Srees Sadhguru Sadan
SREES DEVELOPERS · Medchal-Malkajgiri · RERA P02200002002
SREES SADHGURU SADAN is a residential apartment project in MALKAJGIRI, Qutballapur mandal, Medchal-Malkajgiri district, developed by the registered promoter SREES DEVELOPERS. The site area is 585.2 sq.m, and the project comprises one residential building, BHAGAVAN-1, sanctioned as 1 Stilt + 5 upper floors. It has 15 DOUBLE BED ROOM apartments, each with a saleable area of 99.09 sq.m. The project is registered under TG-RERA number P02200002002, with a proposed completion date of 16/10/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | SREES SADHGURU SADAN RERA record |
| Project type / use | Residential apartment project RERA filing |
| Phase / registered portion | Phase not stated; registration is for the project identified by survey numbers below. |
| TG-RERA registration | P02200002002, issued 06/07/2020; the certificate records validity through 16/10/2025. Registration validity is distinct from the project completion deadline. |
| Registered promoter | SREES DEVELOPERS; the registration certificate spells the name Srees Developers. Entity type in the project identity record: partnership. RERA filing Corporate record |
| RERA status | The supplied certificate records the registration term above; no extension is recorded in the supplied material. Current registration status is not established by these records. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Locality: MALKAJGIRI; revenue village: Malkajgiri in the project identity record. The GHMC building-permit extraction identifies Gajularamaram as the village/locality. The project’s village/site identity should be checked against the underlying cadastral and sanctioned records. RERA record RERA filing |
| Mandal / district / PIN | Mandal: Qutballapur (also shown as QUTHBULLAPUR); district: Medchal-Malkajgiri; PIN: 500055. RERA record RERA filing |
| Project survey numbers | 271, 272, 289, 290, 291, 292, 293, 294 and 296; the TG-RERA certificate groups these as 271, 272, 289 to 294, 296. No subdivision numbers are supplied in the project identity record. Land records |
| Plot / site extent | Plot 355; total site area 585.2 sq.m. The filed land record states 36.58 sq.m affected by road widening/FTL/nala widening and 548.62 sq.m net area. RERA filing |
| Boundaries (RERA land record) | East: 60 WIDE ROAD; west: 344 345; north: 356; south: 354. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building permit | Approval no. 2/C26/14903/2019; file no. 2/C26/22234/2018; approved 16 October, 2019. Approvals record |
| Approved built-up area | The permit extraction lists “Proposed Covered builtup area 80,465.00”; the supplied extraction does not state a unit for this figure. |
| Building count / arrangement | One residential building, identified in the permit as BHAGAVAN-1. |
| Sanctioned floors / height | 1 Stilt + 5 upper floors; sanctioned height 14.75 m. The extraction does not separately describe a basement or podium. |
| Approved versus RERA-declared homes | The project record lists 15 apartment units; the building permit says the sanctioned number of units must not be increased, but the supplied permit extraction does not state its unit count. RERA unit table RERA filing |
| Parking | The supplied extracts do not establish a sanctioned parking count, parking level allocation or unit-by-unit parking allocation. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | DOUBLE BED ROOM (normalized as 2BHK): 15 units. RERA unit table RERA unit details |
| RERA-filed saleable area | 99.09 sq.m per unit. RERA unit table RERA unit details |
| Booked / available | Portal-derived count: 0 booked; 15 available. The portal record has no as-of date, so these counts are indicative. RERA unit table RERA unit details |
| Declared completion date | The project header and registration record state 16/10/2025 as the proposed completion date. The Form B declaration separately records an undertaking to complete by 30.05.2021. RERA record |
| Construction stage | No current, independently verified construction-progress record is supplied. The permit records “Floor handed over: 2nd Floor; Area (m2) 114.95,” but this is not evidence here of overall completion or occupancy. |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The GHMC permit states that an Occupancy Certificate is compulsory before occupation. |
2. The project story
SREES SADHGURU SADAN is recorded as a residential apartment development comprising one building, BHAGAVAN-1, sanctioned by GHMC as 1 Stilt + 5 upper floors. The project is associated in the RERA filing with Plot 355 and survey numbers 271, 272, 289, 290, 291, 292, 293, 294 and 296. RERA record
The RERA unit record describes 15 two-bedroom apartments, each with a filed saleable area of 99.09 sq.m. Booking figures read from the portal show no bookings and 15 available units, but the record has no as-of date. RERA unit table RERA unit details
The supplied evidence does not establish the present construction stage or confirm completion. The building permit contains a floor-handover entry, while the RERA certificate and permit set out completion/occupancy requirements; neither item establishes that the project has received an occupancy certificate.
