Sign in

Sanjanas Interlaken T-3

TUMMALA · Medchal-Malkajgiri · RERA P02200000711

SANJANAS INTERLAKEN T-3 is a residential apartment project at MAISAMMAGUDEM, near Hanuman Temple, Dulapally village, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district. The registered promoter is Mr./Ms. Tummala Srinivas Reddy. The project has a land area of 642.27 sqmts, one proposed building, and 20 2BHK units, each with a RERA-filed saleable area of 88.81 sqmts; the floor configuration is not disclosed. It is registered under TG-RERA number P02200000711, with a proposed completion date of 04/01/2018.

01What we found

Period endedTG-RERA registration ran to 4 Jan 2018 - check its extension on TG-RERA
7documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Dulapally, Dundigal Gandimaisamma, Medchal-Malkajgiri · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered project nameSANJANAS INTERLAKEN T-3 RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionT-3; the RERA record describes one proposed building. A more detailed phase boundary is not disclosed. RERA filing
TG-RERA registrationP02200000711, registered under section 5; certificate issue date 10/05/2019 Approvals record
Registration validityCertificate records commencement 10/05/2019, expiry 04/01/2018, and “-1 years”; no extension is recorded in the supplied certificate. Registration validity is distinct from the completion date and OC status.
Registered promoterMr./Ms. Tummala Srinivas Reddy on the certificate; the project header identifies the promoter as TUMMALA. RERA record
RERA-recorded project statusOn-Going Project RERA filing

Land and geographic identity

ItemProject record
Locality / addressMAISAMMAGUDEM, near Hanuman Temple; street recorded as MAISAMMAGUDEM RERA record RERA filing
Revenue villageDulapally; the title report and receipt also use the spelling Doolapally/Doolspa. RERA record RERA filing
MandalDundigal Gandimaisamma RERA record
DistrictMedchal-Malkajgiri RERA record
PIN500055 RERA record
Project survey numberSurvey No. 8 RERA filing
Subdivision stated in title materialSy. No. 8/6 in the title report; the registration record identifies the project as Survey No. 8.
Registered land areaTotal area 642.27 sqmts; net area 642.27 sqmts; area affected in road widening/FTL/Nala widening 0 RERA filing
BoundariesEast: ROAD 9 MTS; West: VACANT; North: VACANT; South: VACANT RERA filing

Development identity

ItemProject record
Sanctioning authority recorded in project informationHMDA RERA filing
Principal approval number / datePlan approval number is not disclosed. Project record shows approved date 11/05/2017; the filed receipt is a Gram panchayat Dodapoly miscellaneous receipt, not evidence of plan approval. RERA filing RERA filing
Approved built-up area1917.07 sqmts RERA filing
Buildings / blocks1 building unit in the approved-plan fields; 1 proposed building unit in the agreement fields. RERA filing
Sanctioned floor configuration / heightNot disclosed in the supplied project data; the available floor-plan record has no measured plan and one scan pending. Floor plans
Parking levels and sanctioned parking countNot established in the supplied records. “Surface Car Park” appears in the vendor amenity list, but no count or sanctioned parking drawing is supplied. Promoter website Document index
Approved versus RERA-declared units20 2BHK units are recorded in the RERA filing; the supplied land fields state one building unit, not a separate sanctioned apartment count. RERA unit details RERA filing

Offering and status

ItemProject record
RERA-filed unit type2BHK; 20 units RERA unit details
RERA-filed saleable area88.81 sqmts per 2BHK RERA unit details
Booked / available20 booked; 0 available, as last read from the TG-RERA portal; the portal record supplied has no as-of date, so counts are indicative. RERA unit table
Construction stageProject status is recorded as On-Going Project. The header reports 90% completeness, but this is not identified as an independently verified site measurement. RERA filing RERA record
Original / revised completion dates04/01/2018 / 04/01/2018 RERA record
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied documents; certificate status is therefore not established. Document index

