Silver Jade Homes
SRIKAARAM CONSTRUCTIONS · Rangareddy · RERA P02400008504
SILVER JADE HOMES is an apartment/residential project at Plot No. 1/D, Nallagandla, Serilingampally mandal, Ranga Reddy district, developed by registered promoter SRIKAARAM CONSTRUCTIONS. The project covers 360.00 sq. m and comprises one residential building with 1 Stilt + 5 upper floors and 10 2BHK apartments. It is registered with TG-RERA under P02400008504, and the project header lists a proposed completion date of 16/10/2027.
More from Srikaaram Constructions · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project | SILVER JADE HOMES; apartment/residential project. |
| Registered portion / phase | A single registered project is identified; a separate phase name is not disclosed. |
| TG-RERA registration | P02400008504; registration certificate says valid from 15/07/2024 to 16/06/2027. This is registration validity, not the construction completion date. |
| Registered promoter | SRIKAARAM CONSTRUCTIONS, identified in the RERA record as a partnership. |
| RERA status | New Project; the available certificate records registration. RERA record RERA filing Corporate record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / site | Plot No. 1/D, Nallagandla / NALAGANDLA; the layout-plan record also identifies G.H.M.C WEST ZONE CIRCLE-20. |
| Revenue village | Nallagandla (also rendered NALLAGANDLA in the filed plan). |
| Mandal / district / PIN | Serilingampally, Ranga Reddy, 500015. |
| Project survey numbers | 302 TO 310; 320 TO 322; 324 TO 361; 363 TO 365; 384; 385; 387 TO 391; 399. No subdivisions are specified in the project’s filed survey-number list. |
| Site extent | 360.00 sq. m; the building-permit record states both plot area and net plot area as 360 sq. m. |
| Boundaries | Not disclosed in the supplied project record. |
| Road references in filed plan | 9.00MT WIDE MAINROAD, 18 mt. road width, and 30' ROAD are listed; their specific relationship to the site boundaries is not supplied here. |
RERA record RERA filing Land records
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). |
| Principal building approval | 1622/GHMC/SLP/2024-BP, dated 16 June 2024. The filed plan also gives file numbers TS/024474/2024 and 004979/GHMC/2414/SLP2/2024-BP. |
| Approved building | One residential building, named in the plan as PROP (AITHA ANJANEYULU); 1 Stilt + 5 upper floors. |
| Height | The permit extraction lists 14.9 (building height) and the layout-plan extraction lists 14.90 MT.; it also records 19.88mt. Total Ht. |
| Approved built-up area | 998.75 sq. m excluding parking; the permit extraction gives residential upper-floor area as 998.75 Sq.Mt. It separately lists 1205.45 including parking and TOTAL BUA 1220.11. These are distinct figures as recorded; the supplied extraction does not further explain the latter total. |
| Parking area | 206.70 in the layout-plan extraction; 206.7 in the permit extraction. A separate sanctioned number of parking spaces is not stated in the supplied data. |
| Units | GHMC plan extraction: 10; RERA unit record: 10. |
Approvals record RERA unit table
Offering and status
| Item | Project record |
|---|---|
| Unit type | 2BHK apartments. |
| RERA-filed saleable area | 120.77 sq. m per unit. |
| Booked / available | 0 booked / 10 available, as last read from the TG-RERA portal; the portal record supplied has no as-of date, so these counts are indicative. |
| Completion dates | Promoter’s Form B declares completion by 16-06-2027; the project header lists proposed completion 16/10/2027. The supplied evidence does not identify the latter as an approved extension. |
| Registration validity | Through 16/06/2027, unless extended by the Authority, according to the registration certificate. |
| Construction stage / OC | No independently verified construction-stage report or occupancy/completion certificate is supplied. The building permit requires completion notice and an occupancy certificate before occupation. The supplied records do not establish an OC for the building. |
RERA unit table RERA unit details RERA record
2. The project story
Silver Jade Homes is registered as a residential apartment project at Plot 1/D in Nallagandla village, Serilingampally mandal, Ranga Reddy district. The filed land identity covers survey numbers 302 TO 310; 320 TO 322; 324 TO 361; 363 TO 365; 384; 385; 387 TO 391; and 399. The stated site extent is 360.00 sq. m. RERA record Land records
The GHMC building-permit record describes one residential building with 1 Stilt + 5 upper floors, and the RERA unit record lists ten 2BHK homes. The project is registered through 16/06/2027; the promoter’s Form B declares completion by that date, while the project header separately gives a proposed completion date of 16/10/2027. No supplied evidence independently verifies construction progress or confirms that any part of the building is complete or occupancy-certified. RERA unit table RERA record
3. Master plan, architecture & building design
The filed GHMC plan is for a single residential building on a 360.00 sq. m plot, with net plot area also stated as 360.00 sq. m. It specifies 1 Stilt + 5 upper floors. The permit extraction records 998.75 Sq.Mt. of residential upper-floor area and 191.55 Sq.Mt. of stilt area. It also separately states 1205.45 as total proposed built-up area including parking, 1220.11 as total BUA, and 206.70 as parking area; the supplied record does not clarify the basis of the difference among the listed total figures.
