SOBHA LIMITED · Hyderabad · RERA P02500005580

SOBHA WATER FRONT is a residential apartment project in Somajiguda, Khairtabad mandal, Hyderabad district. The registered promoter developing it is Sobha Limited. The site area is 16,190.02 sq. m, with 5 building units comprising 4 homes and 1 amenity block; the permit describes Towers 1–4 and a club/house, with residential buildings of Cellar + 2 Stilt + 15 upper floors and Stilt + 15 upper floors, and a club/house of Ground + 5 upper floors. The RERA unit record lists 231 total units, with filed configurations of 3BHK, 3.5BHK, and 4BHK; the project is registered under TG-RERA number P02500005580, with proposed completion on 28/02/2029.

📘 Project brochure from the promoter’s website ↗

01What we found

RegisteredTG-RERA - valid till 29 Oct 2028
20documents on file - each fact links to its page
8court cases on this project's land (survey 20, Somajiguda)
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameSOBHA WATER FRONT
Project typeResidential apartment project RERA record
Phase / registered portionPhase not separately identified in the supplied record. The registration covers the project associated with the site and survey numbers below.
TG-RERA registrationP02500005580
Registration validityFrom 20/12/2022 to 29/10/2028; the certificate records no extension. Registration validity is distinct from the project completion deadline.
Registered legal promoterSobha Limited, company RERA record Corporate record
RERA statusRegistered; status in the project record is “New Project.” The supplied record does not state that an occupancy or completion certificate has been issued. RERA record

Land and geographic identity

FieldProject record
Locality / revenue villageSomajiguda is the filed locality and village; the approval document writes the name “Somaji Guda.” RERA record Land records
Mandal / district / PINKhairtabad mandal, Hyderabad district, 500082 RERA record
Project survey numbers and subdivisions37, 38, 39, 40/P, 43/3/B/1, 43/3/B/2 & 20/1/B Land records
Plot / premises identifiers6-3-1100/A, 6-3-1100/B, 6-3-1100/C AND 6-3-1100/4/1
Site extentTotal site area 16,190.02 sq. m; road-affected area 299.25 sq. m. The RERA land record reports net area 15,890.77 sq. m; the GHMC permit reports net area 15,886.09 sq. m. Land records
BoundariesEast: 24 WIDTH ROAD; west: OTHERS - ROAD; north and south: OTHERS - ROAD AND NEIGHBOURS LAND Land records

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building permit1/C17/00452/2022, approved 29 October, 2022; file no. 1/C17/07767/2021 Approvals record
Approved built-up areaThe project record lists 58,864.82 sq. m. The permit extraction separately reads “Proposed Covered builtup area 5,965,024.00”; its unit/format is not clarified in the supplied extraction. RERA filing
Buildings / blocks in RERA record5 total building units, comprising 4 homes and 1 amenity block in the RERA project breakdown. Land records RERA unit table
Building configuration in GHMC permitCLUB-1 (HOUSE): Ground + 5 upper floors; BLOCK 2-1 (TOWER 3 AND 4): Stilt + 15 upper floors; BLOCL 1-1 (TOWER 1 AND 2): Cellar + 2 Stilt + 15 upper floors. The supplied permit extraction identifies these three building entries.
Parking levelsCellar and stilt areas are approved for vehicle parking under the permit conditions; the record supplied here does not give a parking-space count.
Residential unitsRERA unit record: 231 total units, including 229 filed across the three named home configurations and 2 rows recorded as “3” with no configuration identified. RERA unit table RERA unit details

Offering and status

FieldProject record
Filed home configurations3BHK, 3.5BHK, and 4BHK RERA unit table RERA unit details
Filed saleable areas3BHK: 195.88 sq. m; 3.5BHK: 257.24 sq. m; 4BHK: 291.98 sq. m RERA unit table RERA unit details
Booked / availableRERA portal figures read as 80 booked and 149 available across the three named configurations; there are also 2 booked units recorded under “3” and 0 available there. The portal extract gives no as-of date, so these counts are indicative. RERA unit table RERA unit details
Construction stageAn architect’s certificate dated 30/12/2023 reports building and common-development completion percentages, but the supplied extraction does not include the percentages themselves. It is a promoter-submitted professional certificate, not independent site verification.
Completion dateRERA project record: 28/02/2029 proposed completion. Form-B declaration: promoter undertaking says 31 March 2029. RERA record
Occupancy / completion certificateNo issued OC or completion certificate is identified in the supplied project evidence. GHMC’s permit requires a completion notice and occupancy certificate before occupation.

