Shivams Tejas
SHIVAMS INFRA AND DEVELOPERS · Medchal-Malkajgiri · RERA P02200000963
SHIVAMS TEJAS is a commercial project in VAYUPRI / Vayupuri, Medchal-Malkajgiri district; the mandal is not disclosed in the supplied project record. It is being developed by the registered promoter, SHIVAMS INFRA AND DEVELOPERS. The project covers a registered site area of 1783.74 m² and comprises one building with 2 Cellar + Ground + 4 upper floors and 23 commercial spaces, with a recorded saleable area of 279.92 m² per unit type. It is registered under TG-RERA number P02200000963, and the promoter’s completion undertaking is 19TH February 2025.
More from Shivams Infra And Developers · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | SHIVAMS TEJAS RERA record |
| Project type | Commercial project; the RERA-filed unit type is “COMMERCIAL SPACE.” RERA record RERA filing RERA unit table |
| Phase / registered portion | New Project; a separately identified phase is not disclosed. RERA record RERA filing |
| TG-RERA registration | P02200000963; certificate issued 27/06/2019. Approvals record |
| Registration validity | Certificate records validity from 27/06/2019 to 19/02/2025, unless extended by the Authority. The supplied record does not show an extension. This is the registration period, not an occupancy certificate. Approvals record |
| Registered promoter | SHIVAMS INFRA AND DEVELOPERS; partnership. RERA record Corporate record |
| Status recorded | RERA filing classifies it as “New Project.” A current construction-stage or occupancy-certificate status is not supplied. RERA filing Document index |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | VAYUPRI / Vayupuri. RERA record RERA filing |
| Revenue village | RERA identity records Vayupri; the GHMC permit identifies Malkajgiri (V). RERA record Land records |
| Mandal | Not disclosed in the supplied project record. Land records |
| District | Medchal-Malkajgiri. RERA record RERA filing |
| PIN | 500094. RERA record |
| Project survey / subdivision | Sy. No. 218/1/2. RERA record Land records |
| Plot numbers | 186 AND 187. |
| Registered site area | 1783.74 m²; road-affected area 148.65 m²; net area 1635.09 m². RERA filing |
| Boundaries in RERA record | North: ROAD; south: PLOT NO 191 92 193 AND 194; east: PLOT NO 185; west: PLOT NO 188. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building-permit approval | 1/C28/02999/2019, approved 19 February, 2019; file no. 1/C28/17743/2018. Approvals record |
| Sanctioned building use and configuration | Proposed commercial building; 2 Cellar + Ground + 4 upper floors. The permit states a height of 14.98 m. |
| Building count | One building is recorded in the RERA land details. RERA filing |
| Approved built-up area | RERA records approved built-up area of 5573.34 m². RERA filing |
| Floor-wise sanctioned areas in permit extraction | Commercial: 998.65 m²; cellar: 2,019.83 m²; ground commercial: 998.65 m²; four upper commercial floors: 4,482.36 m². These are permit-extraction figures and are reported as recorded, not recalculated. |
| Parking levels | The permit identifies the cellars as approved for parking; the supplied record does not state a parking-space count. |
| Unit count | RERA filing records 23 commercial spaces in one building. RERA unit table RERA filing |
Offering and status
| Field | Project record |
|---|---|
| Unit type and filed saleable area | COMMERCIAL SPACE; 279.92 m² saleable area per recorded unit type. RERA unit table RERA unit details |
| Booked / available | 23 booked; 0 available, as last read from the TG-RERA portal. The record gives no as-of date, so these counts are indicative. RERA unit table RERA unit details |
| Completion deadline | Promoter’s Form B declaration undertakes completion by 19TH February 2025. The RERA certificate validity also ends on 19/02/2025; these are distinct records and neither establishes completion. |
| Construction stage | Current physical progress is not provided in the supplied evidence. Document index RERA amenities |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project records; current certificate status is not established. Document index |
2. The project story
SHIVAMS TEJAS is a RERA-registered commercial development on Sy. No. 218/1/2, at VAYUPRI/Vayupuri, Medchal-Malkajgiri, associated with Plot Nos. 186 AND 187. The registration and land details describe one building and 23 commercial spaces. RERA record RERA filing
GHMC’s building permit describes a proposed commercial building with two cellar levels, a ground floor and four upper floors. The permit identifies the site area as 1783.74 m², including 148.65 m² road-affected area, and net area as 1635.09 m².
