Santarama Nilayam
JAYANTH RONANKI · Hyderabad · RERA P02500008254
SANTARAMA NILAYAM is a residential apartment project in Mallepally, Asifnagar Mandal, Hyderabad district. The registered promoter is JAYANTH RONANKI. The project occupies 517.09 sq. m. and comprises one building with 1 Stilt + 5 upper floors and 10 homes, configured as 3BHK. It is registered under TG-RERA number P02500008254, with proposed completion on 30/11/2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | SANTARAMA NILAYAM RERA record |
| Project type | Residential apartment project; TG-RERA status recorded as New Project RERA record |
| Phase / registered portion | Phase not separately identified; the registration concerns the project recorded at H No. 10-2-289/69, Plot No. C/8 RERA record |
| TG-RERA registration | P02500008254 RERA record |
| Registration validity | 17 May 2024–16 May 2026, unless extended by the Authority |
| Registered promoter | JAYANTH RONANKI; the promoter record identifies the entity type as Proprietorship RERA record RERA filing |
| Registration status | The supplied certificate records the registration period above. No extension or current registration-status record is supplied. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / address | MALLEPALLY; House No. 10-2-289/69, Plot No. C/8, Shanti Nagar Colony, Mallepally Locality, Hyderabad RERA record |
| Revenue village | Mallepally; a building-permit extraction also records Mallepalli. No other project revenue village is identified in the supplied records. RERA record |
| Mandal | Asifnagar Mandal in the GHMC building-permit extraction; mandal is not disclosed in the RERA land fields. Land records |
| District / PIN | Hyderabad / 500028 RERA record |
| Survey number / subdivision | Not disclosed in the supplied project identity or approval records. The records identify the site by house and plot number instead. RERA record Land records |
| Site extent | 517.09 sq. m. plot area; 515.11 sq. m. net plot area is stated in the approved-plan extraction. The RERA land record lists total and net area as 517.09 sq. m. Land records |
| Road-affected area | GHMC permit extraction: 0.0 sq. m.; the plan extraction also records 1.98 sq. m. as splay area. |
| Boundaries | East: PLOT NO 70; West: 30 FEET ROAD; North: 30 FEET ROAD; South: PLOT NO 104 Land records |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building approval | Permit No. 1325/GHMC/KHB/2023-BP, dated 16 May 2023 |
| Related plan/application number | TS/023865/2023; the drawing extraction records approval date 01-04-2023 |
| Approved building form | One residential building: 1 Stilt + 5 upper floors; total 6 floors as recorded in the plan parameters. Building height: 14.90 MT. |
| Built-up area | Approved-plan extraction: 1,259.50 sq. m. net residential BUA; 1,511.40 sq. m. total proposed BUA including parking. The permit extraction separately records 1,259.50 Sq.Mt. residential upper-floor area and 237.54 Sq.Mt. stilt area. |
| Parking provision in approval | 8 proposed parking spaces; parking area recorded as 251.90 sq. m. in the plan extraction and 251.9 in the permit extraction. |
| Building / unit counts | 1 building; 10 RERA-filed units. The approval extraction states 1 building but does not provide a separate sanctioned dwelling-unit count in the supplied fields. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 3BHK, 10 units RERA unit table |
| RERA-filed saleable area | 185.8 sq. m. per unit RERA unit table |
| Booked / available | 0 booked / 10 available, as last read from the TG-RERA portal; no as-of date is attached, so these counts are indicative. RERA unit table |
| Construction stage | No project-specific construction-progress percentage or independently verified site-status evidence is supplied. RERA amenities |
| Completion dates | Promoter’s Form B undertaking: 16/05/2026; GHMC permit extraction: construction to be completed before 16 May, 2026. The project header separately records proposed completion 30/11/2026. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The GHMC approval makes an occupancy certificate compulsory before occupation. |
2. The project story
- SANTARAMA NILAYAM is a residential apartment development recorded by TG-RERA at Plot No. C/8, House No. 10-2-289/69, in Shanti Nagar Colony, Mallepally, Hyderabad. The filed land record describes a site of 517.09 sq. m.; the approved-plan extraction gives a net plot area of 515.11 sq. m. RERA record Land records
- The approved building form is a single building with one stilt level and five upper floors. TG-RERA records ten 3BHK homes, all listed as available in the portal data supplied, which has no as-of date. The approval records a residential use and does not describe a multi-tower or phased scheme. RERA unit table
- The supplied materials do not establish how much construction has been completed. The project is therefore described here by its approval and registration records, not as independently confirmed to be at a particular construction stage. No occupancy or completion certificate is included. RERA amenities
3. Master plan, architecture & building design
- The GHMC plan extraction describes a proposed residential building on a 517.09 sq. m. plot, with 515.11 sq. m. net plot area. It records 251.91 sq. m. proposed coverage area, 263.20 sq. m. vacant plot area and 400.62 sq. m. of existing structure to be demolished. The extraction lists 1,259.50 sq. m. net residential BUA and 1,511.40 sq. m. total proposed BUA including parking. These are approval-recorded areas; no separate FSI-counted area or carpet-area total for the building is supplied.