The plan lists front, rear and side setbacks and refers to roads of 9.00MT WIDE MAINROAD, 18 mt. road width and 30' ROAD. It requires no parking or construction in setback areas and states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking. The supplied extracts do not establish a cellar, the number of flats per floor, building footprint dimensions, lift or stair count, internal circulation layout, or phase-wise organization.
The filed building-permit conditions include a tot-lot/greenery requirement, periphery planting, a garbage house and rainwater-harvesting provision. These are plan conditions or listed provisions; the supplied records do not establish that they have been completed.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 120.77 sq. m | Software-measured: median 71.7 sq. m; range 62.8–76.0 sq. m | 41% |
Unit counts, booking counts and saleable area are from the RERA unit record; booking counts have no supplied as-of date. Carpet-area estimates were software-measured from the approved floor-plan drawing, are not RERA-filed figures, and are flagged as needing review across five measured flat designs. RERA unit table RERA unit details Floor plans
The distinction matters: the filed 120.77 sq. m is saleable area, while the drawing-based carpet estimate measures the home’s internal carpet area; saleable area also includes a share of common areas. A drawing panel for flat 02 shows two bedrooms, a dining/kitchen area, two toilets and a balcony; its listed balcony measurement is excluded from carpet area. Drawing dimensions and room areas are software-derived, not RERA disclosures. RERA unit details Floor plans
5. Parking & vehicle circulation
The GHMC plan records a parking area of 206.70 (also extracted as 206.7) and requires the approved stilt—and cellar, if provided in the plan—to be used exclusively for vehicle parking. The supplied records do not state a sanctioned count of parking spaces, identify visitor or accessible bays, specify parking allocations to individual homes, or establish a cellar, ramp configuration, vehicle entry/exit arrangements, or pedestrian separation. A plan reference to parking does not by itself establish an exclusive parking right for a buyer.
The building-permit extraction lists Electric Vehicle Charging Infrastructure as a provision. The supplied evidence does not give a charger count or confirm installation.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Plan condition refers to a fenced tot-lot maintained as greenery; the permit extraction separately records “Tot Lot NA.” | Plan condition; completion not established. | |
| Periphery planting / greenery | Tree plantation and a periphery strip of greenery are specified in the filed conditions. | Required by plan; completion not established. | |
| Rainwater harvesting | Percolation pit / rainwater-harvesting provision; permit extraction lists 1 No. of rainwater-harvesting pits. | Listed in approval record; installation not independently verified. | |
| Garbage house | Required within the premises. | Plan condition; completion not established. |
The RERA amenity record lists fourteen project infrastructure/amenity categories, including water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, energy management, fire safety and electrical meter room/sub-station/receiving station. The supplied progress percentages for these entries are 0; they do not establish delivery. RERA amenities
A third-party vendor listing mentions a swimming pool, gym, clubhouse, children’s play areas, garden and indoor games. Those are vendor-listed, not confirmed as RERA-filed or sanctioned facilities, so they are not presented as committed project amenities here. Promoter website
7. Utilities, building services & safety
The filed plan lists water supply, a separate underground static water-storage tank of 25,000 litres, a separate terrace tank of 25,000 litres, a septic tank, a lift, generator, emergency lighting, transformer space, electrical installations and fire-fighting provisions including hose reel, down corner and automatic sprinkler system. It also lists a rainwater-harvesting structure and, in the building-permit extraction, 1 No. of rainwater-harvesting pits. These are approval-record provisions; no supplied evidence establishes their installation, capacities beyond those stated, or operational status.
