Additional survey numbers appearing in building-permit records: 282, 283, 284, 285, 287, 288 P, 289, 290, 291P, 292, 293, 294, 295P, 296P, 297P, 299, 300P, 315P and 316P in the 12 April 2022 permit; the 8 September 2022 revised permit additionally lists 317 and 318. These are identifiers recorded in those permit documents, not a replacement for the RERA certificate’s survey list.
Site area: The project filing records total area 62496.67 sq. m, affected area 10343.48 sq. m and net area 52153.19 sq. m.
Boundaries: North: OTHERS LAND; South: OTHERS LAND; East: OTHRS LAND; West: OTHERS LAND.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building permit: Permit 2427/GHMC/KPL/2022-BP, dated 12 April 2022
Revised building permit: 3097/GHMC/KPL/2022-BP, dated 8 September 2022
Approved built-up area: The supplied project filing records 350888 sq. m as “Approved Built up Area.” The partial OC separately records built-up areas for its covered blocks. These are distinct record fields and are not added together here.
Building count / organization: The project filing records 10 total building units (9 homes blocks and 1 amenity block). The revised permit describes residential Blocks A–L, including J, K and L, and two amenity buildings; the partial OC covers seven residential blocks.
Sanctioned floor configuration: The 12 April 2022 permit records Block A as 3 Cellar + 1 Ground + 22 upper floors, Blocks B and C and Blocks D–I as 1 Ground + 22 upper floors, and an amenities building as 1 Ground + 3 upper floors. The 8 September 2022 revised permit records Block A as 3 Cellar + 1 Stilt + 33 upper floors; Blocks B–I and K–L as 1 Stilt + 33 upper floors; Block J as 1 Stilt + 11 upper floors; and two amenity buildings as 1 Ground + 4 upper floors and 1 Ground + 2 upper floors.
Parking / sanctioned provision: The revised permit records Total Parking Area 169445.48 and 3 Cellar levels for Block A and 1 Stilt for other residential blocks. A number of parking spaces is not supplied in the extracted record.
Approved versus RERA-declared units: RERA filing: 2,099 total units, comprising 2,095 apartment units and four club-house entries that are not homes for sale. The supplied record also states 10 building units as per approved plan and 10 proposed building units as per agreement; an approved apartment-unit total is not separately supplied.
Offering and status
RERA-filed configurations: 2BHK: 654; 3BHK: 1,441.
Filed saleable area: 2BHK: 127.88 sq. m; 3BHK: 174.94 sq. m.
Booked / available counts: 2BHK: 183 booked / 471 available; 3BHK: 600 booked / 841 available. Portal counts are indicative; the supplied record has no as-of date.
Construction stage: The RERA amenity-progress record reports percentages for listed works; it is not an independent site inspection. A partial occupancy certificate is recorded for Blocks A, B, C, D, G, H and I.
Completion dates: Promoter’s Form B undertakes completion by 31 March 2027. The building-permit record separately states construction to be completed before 12 April 2028 in the original permit and 8 September 2028 in the revised permit.
Occupancy certificate: Partial Occupancy Certificate 014111/GHMC/06510/SWOC/KPL1/2026, issued 1 May 2026, covers Blocks A, B, C, D, G, H and I. It is not an overall OC for every building in the project.
2. The project story
BHAVYAS TULASIVANAM AVANI is a registered residential apartment development in Kukatpally, with a project-filed site area of 62496.67 sq. m and a net area of 52153.19 sq. m. Its residential organization is recorded as multiple blocks, alongside amenity buildings; the revised GHMC permit describes blocks with configurations ranging from a stilt and 11 upper floors to a stilt and 33 upper floors, with Block A having three cellar levels.
The RERA filing lists 2BHK and 3BHK homes, with 783 booked units and 1,312 available units at the last portal read supplied. These counts have no recorded as-of date, so they should be treated as indicative rather than current inventory. The project unit table also contains four “CLUB HOUSE” entries; these are not apartments offered for sale.
The project is not simply at a proposed stage: a partial OC dated 1 May 2026 covers seven blocks—A, B, C, D, G, H and I—and an architect’s certificate records those same blocks as completed. The available evidence does not establish OC coverage for the remaining buildings. Separately, the promoter’s Form B gives a completion undertaking to 31 March 2027. These records describe different matters: the promoter’s project completion commitment and occupancy certification for a specified part of the development.
3. Master plan, architecture & building design
The RERA project information records 10 total building units, comprising nine residential blocks and one amenity block. The revised GHMC permit’s building schedule describes residential Blocks A–L and two amenity buildings. The supplied permit extraction does not provide a complete drawing-based account of building footprints, internal-road layout, floor-by-floor dwelling distribution, lifts, stairs, entries or exits.