3. Master plan, architecture & building design
The permit extraction lists proposed covered built-up area as 80,465.00, without a unit in the supplied extraction. No floor-by-floor plans, building footprint, flats-per-floor arrangement, lift or stair details, or measured carpet areas are available in the supplied drawing-derived records. The floor-plan set contains two drawings, but none was measured and the records show no flats extracted from them. Floor plans
The permit lists two rainwater-harvesting structures, 25 trees, transformer space, a garbage house and a tot-lot entry of 0 m2. It also requires a strip of peripheral greenery and says the tot-lot is to be fenced and maintained as greenery before occupancy certification. These are permit-recorded requirements, not evidence that the works have been completed.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK (filed as DOUBLE BED ROOM) | 15 | 0 | 15 | 99.09 sq.m | Not measured from supplied drawings | Not supplied |
The drawing set has not yielded software-measured carpet or room dimensions. Carpet area, if established from drawings, would be a drawing measurement rather than a RERA-filed figure; it should not be treated as interchangeable with saleable area, which may include a share of common areas. RERA unit table RERA unit details Floor plans
5. Parking & vehicle circulation
A parking count, parking levels and allocation by apartment are not established in the supplied GHMC permit extraction or RERA unit record. The project record marks the units as mortgaged, but this does not establish parking entitlement or exclusive allocation. No parking layout, vehicle ramp, visitor-parking or accessible-parking details are supplied. RERA unit table RERA unit table
6. Amenities, recreation & open spaces
| Description / size | Permit lists tot-lot 0 m2 and requires fencing and maintenance as greenery before occupancy certification. |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Requirement recorded; completion not verified. |
| Description / size | Strip of greenery around the site is to be maintained as per rules. |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Requirement recorded; completion not verified. |
| Description / size | 2 rainwater-harvesting structures; permit specifies a percolation pit. |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Required by permit; completion not verified. |
| Description / size | Space for a transformer to be provided within the site. |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Requirement recorded; completion not verified. |
| Description / size | Garbage house to be made within the premises. |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Requirement recorded; completion not verified. |
| Description / size | RERA amenity record lists internal roads and footpaths, water supply, sewerage, storm-water drains, street lighting, community buildings, sewage/sullage treatment and disposal, solid-waste management, water conservation, energy management, fire protection, electrical meter/sub-station/receiving station and recreational open space. Each item is recorded at 0% in the supplied record. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Declared progress shown as 0%; independent site verification not supplied. RERA amenities |
7. Utilities, building services & safety
The GHMC permit requires rainwater harvesting, transformer space, a garbage house and an ETP “as per standard specification.” The RERA amenity record includes water supply, sewerage, storm-water drainage, sewage/sullage treatment, solid-waste management, energy management, fire safety and electrical infrastructure, each with 0% progress in the supplied record. No capacities, completed-service evidence, or operating details are provided. RERA amenities
For building safety, the permit requires compliance with the sanctioned plan, provides that an Occupancy Certificate is compulsory before occupation, and includes conditions concerning construction-worker safety and insurance. It does not, in the supplied extraction, provide detailed fire-system specifications, lift information, emergency-access arrangements or accessibility details.
