Sanjanas Interlaken T-4

TUMMALA · Medchal-Malkajgiri · RERA P02200000530

SANJANAS INTERLAKEN T-4 is a residential apartment project near Hanuman Temple in Maisammagudem, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district. The registered promoter is Mr./Ms. Tummala Srinivas Reddy. The project has a land area of 642.27 sq. m and comprises one building with 1 stilt + 5 upper floors and 20 2BHK apartments. It is registered under TG-RERA number P02200000530, with a proposed completion date of 30/09/2018.

01What we found

Period endedTG-RERA registration ran to 30 Sep 2018 - check its extension on TG-RERA
9documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Dulapally, Dundigal Gandimaisamma, Medchal-Malkajgiri · geocoded — approximate.

1. Project at a glance

Project identity

FieldProject record
Registered nameSANJANAS INTERLAKEN T-4 RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionT-4; phase-wise scope beyond the registered project name is not disclosed RERA record
TG-RERA registrationP02200000530 RERA record
Registration validityCertificate states commencement on 22/03/2019 and end on 30/09/2018; it also records “0 years.” These are the certificate’s stated validity details
Registered promoterMr./Ms. Tummala Srinivas Reddy; the project record’s shortened promoter field says “TUMMALA” RERA filing
RERA statusOn-Going Project, as recorded in the project information RERA filing

Land and geographic identity

FieldProject record
Locality / addressNEAR HANUMAN TEMPLE; Maisammagudem / MAISAMMAGUDEM RERA record RERA filing
Revenue villageDulapally; the title report spells it “Doolapally Village” RERA record RERA filing
MandalDundigal Gandimaisamma RERA record RERA filing
DistrictMedchal-Malkajgiri RERA record RERA filing
PIN500055 RERA record RERA filing
Survey number(s)Survey No. 8; no project subdivision is stated in the RERA land record Land records
Registered site extent642.27 sq. m RERA filing
Total / net land areaTotal area 642.27 sq. m; net area 642.27 sq. m RERA filing
BoundariesEast: ROAD 9 MTS; West, North and South: VACANT RERA filing

Development identity

FieldProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); technical approval records delegation to the local Executive Authority for building-plan sanction Approvals record
Principal approval000395/MED/R1/U6/HMDA/30112016, approved 24/05/2017 Approvals record
Approved built-up area1917.07 sq. m, recorded as proposed built-up area in the technical approval RERA filing
Building countOne building / one proposed building unit RERA filing
Sanctioned floor configuration1 stilt + 5 upper floors
Parking levelsStilt is designated for vehicle parking under the approval conditions; parking-space count is not provided
Unit countRERA filing records 20 apartments; the land-details field separately states one building unit RERA unit table RERA filing

Offering and status

FieldProject record
Unit type2BHK RERA unit table RERA unit details
RERA-filed saleable area26.64 sq. m per recorded configuration RERA unit table RERA unit details
Booked / available20 booked; 0 available, as read from the TG-RERA portal. The record has no booking-count as-of date; figures are indicative RERA unit table
Construction stageProject is recorded as “On-Going Project”; no independently verified site-progress percentage or current construction stage is supplied RERA filing RERA record
Completion datesOriginal and revised proposed completion dates are both 30/09/2018 RERA record
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied project record. The approval requires an Executive Authority “Fit for Occupancy” certificate before occupation; this is an approval condition, not evidence that a certificate was issued

Registration validity, the proposed completion date and occupancy-certificate status are separate record items; the supplied evidence does not establish that an OC was issued.

2. The project story

SANJANAS INTERLAKEN T-4 is registered as a residential apartment project on Survey No. 8 in Dulapally, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district. The RERA-filed site area is 642.27 sq. m, and the recorded scheme is one building with 20 2BHK apartments. RERA record Land records RERA unit table

The HMDA technical approval describes a residential building with one stilt and five upper floors. The project record identifies the development as on-going and gives a proposed completion date of 30/09/2018, but the supplied evidence does not provide a verified construction-progress report or confirm completion or occupancy certification. The RERA portal’s 20-booked, zero-available counts have no stated as-of date and should be treated as indicative rather than a live availability statement. RERA record RERA unit table RERA filing

3. Master plan, architecture & building design

The RERA land record gives a total and net site area of 642.27 sq. m, with 0 sq. m recorded as affected by road widening, FTL or nala widening. HMDA’s technical approval identifies one residential building, “PROP (BLG),” comprising 1 stilt + 5 upper floors. The approval records 1917.07 sq. m as proposed built-up area; the RERA filing records the same as approved built-up area. These are built-up-area figures, not carpet area or RERA saleable area. RERA filing RERA filing

The approval lists a building height of 14.9 and a sanctioned built-up area of 1571.35, alongside proposed built-up area of 1917.07; the supplied extract does not explain these different approval fields.

The approval states that the technically approved plans were subject to sanction by the local Executive Authority and specifies site inspections and construction conditions. The supplied drawings data does not provide a readable, measured floor-plan schedule: two drawings are recorded, none measured, one scan is pending and one has no flats. Accordingly, flat arrangement, floor-by-floor unit count, footprint, lifts, stairs, circulation and open-space design cannot be described from the available drawing-derived evidence. Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK2020026.64 sq. mNot measured in supplied drawing dataNot supplied

The configuration, counts and saleable-area figure above are TG-RERA filing data; booking counts are portal figures without an as-of date. The supplied drawings have not yielded software-measured carpet-area or room measurements. Saleable area and carpet area are different measures; no carpet-area, balcony/utility or common-area-loading figures are available here. RERA unit table RERA unit details Floor plans