The revised permit records total plot area 66327.27 sq. m, road-affected area 2812.47 sq. m, nala-affected area 0.0 sq. m and net plot area 63514.79 sq. m. The RERA project filing separately records total area 62496.67 sq. m, affected area 10343.48 sq. m and net area 52153.19 sq. m. These are reproduced as recorded in their respective documents; no reconciliation is attempted in this Overview.
The permit’s extracted building schedule gives the following configuration: Block A, 3 Cellar + 1 Stilt + 33 upper floors; Blocks B–I and K–L, 1 Stilt + 33 upper floors; Block J, 1 Stilt + 11 upper floors; and two amenity buildings, 1 Ground + 4 upper floors and 1 Ground + 2 upper floors.
The RERA filing’s approved built-up-area field is 350888 sq. m. The partial OC gives separate total built-up areas for its seven covered blocks: A 41810.67 sq. metres; B 38052.63 sq. metres; C 32806.16 sq. metres; D 32850.93 sq. metres; G 32850.93 sq. metres; H 38502.63 sq. metres; and I 41810.67 sq. metres. These figures are reported in their source categories and should not be treated as carpet or saleable area.
4. Homes, configurations & floor plans
The RERA filing lists 654 2BHK units and 1,441 3BHK units. Saleable area is the filed unit-area figure; the separate carpet-area figures below are software measurements from the approved floor-plan drawing geometry, not RERA disclosures. Software measurements need review against the drawing. Saleable area includes the home’s share of common areas and is not interchangeable with carpet area.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 654 | 183 | 471 | 127.88 sq. m | 72.7–114.0 sq. m; median 78.2 sq. m | 39% |
| 3BHK | 1,441 | 600 | 841 | 174.94 sq. m | 89.2–142.1 sq. m; median 113.1 sq. m | 35% |
The drawings include a 2BHK example with two bedrooms, living/dining, kitchen, two toilets and a balcony recorded as 1.53 M. WIDE BALC. A measured 3BHK example shows bedrooms, living/dining, kitchen, toilets and a utility area; the utility and balcony are excluded from the software-measured carpet area where identified by the drawing extraction. Room dimensions and extracted areas are drawing-based software measurements, not RERA-filed specifications.
The RERA unit table also lists four CLUB HOUSE entries of 1278.85 sq. m each. These are not counted as homes or as saleable residential configurations.
5. Parking & vehicle circulation
The revised GHMC permit records Total Parking Area 169445.48 and provides cellar/stilt parking levels in the building schedule. It does not state a number of parking spaces in the supplied extraction. The permit requires the approved cellar and stilt areas to be used exclusively for vehicle parking, without partition walls or rolling shutters.
The available records do not establish resident-versus-visitor allocation, accessible spaces, two-wheeler counts, mechanical parking, EV charging, ramp or driveway arrangements, pedestrian separation, or parking allotment for an individual unit. A stated parking area alone does not establish an exclusive parking right for a buyer.
6. Amenities, recreation & open spaces
The RERA progress record marks the listed facilities as available, but its percentage fields indicate reported progress rather than independent verification of completion. The revised building permit records tot-lot area 6778.26, 31 rain-water-harvesting pits, transformer space and a garbage house.
| Description / size | Amenity buildings are included in the revised permit; RERA unit table records four club-house entries of 1278.85 sq. m each. |
|---|---|
| Evidence source | GHMC permit; RERA unit filing |
| Declared progress / verified status | RERA reports community buildings at 75%; completion not independently verified. |
| Description / size | Revised permit records Tot Lot 6778.26. The original permit records Tot Lot 5568.03. |
|---|---|
| Evidence source | GHMC permit records |
| Declared progress / verified status | RERA reports 20%; completion not independently verified. |
| Description / size | No dimensions or detailed layout measurements supplied. |
|---|---|
| Evidence source | RERA progress record |
| Declared progress / verified status | 25% reported. |
| Description / size | No capacity or detailed system specification supplied. |
|---|---|
| Evidence source | RERA progress record |
| Declared progress / verified status | 15% reported. |
| Description / size | Permit conditions refer to fire-safety requirements and an occupancy Fire NOC before issue of an OC. |
|---|---|
| Evidence source | GHMC permit and RERA progress record |
| Declared progress / verified status | 50% reported; no project-wide completion verification supplied. |
| Description / size | Water supply, sewerage, street lighting, sewage/sullage treatment and disposal, solid-waste management, water conservation/rainwater harvesting, energy management, electrical meter room/sub-station/receiving station and aggregate recreational open space. |
|---|---|
| Evidence source | RERA progress record |
| Declared progress / verified status | Each is marked “YES” in the filing; each has 0% reported progress. This does not establish completed provision. |
7. Utilities, building services & safety
The building permit requires a rain-water-harvesting structure, transformer space and a garbage house; the revised permit records 31 rain-water-harvesting pits. The RERA progress filing lists water supply, sewerage/STP, storm-water drains, sewage treatment and disposal, solid-waste management, energy management and electrical meter room/sub-station/receiving station, but reports progress at 0% for those listed services. The supplied records do not establish capacities, water source or treatment details, STP reuse arrangements, electrical supply or backup capacity.