The RERA-filed booking data shows all 23 recorded commercial spaces as booked, but has no stated retrieval date. The evidence supplied here does not establish whether construction is complete, whether the deadline was met, or whether GHMC has issued an occupancy or completion certificate. The promoter’s completion undertaking and the registration-validity end date should not be read as proof of completion or occupation approval. RERA unit table
3. Master plan, architecture & building design
The supplied GHMC permit describes one proposed commercial building on a site of 1783.74 m², with a net area of 1635.09 m² and road-affected area of 148.65 m². Its sanctioned configuration is 2 Cellar + Ground + 4 upper floors, with stated height 14.98 m. The permit extraction lists commercial use on the ground and upper floors and cellar area; it does not provide a drawing-based account of the building footprint, floor-by-floor unit arrangement, entrances, lifts, stairs, circulation or internal layout.
The RERA record lists approved built-up area as 5573.34 m². The permit extraction separately records proposed covered built-up area as 517,520.00 (as transcribed in the supplied extraction); no unit is supplied for that extracted figure, so it is not interpreted here. RERA filing
The permit records 0 for tot-lot area and requires cellar and stilt areas approved for parking to be used exclusively for vehicle parking without partition walls or rolling shutters. It also requires a rainwater-harvesting percolation pit, transformer space and a garbage house. The permit identifies 9 RWHPs and 22 Trees among its sanctioned parameters; the supplied material does not establish their installed or completed status.
Floor-plan source material includes a second-floor plan in document 48872, but the supplied drawing-extraction summary does not establish a reliable RERA-matched commercial configuration or commercial-unit layout from it. The extracted 1BHK measurements are not treated as part of this commercial offering. Floor plans RERA unit details
4. Homes, configurations & floor plans
The RERA filing identifies a commercial offering, not a residential-home configuration. Its recorded figures are:
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Commercial units (“COMMERCIAL SPACE”) | 23 | 23 | 0 | 279.92 m² | Not established for the commercial configuration | Not supplied |
RERA unit table RERA unit details
The booking and availability figures are the portal values last read, with no as-of date recorded. The supplied software-measurement data concerns 1BHK layouts, which are not the RERA-filed commercial configuration; it therefore does not provide a carpet-area measurement for the commercial units. No room schedule or commercial-unit drawing measurements are established in the supplied data. RERA unit table Floor plans RERA unit details
5. Parking & vehicle circulation
GHMC’s permit says cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. The sanctioned configuration includes 2 Cellar levels, but the supplied evidence does not establish the number or type of parking spaces, whether the stilt is part of the final plan, visitor or accessible parking, ramps or driveway arrangement, EV charging, or parking allocation to individual commercial units. A parking provision in the sanctioned plan does not, by itself, establish exclusive allocation or ownership of a bay.
6. Amenities, recreation & open spaces
The RERA amenity record reports the following facilities and progress fields. The percentages are reported as recorded; they are not independent site verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Sewerage (Chamber, Lines, Septic Tank, STP) | No capacity or system detail supplied. | RERA amenities | 100% recorded; independent completion verification not supplied. |
| Green Strip / TOT LOT / Park | No area or facility detail supplied. | RERA amenities | 100% recorded; independent completion verification not supplied. |
| Water conservation / rainwater harvesting | GHMC permit requires a rainwater-harvesting percolation pit and lists 9 RWHPs. | RERA amenities | 100% recorded in the RERA amenity data; installation independently unverified. |
| Electrical meter room / sub-station / receiving station | Permit requires space for a transformer; no capacity or installation detail supplied. | RERA amenities | 100% recorded in amenity data; independent completion verification not supplied. |
| Water supply | RERA amenity record marks water supply “YES”; source, storage and capacity not supplied. | RERA amenities | Progress shown as 0%; no independent status supplied. |
| Internal roads and footpaths | No specifications supplied. | RERA amenities | 0% recorded. |
| Storm-water drains | No specifications supplied. | RERA amenities | 0% recorded. |
| Street lighting | No specifications supplied. | RERA amenities | 0% recorded. |
| Community buildings | No facility or size supplied. | RERA amenities | 0% recorded. |
| Sewage and sullage treatment/disposal | No additional treatment or reuse detail supplied. | RERA amenities | 0% recorded. |
| Solid-waste management and disposal | GHMC permit requires a garbage house within the premises. | RERA amenities | 0% recorded in amenity data; completion not established. |
| Energy management | No details supplied. | RERA amenities | 0% recorded. |
| Fire protection and fire-safety requirements | No systems or equipment details supplied; the permit assigns responsibility for structural and fire safety to the owner, builder/developer, architect and structural engineer. | RERA amenities | 0% recorded; compliance or completion is not established. |
