Sign in

Solitaire

SITA SHELTERS PRIVATE LIMITED · Hyderabad · RERA P02500004197

SOLITAIRE is a residential apartment project in Somajiguda, Ameerpet mandal, Hyderabad district. The registered promoter is SITA SHELTERS PRIVATE LIMITED. The project covers 388.61 sq. m and comprises one residential building with a stilt level and five upper floors, with 10 3BHK apartments of 138.0 m² saleable area each. It is registered under TG-RERA number P02500004197, with a proposed completion date of 31/12/2026.

More from Sita Shelters Pvt Ltd · 10 projects →

01What we found

RegisteredTG-RERA - valid till 31 Dec 2026
11documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered nameSOLITAIRE RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNot separately identified in the supplied record; the occupancy certificate refers to one residential building.
TG-RERA registrationP02500004197 Approvals record
Registration validity14/03/2022 to 31/12/2026; the certificate records a period of four years. This is the registration period, not the construction or completion date. Approvals record
Registered promoterSITA SHELTERS PRIVATE LIMITED, a company RERA record Corporate record
RERA statusThe supplied record identifies the project as “New Project”; the registration certificate records a grant under section 5. No separate current status beyond the supplied registration record is provided. RERA record

Land and geographic identity

FieldProject record
LocalitySomajiguda, Hyderabad RERA record RERA filing
Revenue villageSomajiguda in the RERA identity record; the occupancy certificate spells it Somaji Guda. Land records
MandalNot disclosed in the RERA identity fields. The occupancy-certificate extraction identifies Ameerpet. Land records
District / PINHyderabad / 500082 RERA record
Survey number(s) / subdivision(s)Survey No. 0 as recorded in the RERA registration and land fields. No subdivision is disclosed. Land records
Plot identifiers6-3-1100/4/2 AND 6-3-1100/4/2/1 RERA filing
Site extent388.61 sq. m; the certificate extraction records sanctioned site area and net area as 388.61 and road-widening area as 0.00. RERA filing
BoundariesEast: ROAD WIDTH 9 METER; West: OTHER NEIGHBOURS PROPERTY; North: SWAMY AYYAPPA TEMPLE; South: H NO 6 3 1100 OBLICK 4 OBLICK 1. RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal approvalOccupancy Certificate / proceedings 3828/GHMC/KHB/2023-OC, approved 11 October, 2023 Approvals record
Building permit2/C17/07225/2021, dated 03 June, 2021 Approvals record
Approved floor area1133.3 m² as stated for the sanctioned plan in the occupancy-certificate extraction.
Building count and formOne residential building; certificate describes Stilt + 5 Upper Floors. RERA filing
ParkingThe occupancy-certificate extraction records sanctioned parking area of 213.79 m². Parking-space count, parking allocation and a separate parking-level schedule are not supplied.
Unit countsRERA unit record: 10 3BHK units. The project-information fields separately show 1 total building unit and 1 proposed building unit; the supplied record does not explain that field’s meaning. RERA unit table RERA filing

Offering and status

FieldProject record
RERA-filed configuration and saleable area3BHK, 138.0 m² saleable area RERA unit table
Booked / available0 booked / 10 available, as last read from the TG-RERA portal; the record has no as-of date, so these figures are indicative. RERA unit table
Declared completion date31/12/2026 RERA record RERA filing
Occupancy-certificate statusAn occupancy certificate for the residential building is included in the project documents; it certifies that building as fit for occupation. The extracted certificate identifies one building and does not provide a separate tower or phase schedule.
Construction stageA current construction-progress percentage or independent site inspection is not supplied. The occupancy certificate records completion; it should not be read as a current site-progress measurement.

