Sri Sai Nilayam 3 is a residential apartment project in Gajularamaram, Kukatpally, Medchal-Malkajgiri District. It is being developed by Naidu Constructions, identified in the filing as a partnership. The project has a registered site extent of 668.75 m² and one proposed residential building with 1 Stilt + 5 upper floors, comprising 20 2BHK apartments. Its TG-RERA registration number is P02500004263, and its declared completion date is 30/06/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | Sri Sai Nilayam 3 RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | The registration identifies the project and its land; no separate phase name or phase number is disclosed. |
| TG-RERA registration / status | P02500004263, Form C; issued 14/03/2022; valid from 14/03/2022 through 30/06/2025. The registration record states no extension. RERA record |
| Registered promoter | Naidu Constructions, identified in the filing as a partnership. RERA filing Corporate record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Gajularamaram; the Form B declaration also describes the land as at “SHIRIDI HILLS.” RERA record |
| Revenue village | Gajularamaram Village. RERA record |
| Mandal | The RERA registration certificate records Kukatpally; the Form B declaration describes the land as within GHMC Quthbullapur Circle and Mandal. The supplied records therefore do not give a single consistent mandal description. |
| District / PIN | The project header records Hyderabad, Telangana, 500072; the RERA certificate gives Medchal-Malkajgiri District and PIN 500072. RERA record |
| Project survey numbers | 271, 272, 289 to 294 and 296. RERA record |
| Plot identifiers | 244 Part South Side, 244 Part North Side, 245, 252 and 253. RERA filing |
| Registered site extent | 668.75 m²; the Form B declaration describes the land as 799.99 Sq Yds. RERA filing |
| Total / net area and road-affected area | The project filing records total and net area of 668.75 m² and affected area 0. The GHMC building permit records a Road affected area (m²) 5 and states that the road-affected portion is to be surrendered to GHMC; see Approvals for the filed permit details. RERA filing |
| Boundaries | East: 30 ft Wide Road; West: 40 ft Wide Road; North: Plot Nos 243 and 254; South: Plot Nos 246 and 251. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building permit | Approval No. 2/C26/07744/2021; File No. 2/C26/06780/2021; dated 21 June, 2021. Approvals record |
| Approved building configuration | One proposed residential building: 1 Stilt + 5 upper floors. |
| Approved built-up area | 2172.20 sq. m. as recorded in the project filing. RERA filing |
| Building / block count | The RERA filing records one building; the permit identifies “Building - PROPOSED-1 (BLDG).” RERA filing |
| Parking floors / area | The permit records Parking floors Area (m2) 344.88; a sanctioned parking-space count is not established in the supplied records. |
| Units | The RERA filing records 20 apartments, all classified as 2BHK; 20 available and 0 booked in the portal data supplied. Counts are indicative: the portal record has no as-of date. RERA unit table RERA unit details |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration and area | 2BHK, 20 units; filed saleable area 32.19 m² per unit. RERA unit table RERA unit details |
| Booked / available | 0 booked / 20 available in the supplied TG-RERA portal snapshot; no snapshot date is provided. RERA unit table RERA unit details |
| Declared completion date | 30/06/2025, stated in the RERA registration and promoter’s Form B completion undertaking. RERA record |
| Construction stage | No independently verified current site-progress percentage is supplied. The project’s Form 1A architect certificate states that construction work is complete, but does not provide occupancy-certificate details. |
| Occupancy certificate | No occupancy certificate number or issuing authority is identified in the supplied documents; the Form 1A occupancy-certificate details table is blank. |
2. The project story
Sri Sai Nilayam 3 is filed with TG-RERA as a residential apartment project in Gajularamaram Village, described in the promoter’s Form B as “SHIRIDI HILLS.” Its registered land schedule covers survey numbers 271, 272, 289 to 294 and 296, and plot portions identified as 244 Part South Side, 244 Part North Side, 245, 252 and 253. RERA record
The GHMC permit describes one proposed residential building with 1 Stilt + 5 upper floors on a site of 668.75 m². The RERA filing lists 20 apartments, all 2BHK. The portal snapshot shows all 20 as available, but it has no stated as-of date. RERA unit table
For status, the promoter undertook in Form B to complete the project before 30th June 2025. A filed architect’s Form 1A says construction work is complete in all aspects; this is a certificate filed with RERA, not independent site verification. Its occupancy-certificate details are blank, and the supplied evidence does not identify an issued OC.