| Recreational open space | Amenity record gives no area. The permit extraction records tot-lot area as 0 m². | RERA amenities | Progress shown as 0% for aggregate recreational open space. |
The supplied RERA amenity data does not establish a clubhouse, indoor recreation facilities or other community amenities. Third-party amenity and “ready to move” descriptions are not treated as RERA-filed or verified delivery evidence. RERA amenities Promoter website
7. Utilities, building services & safety
The RERA amenity record marks water supply “YES” but does not identify its source, storage, treatment or capacity; it records progress as 0%. Sewerage infrastructure (chambers, lines, septic tank, STP) is marked 100%, but no capacity, treatment process, reuse arrangement or independent completion evidence is supplied. Storm-water-drain progress is recorded as 0%. RERA amenities
GHMC’s permit requires a rainwater-harvesting percolation pit, transformer space and a garbage house within the premises. It also says the cellar/stilt parking areas are to remain exclusively for parking, requires a commencement notice and completion notice, and states that an occupancy certificate is compulsory before occupation. These are permit conditions; the supplied record does not establish their fulfilment or show an issued occupancy certificate.
No project-specific capacities or completion evidence are supplied for electrical backup, lifts, fire-fighting systems, escape stairs, CCTV, access control, accessibility features or EV charging. The permit places structural and fire-safety responsibility on the stated project professionals and owner/developer; the permit alone is not proof that safety systems have been installed or that statutory clearances have been obtained. RERA amenities
8. Location, access & connectivity
The registered project location is VAYUPRI/Vayupuri, Medchal-Malkajgiri district, PIN 500094, on Sy. No. 218/1/2. The RERA record gives the north boundary as ROAD. The GHMC permit describes VAYUPURI (Circle 17) and refers to a site abutting 18 mt. road widths; the supplied project data does not identify the road by name. RERA record RERA filing
A cadastral parcel-centroid location is supplied at 17.41528, 78.35459. The location dataset lists Financial District (Nanakramguda) at 1.2 km. The supplied evidence does not establish a project-specific public-transport route or a verified travel time. Location record
9. Developer & development status
The registered promoter is SHIVAMS INFRA AND DEVELOPERS, recorded as a partnership. The listed partners are KANCHAN DEVI, MEENA DEVI and INDERCHAND DEORA; GAUTAMCHAND JAIN is identified as authorised signatory. The promoter’s Form B affidavit identifies Gautamchand Jain as Managing Partner and declares a completion undertaking of 19TH February 2025. Corporate record Parties record
The supplied record does not establish current construction progress, a revised completion date, an extension of RERA registration or an occupancy certificate. The portal’s booking figures show 23 booked spaces and zero available, but no as-of date is recorded. RERA unit table Approvals record Document index
10. Approvals, official records & documents
| Identifier / date | P02200000963; issued 27/06/2019; stated validity to 19/02/2025 |
|---|---|
| What the supplied record establishes | Registration of SHIVAMS TEJAS under section 5, with stated conditions including the separate-account requirement. No extension is shown in the supplied material. |
| Identifier / date | Approval 1/C28/02999/2019; file 1/C28/17743/2018; approved 19 February, 2019 |
|---|---|
| What the supplied record establishes | Permit extraction describes a proposed commercial building at Vayupuri, Sy. No. 218/1/2, with 2 Cellar + Ground + 4 upper floors. |
| Identifier / date | Verified at Hyderabad on 22°° day of April 2019 (date as transcribed) |
|---|---|
| What the supplied record establishes | Promoter’s title-basis, encumbrance and completion declarations; these are promoter declarations, not independent title verification or proof of completion. |
| Identifier / date | Documents 48875 and 48876 |
|---|---|
| What the supplied record establishes | Reports concern different described plots and title histories associated with Sy. No. 218/1/2; the supplied extracts do not establish a complete project-specific title-chain review here. |
| Identifier / date | Documents 48872, 48873, 48874 |
|---|---|
| What the supplied record establishes | Upload labels refer to building-floor-plan and layout-plan material. Two drawing records are listed as scans pending in the supplied extraction; a reliable commercial-unit layout analysis is not available from the extracted data. Document index Floor plans |
| Identifier / date | Document 51470; searched period 24-03-1994 to 28-04-2019 |
|---|---|
| What the supplied record establishes | Statement lists entries including a mortgage without possession, a development agreement-cum-GPA and sale deeds. The entries and current status are addressed in the land-and-title review; this index does not treat the statement as a current encumbrance certificate. |
The supplied materials do not include a GHMC occupancy/completion certificate. The stated permit condition requires an occupancy certificate before occupation; whether one has since been issued is not established by this evidence.
