South Asian Chateau Block -I
SOUTH ASIAN INFRASTRUCTURE · Medchal-Malkajgiri · RERA P02200006137
SOUTH ASIAN CHATEAU BLOCK -I is a residential apartment project in Kapra Circle, Kapra, Kapra, Medchal-Malkajgiri. The registered promoter is SOUTH ASIAN INFRASTRUCTURE, identified as a partnership. The project covers 548.60 sq m and comprises one building with 1 Stilt + 5 upper floors and 10 3BHK apartments, each with a recorded saleable area of 165.23 sq m. It is registered with TG-RERA as P02200006137, with a proposed completion date of 20/06/2025.
More from South Asian Infrastructure · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SOUTH ASIAN CHATEAU BLOCK -I RERA record |
| Project type / use | Residential apartment project RERA record |
| Phase / registered portion | Block-I; the certificate identifies the registered project as SOUTH ASIAN CHATEAU BLOCK-I. A more detailed phase boundary is not stated. RERA record |
| TG-RERA registration | P02200006137; granted 24/04/2023, stated validity to 20/06/2025. The certificate says validity may be extended by the Authority; the supplied certificate records no extension. RERA record |
| Registered promoter | SOUTH ASIAN INFRASTRUCTURE; identified in the project record as a partnership. RERA record Corporate record |
| RERA status | The supplied record gives the registration and its validity period, but does not establish a current registration status. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / village | Kapra Circle; revenue village is recorded as Kapra. The building-permit extraction also names Khapra. RERA record RERA filing |
| Mandal / district / PIN | Kapra / Medchal-Malkajgiri / 500056. The registration certificate separately records Malkajgiri as mandal. RERA record |
| Survey numbers | 612 and 618, as listed in the TG-RERA project record and registration certificate; the GHMC building permit refers to survey numbers 612 TO 618. RERA filing |
| Plot reference | Plot Nos. 51 and 52 NORTHERN PART. RERA filing |
| Registered site area | Total area 548.60 sq m; net area 548.60 sq m; road-widening/FTL/nala-affected area recorded as 0 sq m. The building-permit extraction states plot and net plot area of 548.6 sq m. RERA filing |
| Boundaries | North: Plot No. 50; South: southern part of Plot No. 52; East: Plot Nos. 55 and 56; West: 30 feet wide road. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building approval | Building Permit Order 1951/GHMC/LBN/2022-BP, approved 20 June 2022; file no. 005219/GHMC/2609/LBN2/2022-BP. Approvals record |
| Approved built-up area | 1,383.80 sq m for residential upper floors, as extracted from the permit. Stilt parking area is separately recorded as 276.8 sq m. RERA filing |
| Building and floors | One building is recorded; GHMC permits 1 Stilt + 5 upper floors, with building height stated as 14.75. RERA filing |
| Parking | Permit extract records total parking area of 276.8 sq m and stilt parking. Parking-space count and unit-by-unit allocation are not supplied. |
| Unit counts | GHMC record: one total building unit and one proposed building unit, as recorded in the project fields. TG-RERA filing: 10 apartments. RERA filing RERA unit table |
Offering and status
| Field | Record |
|---|---|
| Configuration | TG-RERA records 10 3BHK apartments. RERA unit table |
| RERA-filed saleable area | 165.23 sq m per recorded 3BHK configuration. RERA unit table |
| Booked / available | 0 booked and 10 available in the portal snapshot supplied; no snapshot as-of date is provided, so these counts are indicative. RERA unit table |
| Construction stage | No independently verified site-progress status is supplied. The project record is labelled “New Project”; this is not a construction-stage assessment. RERA record |
| Completion deadline | The RERA certificate and promoter Form B state 20/06/2025 as the completion date. |
| Occupancy / completion certificate | The supplied building-permit extraction records completion certification as false and says an Occupancy Certificate is required before occupation. This does not establish whether any later certificate has been issued. |
2. The project story
SOUTH ASIAN CHATEAU BLOCK -I is a residential apartment development registered with TG-RERA for land identified as Plot Nos. 51 and 52 NORTHERN PART and survey numbers 612 and 618 in Kapra, Medchal-Malkajgiri. The GHMC building permit describes a residential building of 1 Stilt + 5 upper floors on a 548.6 sq m site. RERA record RERA filing
The TG-RERA filing records ten 3BHK apartments, with 165.23 sq m saleable area per unit. The supplied registration record sets a completion date of 20 June 2025; the supplied evidence does not verify construction progress or establish that the building has since received an Occupancy Certificate. The permit states that an Occupancy Certificate is required before occupation. RERA unit table
3. Master plan, architecture & building design
The GHMC building permit describes one residential building, 1 Stilt + 5 upper floors, with a height recorded as 14.75. It lists a 548.6 sq m plot area, 548.6 sq m net plot area and 1,383.80 sq m residential upper-floor area. The stilt parking area is separately stated as 276.8 sq m; these figures are distinct entries in the permit extraction.