8. Location, access & connectivity
The project identity record places the site in Malkajgiri, Qutballapur mandal, Medchal-Malkajgiri district, PIN 500055. The GHMC permit identifies Gajularamaram as the village/locality and records the site as Plot 355. These location identifiers are reproduced as recorded; the supplied evidence does not provide a verified approach-road description or a detailed public-transport and landmark inventory. RERA record RERA filing
The building permit records an 18 mt. road width and an eastern boundary described in the land record as 60 WIDE ROAD. The location dataset supplies a cadastral parcel centroid of 17.41528, 78.35459 and a distance of 1.2 km to Financial District (Nanakramguda); this is not a RERA-filed distance. RERA filing Location record
9. Developer & development status
The registered promoter is SREES DEVELOPERS, identified as a partnership in the RERA project information. The supplied records name Subrahamanya Ganeswara Rao Sirigineedi and Venkata Krishna Bhagavan Pichikala as authorized signatories. No corporate registration number, verified registered office address, official project website or project contact details are supplied here. Corporate record Parties record RERA filing
The Form B declaration is dated 25 November 2019, names S S Ganeswara Rao as Managing Partner of Sri Developers, and records a completion undertaking of 30.05.2021. The TG-RERA certificate records a proposed completion date of 16/10/2025. These are promoter/RERA-recorded declarations and dates; no current progress certification or occupancy certificate is supplied. RERA record
10. Approvals, official records & documents
| Identifier / date | P02200002002; issued 06/07/2020; certificate records validity through 16/10/2025 |
|---|---|
| What the supplied evidence establishes | Registration of SREES SADHGURU SADAN under section 5 and stated registration conditions. |
| Identifier / date | Approval 2/C26/14903/2019; file 2/C26/22234/2018; approved 16 October, 2019 |
|---|---|
| What the supplied evidence establishes | Building permission for a residential building with 1 stilt and 5 upper floors at the identified site. |
| Identifier / date | Dated 25 November 2019 |
|---|---|
| What the supplied evidence establishes | Promoter declaration concerning title, encumbrances, project completion, separate-account and other obligations. |
| Identifier / date | Document 91561, dated 19-01-2020 |
|---|---|
| What the supplied evidence establishes | A title investigation report is listed in the RERA-filed project documents; detailed title assessment is addressed in the title review. |
| Identifier / date | Document 88955 |
|---|---|
| What the supplied evidence establishes | The supplied record identifies a request for a stamped layout approval or layout plan, but the document is not extracted as a verified approval. Document index |
| Identifier / date | Not supplied |
|---|---|
| What the supplied evidence establishes | The permit states that an Occupancy Certificate is compulsory before occupation; the supplied documents do not establish issuance. |
1. Project at a glance
Project identity
Registered project name: SREES SADHGURU SADAN
Project type / use: Residential apartment project
Phase / registered portion: Phase not stated; registration is for the project identified by survey numbers below.
TG-RERA registration: P02200002002, issued 06/07/2020; the certificate records validity through 16/10/2025. Registration validity is distinct from the project completion deadline.
Registered promoter: SREES DEVELOPERS; the registration certificate spells the name Srees Developers. Entity type in the project identity record: partnership.
RERA status: The supplied certificate records the registration term above; no extension is recorded in the supplied material. Current registration status is not established by these records.
Land and geographic identity
Locality / revenue village: Locality: MALKAJGIRI; revenue village: Malkajgiri in the project identity record. The GHMC building-permit extraction identifies Gajularamaram as the village/locality. The project’s village/site identity should be checked against the underlying cadastral and sanctioned records.
Mandal / district / PIN: Mandal: Qutballapur (also shown as QUTHBULLAPUR); district: Medchal-Malkajgiri; PIN: 500055.
Project survey numbers: 271, 272, 289, 290, 291, 292, 293, 294 and 296; the TG-RERA certificate groups these as 271, 272, 289 to 294, 296. No subdivision numbers are supplied in the project identity record.
Plot / site extent: Plot 355; total site area 585.2 sq.m. The filed land record states 36.58 sq.m affected by road widening/FTL/nala widening and 548.62 sq.m net area.
Boundaries (RERA land record): East: 60 WIDE ROAD; west: 344 345; north: 356; south: 354.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building permit: Approval no. 2/C26/14903/2019; file no. 2/C26/22234/2018; approved 16 October, 2019.
Approved built-up area: The permit extraction lists “Proposed Covered builtup area 80,465.00”; the supplied extraction does not state a unit for this figure.