- The sanctioned organization is one building, 1 Stilt + 5 upper floors, with a recorded height of 14.90 MT. The supplied drawing and approval data do not specify flats per floor, lift or stair count, entrance arrangement, internal circulation, or a phase-by-phase layout.
- The plan conditions require tree planting along the site periphery and in front of the premises, and a fenced tot-lot maintained as greenery before occupancy certification. They also refer to rainwater harvesting, transformer space and a garbage house. These are approval conditions or listed provisions; the supplied evidence does not verify installation or completion.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 185.8 sq. m. | 91.6–92.3 sq. m. software-measured; median 91.9 sq. m. | 51% (software-derived from drawing measurement) |
- RERA records ten 3BHK units with a saleable area of 185.8 sq. m. per unit. Booked and available counts are portal readings without an attached as-of date. RERA unit table RERA unit details
- The carpet-area measurements are software-measured from two approved floor-plan drawing designs in document 334345; they are not RERA-filed measurements and are noted as needing review. One measured plan labels a guest room, kitchen, living/dining area, two bedrooms, dress room, three toilets, utility and balcony. In that plan, the utility (4.22 sq. m.) and balcony (4.94 sq. m.) are excluded from the measured carpet area. RERA unit details Floor plans
- Carpet area, balcony and utility areas, and saleable area are distinct measures. The supplied drawing-based carpet measurement should not be treated as the RERA saleable area; the records do not provide a separate unit-level common-area loading disclosure. RERA unit details Floor plans
5. Parking & vehicle circulation
- The GHMC plan extraction records 8 proposed parking spaces and 251.90 sq. m. parking area; the building permit extraction records total parking area of 251.9 and a stilt level. The plan conditions state that the approved cellar and stilt parking areas are to be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. The supplied evidence does not give a separate count by vehicle type or establish unit-specific parking allocations.
- No details are supplied about visitor or accessible spaces, ramps, EV charging, pedestrian separation, or a legally documented allocation of particular bays to individual homes. The approval’s parking provision is not evidence of exclusive ownership of any drawn bay.
6. Amenities, recreation & open spaces
- The project’s RERA amenity record lists infrastructure items with 0% progress where a percentage is shown. “YES” indicates availability in the filing, not independent confirmation that the facility is complete. The GHMC plan extraction also lists proposed site provisions and approval conditions. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | Tot-lot to be fenced and maintained as greenery; no area or capacity supplied | RERA amenities | RERA progress 0%; installation not independently verified |
| Community buildings | Listed; no description or size supplied | RERA amenities | RERA progress 0%; not independently verified |
| Rainwater harvesting / water conservation | Plan lists rainwater harvesting; permit extraction refers to a rainwater-harvesting pit | RERA amenities | RERA record says “YES” for water conservation/rainwater harvesting; progress not established |
| Internal roads and footpaths | Listed; no dimensions supplied | RERA amenities | RERA progress 0%; not independently verified |
| Street lighting | Listed; no quantity or specification supplied | RERA amenities | RERA progress 0%; not independently verified |
- No clubhouse, indoor recreation or sports facilities are identified in the supplied project-filed amenity record. Third-party vendor-listed features are not treated here as RERA-filed, sanctioned or delivered amenities.