3. Master plan, architecture & building design
The GHMC building permit describes one residential building, “Building - PROPOSED-1 (BLDG),” with 1 Stilt + 5 upper floors, a permitted height of 14.95 m, and site area of 668.75 m². The project filing separately records approved built-up area of 2172.20 sq. m. The permit also lists Parking floors Area (m2) 344.88. These are distinct filed measures; no FSI-counted area, apartment carpet area, or floor-by-floor unit arrangement is established in the supplied evidence. RERA filing
The permit records a compound wall of 95.4 RM and 30 Trees. It lists No. of RWHPs 10, a transformer space and a garbage house among the site provisions. The supplied material does not establish the detailed building footprint, flats per floor, lift or stair arrangements, or internal circulation layout.
The RERA filing includes two floor-plan drawings, but the supplied drawing analysis reports no measured flat designs for the matched 2BHK configuration. Accordingly, no room layout or drawing-derived carpet measurement is available to report. Floor plans
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 32.19 m² | Not measured | Not supplied |
The 2BHK unit count, booking figures and saleable area are from the RERA filing; the portal record gives no as-of date for the booking snapshot. No software-measured carpet area is available for the matched 2BHK drawings. Saleable area and carpet area are different measures, and the supplied records do not quantify any common-area loading. RERA unit table RERA unit details Floor plans
5. Parking & vehicle circulation
The building permit records a parking-floor area of 344.88 m². The supplied project records do not establish the sanctioned number of car or two-wheeler spaces, visitor or accessible bays, parking allocation to individual apartments, or the arrangements for vehicle entry, ramps and internal driveways. A parking-space count or exclusive unit entitlement cannot be inferred from the area alone.
6. Amenities, recreation & open spaces
The RERA amenities record lists 14 infrastructure and facility categories. Each item’s progress percentage is recorded as 0 in the supplied data; that is a portal-field value, not independent verification of site condition. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | Size not supplied | TG-RERA amenities record RERA amenities | 0%; not independently verified |
| Water Supply | Listed as YES; capacity and source not supplied | TG-RERA amenities record RERA amenities | 0%; not independently verified |
| Sewerage (Chamber, Lines, Septic Tank, STP) | Listed as YES; capacity not supplied | TG-RERA amenities record RERA amenities | 0%; not independently verified |
| Storm Water Drains | Size not supplied | TG-RERA amenities record RERA amenities | 0%; not independently verified |
| Green Strip/TOT LOT/Park | Size not supplied | TG-RERA amenities record RERA amenities; GHMC permit also lists tot-lot and 30 trees | 0% in amenities record; delivery not independently verified |
| Street Lighting | Details not supplied | TG-RERA amenities record RERA amenities | 0%; not independently verified |
| Community Buildings | Type and size not supplied | TG-RERA amenities record RERA amenities | 0%; not independently verified |
| Treatment and Disposal of Sewage and Sullage Water | System details not supplied | TG-RERA amenities record RERA amenities | 0%; not independently verified |
| Solid Waste Management and Disposal | System details not supplied | TG-RERA amenities record RERA amenities | 0%; not independently verified |
| Water Conservation, Rain Water Harvesting | Listed as YES; permit specifies 10 RWHPs | TG-RERA amenities record RERA amenities | 0% in amenities record; not independently verified |
| Energy management | Details not supplied | TG-RERA amenities record RERA amenities | 0%; not independently verified |
| Fire Protection and Fire Safety Requirements | System details not supplied | TG-RERA amenities record RERA amenities | 0%; not independently verified |
| Electrical Meter Room, Sub-Station, Receiving Station | Listed as YES; capacity not supplied | TG-RERA amenities record RERA amenities | 0%; not independently verified |
| Aggregate area of recreational Open Space | Area not supplied | TG-RERA amenities record RERA amenities | 0%; not independently verified |
7. Utilities, building services & safety
