Sign in

Shreya Residency

SS INFRA DEVELOPER · Hyderabad · RERA P02500000543

SHREYA RESIDENCY is a residential apartment project at OPP VISHWA PRIYA VIHAR, PIN 500035; the mandal is not disclosed, and the project header records Hyderabad district. It is being developed by TG-RERA-registered promoter SS INFRA DEVELOPER. The project has a site area of 717.33 sq. m, one building of 6 floors, and 10 3BHK apartments, each with a filed saleable area of 134.94 sq. m. Its TG-RERA registration number is P02500000543, and its proposed completion date is 28/02/2020.

More from Ss Infra Developer · 2 projects →

01What we found

Period endedTG-RERA registration ran to 28 Feb 2020 - check its extension on TG-RERA
7documents on file - each fact links to its page
6court cases on this project's land (survey 7, Opp Vishwa Priya Vihar)
10items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered name and typeSHREYA RESIDENCY; residential apartment project. RERA record RERA filing
Registered portion / phaseOne building is recorded; a separate phase name or phase identifier is not disclosed. RERA filing RERA filing
TG-RERA registrationP02500000543, granted under section 5; registration certificate issued 27/03/2019, valid through 28/02/2020.
Registered promoterSS INFRA DEVELOPER (also rendered as “Ss Infra Developer” in the certificate). The promoter record identifies the entity type as a partnership. RERA record RERA filing
RERA statusThe project is recorded as On-Going Project. The certificate’s stated registration period has ended; no extension is recorded in the supplied evidence. Registration validity is distinct from the completion deadline and from occupancy certification. RERA record

Land and geographic identity

FieldProject record
Locality / recorded villageOPP VISHWA PRIYA VIHAR; the RERA record also identifies the village as Opp Vishwa Priya Vihar. A revenue-village name distinct from this locality entry is not disclosed. RERA record RERA filing
Mandal / district / PINMandal: not disclosed. District: Hyderabad in the project header; the registration certificate records Ranga Reddy. PIN: 500035. RERA record
Survey number(s)Survey No. 7; no subdivision is stated in the project land record. Land records
Plot / house identifiers11-13-744 AND 11-13-745 (PLOT NO 60-A AND 60-B). RERA filing
Registered site extent717.33 sq. m total area and 717.33 sq. m net area; affected area recorded as 0. RERA filing
BoundariesNorth: ROAD WIDTH 12; South: PLOT NO 61; East: PLOT NO 64; West: PLOT NO 60 PART. RERA filing

Development identity

FieldProject record
Sanctioning authority and principal approvalGreater Hyderabad Municipal Corporation (GHMC) building permission, Permit No. 2/C3007325/2013, dated 27 April 2013. The document also gives File No. 2/C300536/2018.
Approved site / built-up figuresThe permission records site area 717.33 m² and “Total property built-up area” 155.532; the source does not specify a unit for the latter figure in the extracted field. The project record separately lists approved built-up area as 2194.40 sq. m. These are retained as recorded, without treating them as interchangeable measures. RERA filing
Building count and sanctioned configurationOne building is recorded in the RERA land details. The GHMC permission extraction describes a residential building of 6 floors and records height 14.95 m. Basement/stilt/podium/ground/upper-floor breakdown and parking levels are not established by the supplied extraction. RERA filing
Unit countsThe project record lists 1 total building unit in the approved plan and 1 proposed building unit as per agreement; the RERA unit schedule lists 10 apartments. RERA filing RERA unit table

Offering and status

FieldProject record
Configuration and RERA saleable area3BHK, 10 units; filed saleable area 134.94 sq. m per unit. RERA unit table RERA unit details
Booked / available3 booked and 7 available, as last read from the TG-RERA portal; no as-of date is supplied, so counts are indicative. RERA unit table
Completion timelinePromoter’s Form B declaration states completion by 28-02-2020; the RERA record gives original and revised proposed completion as 28/02/2020. RERA record
Construction stage / OCRERA status is On-Going Project. No project-specific occupancy or completion certificate is included in the supplied documents; the construction stage and OC status by building are not independently established here. RERA record Document index