The permit extraction also lists four setbacks—front, rear and both sides—of 3.5 m each, and requires tree planting around the site perimeter and in front of the premises. It specifies a transformer space, a garbage house and a rainwater-harvesting structure; the extracted permit details two rainwater-harvesting pits. The supplied material does not provide a readable architectural plan sufficient to establish floor-by-floor flat arrangement, footprint, lifts, stairs, internal circulation or open-space dimensions.
The permit references approved layout no. 2478/MP2/HUDA/96. The project record says no LP number is present in the RERA record; a public HMDA DPMS layout lookup was unavailable in the supplied evidence. HMDA
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 165.23 sq m | Not supplied | Not supplied |
The unit type, count, bookings and saleable area above are from the TG-RERA filing; the booking snapshot has no supplied as-of date. RERA unit table
The supplied floor-plan measurement record relates to a 2BHK drawing configuration, which is not listed as a TG-RERA configuration for this project. Software measurement of those drawings gives a carpet-area median of 95.4 sq m, with a range of 90.4–101.5 sq m across six measured designs. These are drawing-based software measurements, not RERA-filed carpet areas, and do not establish the area of the filed 3BHK units. Floor plans RERA unit details
Carpet area, balcony or utility area, and saleable area are different area measures. The supplied material does not provide a measured carpet area, balcony or utility dimensions, or loading figure for the TG-RERA-filed 3BHK configuration. RERA unit table Floor plans
5. Parking & vehicle circulation
The GHMC permit records 276.8 sq m of total parking area and identifies stilt parking. It also states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not converted or partitioned for other uses.
No parking-space count, visitor or accessible parking provision, two-wheeler count, ramp or driveway arrangement, EV charging provision, or unit-specific parking allocation is established by the supplied evidence. A parking area in the permit does not by itself establish an exclusive allocation to a particular apartment.
6. Amenities, recreation & open spaces
The TG-RERA amenities record lists 14 infrastructure and facility categories. All listed progress percentages are 0%; the record therefore does not establish completion. “YES” entries are filed availability indications, not independent verification of delivery. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | No dimensions supplied. | TG-RERA amenities record RERA amenities | 0%; completion not verified. |
| Green Strip / TOT LOT / Park | Permit requires peripheral greenery and identifies tot-lot maintenance as a condition; the permit extraction also records “Tot-lot NA.” No area is supplied. | RERA amenities | 0% in amenities record; completion not verified. |
| Community Buildings | Listed; no facility description or size supplied. | RERA amenities | 0%; completion not verified. |
| Street Lighting | Listed; no quantity supplied. | RERA amenities | 0%; completion not verified. |
The available project record does not provide a substantiated clubhouse, indoor recreation, sports-facility or convenience-facility schedule. RERA amenities Document index
7. Utilities, building services & safety
| Evidence in the project record | Listed as available in the TG-RERA amenities record; the permit says public water connections will be provided only on production of an Occupancy Certificate. No source, storage or treatment capacity is supplied. RERA amenities |
|---|---|
| Status / limitation | Amenities progress recorded as 0%; delivery is not verified. |
| Evidence in the project record | Sewerage (including chamber, lines, septic tank and STP), storm-water drains, and treatment/disposal of sewage and sullage water are listed. No capacities or system design are supplied. RERA amenities |
|---|---|
| Status / limitation | Progress recorded as 0%; operation or completion is not verified. |
| Evidence in the project record | Listed in the amenities record; the permit requires a rainwater-harvesting structure and specifies two pits. RERA amenities |
|---|---|
| Status / limitation | Progress recorded as 0%; installation is not verified. |