1. Project at a glance
Project identity
Registered name: SHIVAMS TEJAS
Project type: Commercial project; the RERA-filed unit type is “COMMERCIAL SPACE.”
Phase / registered portion: New Project; a separately identified phase is not disclosed.
TG-RERA registration: P02200000963; certificate issued 27/06/2019.
Registration validity: Certificate records validity from 27/06/2019 to 19/02/2025, unless extended by the Authority. The supplied record does not show an extension. This is the registration period, not an occupancy certificate.
Registered promoter: SHIVAMS INFRA AND DEVELOPERS; partnership.
Status recorded: RERA filing classifies it as “New Project.” A current construction-stage or occupancy-certificate status is not supplied.
Land and geographic identity
Locality: VAYUPRI / Vayupuri.
Revenue village: RERA identity records Vayupri; the GHMC permit identifies Malkajgiri (V).
Mandal: Not disclosed in the supplied project record.
District: Medchal-Malkajgiri.
PIN: 500094.
Project survey / subdivision: Sy. No. 218/1/2.
Plot numbers: 186 AND 187.
Registered site area: 1783.74 m²; road-affected area 148.65 m²; net area 1635.09 m².
Boundaries in RERA record: North: ROAD; south: PLOT NO 191 92 193 AND 194; east: PLOT NO 185; west: PLOT NO 188.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building-permit approval: 1/C28/02999/2019, approved 19 February, 2019; file no. 1/C28/17743/2018.
Sanctioned building use and configuration: Proposed commercial building; 2 Cellar + Ground + 4 upper floors. The permit states a height of 14.98 m.
Building count: One building is recorded in the RERA land details.
Approved built-up area: RERA records approved built-up area of 5573.34 m².
Floor-wise sanctioned areas in permit extraction: Commercial: 998.65 m²; cellar: 2,019.83 m²; ground commercial: 998.65 m²; four upper commercial floors: 4,482.36 m². These are permit-extraction figures and are reported as recorded, not recalculated.
Parking levels: The permit identifies the cellars as approved for parking; the supplied record does not state a parking-space count.
Unit count: RERA filing records 23 commercial spaces in one building.
Offering and status
Unit type and filed saleable area: COMMERCIAL SPACE; 279.92 m² saleable area per recorded unit type.
Booked / available: 23 booked; 0 available, as last read from the TG-RERA portal. The record gives no as-of date, so these counts are indicative.
Completion deadline: Promoter’s Form B declaration undertakes completion by 19TH February 2025. The RERA certificate validity also ends on 19/02/2025; these are distinct records and neither establishes completion.
Construction stage: Current physical progress is not provided in the supplied evidence.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project records; current certificate status is not established.
2. The project story
SHIVAMS TEJAS is a RERA-registered commercial development on Sy. No. 218/1/2, at VAYUPRI/Vayupuri, Medchal-Malkajgiri, associated with Plot Nos. 186 AND 187. The registration and land details describe one building and 23 commercial spaces.
GHMC’s building permit describes a proposed commercial building with two cellar levels, a ground floor and four upper floors. The permit identifies the site area as 1783.74 m², including 148.65 m² road-affected area, and net area as 1635.09 m².
The RERA-filed booking data shows all 23 recorded commercial spaces as booked, but has no stated retrieval date. The evidence supplied here does not establish whether construction is complete, whether the deadline was met, or whether GHMC has issued an occupancy or completion certificate. The promoter’s completion undertaking and the registration-validity end date should not be read as proof of completion or occupation approval.
3. Master plan, architecture & building design
The supplied GHMC permit describes one proposed commercial building on a site of 1783.74 m², with a net area of 1635.09 m² and road-affected area of 148.65 m². Its sanctioned configuration is 2 Cellar + Ground + 4 upper floors, with stated height 14.98 m. The permit extraction lists commercial use on the ground and upper floors and cellar area; it does not provide a drawing-based account of the building footprint, floor-by-floor unit arrangement, entrances, lifts, stairs, circulation or internal layout.