2. The project story

SOBHA WATER FRONT is registered as a residential apartment project in Somajiguda, Khairtabad, Hyderabad, on a site identified by seven survey numbers and subdivisions: 37, 38, 39, 40/P, 43/3/B/1, 43/3/B/2 & 20/1/B. Its RERA land record identifies a total site area of 16,190.02 sq. m, including 299.25 sq. m affected by road widening. The promoter’s filed site details report four home buildings and one amenity building. RERA record Land records RERA unit table

GHMC’s building permit describes two residential building entries covering Towers 1–4 and one club/house building, with the floor configurations set out in Section 1. The RERA unit schedule offers 3BHK, 3.5BHK and 4BHK apartments; the filing also contains two booked units under an unexplained “3” entry. The supplied construction certificate is dated 30/12/2023, but its extracted record does not provide the percentages it certifies. Accordingly, construction progress cannot be quantified here, and no supplied evidence independently verifies on-site progress or identifies an OC for any tower or phase. RERA unit table

3. Master plan, architecture & building design

The GHMC permit identifies three building entries: a club/house building at Ground + 5 upper floors; a residential block covering Towers 3 and 4 at Stilt + 15 upper floors; and a residential block covering Towers 1 and 2 at Cellar + 2 Stilt + 15 upper floors. It also records building heights of 29.95 m and 44.4 m, without specifying in the supplied extraction which height corresponds to which entry.

The project’s RERA record lists approved built-up area as 58,864.82 sq. m. The permit extraction also contains a “Proposed Covered builtup area 5,965,024.00” entry, but the supplied record does not clarify its units or formatting, so it is not treated here as an interpretable area figure. The permit records a Tot-lot (m2) 1591.16 and 805 Trees. These are permit-recorded provisions; the evidence does not establish that they are complete. RERA filing

The permit requires adherence to the sanctioned plan and records setbacks for the three building entries and the plot. Detailed approved floor plans, tower-by-tower flat layouts, lift and stair counts, building footprints, internal circulation plans and residential/common-area distribution are not present in the supplied drawing-derived records. The promoter’s brochure depicts four towers and calls its plans conceptual; those promotional drawings are not used as sanctioned-plan evidence.

4. Homes, configurations & floor plans

RERA filing data lists the following home configurations and saleable areas. The portal counts lack an as-of date and should be treated as indicative. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK572433195.88 sq. mNot available from measured drawingsNot supplied
3.5BHK894049257.24 sq. mNot available from measured drawingsNot supplied
4BHK831667291.98 sq. mNot available from measured drawingsNot supplied

The RERA unit table additionally contains 2 units recorded under “3,” both booked, with saleable area 232.88 sq. m each. The record does not identify these as a home configuration, so they are excluded from the configuration table above. RERA unit table RERA unit details

The supplied floor-plan measurement record reports two drawings reviewed, but no measured flats for the RERA-matched 3BHK or 4BHK configurations. No software-measured carpet area is available for this table. Carpet area, exclusive balcony or utility area, common-area allocation and saleable area are distinct measures; the RERA filing supplies saleable areas here, not carpet-area measurements. Floor plans RERA unit details

5. Parking & vehicle circulation

The GHMC permit states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not give a car or two-wheeler space count in the supplied extraction, nor does the RERA evidence establish visitor, accessible or EV spaces, mechanical parking, parking allocation by apartment, or ramp and internal-driveway arrangements. A plan approval for parking does not, by itself, establish an exclusive parking entitlement for a particular unit.

6. Amenities, recreation & open spaces

The project’s RERA amenity schedule marks the following common facilities as “YES.” The reported completion percentage is 6% for sewerage; the remaining listed entries show 0%. These are filed progress figures, not independently verified completion. RERA amenities

Recreational open space
Description / sizeAggregate area recorded as available; size not supplied in this schedule
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified status0%; not independently verified
Green strip / tot lot / park
Description / sizeGHMC permit specifies Tot-lot 1591.16 m² and requires it to be fenced and maintained as greenery
Evidence sourceRERA amenity schedule RERA amenities; GHMC permit
Declared progress / verified statusRERA schedule: 0%; permit requires provision; completion not independently verified
Community buildings
Description / sizeListed as available; size and facilities not specified in the RERA schedule
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified status0%; not independently verified
Water conservation / rainwater harvesting
Description / sizeListed in the RERA amenity schedule; GHMC permit requires a rainwater-harvesting percolation pit
Evidence sourceRERA amenity schedule RERA amenities; GHMC permit
Declared progress / verified status0%; not independently verified
Energy management
Description / sizeListed as available; details not supplied
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified status0%; not independently verified
Fire protection and fire-safety requirements
Description / sizeListed as available; detailed systems and approvals are not supplied here
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified status0%; not independently verified
Electrical meter room, sub-station, receiving station
Description / sizeListed as available; GHMC permit requires transformer space
Evidence sourceRERA amenity schedule RERA amenities; GHMC permit
Declared progress / verified status0%; not independently verified
Internal roads and footpaths
Description / sizeListed as available; dimensions and layout not supplied
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified status0%; not independently verified
Water supply
Description / sizeListed as available; source, storage and treatment details not supplied
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified status0%; not independently verified
Sewerage (chamber, lines, septic tank, STP)
Description / sizeListed; specific system and capacity not supplied
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified status6%; not independently verified
Storm-water drains
Description / sizeListed as available; design details not supplied
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified status0%; not independently verified
Street lighting
Description / sizeListed as available; specifications not supplied
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified status0%; not independently verified
Treatment and disposal of sewage and sullage water
Description / sizeListed as available; treatment details not supplied
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified status0%; not independently verified
Solid-waste management and disposal
Description / sizeListed as available; GHMC permit also requires a garbage house within the premises
Evidence sourceRERA amenity schedule RERA amenities; GHMC permit
Declared progress / verified status0%; not independently verified

The promoter’s marketing brochure separately advertises indoor and outdoor recreation facilities, including a clubhouse, pool, gym, sports and play facilities, landscaped features and a jogging/cycling path. These are marketing claims; the supplied RERA amenity schedule and permit do not establish their detailed specifications or delivery status.