| Evidence in the project record | Energy management and an electrical meter room/sub-station/receiving station are listed. The permit requires space for a transformer. No supply or backup capacity is supplied. RERA amenities |
|---|---|
| Status / limitation | Progress recorded as 0%; installation is not verified. |
| Evidence in the project record | Fire protection and fire-safety requirements are listed. The permit requires an Occupancy Fire NOC before an Occupancy Certificate and assigns responsibility for fire-fighting installations and means-of-escape safety. RERA amenities |
|---|---|
| Status / limitation | No Fire NOC or completed-system evidence is supplied. |
| Evidence in the project record | Solid-waste management and disposal are listed; the permit requires a garbage house within the premises. RERA amenities |
|---|---|
| Status / limitation | Progress recorded as 0%; completion is not verified. |
| Evidence in the project record | The permit refers to lifts as a building service to be executed under qualified technical supervision, but supplies no number or capacity. No project-specific accessible circulation details are supplied. |
|---|---|
| Status / limitation | Design particulars and installed status are not established. |
The building permit sets conditions for construction to follow the sanctioned plan and for specified completion, structural-stability and safety documents to be submitted for Occupancy Certificate processing. The supplied evidence does not establish that these later-stage documents or clearances have been issued.
8. Location, access & connectivity
The registered project location is Kapra Circle, Kapra, Medchal-Malkajgiri, Telangana, PIN 500056. The project record identifies survey numbers 612 and 618; the cadastral parcel centroid supplied is 17.49709, 78.54401, labelled as a software geocode rather than a surveyed project boundary. RERA record RERA filing Cadastral map
The project boundaries identify a 30 feet wide road to the west. A location dataset gives the nearest sampled Outer Ring Road interchange at approximately 5.1 km. No route, travel time, public-transport service or other measured landmark distance is supplied. RERA filing Location record
9. Developer & development status
The registered promoter is SOUTH ASIAN INFRASTRUCTURE, identified in the project record as a partnership, with GSTIN 36AEMFS0213D1ZE. The record gives a Kapra Circle, Kapra, Medchal-Malkajgiri address and PIN 500056. It lists GOWTHAM SAI KOPPISETTY as Authorized Signatory and SAI CHARAN SINGAM as Partner. No official promoter website or contact details are supplied. Corporate record Parties record RERA record
The promoter’s Form B declaration dated 11 December 2022 states a completion undertaking of 20 June 2025. The TG-RERA registration certificate also records that completion date. The supplied evidence does not include an independently verified construction-progress report or establish the current OC status.
10. Approvals, official records & documents
| Reference and scope | P02200006137; Form C; project SOUTH ASIAN CHATEAU BLOCK-I; validity stated as 24/04/2023–20/06/2025. |
|---|---|
| Evidence / limitation | Certificate supplied; no extension is recorded in it. |
| Reference and scope | 1951/GHMC/LBN/2022-BP; file no. 005219/GHMC/2609/LBN2/2022-BP; approved 20 June 2022. |
|---|---|
| Evidence / limitation | Permit extraction covers residential construction of 1 Stilt + 5 upper floors. |
| Reference and scope | 2478/MP2/HUDA/96. |
|---|---|
| Evidence / limitation | Appears in the building-permit extraction; public HMDA DPMS lookup was unavailable in the supplied evidence. HMDA |
| Reference and scope | Form B for SOUTH ASIAN CHATEAU BLOCK-I, dated 11 December 2022. |
|---|---|
| Evidence / limitation | Includes promoter declarations about title authentication, encumbrances, project funds and completion date. |
| Reference and scope | Permit requires an Occupancy Certificate before occupation. |
|---|---|
| Evidence / limitation | No issued Occupancy Certificate or completion certificate is included in the supplied project documents; the permit extraction records completion certification as false. |
1. Project at a glance
Project identity
Registered project name: SOUTH ASIAN CHATEAU BLOCK -I
Project type / use: Residential apartment project
Phase / registered portion: Block-I; the certificate identifies the registered project as SOUTH ASIAN CHATEAU BLOCK-I. A more detailed phase boundary is not stated.