The RERA amenity record marks water supply, sewerage, storm-water drains, rainwater harvesting, energy management, fire protection/fire safety and electrical meter room/sub-station/receiving station as available “YES,” while their recorded progress percentages are 0. This is a filed-status record, not independent verification of completed services. RERA amenities
The permit conditions require an Occupancy Fire NOC before issue of an occupancy certificate, require applicable fire and structural safety installations, and specify that occupancy certification is required before occupation. The permit also lists CCTV installation, C&D waste disposal to the designated GHMC collection point and EV-charging infrastructure. The supplied evidence does not establish a Fire NOC, an occupancy certificate, CCTV installation, completed waste arrangements, or installed EV chargers.
8. Location, access & connectivity
The registered location is Plot 1/D, Nallagandla village, Serilingampally mandal, Ranga Reddy district, PIN 500015. The filed plan describes the locality as G.H.M.C WEST ZONE CIRCLE-20 and the building-permit record places the site in the Nallagandla MIG, LIG residential layout.
A supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 6.4 km. The filed plan lists nearby road-width references but does not establish the exact approach route or a measured distance to a particular road. No public-transport distance or travel time is supplied. Location record
9. Developer & development status
The registered promoter is SRIKAARAM CONSTRUCTIONS, identified in the project record as a partnership. Its listed partners are KAKAMUNI CHANDRA SHEKAR and MUDDANA BHARGAV CHOWDARY; AITHA ANJANEYULU is identified as an authorized signatory. The supplied promoter identifier is masked as xxxxxx889F, and the GSTIN is 36ADHFS0889F1ZR. Corporate record Parties record RERA filing
The project record gives the promoter address as G H M C WEST ZONE CIRCLE 20, NALAGANDLA, Serilingampally, Ranga Reddy, 500015. The registration certificate lists the promoter address as Village: Miyapur, Mandal: Serilingampally, District: Ranga Reddy, PIN: 500049. The supplied data does not provide an official promoter website or contact details. Parties record
Form B, signed by the promoter’s representative, declares a completion period ending 16-06-2027. The project header separately records a proposed completion date of 16/10/2027. No construction-progress evidence or occupancy certificate is supplied, so the present stage and completion of the building cannot be independently stated. RERA record Document index
10. Approvals, official records & documents
| Identifier / date | P02400008504; valid 15/07/2024–16/06/2027 |
|---|---|
| What the supplied record establishes | Form C certificate for SILVER JADE HOMES, naming Srikaaram Constructions as promoter and identifying the project location and survey numbers. |
| Identifier / date | 1622/GHMC/SLP/2024-BP, 16 June 2024 |
|---|---|
| What the supplied record establishes | Building permit for one residential building, 1 Stilt + 5 upper floors, on a stated 360 sq. m plot. |
| Identifier / date | File references TS/024474/2024 and 004979/GHMC/2414/SLP2/2024-BP |
|---|---|
| What the supplied record establishes | Plan details, floor configuration, area entries and conditions; the supplied evidence does not include an occupancy/completion certificate. |
| Identifier / date | Legal scrutiny report 456553; source documents include 456538, 456539 and 456566 |
|---|---|
| What the supplied record establishes | Report and underlying documents concerning the land and development arrangement. Their full title implications are addressed in the Land & Title section. |
| Identifier / date | Form B, document 456590 |
|---|---|
| What the supplied record establishes | Promoter declaration concerning title, encumbrances, project funds, audits, approvals and declared completion by 16-06-2027. |
| Identifier / date | Layout-plan document 456541 |
|---|---|
| What the supplied record establishes | GHMC-filed building-plan details and conditions. A separate approved-layout certificate is not established by the supplied extraction. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No certificate establishing occupancy or completion of the building is included in the available records. |
1. Project at a glance
Project identity
Registered project: SILVER JADE HOMES; apartment/residential project.