The RERA record lists approved built-up area as 5573.34 m². The permit extraction separately records proposed covered built-up area as 517,520.00 (as transcribed in the supplied extraction); no unit is supplied for that extracted figure, so it is not interpreted here.
The permit records 0 for tot-lot area and requires cellar and stilt areas approved for parking to be used exclusively for vehicle parking without partition walls or rolling shutters. It also requires a rainwater-harvesting percolation pit, transformer space and a garbage house. The permit identifies 9 RWHPs and 22 Trees among its sanctioned parameters; the supplied material does not establish their installed or completed status.
Floor-plan source material includes a second-floor plan in document 48872, but the supplied drawing-extraction summary does not establish a reliable RERA-matched commercial configuration or commercial-unit layout from it. The extracted 1BHK measurements are not treated as part of this commercial offering.
4. Homes, configurations & floor plans
The RERA filing identifies a commercial offering, not a residential-home configuration. Its recorded figures are:
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Commercial units (“COMMERCIAL SPACE”) | 23 | 23 | 0 | 279.92 m² | Not established for the commercial configuration | Not supplied |
The booking and availability figures are the portal values last read, with no as-of date recorded. The supplied software-measurement data concerns 1BHK layouts, which are not the RERA-filed commercial configuration; it therefore does not provide a carpet-area measurement for the commercial units. No room schedule or commercial-unit drawing measurements are established in the supplied data.
5. Parking & vehicle circulation
GHMC’s permit says cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. The sanctioned configuration includes 2 Cellar levels, but the supplied evidence does not establish the number or type of parking spaces, whether the stilt is part of the final plan, visitor or accessible parking, ramps or driveway arrangement, EV charging, or parking allocation to individual commercial units. A parking provision in the sanctioned plan does not, by itself, establish exclusive allocation or ownership of a bay.
6. Amenities, recreation & open spaces
The RERA amenity record reports the following facilities and progress fields. The percentages are reported as recorded; they are not independent site verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Sewerage (Chamber, Lines, Septic Tank, STP) | No capacity or system detail supplied. | 100% recorded; independent completion verification not supplied. | |
| Green Strip / TOT LOT / Park | No area or facility detail supplied. | 100% recorded; independent completion verification not supplied. | |
| Water conservation / rainwater harvesting | GHMC permit requires a rainwater-harvesting percolation pit and lists 9 RWHPs. | 100% recorded in the RERA amenity data; installation independently unverified. | |
| Electrical meter room / sub-station / receiving station | Permit requires space for a transformer; no capacity or installation detail supplied. | 100% recorded in amenity data; independent completion verification not supplied. | |
| Water supply | RERA amenity record marks water supply “YES”; source, storage and capacity not supplied. | Progress shown as 0%; no independent status supplied. | |
| Internal roads and footpaths | No specifications supplied. | 0% recorded. | |
| Storm-water drains | No specifications supplied. | 0% recorded. | |
| Street lighting | No specifications supplied. | 0% recorded. | |
| Community buildings | No facility or size supplied. | 0% recorded. | |
| Sewage and sullage treatment/disposal | No additional treatment or reuse detail supplied. | 0% recorded. | |
| Solid-waste management and disposal | GHMC permit requires a garbage house within the premises. | 0% recorded in amenity data; completion not established. | |
| Energy management | No details supplied. | 0% recorded. | |
| Fire protection and fire-safety requirements | No systems or equipment details supplied; the permit assigns responsibility for structural and fire safety to the owner, builder/developer, architect and structural engineer. | 0% recorded; compliance or completion is not established. | |
| Recreational open space | Amenity record gives no area. The permit extraction records tot-lot area as 0 m². | Progress shown as 0% for aggregate recreational open space. |
The supplied RERA amenity data does not establish a clubhouse, indoor recreation facilities or other community amenities. Third-party amenity and “ready to move” descriptions are not treated as RERA-filed or verified delivery evidence.
7. Utilities, building services & safety
The RERA amenity record marks water supply “YES” but does not identify its source, storage, treatment or capacity; it records progress as 0%. Sewerage infrastructure (chambers, lines, septic tank, STP) is marked 100%, but no capacity, treatment process, reuse arrangement or independent completion evidence is supplied. Storm-water-drain progress is recorded as 0%.