The RERA amenities record lists water supply and sewerage as YES, and also lists storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management, and water conservation/rainwater harvesting. It gives no water source, storage or treatment capacity, STP capacity, reuse arrangements, or drainage specifications. RERA amenities
The GHMC permit requires construction of a rainwater-harvesting structure (percolation pit), provision of transformer space, and a garbage house within the premises; it also lists 10 RWHPs. The RERA amenities record lists an electrical meter room/sub-station/receiving station as YES, but no electrical capacity or backup specification is supplied there. RERA amenities
Fire protection and fire-safety requirements are listed in the RERA amenities record. The permit states that an occupancy Fire NOC is to be obtained from the Director (EV&DM) before issue of an Occupancy Certificate. The supplied records do not establish that the NOC or an OC has been issued. Lift provision, lift capacity, escape-stair details, CCTV, access control and accessibility features are not established in the RERA-filed material supplied for this overview. RERA amenities
8. Location, access & connectivity
The project is registered at Gajularamaram, PIN 500072; the Form B declaration describes the site as “SHIRIDI HILLS.” The project boundary schedule identifies a 30 ft Wide Road on the east and a 40 ft Wide Road on the west. The GHMC permit refers to 18 mt. road widths; this overview does not infer a specific approach route from that entry. RERA record RERA filing
No public-transport routes, verified distances to landmarks or measured connectivity data are supplied in the project’s TG-RERA records provided here. The third-party listing material is not used to establish project connectivity. Location record
9. Developer & development status
The registered promoter is Naidu Constructions, identified in the RERA filing as a Partnership. The supplied corporate identifier is GSTIN 36AAFFN2403B1ZY. The project’s RERA certificate gives a promoter-office location entry of Village: blank, Mandal: Kukatpally, District: Medchal-Malkajgiri, PIN 500072; the promoter information also gives an address at Plot No. 1330, 1331, Shirdi Hills, Gajularamaram. No official website or project contact details are supplied. Corporate record RERA filing
In its Form B declaration, Naidu Constructions states that it entered a Development Agreement-cum-General Power of Attorney dated 7 April 2021, Document No. 13028 of 2021, with the named landlords and undertook completion before 30th June 2025. The declaration is the promoter’s filed statement. Separately, the architect’s Form 1A certificate states that construction work is complete in all aspects; the evidence supplied does not include an occupancy-certificate number or issuing authority.
10. Approvals, official records & documents
| Identifier / date | P02500004263, Form C; issued 14/03/2022; validity stated through 30/06/2025 |
|---|---|
| What the supplied record establishes | Registration for Sri Sai Nilayam 3; no extension is recorded in the supplied certificate. |
| Identifier / date | Approval No. 2/C26/07744/2021; File No. 2/C26/06780/2021; 21 June, 2021 |
|---|---|
| What the supplied record establishes | Permit for one residential building of 1 Stilt + 5 upper floors on a stated site area of 668.75 m². |
| Identifier / date | 3/15B/11024/2017 |
|---|---|
| What the supplied record establishes | Number recorded in the GHMC permit. |
| Identifier / date | Declaration date shown as “— day of December 2021” |
|---|---|
| What the supplied record establishes | Promoter’s declaration describing the land, development agreement-cum-GPA and completion undertaking. |
| Identifier / date | Project registration P02500004263 |
|---|---|
| What the supplied record establishes | States that construction work is complete in all aspects; the OC details table is blank. |
| Identifier / date | Documents 202219, 202220, 202221, 202222, 202223 |
|---|---|
| What the supplied record establishes | Filed title-report materials include development and sale instruments and a GHMC mortgage deed. |
| Identifier / date | Statement 59795575 |
|---|---|
| What the supplied record establishes | Searched Quthbullapur SRO records from 01-10-2007 to 13-06-2021; the supplied statement lists registered transactions for the property schedule. |
The supplied evidence does not include an issued occupancy certificate. The GHMC permit states that an Occupancy Certificate is compulsory before occupation and requires an occupancy Fire NOC before issue of the certificate.