7. Utilities, building services & safety
| Evidence in the project record | RERA amenity record lists water supply as “YES.” The plan extraction lists an underground static water storage tank of 25,000 lits. and a terrace tank of 25,000lits capacity. |
|---|---|
| Status indicated by the evidence | Filing/plan provision; no independent commissioning or supply verification supplied. RERA amenities |
| Evidence in the project record | RERA record lists sewerage (including chamber, lines, septic tank, STP) as “YES,” treatment and disposal of sewage/sullage, and storm-water drains. |
|---|---|
| Status indicated by the evidence | Listed in the RERA record; progress is 0% where reported, and completion is not independently verified. RERA amenities |
| Evidence in the project record | Rainwater harvesting is listed in the RERA record and approval documents. |
|---|---|
| Status indicated by the evidence | Proposed/listed provision; completion not verified. RERA amenities |
| Evidence in the project record | RERA record lists an electrical meter room/sub-station/receiving station as “YES.” The plan lists transformer space, generator and emergency lighting. |
|---|---|
| Status indicated by the evidence | Plan/RERA-listed provisions; installation and operating capacity not supplied. RERA amenities |
| Evidence in the project record | Plan extraction lists fire-fighting installations, hose reel, down corner and automatic sprinkler system. The building-permit conditions require fire installations and state that an occupancy fire NOC is to be obtained before issue of the occupancy certificate. |
|---|---|
| Status indicated by the evidence | Approval requirements/listed provisions; no fire NOC or completed-system verification supplied. |
| Evidence in the project record | Plan lists a garbage house. GHMC permit conditions refer to twin bins for each tenement, waste segregation and onsite composting. |
|---|---|
| Status indicated by the evidence | Approval conditions/provisions; completion not verified. |
| Evidence in the project record | The supplied GHMC permit conditions require CCTV installation and linkage to the concerned SHO. |
|---|---|
| Status indicated by the evidence | Approval condition; installation not independently verified. |
| Evidence in the project record | The plan conditions refer to lift services and technical supervision, but no lift count, capacity or accessibility details are supplied. |
|---|---|
| Status indicated by the evidence | No specific installed or commissioned facility is verified. |
8. Location, access & connectivity
- The registered location is H No. 10-2-289/69, Plot No. C/8, Shanti Nagar Colony, Mallepally Locality, Hyderabad, PIN 500028. GHMC’s building-permit extraction identifies Asifnagar Mandal and Mallepalli village. RERA record
- The land record gives the site boundaries as Plot No. 70 to the east, a 30-foot road to the west and north, and Plot No. 104 to the south. The approved-plan extraction also records road widths of 9.14 MT WIDE EXISTING ROAD, 9.14 MT WIDE PROPOSED ROAD and 30'-0" WIDE ROAD. Land records
- The supplied location data gives a distance of 1.2 km to Financial District (Nanakramguda). No other measured distances, public-transport details or verified travel times are supplied. Location record
9. Developer & development status
- The registered promoter is JAYANTH RONANKI, identified in the promoter record as a Proprietorship. The supplied RERA registration certificate gives the promoter’s registered location as Hyderabad, PIN 500028; no official telephone number, email address or website is supplied. RERA filing
- The GHMC plan extraction names Ronanki Jayanth as developer, while the building-permit order also identifies MS.J AND T DEVELOPERS as developer/builder. No separate legal-entity or project-role particulars for that name are supplied here.