GHMC’s permit requires a rainwater-harvesting percolation pit, transformer space and a garbage house within the premises. It also says the cellar/stilt parking areas are to remain exclusively for parking, requires a commencement notice and completion notice, and states that an occupancy certificate is compulsory before occupation. These are permit conditions; the supplied record does not establish their fulfilment or show an issued occupancy certificate.
No project-specific capacities or completion evidence are supplied for electrical backup, lifts, fire-fighting systems, escape stairs, CCTV, access control, accessibility features or EV charging. The permit places structural and fire-safety responsibility on the stated project professionals and owner/developer; the permit alone is not proof that safety systems have been installed or that statutory clearances have been obtained.
8. Location, access & connectivity
The registered project location is VAYUPRI/Vayupuri, Medchal-Malkajgiri district, PIN 500094, on Sy. No. 218/1/2. The RERA record gives the north boundary as ROAD. The GHMC permit describes VAYUPURI (Circle 17) and refers to a site abutting 18 mt. road widths; the supplied project data does not identify the road by name.
A cadastral parcel-centroid location is supplied at 17.41528, 78.35459. The location dataset lists Financial District (Nanakramguda) at 1.2 km. The supplied evidence does not establish a project-specific public-transport route or a verified travel time.
9. Developer & development status
The registered promoter is SHIVAMS INFRA AND DEVELOPERS, recorded as a partnership. The listed partners are KANCHAN DEVI, MEENA DEVI and INDERCHAND DEORA; GAUTAMCHAND JAIN is identified as authorised signatory. The promoter’s Form B affidavit identifies Gautamchand Jain as Managing Partner and declares a completion undertaking of 19TH February 2025.
The supplied record does not establish current construction progress, a revised completion date, an extension of RERA registration or an occupancy certificate. The portal’s booking figures show 23 booked spaces and zero available, but no as-of date is recorded.
10. Approvals, official records & documents
| Identifier / date | P02200000963; issued 27/06/2019; stated validity to 19/02/2025 |
|---|---|
| What the supplied record establishes | Registration of SHIVAMS TEJAS under section 5, with stated conditions including the separate-account requirement. No extension is shown in the supplied material. |
| Identifier / date | Approval 1/C28/02999/2019; file 1/C28/17743/2018; approved 19 February, 2019 |
|---|---|
| What the supplied record establishes | Permit extraction describes a proposed commercial building at Vayupuri, Sy. No. 218/1/2, with 2 Cellar + Ground + 4 upper floors. |
| Identifier / date | Verified at Hyderabad on 22°° day of April 2019 (date as transcribed) |
|---|---|
| What the supplied record establishes | Promoter’s title-basis, encumbrance and completion declarations; these are promoter declarations, not independent title verification or proof of completion. |
| Identifier / date | Documents 48875 and 48876 |
|---|---|
| What the supplied record establishes | Reports concern different described plots and title histories associated with Sy. No. 218/1/2; the supplied extracts do not establish a complete project-specific title-chain review here. |
| Identifier / date | Documents 48872, 48873, 48874 |
|---|---|
| What the supplied record establishes | Upload labels refer to building-floor-plan and layout-plan material. Two drawing records are listed as scans pending in the supplied extraction; a reliable commercial-unit layout analysis is not available from the extracted data. |
| Identifier / date | Document 51470; searched period 24-03-1994 to 28-04-2019 |
|---|---|
| What the supplied record establishes | Statement lists entries including a mortgage without possession, a development agreement-cum-GPA and sale deeds. The entries and current status are addressed in the land-and-title review; this index does not treat the statement as a current encumbrance certificate. |
The supplied materials do not include a GHMC occupancy/completion certificate. The stated permit condition requires an occupancy certificate before occupation; whether one has since been issued is not established by this evidence.
Frequently asked questions
Is SHIVAMS TEJAS registered with Telangana RERA?
Yes. SHIVAMS TEJAS is registered with the Telangana Real Estate Regulatory Authority as P02200000963; the registration status is New Project.
Who is the developer of SHIVAMS TEJAS?
The promoter named in the RERA registration is SHIVAMS INFRA AND DEVELOPERS.
Where is SHIVAMS TEJAS located?
SHIVAMS TEJAS is in VAYUPRI, Medchal-Malkajgiri, Telangana (500094).
When will SHIVAMS TEJAS be completed?
The promoter's proposed date of completion filed with RERA is 19/02/2025. This is the promoter's declaration, not a guarantee.