Building count / arrangement: One residential building, identified in the permit as BHAGAVAN-1.
Sanctioned floors / height: 1 Stilt + 5 upper floors; sanctioned height 14.75 m. The extraction does not separately describe a basement or podium.
Approved versus RERA-declared homes: The project record lists 15 apartment units; the building permit says the sanctioned number of units must not be increased, but the supplied permit extraction does not state its unit count.
Parking: The supplied extracts do not establish a sanctioned parking count, parking level allocation or unit-by-unit parking allocation.
Offering and status
RERA-filed configuration: DOUBLE BED ROOM (normalized as 2BHK): 15 units.
RERA-filed saleable area: 99.09 sq.m per unit.
Booked / available: Portal-derived count: 0 booked; 15 available. The portal record has no as-of date, so these counts are indicative.
Declared completion date: The project header and registration record state 16/10/2025 as the proposed completion date. The Form B declaration separately records an undertaking to complete by 30.05.2021.
Construction stage: No current, independently verified construction-progress record is supplied. The permit records “Floor handed over: 2nd Floor; Area (m2) 114.95,” but this is not evidence here of overall completion or occupancy.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The GHMC permit states that an Occupancy Certificate is compulsory before occupation.
2. The project story
SREES SADHGURU SADAN is recorded as a residential apartment development comprising one building, BHAGAVAN-1, sanctioned by GHMC as 1 Stilt + 5 upper floors. The project is associated in the RERA filing with Plot 355 and survey numbers 271, 272, 289, 290, 291, 292, 293, 294 and 296.
The RERA unit record describes 15 two-bedroom apartments, each with a filed saleable area of 99.09 sq.m. Booking figures read from the portal show no bookings and 15 available units, but the record has no as-of date.
The supplied evidence does not establish the present construction stage or confirm completion. The building permit contains a floor-handover entry, while the RERA certificate and permit set out completion/occupancy requirements; neither item establishes that the project has received an occupancy certificate.
3. Master plan, architecture & building design
The permit extraction lists proposed covered built-up area as 80,465.00, without a unit in the supplied extraction. No floor-by-floor plans, building footprint, flats-per-floor arrangement, lift or stair details, or measured carpet areas are available in the supplied drawing-derived records. The floor-plan set contains two drawings, but none was measured and the records show no flats extracted from them.
The permit lists two rainwater-harvesting structures, 25 trees, transformer space, a garbage house and a tot-lot entry of 0 m2. It also requires a strip of peripheral greenery and says the tot-lot is to be fenced and maintained as greenery before occupancy certification. These are permit-recorded requirements, not evidence that the works have been completed.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK (filed as DOUBLE BED ROOM) | 15 | 0 | 15 | 99.09 sq.m | Not measured from supplied drawings | Not supplied |
The drawing set has not yielded software-measured carpet or room dimensions. Carpet area, if established from drawings, would be a drawing measurement rather than a RERA-filed figure; it should not be treated as interchangeable with saleable area, which may include a share of common areas.
5. Parking & vehicle circulation
A parking count, parking levels and allocation by apartment are not established in the supplied GHMC permit extraction or RERA unit record. The project record marks the units as mortgaged, but this does not establish parking entitlement or exclusive allocation. No parking layout, vehicle ramp, visitor-parking or accessible-parking details are supplied.
6. Amenities, recreation & open spaces
| Description / size | Permit lists tot-lot 0 m2 and requires fencing and maintenance as greenery before occupancy certification. |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Requirement recorded; completion not verified. |
| Description / size | Strip of greenery around the site is to be maintained as per rules. |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Requirement recorded; completion not verified. |
| Description / size | 2 rainwater-harvesting structures; permit specifies a percolation pit. |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Required by permit; completion not verified. |
| Description / size | Space for a transformer to be provided within the site. |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Requirement recorded; completion not verified. |
| Description / size | Garbage house to be made within the premises. |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Requirement recorded; completion not verified. |
| Description / size | RERA amenity record lists internal roads and footpaths, water supply, sewerage, storm-water drains, street lighting, community buildings, sewage/sullage treatment and disposal, solid-waste management, water conservation, energy management, fire protection, electrical meter/sub-station/receiving station and recreational open space. Each item is recorded at 0% in the supplied record. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Declared progress shown as 0%; independent site verification not supplied. |
7. Utilities, building services & safety
The GHMC permit requires rainwater harvesting, transformer space, a garbage house and an ETP “as per standard specification.” The RERA amenity record includes water supply, sewerage, storm-water drainage, sewage/sullage treatment, solid-waste management, energy management, fire safety and electrical infrastructure, each with 0% progress in the supplied record. No capacities, completed-service evidence, or operating details are provided.