Registered portion / phase: A single registered project is identified; a separate phase name is not disclosed.
TG-RERA registration: P02400008504; registration certificate says valid from 15/07/2024 to 16/06/2027. This is registration validity, not the construction completion date.
Registered promoter: SRIKAARAM CONSTRUCTIONS, identified in the RERA record as a partnership.
RERA status: New Project; the available certificate records registration.
Land and geographic identity
Locality / site: Plot No. 1/D, Nallagandla / NALAGANDLA; the layout-plan record also identifies G.H.M.C WEST ZONE CIRCLE-20.
Revenue village: Nallagandla (also rendered NALLAGANDLA in the filed plan).
Mandal / district / PIN: Serilingampally, Ranga Reddy, 500015.
Project survey numbers: 302 TO 310; 320 TO 322; 324 TO 361; 363 TO 365; 384; 385; 387 TO 391; 399. No subdivisions are specified in the project’s filed survey-number list.
Site extent: 360.00 sq. m; the building-permit record states both plot area and net plot area as 360 sq. m.
Boundaries: Not disclosed in the supplied project record.
Road references in filed plan: 9.00MT WIDE MAINROAD, 18 mt. road width, and 30' ROAD are listed; their specific relationship to the site boundaries is not supplied here.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building approval: 1622/GHMC/SLP/2024-BP, dated 16 June 2024. The filed plan also gives file numbers TS/024474/2024 and 004979/GHMC/2414/SLP2/2024-BP.
Approved building: One residential building, named in the plan as PROP (AITHA ANJANEYULU); 1 Stilt + 5 upper floors.
Height: The permit extraction lists 14.9 (building height) and the layout-plan extraction lists 14.90 MT.; it also records 19.88mt. Total Ht.
Approved built-up area: 998.75 sq. m excluding parking; the permit extraction gives residential upper-floor area as 998.75 Sq.Mt. It separately lists 1205.45 including parking and TOTAL BUA 1220.11. These are distinct figures as recorded; the supplied extraction does not further explain the latter total.
Parking area: 206.70 in the layout-plan extraction; 206.7 in the permit extraction. A separate sanctioned number of parking spaces is not stated in the supplied data.
Units: GHMC plan extraction: 10; RERA unit record: 10.
Offering and status
Unit type: 2BHK apartments.
RERA-filed saleable area: 120.77 sq. m per unit.
Booked / available: 0 booked / 10 available, as last read from the TG-RERA portal; the portal record supplied has no as-of date, so these counts are indicative.
Completion dates: Promoter’s Form B declares completion by 16-06-2027; the project header lists proposed completion 16/10/2027. The supplied evidence does not identify the latter as an approved extension.
Registration validity: Through 16/06/2027, unless extended by the Authority, according to the registration certificate.
Construction stage / OC: No independently verified construction-stage report or occupancy/completion certificate is supplied. The building permit requires completion notice and an occupancy certificate before occupation. The supplied records do not establish an OC for the building.
2. The project story
Silver Jade Homes is registered as a residential apartment project at Plot 1/D in Nallagandla village, Serilingampally mandal, Ranga Reddy district. The filed land identity covers survey numbers 302 TO 310; 320 TO 322; 324 TO 361; 363 TO 365; 384; 385; 387 TO 391; and 399. The stated site extent is 360.00 sq. m.
The GHMC building-permit record describes one residential building with 1 Stilt + 5 upper floors, and the RERA unit record lists ten 2BHK homes. The project is registered through 16/06/2027; the promoter’s Form B declares completion by that date, while the project header separately gives a proposed completion date of 16/10/2027. No supplied evidence independently verifies construction progress or confirms that any part of the building is complete or occupancy-certified.