The permit requires sanitation, plumbing, fire safety, lifts and electrical installations to be carried out under qualified technical supervision. It also requires an occupancy Fire NOC before issue of an occupancy certificate. These are permit conditions, not evidence that every service or clearance has been completed across the whole project.
The supplied project records do not establish lift numbers or capacities, fire-system specifications, escape-stair arrangements, CCTV or access-control systems, accessibility routes or ramps. The partial OC and architect’s certificate support occupancy certification for their stated seven-block scope only.
8. Location, access & connectivity
The project is recorded in Kukatpally, PIN 500072, district Medchal-Malkajgiri. The RERA certificate identifies Kukatpally as locality; its supplied extract does not identify a revenue village. The building-permit documents identify Baghameer, while the partial OC identifies Kukatpally.
The supplied location record provides a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and one connectivity entry: Financial District (Nanakramguda), 1.2 km. No approach-road description, public-transport details or other independently supported distance measurements are supplied.
9. Developer & development status
The registered promoter is Bhavya Constructions Pvt Ltd, a company, with GSTIN 36AAACB8482C1ZS. The RERA filing gives the promoter’s address as Bhavya’s Spoothi Bhavan, Road no. 92, KUKATPALLY, Balanagar, Medchal-Malkajgiri, 500072. Aditya Venigalla is identified in the supplied records as Managing Director and authorized signatory.
The promoter’s Form B affidavit, dated 20 April 2022, declares a completion period of five years, ending 31 March 2027, and includes declarations about project funds, approvals and allotment. This is a promoter declaration, not an independent finding of construction progress.
The partial OC issued 1 May 2026 covers Blocks A, B, C, D, G, H and I. An architect’s certificate identifies the same blocks and states completion in all aspects. No corresponding project-wide OC evidence for all buildings is supplied.
10. Approvals, official records & documents
| Reference and scope | P02200004672; BHAVYAS TULASIVANAM AVANI; valid 27 June 2022–31 March 2027. |
|---|---|
| Evidence | TG-RERA Form C registration certificate |
| Reference and scope | 2427/GHMC/KPL/2022-BP, dated 12 April 2022; residential blocks and amenity building. |
|---|---|
| Evidence | Building Permit Order |
| Reference and scope | 3097/GHMC/KPL/2022-BP, dated 8 September 2022; revised building schedule. |
|---|---|
| Evidence | Revised Building Permit Order |
| Reference and scope | 014111/GHMC/06510/SWOC/KPL1/2026, dated 1 May 2026; Blocks A, B, C, D, G, H and I. |
|---|---|
| Evidence | Cyberabad Municipal Corporation Partial Occupancy Certificate |
| Reference and scope | Records the partial OC for Blocks A, B, C, D, G, H and I, dated 1 May 2026. |
|---|---|
| Evidence | Form–1A architect’s certificate |
| Reference and scope | Form B affidavit dated 20 April 2022, signed by Aditya Venigalla for Bhavya Constructions Private Limited. |
|---|---|
| Evidence | TG-RERA Form B |
| Reference and scope | The RERA filing lists layout plan document 235607, but the supplied record identifies it as a layout plan whose extraction is unavailable. Drawing-derived unit measurements are reported separately as software measurements. |
|---|---|
| Evidence | RERA-filed layout-plan document |
The approvals and certificates above are the supplied project records. The building permits contain additional conditions; this overview summarizes the building configuration and key records rather than reproducing every condition.
Frequently asked questions
Is BHAVYAS TULASIVANAM AVANI registered with Telangana RERA?
Yes. BHAVYAS TULASIVANAM AVANI is registered with the Telangana Real Estate Regulatory Authority as P02200004672; the registration status is New Project.
Who is the developer of BHAVYAS TULASIVANAM AVANI?
The promoter named in the RERA registration is Bhavya constructions Pvt Ltd.
Where is BHAVYAS TULASIVANAM AVANI located?
BHAVYAS TULASIVANAM AVANI is in KUKATPALLY, Balanagar, Medchal-Malkajgiri, Telangana (500072).
When will BHAVYAS TULASIVANAM AVANI be completed?
The promoter's proposed date of completion filed with RERA is 31/03/2027. This is the promoter's declaration, not a guarantee.