1. Project at a glance
Project identity
Registered name: Sri Sai Nilayam 3
Project type: Residential apartment project
Phase / registered portion: The registration identifies the project and its land; no separate phase name or phase number is disclosed.
TG-RERA registration / status: P02500004263, Form C; issued 14/03/2022; valid from 14/03/2022 through 30/06/2025. The registration record states no extension.
Registered promoter: Naidu Constructions, identified in the filing as a partnership.
Land and geographic identity
Locality: Gajularamaram; the Form B declaration also describes the land as at “SHIRIDI HILLS.”
Revenue village: Gajularamaram Village.
Mandal: The RERA registration certificate records Kukatpally; the Form B declaration describes the land as within GHMC Quthbullapur Circle and Mandal. The supplied records therefore do not give a single consistent mandal description.
District / PIN: The project header records Hyderabad, Telangana, 500072; the RERA certificate gives Medchal-Malkajgiri District and PIN 500072.
Project survey numbers: 271, 272, 289 to 294 and 296.
Plot identifiers: 244 Part South Side, 244 Part North Side, 245, 252 and 253.
Registered site extent: 668.75 m²; the Form B declaration describes the land as 799.99 Sq Yds.
Total / net area and road-affected area: The project filing records total and net area of 668.75 m² and affected area 0. The GHMC building permit records a Road affected area (m²) 5 and states that the road-affected portion is to be surrendered to GHMC; see Approvals for the filed permit details.
Boundaries: East: 30 ft Wide Road; West: 40 ft Wide Road; North: Plot Nos 243 and 254; South: Plot Nos 246 and 251.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building permit: Approval No. 2/C26/07744/2021; File No. 2/C26/06780/2021; dated 21 June, 2021.
Approved building configuration: One proposed residential building: 1 Stilt + 5 upper floors.
Approved built-up area: 2172.20 sq. m. as recorded in the project filing.
Building / block count: The RERA filing records one building; the permit identifies “Building - PROPOSED-1 (BLDG).”
Parking floors / area: The permit records Parking floors Area (m2) 344.88; a sanctioned parking-space count is not established in the supplied records.
Units: The RERA filing records 20 apartments, all classified as 2BHK; 20 available and 0 booked in the portal data supplied. Counts are indicative: the portal record has no as-of date.
Offering and status
RERA-filed configuration and area: 2BHK, 20 units; filed saleable area 32.19 m² per unit.
Booked / available: 0 booked / 20 available in the supplied TG-RERA portal snapshot; no snapshot date is provided.
Declared completion date: 30/06/2025, stated in the RERA registration and promoter’s Form B completion undertaking.
Construction stage: No independently verified current site-progress percentage is supplied. The project’s Form 1A architect certificate states that construction work is complete, but does not provide occupancy-certificate details.
Occupancy certificate: No occupancy certificate number or issuing authority is identified in the supplied documents; the Form 1A occupancy-certificate details table is blank.
2. The project story
Sri Sai Nilayam 3 is filed with TG-RERA as a residential apartment project in Gajularamaram Village, described in the promoter’s Form B as “SHIRIDI HILLS.” Its registered land schedule covers survey numbers 271, 272, 289 to 294 and 296, and plot portions identified as 244 Part South Side, 244 Part North Side, 245, 252 and 253.
The GHMC permit describes one proposed residential building with 1 Stilt + 5 upper floors on a site of 668.75 m². The RERA filing lists 20 apartments, all 2BHK. The portal snapshot shows all 20 as available, but it has no stated as-of date.
For status, the promoter undertook in Form B to complete the project before 30th June 2025. A filed architect’s Form 1A says construction work is complete in all aspects; this is a certificate filed with RERA, not independent site verification. Its occupancy-certificate details are blank, and the supplied evidence does not identify an issued OC.