3. Master plan, architecture & building design
The filed GHMC plan is for a single residential building on a 360.00 sq. m plot, with net plot area also stated as 360.00 sq. m. It specifies 1 Stilt + 5 upper floors. The permit extraction records 998.75 Sq.Mt. of residential upper-floor area and 191.55 Sq.Mt. of stilt area. It also separately states 1205.45 as total proposed built-up area including parking, 1220.11 as total BUA, and 206.70 as parking area; the supplied record does not clarify the basis of the difference among the listed total figures.
The plan lists front, rear and side setbacks and refers to roads of 9.00MT WIDE MAINROAD, 18 mt. road width and 30' ROAD. It requires no parking or construction in setback areas and states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking. The supplied extracts do not establish a cellar, the number of flats per floor, building footprint dimensions, lift or stair count, internal circulation layout, or phase-wise organization.
The filed building-permit conditions include a tot-lot/greenery requirement, periphery planting, a garbage house and rainwater-harvesting provision. These are plan conditions or listed provisions; the supplied records do not establish that they have been completed.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 120.77 sq. m | Software-measured: median 71.7 sq. m; range 62.8–76.0 sq. m | 41% |
Unit counts, booking counts and saleable area are from the RERA unit record; booking counts have no supplied as-of date. Carpet-area estimates were software-measured from the approved floor-plan drawing, are not RERA-filed figures, and are flagged as needing review across five measured flat designs.
The distinction matters: the filed 120.77 sq. m is saleable area, while the drawing-based carpet estimate measures the home’s internal carpet area; saleable area also includes a share of common areas. A drawing panel for flat 02 shows two bedrooms, a dining/kitchen area, two toilets and a balcony; its listed balcony measurement is excluded from carpet area. Drawing dimensions and room areas are software-derived, not RERA disclosures.
5. Parking & vehicle circulation
The GHMC plan records a parking area of 206.70 (also extracted as 206.7) and requires the approved stilt—and cellar, if provided in the plan—to be used exclusively for vehicle parking. The supplied records do not state a sanctioned count of parking spaces, identify visitor or accessible bays, specify parking allocations to individual homes, or establish a cellar, ramp configuration, vehicle entry/exit arrangements, or pedestrian separation. A plan reference to parking does not by itself establish an exclusive parking right for a buyer.
The building-permit extraction lists Electric Vehicle Charging Infrastructure as a provision. The supplied evidence does not give a charger count or confirm installation.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Plan condition refers to a fenced tot-lot maintained as greenery; the permit extraction separately records “Tot Lot NA.” | Plan condition; completion not established. | |
| Periphery planting / greenery | Tree plantation and a periphery strip of greenery are specified in the filed conditions. | Required by plan; completion not established. | |
| Rainwater harvesting | Percolation pit / rainwater-harvesting provision; permit extraction lists 1 No. of rainwater-harvesting pits. | Listed in approval record; installation not independently verified. | |
| Garbage house | Required within the premises. | Plan condition; completion not established. |
The RERA amenity record lists fourteen project infrastructure/amenity categories, including water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, energy management, fire safety and electrical meter room/sub-station/receiving station. The supplied progress percentages for these entries are 0; they do not establish delivery.
A third-party vendor listing mentions a swimming pool, gym, clubhouse, children’s play areas, garden and indoor games. Those are vendor-listed, not confirmed as RERA-filed or sanctioned facilities, so they are not presented as committed project amenities here.
7. Utilities, building services & safety
The filed plan lists water supply, a separate underground static water-storage tank of 25,000 litres, a separate terrace tank of 25,000 litres, a septic tank, a lift, generator, emergency lighting, transformer space, electrical installations and fire-fighting provisions including hose reel, down corner and automatic sprinkler system. It also lists a rainwater-harvesting structure and, in the building-permit extraction, 1 No. of rainwater-harvesting pits. These are approval-record provisions; no supplied evidence establishes their installation, capacities beyond those stated, or operational status.
The RERA amenity record marks water supply, sewerage, storm-water drains, rainwater harvesting, energy management, fire protection/fire safety and electrical meter room/sub-station/receiving station as available “YES,” while their recorded progress percentages are 0. This is a filed-status record, not independent verification of completed services.