7. Utilities, building services & safety

The RERA amenity schedule lists water supply, sewerage, storm-water drainage, sewage treatment and disposal, rainwater harvesting, energy management, electrical facilities and solid-waste management. It supplies no water source, storage or treatment capacity; STP capacity or reuse arrangements; electrical supply or backup capacity; or waste-segregation detail. The GHMC permit specifically requires a rainwater-harvesting percolation pit, transformer space and a garbage house within the premises. RERA amenities

For fire and life safety, the RERA schedule marks fire protection and fire-safety requirements as available. GHMC’s permit makes the sanction subject to fire-services and Airports Authority of India NOC conditions and requires applicable high-rise safety norms and necessary NOCs. The supplied evidence does not include the NOCs or describe fire systems, escape stairs, emergency access, lift numbers or accessible circulation; no compliance conclusion is made from the schedule entry alone. RERA amenities

8. Location, access & connectivity

The registered project location is Somajiguda, Khairtabad mandal, Hyderabad district, Telangana 500082. The supplied geocode places the site near Rose School, 6-3-1247/201, Somajiguda, opposite Rajbhavan, and the project’s filed boundaries identify a 24 WIDTH ROAD to the east, with roads also recorded to the west, north and south. RERA record Location record Land records

The location record lists HITEC City at 9.4 km. This is the sole distance in the supplied location connectivity record; no travel time or route is provided. Location record

9. Developer & development status

The registered promoter is Sobha Limited, a company; the supplied corporate identifier is CIN:L45201KA1995PLC018475, and the GSTIN is 36AABCS7723E1ZG. The project registration certificate lists the promoter office as Village: Pocharam, Mandal: Ghatkesar, District: Medchal-Malkajgiri, Pin: 500088. The promoter’s website is listed as sobha.com. Corporate record

RERA lists Sreelatha Bhupal and Keshav Bhupal Hindu Undivided Family as landowners associated with the project under area-share agreements. A Form-B declaration by the promoter’s stated authorised signatory records an undertaking to complete the project by 31 March 2029; the RERA project record separately gives 28/02/2029 as the proposed completion date. The registration certificate remains valid to 29/10/2028, a separate date from either completion statement. Parties record RERA record

An architect’s certificate dated 30/12/2023 reports construction-completion percentages for four towers and common development works, but those percentages are not included in the supplied extraction. No independent site-progress verification or OC scope by tower is available here.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02500005580, issued 20/12/2022; valid through 29/10/2028
What the supplied evidence establishesFORM ‘C’ registration for SOBHA WATER FRONT, with registration conditions including separate-account and agreement-for-sale requirements.
GHMC building permit order
Identifier / datePermit 1/C17/00452/2022; file no. 1/C17/07767/2021; approved 29 October, 2022
What the supplied evidence establishesBuilding-permit order for the project site and building entries; includes floor configurations and conditions.
RERA title and development documents
Identifier / dateTitle-search report 276098; development agreement and GPA extracts 276089 and 276088
What the supplied evidence establishesProject-filed title due-diligence and development-rights records.
Form-B declaration
Identifier / date276103
What the supplied evidence establishesPromoter declaration covering title basis, encumbrance statement and undertaking to complete by 31 March 2029.
Architect’s construction certificate
Identifier / date388299, dated 30/12/2023
What the supplied evidence establishesReports construction-work percentages, but the extracted evidence provided here omits the actual percentages.
Layout / approved plan lookup
Identifier / dateNo public approved-layout record or LP number supplied
What the supplied evidence establishesThe project evidence says HMDA DPMS lookup was not publicly reachable; this is an unavailable record, not evidence of refusal. HMDA
Occupancy / completion certificate
Identifier / dateNot identified in the supplied evidence
What the supplied evidence establishesGHMC’s permit requires a completion notice and occupancy certificate before occupation; no issued certificate is included here.

The RERA filing identifies sanctioned drawings and plans as project documents, but the supplied evidence does not provide a complete drawing set or an issued occupancy/completion certificate. The detailed permit conditions and other approval matters are addressed in the approvals review.

Frequently asked questions

Is SOBHA WATER FRONT registered with Telangana RERA?

Yes. SOBHA WATER FRONT is registered with the Telangana Real Estate Regulatory Authority as P02500005580; the registration status is New Project.

Who is the developer of SOBHA WATER FRONT?

The promoter named in the RERA registration is SOBHA LIMITED.

Where is SOBHA WATER FRONT located?

SOBHA WATER FRONT is in SOMAJIGUDA, KHAIRTABAD, Hyderabad, Telangana (500082).

When will SOBHA WATER FRONT be completed?

The promoter's proposed date of completion filed with RERA is 28/02/2029. This is the promoter's declaration, not a guarantee.