3. Master plan, architecture & building design
The GHMC building permit describes one residential building, “Building - PROPOSED-1 (BLDG),” with 1 Stilt + 5 upper floors, a permitted height of 14.95 m, and site area of 668.75 m². The project filing separately records approved built-up area of 2172.20 sq. m. The permit also lists Parking floors Area (m2) 344.88. These are distinct filed measures; no FSI-counted area, apartment carpet area, or floor-by-floor unit arrangement is established in the supplied evidence.
The permit records a compound wall of 95.4 RM and 30 Trees. It lists No. of RWHPs 10, a transformer space and a garbage house among the site provisions. The supplied material does not establish the detailed building footprint, flats per floor, lift or stair arrangements, or internal circulation layout.
The RERA filing includes two floor-plan drawings, but the supplied drawing analysis reports no measured flat designs for the matched 2BHK configuration. Accordingly, no room layout or drawing-derived carpet measurement is available to report.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 32.19 m² | Not measured | Not supplied |
The 2BHK unit count, booking figures and saleable area are from the RERA filing; the portal record gives no as-of date for the booking snapshot. No software-measured carpet area is available for the matched 2BHK drawings. Saleable area and carpet area are different measures, and the supplied records do not quantify any common-area loading.
5. Parking & vehicle circulation
The building permit records a parking-floor area of 344.88 m². The supplied project records do not establish the sanctioned number of car or two-wheeler spaces, visitor or accessible bays, parking allocation to individual apartments, or the arrangements for vehicle entry, ramps and internal driveways. A parking-space count or exclusive unit entitlement cannot be inferred from the area alone.
6. Amenities, recreation & open spaces
The RERA amenities record lists 14 infrastructure and facility categories. Each item’s progress percentage is recorded as 0 in the supplied data; that is a portal-field value, not independent verification of site condition.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | Size not supplied | TG-RERA amenities record | 0%; not independently verified |
| Water Supply | Listed as YES; capacity and source not supplied | TG-RERA amenities record | 0%; not independently verified |
| Sewerage (Chamber, Lines, Septic Tank, STP) | Listed as YES; capacity not supplied | TG-RERA amenities record | 0%; not independently verified |
| Storm Water Drains | Size not supplied | TG-RERA amenities record | 0%; not independently verified |
| Green Strip/TOT LOT/Park | Size not supplied | TG-RERA amenities record; GHMC permit also lists tot-lot and 30 trees | 0% in amenities record; delivery not independently verified |
| Street Lighting | Details not supplied | TG-RERA amenities record | 0%; not independently verified |
| Community Buildings | Type and size not supplied | TG-RERA amenities record | 0%; not independently verified |
| Treatment and Disposal of Sewage and Sullage Water | System details not supplied | TG-RERA amenities record | 0%; not independently verified |
| Solid Waste Management and Disposal | System details not supplied | TG-RERA amenities record | 0%; not independently verified |
| Water Conservation, Rain Water Harvesting | Listed as YES; permit specifies 10 RWHPs | TG-RERA amenities record | 0% in amenities record; not independently verified |
| Energy management | Details not supplied | TG-RERA amenities record | 0%; not independently verified |
| Fire Protection and Fire Safety Requirements | System details not supplied | TG-RERA amenities record | 0%; not independently verified |
| Electrical Meter Room, Sub-Station, Receiving Station | Listed as YES; capacity not supplied | TG-RERA amenities record | 0%; not independently verified |
| Aggregate area of recreational Open Space | Area not supplied | TG-RERA amenities record | 0%; not independently verified |
7. Utilities, building services & safety
The RERA amenities record lists water supply and sewerage as YES, and also lists storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management, and water conservation/rainwater harvesting. It gives no water source, storage or treatment capacity, STP capacity, reuse arrangements, or drainage specifications.
The GHMC permit requires construction of a rainwater-harvesting structure (percolation pit), provision of transformer space, and a garbage house within the premises; it also lists 10 RWHPs. The RERA amenities record lists an electrical meter room/sub-station/receiving station as YES, but no electrical capacity or backup specification is supplied there.