2. The project story

SOLITAIRE is recorded with TG-RERA as a residential apartment project at Somajiguda, Hyderabad, on a stated site area of 388.61 sq. m. Its documented building is a single residential block with a stilt level and five upper floors. The RERA unit schedule lists ten 3BHK apartments, with 0 booked and 10 available in the portal data; those counts are indicative because no as-of date is supplied. RERA record Land records RERA unit table

The project record gives a proposed completion date of 31/12/2026, while the filed GHMC occupancy certificate identifies the residential building as fit for occupation and records a completion date of 05 September, 2023. The certificate is building-level evidence; the supplied material does not provide a separate phase schedule or a current independent inspection of site conditions. RERA record

3. Master plan, architecture & building design

The occupancy-certificate extraction records a site area and net area of 388.61 m², sanctioned floor area of 1133.3 m², and a building height of 15 m. It describes one residential building as Stilt + 5 Upper Floors. The extraction also records a sanctioned parking area of 213.79 m² and total lot area of 0. No detailed architectural drawing schedule is supplied here for building footprint, number of apartments per floor, lift or stair locations, circulation, internal roads, or residential/common-area distribution.

The filed occupancy certificate lists rainwater harvesting and includes conditions concerning rainwater-harvesting provision, perimeter planting, rooftop greenery, waste segregation, fire extinguishers, CCTV, ramp placement and other building-use and construction requirements. These are certificate conditions, not evidence in this record that each item has been installed or independently inspected.

4. Homes, configurations & floor plans

The TG-RERA unit schedule records ten 3BHK apartments with a saleable area of 138.0 m² each. A software measurement from the approved floor-plan drawing reports a 3BHK carpet-area estimate of 99.6 m² (median, minimum and maximum) and a 28% loading figure. The drawing-based figure is software-measured, not a RERA-filed carpet-area disclosure, and the source notes that it needs review. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010138.0 m²99.6 m² — software-measured from drawing; not RERA-filed28% — supplied with drawing measurement

The supplied measured 3BHK drawing includes bedrooms, a drawing room, living/dining area, kitchen, toilets and a utility area. The utility is excluded from the reported carpet measurement. Saleable area and carpet area are different area measures; the supplied record does not provide a separately filed carpet-area figure. RERA unit details Floor plans

5. Parking & vehicle circulation

The occupancy-certificate extraction records 213.79 m² of parking area as per the sanctioned plan. It does not establish the number of parking spaces, their type or location, visitor or accessible provision, parking allocation to individual apartments, or a vehicle-circulation and ramp arrangement. A parking-space count or legally documented unit allocation cannot be confirmed from the supplied material.

6. Amenities, recreation & open spaces

The RERA amenities record marks water supply, sewerage, green strip/tot lot/park, rainwater harvesting, energy management, and an electrical meter room/sub-station/receiving station as available (“YES”), but records 0% progress for each of the listed amenities. The occupancy certificate separately lists rainwater harvesting and includes conditions on planting, rooftop greenery, waste handling and fire extinguishers. The supplied evidence does not independently verify delivery or completion of these facilities. RERA amenities

Water supply
Description / sizeListed as available; no source, storage capacity or treatment details provided
Evidence sourceRERA amenities RERA amenities
Declared progress / verified status0% recorded; completion not independently verified
Sewerage
Description / sizeListed as “Sewerage (Chamber, Lines, Septic Tank, STP)”; no facility-specific detail provided
Evidence sourceRERA amenities RERA amenities
Declared progress / verified status0% recorded; completion not independently verified
Green strip / tot lot / park
Description / sizeListed as available; no area or layout detail provided
Evidence sourceRERA amenities RERA amenities
Declared progress / verified status0% recorded; completion not independently verified
Rainwater harvesting
Description / sizeListed as available; occupancy-certificate extraction also lists rainwater harvesting and includes a rainwater-harvesting condition
Evidence sourceRERA amenities RERA amenities; occupancy certificate
Declared progress / verified status0% recorded in amenities; installation not independently verified
Energy management
Description / sizeListed as available; no equipment or performance details provided
Evidence sourceRERA amenities RERA amenities
Declared progress / verified status0% recorded; completion not independently verified
Electrical meter room / sub-station / receiving station
Description / sizeListed as available; no capacity or configuration provided
Evidence sourceRERA amenities RERA amenities
Declared progress / verified status0% recorded; completion not independently verified

No clubhouse, indoor recreation or sports facility is established by the supplied RERA project records.