TG-RERA registration: P02200006137; granted 24/04/2023, stated validity to 20/06/2025. The certificate says validity may be extended by the Authority; the supplied certificate records no extension.
Registered promoter: SOUTH ASIAN INFRASTRUCTURE; identified in the project record as a partnership.
RERA status: The supplied record gives the registration and its validity period, but does not establish a current registration status.
Land and geographic identity
Locality / village: Kapra Circle; revenue village is recorded as Kapra. The building-permit extraction also names Khapra.
Mandal / district / PIN: Kapra / Medchal-Malkajgiri / 500056. The registration certificate separately records Malkajgiri as mandal.
Survey numbers: 612 and 618, as listed in the TG-RERA project record and registration certificate; the GHMC building permit refers to survey numbers 612 TO 618.
Plot reference: Plot Nos. 51 and 52 NORTHERN PART.
Registered site area: Total area 548.60 sq m; net area 548.60 sq m; road-widening/FTL/nala-affected area recorded as 0 sq m. The building-permit extraction states plot and net plot area of 548.6 sq m.
Boundaries: North: Plot No. 50; South: southern part of Plot No. 52; East: Plot Nos. 55 and 56; West: 30 feet wide road.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building approval: Building Permit Order 1951/GHMC/LBN/2022-BP, approved 20 June 2022; file no. 005219/GHMC/2609/LBN2/2022-BP.
Approved built-up area: 1,383.80 sq m for residential upper floors, as extracted from the permit. Stilt parking area is separately recorded as 276.8 sq m.
Building and floors: One building is recorded; GHMC permits 1 Stilt + 5 upper floors, with building height stated as 14.75.
Parking: Permit extract records total parking area of 276.8 sq m and stilt parking. Parking-space count and unit-by-unit allocation are not supplied.
Unit counts: GHMC record: one total building unit and one proposed building unit, as recorded in the project fields. TG-RERA filing: 10 apartments.
Offering and status
Configuration: TG-RERA records 10 3BHK apartments.
RERA-filed saleable area: 165.23 sq m per recorded 3BHK configuration.
Booked / available: 0 booked and 10 available in the portal snapshot supplied; no snapshot as-of date is provided, so these counts are indicative.
Construction stage: No independently verified site-progress status is supplied. The project record is labelled “New Project”; this is not a construction-stage assessment.
Completion deadline: The RERA certificate and promoter Form B state 20/06/2025 as the completion date.
Occupancy / completion certificate: The supplied building-permit extraction records completion certification as false and says an Occupancy Certificate is required before occupation. This does not establish whether any later certificate has been issued.
2. The project story
SOUTH ASIAN CHATEAU BLOCK -I is a residential apartment development registered with TG-RERA for land identified as Plot Nos. 51 and 52 NORTHERN PART and survey numbers 612 and 618 in Kapra, Medchal-Malkajgiri. The GHMC building permit describes a residential building of 1 Stilt + 5 upper floors on a 548.6 sq m site.
The TG-RERA filing records ten 3BHK apartments, with 165.23 sq m saleable area per unit. The supplied registration record sets a completion date of 20 June 2025; the supplied evidence does not verify construction progress or establish that the building has since received an Occupancy Certificate. The permit states that an Occupancy Certificate is required before occupation.
3. Master plan, architecture & building design
The GHMC building permit describes one residential building, 1 Stilt + 5 upper floors, with a height recorded as 14.75. It lists a 548.6 sq m plot area, 548.6 sq m net plot area and 1,383.80 sq m residential upper-floor area. The stilt parking area is separately stated as 276.8 sq m; these figures are distinct entries in the permit extraction.