- The promoter’s Form B declares completion by 16/05/2026. The project header records a proposed completion date of 30/11/2026; the supplied materials do not include a project-specific progress certificate or site verification establishing construction progress. No occupancy or completion certificate is provided. RERA record
10. Approvals, official records & documents
| Record | Project evidence |
|---|---|
| TG-RERA registration | Form C certificate for SANTARAMA NILAYAM, registration P02500008254, with stated validity 17/05/2024–16/05/2026 unless extended |
| GHMC building permit | Building Permit Order 1325/GHMC/KHB/2023-BP, dated 16 May, 2023, for residential construction of one building with 1 Stilt + 5 upper floors |
| Plan/application record | TS/023865/2023, with drawing stamp dated 01-04-2023 in the supplied plan extraction |
| RERA declaration | Form B affidavit-cum-declaration by RONANKI JAYANTH, including the promoter’s stated completion date and project-related declarations |
| Occupancy/completion certificate | Not included in the supplied documents; the GHMC plan conditions require an occupancy certificate before occupation |
| Site progress evidence | No project-specific progress certificate or independently verified construction-status record supplied |
1. Project at a glance
Project identity
Registered name: SANTARAMA NILAYAM
Project type: Residential apartment project; TG-RERA status recorded as New Project
Phase / registered portion: Phase not separately identified; the registration concerns the project recorded at H No. 10-2-289/69, Plot No. C/8
TG-RERA registration: P02500008254
Registration validity: 17 May 2024–16 May 2026, unless extended by the Authority
Registered promoter: JAYANTH RONANKI; the promoter record identifies the entity type as Proprietorship
Registration status: The supplied certificate records the registration period above. No extension or current registration-status record is supplied.
Land and geographic identity
Locality / address: MALLEPALLY; House No. 10-2-289/69, Plot No. C/8, Shanti Nagar Colony, Mallepally Locality, Hyderabad
Revenue village: Mallepally; a building-permit extraction also records Mallepalli. No other project revenue village is identified in the supplied records.
Mandal: Asifnagar Mandal in the GHMC building-permit extraction; mandal is not disclosed in the RERA land fields.
District / PIN: Hyderabad / 500028
Survey number / subdivision: Not disclosed in the supplied project identity or approval records. The records identify the site by house and plot number instead.
Site extent: 517.09 sq. m. plot area; 515.11 sq. m. net plot area is stated in the approved-plan extraction. The RERA land record lists total and net area as 517.09 sq. m.
Road-affected area: GHMC permit extraction: 0.0 sq. m.; the plan extraction also records 1.98 sq. m. as splay area.
Boundaries: East: PLOT NO 70; West: 30 FEET ROAD; North: 30 FEET ROAD; South: PLOT NO 104
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Permit No. 1325/GHMC/KHB/2023-BP, dated 16 May 2023
Related plan/application number: TS/023865/2023; the drawing extraction records approval date 01-04-2023
Approved building form: One residential building: 1 Stilt + 5 upper floors; total 6 floors as recorded in the plan parameters. Building height: 14.90 MT.
Built-up area: Approved-plan extraction: 1,259.50 sq. m. net residential BUA; 1,511.40 sq. m. total proposed BUA including parking. The permit extraction separately records 1,259.50 Sq.Mt. residential upper-floor area and 237.54 Sq.Mt. stilt area.
Parking provision in approval: 8 proposed parking spaces; parking area recorded as 251.90 sq. m. in the plan extraction and 251.9 in the permit extraction.
Building / unit counts: 1 building; 10 RERA-filed units. The approval extraction states 1 building but does not provide a separate sanctioned dwelling-unit count in the supplied fields.
Offering and status
RERA-filed configuration: 3BHK, 10 units
RERA-filed saleable area: 185.8 sq. m. per unit
Booked / available: 0 booked / 10 available, as last read from the TG-RERA portal; no as-of date is attached, so these counts are indicative.
Construction stage: No project-specific construction-progress percentage or independently verified site-status evidence is supplied.
Completion dates: Promoter’s Form B undertaking: 16/05/2026; GHMC permit extraction: construction to be completed before 16 May, 2026. The project header separately records proposed completion 30/11/2026.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The GHMC approval makes an occupancy certificate compulsory before occupation.
2. The project story
- SANTARAMA NILAYAM is a residential apartment development recorded by TG-RERA at Plot No. C/8, House No. 10-2-289/69, in Shanti Nagar Colony, Mallepally, Hyderabad. The filed land record describes a site of 517.09 sq. m.; the approved-plan extraction gives a net plot area of 515.11 sq. m.
- The approved building form is a single building with one stilt level and five upper floors. TG-RERA records ten 3BHK homes, all listed as available in the portal data supplied, which has no as-of date. The approval records a residential use and does not describe a multi-tower or phased scheme.
- The supplied materials do not establish how much construction has been completed. The project is therefore described here by its approval and registration records, not as independently confirmed to be at a particular construction stage. No occupancy or completion certificate is included.