2. The project story

SHREYA RESIDENCY is recorded with TG-RERA as a residential apartment project on Survey No. 7, at the RERA-filed address OPP VISHWA PRIYA VIHAR, with plot identifiers 11-13-744 and 11-13-745 (Plot No. 60-A and 60-B). The filed site extent is 717.33 sq. m. RERA record RERA filing

The RERA unit schedule describes one 3BHK configuration comprising 10 apartments, with 3 booked and 7 available in the portal snapshot; that snapshot has no as-of date. RERA unit table The project is recorded as on-going, and the declared completion date was 28/02/2020. The supplied record does not establish current construction progress or independently verify completion; nor does it include an occupancy certificate. RERA record Document index

3. Master plan, architecture & building design

The RERA record gives a site area of 717.33 sq. m, an approved built-up area of 2194.40 sq. m, and one building. The GHMC permission extraction records a residential building of 6 floors, height 14.95 m, site area 717.33 m², and “Total property built-up area” 155.532 (unit not specified in the extraction). The two built-up figures are reported as separately labelled source entries; the supplied material does not provide a drawing-based reconciliation. RERA filing RERA filing

The GHMC permission is identified as Permit No. 2/C3007325/2013, dated 27 April 2013. The supplied extracted record does not detail floor-by-floor uses, basement or stilt levels, apartment distribution per floor, building footprint, lifts, stairs, entries, internal circulation, landscaping, or phase organization. The layout-plan filing is listed, but its document is not extracted; no approved layout drawing is available in the supplied material to describe those features. Document index

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK1037134.94 sq. mNot availableNot supplied

RERA records the 3BHK unit type and saleable area; the booking figures are an undated portal snapshot and are indicative. RERA unit details RERA unit table

The supplied floor-plan register contains two drawings, but neither was measured and both are classified as having no flats for measurement. No software-measured carpet area or room dimensions are therefore available from the drawings in this evidence. Floor plans Saleable area and carpet area are distinct measures; the supplied project record provides the former but no verified carpet-area measurement or loading figure. No balcony, utility-area, orientation, or typical-floor arrangement details are established by the supplied material.

5. Parking & vehicle circulation

The RERA record states 191 sq. m as “Mortgage Area”; it does not identify this as a parking count or describe the type or location of parking. RERA filing The supplied evidence does not establish sanctioned car or two-wheeler space counts, visitor or accessible spaces, parking levels, ramps, internal driveways, pedestrian separation, EV charging, or unit-wise parking allocation. A parking arrangement or exclusive unit entitlement cannot be confirmed from the available project documents.

6. Amenities, recreation & open spaces

The RERA amenity register lists 14 facilities. Its progress fields show 0 for every listed item; these figures are record entries, not independent site verification. “YES” denotes the RERA register’s availability entry where shown. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsNo size or further specification suppliedTG-RERA amenities register0%; not independently verified
Green Strip/TOT LOT/ParkNo size suppliedTG-RERA amenities registerAvailable: YES; 0%; not independently verified
Community BuildingsNo size or further specification suppliedTG-RERA amenities register0%; not independently verified
Water Conservation, Rain water HarvestingNo capacity or further specification suppliedTG-RERA amenities registerAvailable: YES; 0%; not independently verified

The evidence does not provide an identified clubhouse, indoor facility, sports facility, or quantified recreational open-space area in the RERA amenity register. RERA amenities Third-party amenity listings are not treated as evidence of sanctioned or delivered facilities in this project profile.

7. Utilities, building services & safety

The RERA amenity register records Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Water Conservation/Rain water Harvesting, and Electrical Meter Room/Sub-Station/Receiving Station as YES; each has 0 entered in its progress field. Other listed utility or safety items have no “YES” value in the supplied extraction. These entries describe the filing record, not verified completion. RERA amenities