The permit extraction also lists four setbacks—front, rear and both sides—of 3.5 m each, and requires tree planting around the site perimeter and in front of the premises. It specifies a transformer space, a garbage house and a rainwater-harvesting structure; the extracted permit details two rainwater-harvesting pits. The supplied material does not provide a readable architectural plan sufficient to establish floor-by-floor flat arrangement, footprint, lifts, stairs, internal circulation or open-space dimensions.
The permit references approved layout no. 2478/MP2/HUDA/96. The project record says no LP number is present in the RERA record; a public HMDA DPMS layout lookup was unavailable in the supplied evidence.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 165.23 sq m | Not supplied | Not supplied |
The unit type, count, bookings and saleable area above are from the TG-RERA filing; the booking snapshot has no supplied as-of date.
The supplied floor-plan measurement record relates to a 2BHK drawing configuration, which is not listed as a TG-RERA configuration for this project. Software measurement of those drawings gives a carpet-area median of 95.4 sq m, with a range of 90.4–101.5 sq m across six measured designs. These are drawing-based software measurements, not RERA-filed carpet areas, and do not establish the area of the filed 3BHK units.
Carpet area, balcony or utility area, and saleable area are different area measures. The supplied material does not provide a measured carpet area, balcony or utility dimensions, or loading figure for the TG-RERA-filed 3BHK configuration.
5. Parking & vehicle circulation
The GHMC permit records 276.8 sq m of total parking area and identifies stilt parking. It also states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not converted or partitioned for other uses.
No parking-space count, visitor or accessible parking provision, two-wheeler count, ramp or driveway arrangement, EV charging provision, or unit-specific parking allocation is established by the supplied evidence. A parking area in the permit does not by itself establish an exclusive allocation to a particular apartment.
6. Amenities, recreation & open spaces
The TG-RERA amenities record lists 14 infrastructure and facility categories. All listed progress percentages are 0%; the record therefore does not establish completion. “YES” entries are filed availability indications, not independent verification of delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | No dimensions supplied. | TG-RERA amenities record | 0%; completion not verified. |
| Green Strip / TOT LOT / Park | Permit requires peripheral greenery and identifies tot-lot maintenance as a condition; the permit extraction also records “Tot-lot NA.” No area is supplied. | 0% in amenities record; completion not verified. | |
| Community Buildings | Listed; no facility description or size supplied. | 0%; completion not verified. | |
| Street Lighting | Listed; no quantity supplied. | 0%; completion not verified. |
The available project record does not provide a substantiated clubhouse, indoor recreation, sports-facility or convenience-facility schedule.
7. Utilities, building services & safety
| Evidence in the project record | Listed as available in the TG-RERA amenities record; the permit says public water connections will be provided only on production of an Occupancy Certificate. No source, storage or treatment capacity is supplied. |
|---|---|
| Status / limitation | Amenities progress recorded as 0%; delivery is not verified. |
| Evidence in the project record | Sewerage (including chamber, lines, septic tank and STP), storm-water drains, and treatment/disposal of sewage and sullage water are listed. No capacities or system design are supplied. |
|---|---|
| Status / limitation | Progress recorded as 0%; operation or completion is not verified. |
| Evidence in the project record | Listed in the amenities record; the permit requires a rainwater-harvesting structure and specifies two pits. |
|---|---|
| Status / limitation | Progress recorded as 0%; installation is not verified. |
| Evidence in the project record | Energy management and an electrical meter room/sub-station/receiving station are listed. The permit requires space for a transformer. No supply or backup capacity is supplied. |
|---|---|
| Status / limitation | Progress recorded as 0%; installation is not verified. |
| Evidence in the project record | Fire protection and fire-safety requirements are listed. The permit requires an Occupancy Fire NOC before an Occupancy Certificate and assigns responsibility for fire-fighting installations and means-of-escape safety. |
|---|---|
| Status / limitation | No Fire NOC or completed-system evidence is supplied. |
| Evidence in the project record | Solid-waste management and disposal are listed; the permit requires a garbage house within the premises. |
|---|---|
| Status / limitation | Progress recorded as 0%; completion is not verified. |
| Evidence in the project record | The permit refers to lifts as a building service to be executed under qualified technical supervision, but supplies no number or capacity. No project-specific accessible circulation details are supplied. |
|---|---|
| Status / limitation | Design particulars and installed status are not established. |
The building permit sets conditions for construction to follow the sanctioned plan and for specified completion, structural-stability and safety documents to be submitted for Occupancy Certificate processing. The supplied evidence does not establish that these later-stage documents or clearances have been issued.