2. The project story

SANJANAS INTERLAKEN T-3 is recorded with TG-RERA as a residential apartment project at MAISAMMAGUDEM, near Hanuman Temple, in Dulapally village, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district. The registered land record identifies Survey No. 8 and an area of 642.27 sqmts; the title report refers to Sy. No. 8/6. RERA record RERA filing RERA filing

The project filing describes one building and a 20-unit 2BHK offering, with RERA-filed saleable area of 88.81 sqmts per unit. All 20 units are shown as booked in the portal data supplied, which has no as-of date. RERA filing RERA unit details RERA unit table

The project is labelled On-Going Project, and the header gives 90% completeness. This is a record-based status, not independent confirmation of physical progress. The stated original and revised completion dates are both 04/01/2018. No occupancy or completion certificate is present in the supplied document set. RERA filing RERA record Document index

3. Master plan, architecture & building design

The RERA fields state a site area of 642.27 sqmts and approved built-up area of 1917.07 sqmts, with one building unit. A floor configuration, building footprint, height, floors per building, flats per floor, lifts, stairs, entry/exit arrangement, circulation plan, internal roads and landscaping plan are not established by the supplied extracted records. RERA filing RERA filing

The floor-plan record covers two drawings: none is software-measured, one scan is pending, and one is marked as having no flats. Accordingly, no drawing-based room or building-layout measurements are available for this overview. Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK2020088.81 sqmtsNot measuredNot supplied

The configuration, unit counts, booking counts and saleable area are from the TG-RERA filing/portal data. RERA unit details RERA unit table Carpet area is not available: the supplied floor-plan review reports zero measured drawings and one scan pending. The filing’s saleable area should not be read as carpet area; no project-specific carpet, balcony/utility or common-area loading figures are supplied. Floor plans

5. Parking & vehicle circulation

The vendor amenity list includes Surface Car Park, but the supplied records do not establish the parking count, parking levels, vehicle circulation, visitor or accessible spaces, EV charging, or unit-specific parking allocation. A parking bay count or exclusive allotment cannot be inferred from the available material. Promoter website Document index

6. Amenities, recreation & open spaces

The vendor record lists the facilities below as project amenities. These are vendor-listed claims; the supplied data does not provide facility sizes or independent completion verification. The RERA amenity schedule separately records selected infrastructure items and declared percentages. Promoter website RERA amenities

Clubhouse / indoor
FacilityGym; Indoor Games; Library; Party Hall
Description / sizeSize/capacity not supplied
Evidence sourceVendor amenity list Promoter website
Declared progress / verified statusNo independent completion status supplied
Sports / recreation
FacilityBasketball Court; Bike Track; Jogging Track; Outdoor Sports Facilities; Swimming Pool
Description / sizeSize/capacity not supplied
Evidence sourceVendor amenity list Promoter website
Declared progress / verified statusNo independent completion status supplied
Landscape / open space
FacilityCommunity Garden
Description / sizeSize not supplied
Evidence sourceVendor amenity list Promoter website
Declared progress / verified statusRERA schedule records “Green Strip/TOT LOT/Park” and aggregate recreational open space at 0%; no independent completion verification supplied RERA amenities
Convenience / community
FacilityMaintenance Staff
Description / sizeDetails not supplied
Evidence sourceVendor amenity list Promoter website
Declared progress / verified statusNo independent completion status supplied

The vendor list also names 24 Hrs Running Water, 24/7 Security, CCTV Camera, Power Backup, Rain Water Harvesting, Sewage Treatment and Surface Car Park. The RERA schedule records water supply, sewerage, rainwater harvesting, and electrical meter room/sub-station/receiving station as available at 100%; those percentages are filed declarations, not independent verification. Promoter website RERA amenities

7. Utilities, building services & safety

The RERA amenity schedule records Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Water Conservation, Rain water Harvesting, and Electrical Meter Room, Sub-Station, Receiving Station as available at 100%. These are schedule entries and do not, by themselves, establish independent inspection or operating status. RERA amenities