Fire protection and fire-safety requirements are listed in the RERA amenities record. The permit states that an occupancy Fire NOC is to be obtained from the Director (EV&DM) before issue of an Occupancy Certificate. The supplied records do not establish that the NOC or an OC has been issued. Lift provision, lift capacity, escape-stair details, CCTV, access control and accessibility features are not established in the RERA-filed material supplied for this overview.
8. Location, access & connectivity
The project is registered at Gajularamaram, PIN 500072; the Form B declaration describes the site as “SHIRIDI HILLS.” The project boundary schedule identifies a 30 ft Wide Road on the east and a 40 ft Wide Road on the west. The GHMC permit refers to 18 mt. road widths; this overview does not infer a specific approach route from that entry.
No public-transport routes, verified distances to landmarks or measured connectivity data are supplied in the project’s TG-RERA records provided here. The third-party listing material is not used to establish project connectivity.
9. Developer & development status
The registered promoter is Naidu Constructions, identified in the RERA filing as a Partnership. The supplied corporate identifier is GSTIN 36AAFFN2403B1ZY. The project’s RERA certificate gives a promoter-office location entry of Village: blank, Mandal: Kukatpally, District: Medchal-Malkajgiri, PIN 500072; the promoter information also gives an address at Plot No. 1330, 1331, Shirdi Hills, Gajularamaram. No official website or project contact details are supplied.
In its Form B declaration, Naidu Constructions states that it entered a Development Agreement-cum-General Power of Attorney dated 7 April 2021, Document No. 13028 of 2021, with the named landlords and undertook completion before 30th June 2025. The declaration is the promoter’s filed statement. Separately, the architect’s Form 1A certificate states that construction work is complete in all aspects; the evidence supplied does not include an occupancy-certificate number or issuing authority.
10. Approvals, official records & documents
| Identifier / date | P02500004263, Form C; issued 14/03/2022; validity stated through 30/06/2025 |
|---|---|
| What the supplied record establishes | Registration for Sri Sai Nilayam 3; no extension is recorded in the supplied certificate. |
| Identifier / date | Approval No. 2/C26/07744/2021; File No. 2/C26/06780/2021; 21 June, 2021 |
|---|---|
| What the supplied record establishes | Permit for one residential building of 1 Stilt + 5 upper floors on a stated site area of 668.75 m². |
| Identifier / date | 3/15B/11024/2017 |
|---|---|
| What the supplied record establishes | Number recorded in the GHMC permit. |
| Identifier / date | Declaration date shown as “— day of December 2021” |
|---|---|
| What the supplied record establishes | Promoter’s declaration describing the land, development agreement-cum-GPA and completion undertaking. |
| Identifier / date | Project registration P02500004263 |
|---|---|
| What the supplied record establishes | States that construction work is complete in all aspects; the OC details table is blank. |
| Identifier / date | Documents 202219, 202220, 202221, 202222, 202223 |
|---|---|
| What the supplied record establishes | Filed title-report materials include development and sale instruments and a GHMC mortgage deed. |
| Identifier / date | Statement 59795575 |
|---|---|
| What the supplied record establishes | Searched Quthbullapur SRO records from 01-10-2007 to 13-06-2021; the supplied statement lists registered transactions for the property schedule. |
The supplied evidence does not include an issued occupancy certificate. The GHMC permit states that an Occupancy Certificate is compulsory before occupation and requires an occupancy Fire NOC before issue of the certificate.
Frequently asked questions
Is Sri Sai Nilayam 3 registered with Telangana RERA?
Yes. Sri Sai Nilayam 3 is registered with the Telangana Real Estate Regulatory Authority as P02500004263; the registration status is New Project.
Who is the developer of Sri Sai Nilayam 3?
The promoter named in the RERA registration is Naidu Constructions.
Where is Sri Sai Nilayam 3 located?
Sri Sai Nilayam 3 is in Gajularamaram, Hyderabad, Telangana (500072).
When will Sri Sai Nilayam 3 be completed?
The promoter's proposed date of completion filed with RERA is 30/06/2025. This is the promoter's declaration, not a guarantee.