7. Utilities, building services & safety

The RERA amenities record lists water supply, sewerage, rainwater harvesting, energy management and an electrical meter room/sub-station/receiving station as available, with 0% progress recorded for the listed items. It does not provide water-source or storage capacities, a defined treatment or reuse system, electrical supply or backup capacities, or lift specifications. RERA amenities

The occupancy certificate lists rainwater harvesting and sets out conditions that include installing a working fire extinguisher on each floor, CCTV as specified with linkage to the concerned SHO, twin waste bins for each tenement, and provision for segregated waste handling. It also specifies a zero ramp within the plot without extension onto the road or footpath. These are certificate conditions; the supplied record does not establish that the facilities have been installed or independently verified.

8. Location, access & connectivity

The registered project location is Somajiguda, Hyderabad, Hyderabad district, PIN 500082. The project boundary record identifies a 9 METER road on the east side; it does not provide a named approach road, public-transport details or measured distances to local landmarks. RERA record RERA filing RERA filing

The location data supplies a geocode identified as a cadastral parcel centroid at 17.41528, 78.35459, and a measured distance of 1.2 km to Financial District (Nanakramguda). Location record

9. Developer & development status

The registered promoter is SITA SHELTERS PRIVATE LIMITED, a company, with GSTIN 36AAKCS2926A1ZK. The promoter address recorded in the project data is SITA SAROVAR, BEGUMPET, SOMAJIGUDA, SOMAJIGUDA, HYDERABAD, Hyderabad, 500082. The supplied project record does not provide an official contact number or email address. Corporate record Parties record

The occupancy-certificate extraction identifies the promoter as the owner/developer and identifies the managing director as Sri P. Rama Chandra Raju. The RERA party record also names RAMACHANDRA RAJU PENMETSA as authorized signatory and RAMCHANDRA RAJU PENMETSA as managing director. Parties record

The RERA record gives a proposed completion date of 31/12/2026. Separately, the filed GHMC certificate covers the residential building and records it fit for occupation; no current independent construction-progress assessment is supplied. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate, Form C
Identifier / dateP02500004197; issued 14/03/2022; valid through 31/12/2026
Scope or record descriptionRegistration of SOLITAIRE under section 5; certificate conditions include the separate-account requirement.
GHMC building permit
Identifier / date2/C17/07225/2021, 03 June, 2021
Scope or record descriptionBuilding permit referenced in the occupancy certificate.
GHMC Occupancy Certificate / proceedings
Identifier / date3828/GHMC/KHB/2023-OC, approved 11 October, 2023
Scope or record descriptionCertificate for the residential building; records completion date 05 September, 2023 and that the building was inspected and fit for occupation.
Occupancy application
Identifier / date010032/GHMC/4973/KHB2/2023-OC, dated 11/10/2023
Scope or record descriptionApplication reference recorded in the certificate.
Certificate references
Identifier / dateDRC No. 02164/TDR/2022; architect license CA/94/17846; structural engineer license 71/Strl Er/TP10/GHMC-28
Scope or record descriptionIdentifiers recorded in the occupancy-certificate extraction.
Other filed records
Identifier / dateForm B declaration (doc. 202722); commencement-certificate document (doc. 202728); title report (doc. 202715); encumbrance document (doc. 202717)
Scope or record descriptionOCR for these records is too garbled to establish their substantive contents. Document index
Layout-plan record
Identifier / dateDocument 202718
Scope or record descriptionListed in the project documents; drawing-derived unit measurements are reported above. The supplied document record does not establish a separate layout approval instrument.

The supplied extracts do not provide a readable title-report or encumbrance-statement analysis, and the commencement-certificate OCR does not establish its particulars. The occupancy-certificate evidence is building-specific; no separate phase-by-phase certificate schedule is supplied.

Frequently asked questions

Is SOLITAIRE registered with Telangana RERA?

Yes. SOLITAIRE is registered with the Telangana Real Estate Regulatory Authority as P02500004197; the registration status is New Project.

Who is the developer of SOLITAIRE?

The promoter named in the RERA registration is SITA SHELTERS PRIVATE LIMITED.

Where is SOLITAIRE located?

SOLITAIRE is in SOMAJIGUDA, HYDERABAD, Hyderabad, Telangana (500082).

When will SOLITAIRE be completed?

The promoter's proposed date of completion filed with RERA is 31/12/2026. This is the promoter's declaration, not a guarantee.

More projects in Hyderabad