Service / systemWhat the supplied record establishes
Water“Water Supply” is marked YES in the RERA register. Source, storage, treatment, capacity, and delivery status are not supplied. RERA amenities
Sewerage and drainageSewerage (including chamber, lines, septic tank, STP) is marked YES. Treatment/disposal and storm-water drains appear in the register, but no capacity, design, or verified completion details are supplied. RERA amenities
Rainwater / conservationWater Conservation, Rain water Harvesting is marked YES; no capacity or completed status is established. RERA amenities
ElectricalElectrical Meter Room, Sub-Station, Receiving Station is marked YES; supply capacity and backup details are not supplied. RERA amenities
Fire and life safetyFire Protection and Fire Safety Requirements is listed, with no progress value established beyond the register’s 0 entry. The GHMC permission states that the concerned local body shall ensure the relevant requirements before issue of an occupancy certificate; the supplied permission extraction does not establish a project-specific fire clearance or completion. RERA amenities
Lifts, waste, security and accessibilityLift provision, lift capacities, waste-management completion, CCTV/security systems, and accessible circulation are not established by the supplied RERA project records and extracted approval. RERA amenities Document index

8. Location, access & connectivity

The registered location is OPP VISHWA PRIYA VIHAR, PIN 500035; the project record identifies Opp Vishwa Priya Vihar as the village entry and does not disclose a mandal. RERA record The supplied location data provides a cadastral parcel-centroid coordinate of 17.41528, 78.35459. Location record

One measured connection is listed: Financial District (Nanakramguda), 1.2 km. Location record No approach-road description, public-transport information, or further verified landmark distances are supplied.

9. Developer & development status

The TG-RERA-registered promoter is SS INFRA DEVELOPER, recorded as a partnership. The promoter record names DEEPKANTH SOMA, KOTAIAH GUDUGUTLA, YELLAIAH SETTY, JAYAKRISHNA SOMA, SARITHA SOMA, and SHYAMSUNDER SOMA as partners; SHYAMSUNDER SOMA is also listed as authorized signatory. RERA record RERA filing Parties record

The promoter address recorded in the project evidence is VENKATESHWARA NILAYAM, ROAD NO 1, PLOT NO 1 ROAD NO 1, OPP VISHWA PRIYA VIHAR, Hyderabad, 500035. A corporate identifier is partly masked as xxxxxx061F; a company registration number, promoter website, and official project contact details are not supplied. Parties record RERA filing Corporate record

In Form B, SOMA SHYAMSUNDER declares the project completion period ending 28-02-2020 and makes undertakings concerning the separate account, audit, and other RERA disclosures. The RERA record carries the same completion date. No current, independently verified construction-progress figure or project-specific occupancy certificate is supplied. RERA record Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02500000543; issued 27/03/2019, valid through 28/02/2020
What it establishes in the supplied recordForm C registration for SHREYA RESIDENCY under section 5; includes the 70% separate-account condition.
GHMC building permission
Identifier / datePermit No. 2/C3007325/2013, dated 27 April 2013; File No. 2/C300536/2018
What it establishes in the supplied recordExtracted permission for a residential building described as 6 floors; includes site and built-up entries and permission conditions.
Form B declaration
Identifier / dateDocument 16694, page 1; declaration dated December 2018
What it establishes in the supplied recordPromoter declaration, including stated completion by 28-02-2020 and RERA-related undertakings. No project registration number is stated in this declaration.
Title report
Identifier / dateDocument 36907, including page 2 and page 3 citations in the title record
What it establishes in the supplied recordFiled legal title opinion concerning the residential land and houses in Plot Nos. 60/A and 60/B, Survey No. 7, Green Hills Colony, Saroornagar.
Encumbrance statement
Identifier / dateDocument 16697
What it establishes in the supplied recordFiled encumbrance statement for a stated search period from 1995 to 2018. It is not a current search record.
Layout-plan filing
Identifier / dateDocument 29142
What it establishes in the supplied recordListed as a layout-plan document, but not extracted in the supplied evidence; its plan contents are not described here. Document index
Occupancy / completion certificate
Identifier / dateNot included in supplied project documents
What it establishes in the supplied recordThe available evidence does not establish issuance or date. Document index

Frequently asked questions

Is SHREYA RESIDENCY registered with Telangana RERA?

Yes. SHREYA RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02500000543; the registration status is On-Going Project.

Who is the developer of SHREYA RESIDENCY?

The promoter named in the RERA registration is SS INFRA DEVELOPER.

Where is SHREYA RESIDENCY located?

SHREYA RESIDENCY is in OPP VISHWA PRIYA VIHAR, Hyderabad, Telangana (500035).

When will SHREYA RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 28/02/2020. This is the promoter's declaration, not a guarantee.

More projects in Hyderabad