For building safety, the permit requires compliance with the sanctioned plan, provides that an Occupancy Certificate is compulsory before occupation, and includes conditions concerning construction-worker safety and insurance. It does not, in the supplied extraction, provide detailed fire-system specifications, lift information, emergency-access arrangements or accessibility details.
8. Location, access & connectivity
The project identity record places the site in Malkajgiri, Qutballapur mandal, Medchal-Malkajgiri district, PIN 500055. The GHMC permit identifies Gajularamaram as the village/locality and records the site as Plot 355. These location identifiers are reproduced as recorded; the supplied evidence does not provide a verified approach-road description or a detailed public-transport and landmark inventory.
The building permit records an 18 mt. road width and an eastern boundary described in the land record as 60 WIDE ROAD. The location dataset supplies a cadastral parcel centroid of 17.41528, 78.35459 and a distance of 1.2 km to Financial District (Nanakramguda); this is not a RERA-filed distance.
9. Developer & development status
The registered promoter is SREES DEVELOPERS, identified as a partnership in the RERA project information. The supplied records name Subrahamanya Ganeswara Rao Sirigineedi and Venkata Krishna Bhagavan Pichikala as authorized signatories. No corporate registration number, verified registered office address, official project website or project contact details are supplied here.
The Form B declaration is dated 25 November 2019, names S S Ganeswara Rao as Managing Partner of Sri Developers, and records a completion undertaking of 30.05.2021. The TG-RERA certificate records a proposed completion date of 16/10/2025. These are promoter/RERA-recorded declarations and dates; no current progress certification or occupancy certificate is supplied.
10. Approvals, official records & documents
| Identifier / date | P02200002002; issued 06/07/2020; certificate records validity through 16/10/2025 |
|---|---|
| What the supplied evidence establishes | Registration of SREES SADHGURU SADAN under section 5 and stated registration conditions. |
| Identifier / date | Approval 2/C26/14903/2019; file 2/C26/22234/2018; approved 16 October, 2019 |
|---|---|
| What the supplied evidence establishes | Building permission for a residential building with 1 stilt and 5 upper floors at the identified site. |
| Identifier / date | Dated 25 November 2019 |
|---|---|
| What the supplied evidence establishes | Promoter declaration concerning title, encumbrances, project completion, separate-account and other obligations. |
| Identifier / date | Document 91561, dated 19-01-2020 |
|---|---|
| What the supplied evidence establishes | A title investigation report is listed in the RERA-filed project documents; detailed title assessment is addressed in the title review. |
| Identifier / date | Document 88955 |
|---|---|
| What the supplied evidence establishes | The supplied record identifies a request for a stamped layout approval or layout plan, but the document is not extracted as a verified approval. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied evidence establishes | The permit states that an Occupancy Certificate is compulsory before occupation; the supplied documents do not establish issuance. |
Frequently asked questions
Is SREES SADHGURU SADAN registered with Telangana RERA?
Yes. SREES SADHGURU SADAN is registered with the Telangana Real Estate Regulatory Authority as P02200002002; the registration status is New Project.
Who is the developer of SREES SADHGURU SADAN?
The promoter named in the RERA registration is SREES DEVELOPERS.
Where is SREES SADHGURU SADAN located?
SREES SADHGURU SADAN is in MALKAJGIRI, Qutballapur, Medchal-Malkajgiri, Telangana (500055).
When will SREES SADHGURU SADAN be completed?
The promoter's proposed date of completion filed with RERA is 16/10/2025. This is the promoter's declaration, not a guarantee.