8. Location, access & connectivity
The registered project location is Kapra Circle, Kapra, Medchal-Malkajgiri, Telangana, PIN 500056. The project record identifies survey numbers 612 and 618; the cadastral parcel centroid supplied is 17.49709, 78.54401, labelled as a software geocode rather than a surveyed project boundary.
The project boundaries identify a 30 feet wide road to the west. A location dataset gives the nearest sampled Outer Ring Road interchange at approximately 5.1 km. No route, travel time, public-transport service or other measured landmark distance is supplied.
9. Developer & development status
The registered promoter is SOUTH ASIAN INFRASTRUCTURE, identified in the project record as a partnership, with GSTIN 36AEMFS0213D1ZE. The record gives a Kapra Circle, Kapra, Medchal-Malkajgiri address and PIN 500056. It lists GOWTHAM SAI KOPPISETTY as Authorized Signatory and SAI CHARAN SINGAM as Partner. No official promoter website or contact details are supplied.
The promoter’s Form B declaration dated 11 December 2022 states a completion undertaking of 20 June 2025. The TG-RERA registration certificate also records that completion date. The supplied evidence does not include an independently verified construction-progress report or establish the current OC status.
10. Approvals, official records & documents
| Reference and scope | P02200006137; Form C; project SOUTH ASIAN CHATEAU BLOCK-I; validity stated as 24/04/2023–20/06/2025. |
|---|---|
| Evidence / limitation | Certificate supplied; no extension is recorded in it. |
| Reference and scope | 1951/GHMC/LBN/2022-BP; file no. 005219/GHMC/2609/LBN2/2022-BP; approved 20 June 2022. |
|---|---|
| Evidence / limitation | Permit extraction covers residential construction of 1 Stilt + 5 upper floors. |
| Reference and scope | 2478/MP2/HUDA/96. |
|---|---|
| Evidence / limitation | Appears in the building-permit extraction; public HMDA DPMS lookup was unavailable in the supplied evidence. |
| Reference and scope | Form B for SOUTH ASIAN CHATEAU BLOCK-I, dated 11 December 2022. |
|---|---|
| Evidence / limitation | Includes promoter declarations about title authentication, encumbrances, project funds and completion date. |
| Reference and scope | Permit requires an Occupancy Certificate before occupation. |
|---|---|
| Evidence / limitation | No issued Occupancy Certificate or completion certificate is included in the supplied project documents; the permit extraction records completion certification as false. |
Other registrations of South Asian Chateau
Frequently asked questions
Is SOUTH ASIAN CHATEAU BLOCK -I registered with Telangana RERA?
Yes. SOUTH ASIAN CHATEAU BLOCK -I is registered with the Telangana Real Estate Regulatory Authority as P02200006137; the registration status is New Project.
Who is the developer of SOUTH ASIAN CHATEAU BLOCK -I?
The promoter named in the RERA registration is SOUTH ASIAN INFRASTRUCTURE.
Where is SOUTH ASIAN CHATEAU BLOCK -I located?
SOUTH ASIAN CHATEAU BLOCK -I is in Kapra Circle, Kapra, Medchal-Malkajgiri, Telangana (500056).
When will SOUTH ASIAN CHATEAU BLOCK -I be completed?
The promoter's proposed date of completion filed with RERA is 20/06/2025. This is the promoter's declaration, not a guarantee.
More projects in Kapra