3. Master plan, architecture & building design
- The GHMC plan extraction describes a proposed residential building on a 517.09 sq. m. plot, with 515.11 sq. m. net plot area. It records 251.91 sq. m. proposed coverage area, 263.20 sq. m. vacant plot area and 400.62 sq. m. of existing structure to be demolished. The extraction lists 1,259.50 sq. m. net residential BUA and 1,511.40 sq. m. total proposed BUA including parking. These are approval-recorded areas; no separate FSI-counted area or carpet-area total for the building is supplied.
- The sanctioned organization is one building, 1 Stilt + 5 upper floors, with a recorded height of 14.90 MT. The supplied drawing and approval data do not specify flats per floor, lift or stair count, entrance arrangement, internal circulation, or a phase-by-phase layout.
- The plan conditions require tree planting along the site periphery and in front of the premises, and a fenced tot-lot maintained as greenery before occupancy certification. They also refer to rainwater harvesting, transformer space and a garbage house. These are approval conditions or listed provisions; the supplied evidence does not verify installation or completion.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 185.8 sq. m. | 91.6–92.3 sq. m. software-measured; median 91.9 sq. m. | 51% (software-derived from drawing measurement) |
- RERA records ten 3BHK units with a saleable area of 185.8 sq. m. per unit. Booked and available counts are portal readings without an attached as-of date.
- The carpet-area measurements are software-measured from two approved floor-plan drawing designs in document 334345; they are not RERA-filed measurements and are noted as needing review. One measured plan labels a guest room, kitchen, living/dining area, two bedrooms, dress room, three toilets, utility and balcony. In that plan, the utility (4.22 sq. m.) and balcony (4.94 sq. m.) are excluded from the measured carpet area.
- Carpet area, balcony and utility areas, and saleable area are distinct measures. The supplied drawing-based carpet measurement should not be treated as the RERA saleable area; the records do not provide a separate unit-level common-area loading disclosure.
5. Parking & vehicle circulation
- The GHMC plan extraction records 8 proposed parking spaces and 251.90 sq. m. parking area; the building permit extraction records total parking area of 251.9 and a stilt level. The plan conditions state that the approved cellar and stilt parking areas are to be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. The supplied evidence does not give a separate count by vehicle type or establish unit-specific parking allocations.
- No details are supplied about visitor or accessible spaces, ramps, EV charging, pedestrian separation, or a legally documented allocation of particular bays to individual homes. The approval’s parking provision is not evidence of exclusive ownership of any drawn bay.
6. Amenities, recreation & open spaces
- The project’s RERA amenity record lists infrastructure items with 0% progress where a percentage is shown. “YES” indicates availability in the filing, not independent confirmation that the facility is complete. The GHMC plan extraction also lists proposed site provisions and approval conditions.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | Tot-lot to be fenced and maintained as greenery; no area or capacity supplied | RERA progress 0%; installation not independently verified | |
| Community buildings | Listed; no description or size supplied | RERA progress 0%; not independently verified | |
| Rainwater harvesting / water conservation | Plan lists rainwater harvesting; permit extraction refers to a rainwater-harvesting pit | RERA record says “YES” for water conservation/rainwater harvesting; progress not established | |
| Internal roads and footpaths | Listed; no dimensions supplied | RERA progress 0%; not independently verified | |
| Street lighting | Listed; no quantity or specification supplied | RERA progress 0%; not independently verified |
- No clubhouse, indoor recreation or sports facilities are identified in the supplied project-filed amenity record. Third-party vendor-listed features are not treated here as RERA-filed, sanctioned or delivered amenities.