5. Parking & vehicle circulation

The HMDA approval directs that the stilt/cellar be used exclusively for vehicle parking and not converted, and the RERA filing records 200.07 sq. m as mortgage area. The approval also refers to a common parking floor and requires the construction to follow the sanctioned plan. No number of parking bays, visitor or accessible spaces, parking-allocation terms, ramp configuration, driveway or EV-charging provision is supplied. A stated parking use or drawn provision does not, by itself, establish exclusive parking rights for an apartment. RERA filing RERA filing

6. Amenities, recreation & open spaces

The project’s RERA amenity fields report the following. The percentages and availability entries are portal declarations; independent completion verification is not supplied.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Water supplyNo source, storage or capacity specifiedRERA amenitiesAvailable: YES; 100% declared; not independently verified
Sewerage (chamber, lines, septic tank, STP)No capacity specifiedRERA amenitiesAvailable: YES; 100% declared; not independently verified
Water conservation / rainwater harvestingNo size or capacity specifiedRERA amenitiesAvailable: YES; 100% declared; not independently verified
Electrical meter room, sub-station, receiving stationNo capacity specifiedRERA amenitiesAvailable: YES; 100% declared; not independently verified
Fire safety provisionNo system details or capacity specifiedRERA amenitiesAvailable: YES; 100% declared; not independently verified
Internal roads and footpathsNo dimensions specifiedRERA amenities0% recorded
Storm-water drainsNo dimensions specifiedRERA amenities0% recorded
Green strip / tot lot / parkNo area specifiedRERA amenities0% recorded
Street lightingNo details specifiedRERA amenities0% recorded
Community buildingsNo facility or area specifiedRERA amenities0% recorded
Treatment and disposal of sewage and sullage waterNo system details specifiedRERA amenities0% recorded
Solid-waste management and disposalNo system details specifiedRERA amenities0% recorded
Energy managementNo system details specifiedRERA amenities0% recorded
Aggregate recreational open spaceArea not specifiedRERA amenities0% recorded

The HMDA approval also specifies a transformer, garbage house and septic tank as provisions to be made, and rainwater-harvesting structures. These are approval requirements; the supplied evidence does not verify installation or completion.

7. Utilities, building services & safety

HMDA’s technical approval sets out utility and safety conditions, including a water-supply source and sewerage-disposal source within the site; bore and water-disinfection requirements; septic-tank and treated-sewage disposal arrangements; rainwater harvesting; transformer and garbage-house provisions; and fire-safety requirements. It also calls for a generator as an alternative power source, emergency lighting in common passages and staircases, a manually operated alarm system, and an automatic sprinkler system if the basement area exceeds 200 sq. m. These are approval conditions, not evidence that the systems have been installed, tested or certified.

The RERA amenity record declares water supply, sewerage, water conservation/rainwater harvesting, electrical meter room/sub-station/receiving station and fire-safety provision as available at 100%, without supplying capacities or independent verification. No lift details, accessibility provisions, CCTV, access-control arrangements, waste-segregation details, STP capacity or confirmed utility-source data are supplied. RERA amenities

8. Location, access & connectivity

The registered location is NEAR HANUMAN TEMPLE, Maisammagudem, Dulapally, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district, Telangana 500055. The RERA boundary record describes a 9-metre road on the east and vacant land on the other three sides. RERA record RERA filing RERA filing

A supplied location record gives the nearest sampled Outer Ring Road interchange as approximately 3.0 km. No public-transport or landmark distances beyond that record are provided in the project evidence. Location record

9. Developer & development status

The TG-RERA certificate names Mr./Ms. Tummala Srinivas Reddy as the registered promoter; the Form B affidavit identifies T. Srinivas Reddy as promoter and declares an undertaking to complete the project within three years. The promoter’s legal-entity type, corporate registration identifiers, registered office and official contact details are not disclosed in the supplied evidence. Corporate record

The project is recorded as on-going, with original and revised proposed completion dates of 30/09/2018. No current, independently verified construction-stage assessment, completion certificate or occupancy certificate is supplied. The promoter’s completion undertaking is a filed declaration, not independent confirmation of completion. RERA filing RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
DetailsForm C; project SANJANAS INTERLAKEN T-4; P02200000530; certificate records issue/commencement 22/03/2019 and stated end 30/09/2018
HMDA technical building approval
DetailsApproval no. 000395/MED/R1/U6/HMDA/30112016; dated 24/05/2017; Survey No. 8; residential building, 1 stilt + 5 floors
Panchayat receipt
DetailsGP Form No. 37 miscellaneous receipt no. 6856, dated 03/07/2017; records payment but does not establish a building or layout approval
Form B promoter declaration
DetailsT. Srinivas Reddy’s declaration, including title and encumbrance statements and a three-year completion undertaking
Legal title report
DetailsAdvocate C. Manohar’s title opinion dated 30-11-2018; includes instruments and revenue records concerning land in Doolapally Village
Occupancy / completion certificate
DetailsNot identified in the supplied project documents
EvidenceDocument index

The available HMDA approval is a technical approval letter that states the building plans are to be sanctioned by the local Executive Authority in conformity with the technically approved plans. The supplied evidence does not include an occupancy certificate.

Frequently asked questions

Is SANJANAS INTERLAKEN T-4 registered with Telangana RERA?

Yes. SANJANAS INTERLAKEN T-4 is registered with the Telangana Real Estate Regulatory Authority as P02200000530; the registration status is On-Going Project.

Who is the developer of SANJANAS INTERLAKEN T-4?

The promoter named in the RERA registration is TUMMALA.

Where is SANJANAS INTERLAKEN T-4 located?

SANJANAS INTERLAKEN T-4 is in NEAR HANUMAN TEMPLE, Dulapally, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (500055).

When will SANJANAS INTERLAKEN T-4 be completed?

The promoter's proposed date of completion filed with RERA is 30/09/2018. This is the promoter's declaration, not a guarantee.