The same schedule records Storm Water Drains, Street Lighting, Treatment And Disposal Of Sewage And Sullage Water, Solid Waste Management And Disposal, Energy management, Fire Protection And Fire Safety Requirements, and Fire Safety Provision at 0%. The vendor list also names 24 Hrs Running Water, Power Backup, Rain Water Harvesting, Sewage Treatment, 24/7 Security and CCTV Camera; capacities, installed specifications and verified status are not supplied. RERA amenities Promoter website

No sourced details establish water source or storage capacity, STP capacity/reuse, electrical backup capacity, lifts, fire-system specifications, escape stairs, accessibility provisions or waste-management arrangements. Document index Floor plans

8. Location, access & connectivity

The registered location is MAISAMMAGUDEM, near Hanuman Temple, Dulapally village, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district, PIN 500055. RERA record RERA filing

A location record provides a geocode description referring to Kowkoor Main Road, Near Hanuman Temple (Basti Dawakhana), Yapral-Ammuguda road, Jai Jawahar Nagar, Yapral, and an approximate distance of 3.0 km to the nearest sampled Outer Ring Road interchange. This is a geocoded location record, not a stated travel time. Location record

9. Developer & development status

The registration certificate names Mr./Ms. Tummala Srinivas Reddy as promoter; the project header uses TUMMALA. The supplied data does not establish the promoter’s entity type, corporate identification number, registered office, official contact details or official website. The certificate gives a promoter-office address at House No. SURVEY NO 6 AND 8, Dulapally, Dundigal Gandimaisamma, Medchal-Malkajgiri, PIN 500100. RERA record Corporate record

Form B is a promoter declaration by T. Srinivas Reddy stating that the project would be completed within 3 years and declaring legal title and that the land was free from encumbrances. These are promoter declarations in the filed affidavit.

The project is recorded as On-Going Project, with 90% completeness in the header and completion dates of 04/01/2018 in both the original and revised fields. No independent site-progress report or occupancy/completion certificate is supplied here. RERA filing RERA record Document index

10. Approvals, official records & documents

RecordWhat the supplied material establishes
TG-RERA registration certificate, P02200000711FORM C records registration under section 5 for SANJANAS INTERLAKEN T-3, issued 10/05/2019; includes a separate-account condition.
Project approval fieldsHMDA is recorded as the authority and 11/05/2017 as approved date; the plan approval number is not disclosed in the supplied fields. RERA filing RERA filing
Gram panchayat receipt, document 13443Miscellaneous receipt for a plan appearer fee, identifying Survey No. 8; it does not establish plan approval or title. Recorded numbers include Receipt No. 880030, G.P. Form No. 37, DDNO 965030 and GPD 04/ 2017-2018.
Legal title report, document 13441Advocate’s report dated 30-11-2018 concerning Ac. 0-11 Gts in Sy. No. 8/6, Doolapally Village; cited title instruments are detailed in the title section.
Form B declaration, document 34470Promoter affidavit containing title, encumbrance, completion and RERA-related declarations.
Occupancy / completion certificateNot present in the supplied documents. Document index
Building / layout drawingsDrawing review records two drawings, none measured, one scan pending and one with no flats; an approved drawing set is not established by the supplied extracts. Floor plans

Frequently asked questions

Is SANJANAS INTERLAKEN T-3 registered with Telangana RERA?

Yes. SANJANAS INTERLAKEN T-3 is registered with the Telangana Real Estate Regulatory Authority as P02200000711; the registration status is On-Going Project.

Who is the developer of SANJANAS INTERLAKEN T-3?

The promoter named in the RERA registration is TUMMALA.

Where is SANJANAS INTERLAKEN T-3 located?

SANJANAS INTERLAKEN T-3 is in NEAR HANUMAN TEMPLE, Dulapally, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (500055).

When will SANJANAS INTERLAKEN T-3 be completed?

The promoter's proposed date of completion filed with RERA is 04/01/2018. This is the promoter's declaration, not a guarantee.

More projects in Dulapally