7. Utilities, building services & safety
| Evidence in the project record | RERA amenity record lists water supply as “YES.” The plan extraction lists an underground static water storage tank of 25,000 lits. and a terrace tank of 25,000lits capacity. |
|---|---|
| Status indicated by the evidence | Filing/plan provision; no independent commissioning or supply verification supplied. |
| Evidence in the project record | RERA record lists sewerage (including chamber, lines, septic tank, STP) as “YES,” treatment and disposal of sewage/sullage, and storm-water drains. |
|---|---|
| Status indicated by the evidence | Listed in the RERA record; progress is 0% where reported, and completion is not independently verified. |
| Evidence in the project record | Rainwater harvesting is listed in the RERA record and approval documents. |
|---|---|
| Status indicated by the evidence | Proposed/listed provision; completion not verified. |
| Evidence in the project record | RERA record lists an electrical meter room/sub-station/receiving station as “YES.” The plan lists transformer space, generator and emergency lighting. |
|---|---|
| Status indicated by the evidence | Plan/RERA-listed provisions; installation and operating capacity not supplied. |
| Evidence in the project record | Plan extraction lists fire-fighting installations, hose reel, down corner and automatic sprinkler system. The building-permit conditions require fire installations and state that an occupancy fire NOC is to be obtained before issue of the occupancy certificate. |
|---|---|
| Status indicated by the evidence | Approval requirements/listed provisions; no fire NOC or completed-system verification supplied. |
| Evidence in the project record | Plan lists a garbage house. GHMC permit conditions refer to twin bins for each tenement, waste segregation and onsite composting. |
|---|---|
| Status indicated by the evidence | Approval conditions/provisions; completion not verified. |
| Evidence in the project record | The supplied GHMC permit conditions require CCTV installation and linkage to the concerned SHO. |
|---|---|
| Status indicated by the evidence | Approval condition; installation not independently verified. |
| Evidence in the project record | The plan conditions refer to lift services and technical supervision, but no lift count, capacity or accessibility details are supplied. |
|---|---|
| Status indicated by the evidence | No specific installed or commissioned facility is verified. |
8. Location, access & connectivity
- The registered location is H No. 10-2-289/69, Plot No. C/8, Shanti Nagar Colony, Mallepally Locality, Hyderabad, PIN 500028. GHMC’s building-permit extraction identifies Asifnagar Mandal and Mallepalli village.
- The land record gives the site boundaries as Plot No. 70 to the east, a 30-foot road to the west and north, and Plot No. 104 to the south. The approved-plan extraction also records road widths of 9.14 MT WIDE EXISTING ROAD, 9.14 MT WIDE PROPOSED ROAD and 30'-0" WIDE ROAD.
- The supplied location data gives a distance of 1.2 km to Financial District (Nanakramguda). No other measured distances, public-transport details or verified travel times are supplied.
9. Developer & development status
- The registered promoter is JAYANTH RONANKI, identified in the promoter record as a Proprietorship. The supplied RERA registration certificate gives the promoter’s registered location as Hyderabad, PIN 500028; no official telephone number, email address or website is supplied.
- The GHMC plan extraction names Ronanki Jayanth as developer, while the building-permit order also identifies MS.J AND T DEVELOPERS as developer/builder. No separate legal-entity or project-role particulars for that name are supplied here.
- The promoter’s Form B declares completion by 16/05/2026. The project header records a proposed completion date of 30/11/2026; the supplied materials do not include a project-specific progress certificate or site verification establishing construction progress. No occupancy or completion certificate is provided.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for SANTARAMA NILAYAM, registration P02500008254, with stated validity 17/05/2024–16/05/2026 unless extended
GHMC building permit: Building Permit Order 1325/GHMC/KHB/2023-BP, dated 16 May, 2023, for residential construction of one building with 1 Stilt + 5 upper floors
Plan/application record: TS/023865/2023, with drawing stamp dated 01-04-2023 in the supplied plan extraction
RERA declaration: Form B affidavit-cum-declaration by RONANKI JAYANTH, including the promoter’s stated completion date and project-related declarations
Occupancy/completion certificate: Not included in the supplied documents; the GHMC plan conditions require an occupancy certificate before occupation
Site progress evidence: No project-specific progress certificate or independently verified construction-status record supplied
Frequently asked questions
Is SANTARAMA NILAYAM registered with Telangana RERA?
Yes. SANTARAMA NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P02500008254; the registration status is New Project.
Who is the developer of SANTARAMA NILAYAM?
The promoter named in the RERA registration is JAYANTH RONANKI.
Where is SANTARAMA NILAYAM located?
SANTARAMA NILAYAM is in MALLEPALLY, Hyderabad, Telangana (500028).
When will SANTARAMA NILAYAM be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.
More projects in Hyderabad