The permit conditions require an Occupancy Fire NOC before issue of an occupancy certificate, require applicable fire and structural safety installations, and specify that occupancy certification is required before occupation. The permit also lists CCTV installation, C&D waste disposal to the designated GHMC collection point and EV-charging infrastructure. The supplied evidence does not establish a Fire NOC, an occupancy certificate, CCTV installation, completed waste arrangements, or installed EV chargers.
8. Location, access & connectivity
The registered location is Plot 1/D, Nallagandla village, Serilingampally mandal, Ranga Reddy district, PIN 500015. The filed plan describes the locality as G.H.M.C WEST ZONE CIRCLE-20 and the building-permit record places the site in the Nallagandla MIG, LIG residential layout.
A supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 6.4 km. The filed plan lists nearby road-width references but does not establish the exact approach route or a measured distance to a particular road. No public-transport distance or travel time is supplied.
9. Developer & development status
The registered promoter is SRIKAARAM CONSTRUCTIONS, identified in the project record as a partnership. Its listed partners are KAKAMUNI CHANDRA SHEKAR and MUDDANA BHARGAV CHOWDARY; AITHA ANJANEYULU is identified as an authorized signatory. The supplied promoter identifier is masked as xxxxxx889F, and the GSTIN is 36ADHFS0889F1ZR.
The project record gives the promoter address as G H M C WEST ZONE CIRCLE 20, NALAGANDLA, Serilingampally, Ranga Reddy, 500015. The registration certificate lists the promoter address as Village: Miyapur, Mandal: Serilingampally, District: Ranga Reddy, PIN: 500049. The supplied data does not provide an official promoter website or contact details.
Form B, signed by the promoter’s representative, declares a completion period ending 16-06-2027. The project header separately records a proposed completion date of 16/10/2027. No construction-progress evidence or occupancy certificate is supplied, so the present stage and completion of the building cannot be independently stated.
10. Approvals, official records & documents
| Identifier / date | P02400008504; valid 15/07/2024–16/06/2027 |
|---|---|
| What the supplied record establishes | Form C certificate for SILVER JADE HOMES, naming Srikaaram Constructions as promoter and identifying the project location and survey numbers. |
| Identifier / date | 1622/GHMC/SLP/2024-BP, 16 June 2024 |
|---|---|
| What the supplied record establishes | Building permit for one residential building, 1 Stilt + 5 upper floors, on a stated 360 sq. m plot. |
| Identifier / date | File references TS/024474/2024 and 004979/GHMC/2414/SLP2/2024-BP |
|---|---|
| What the supplied record establishes | Plan details, floor configuration, area entries and conditions; the supplied evidence does not include an occupancy/completion certificate. |
| Identifier / date | Legal scrutiny report 456553; source documents include 456538, 456539 and 456566 |
|---|---|
| What the supplied record establishes | Report and underlying documents concerning the land and development arrangement. Their full title implications are addressed in the Land & Title section. |
| Identifier / date | Form B, document 456590 |
|---|---|
| What the supplied record establishes | Promoter declaration concerning title, encumbrances, project funds, audits, approvals and declared completion by 16-06-2027. |
| Identifier / date | Layout-plan document 456541 |
|---|---|
| What the supplied record establishes | GHMC-filed building-plan details and conditions. A separate approved-layout certificate is not established by the supplied extraction. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No certificate establishing occupancy or completion of the building is included in the available records. |
Frequently asked questions
Is SILVER JADE HOMES registered with Telangana RERA?
Yes. SILVER JADE HOMES is registered with the Telangana Real Estate Regulatory Authority as P02400008504; the registration status is New Project.
Who is the developer of SILVER JADE HOMES?
The promoter named in the RERA registration is SRIKAARAM CONSTRUCTIONS.
Where is SILVER JADE HOMES located?
SILVER JADE HOMES is in NALAGANDLA, Nallagandla, Serilingampally, Rangareddy, Telangana (500015).
When will SILVER JADE HOMES be completed?
The promoter's proposed date of completion filed with RERA is 16/10/2027. This is the promoter's declaration, not a guarantee.
More projects in Nallagandla