Pearl City
V SRINIVAS AND OTHERS · Sangareddy · RERA P01100005882
PEARL CITY is a plotted development in MOHDSHAPUR, Sangareddy Mandal, Sangareddy District. The registered promoter is V SRINIVAS AND OTHERS. The layout has a total site area of 31331 sq.m and a net site area of 30371.09 sq.m; the supplied record does not state a complete plot count or plot-size schedule. It is registered under TG-RERA number P01100005882, with the promoter’s Form B declaration stating project completion by 23.11.2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | PEARL CITY RERA record |
| Project type | Plotted development / open-plot layout RERA record RERA filing |
| Phase / registered portion | Phase not stated; TG-RERA registration is for the project identified as PEARL CITY |
| TG-RERA registration number | P01100005882 Approvals record |
| Registration validity | 28/03/2023 to 23/11/2024; certificate says “1 years.” The supplied certificate records no extension. Approvals record |
| Registered promoter | V SRINIVAS AND OTHERS RERA record Corporate record |
| Current RERA status | The recorded validity ended on 23/11/2024; no extension is recorded in the supplied evidence. Approvals record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | MOHDSHAPUR RERA record RERA filing |
| Revenue village | The project approval identifies Mohammad Shapur Village; the RERA record identifies SANGAREDDY as the village. RERA record RERA filing |
| Mandal | SANGAREDDY RERA record RERA filing |
| District | Sangareddy RERA record RERA filing |
| PIN | 502306 RERA record RERA filing |
| Project survey number | Survey No. 34 PART RERA record Approvals record |
| Site area | Total site area: 31331 sq.m; net site area: 30371.09 sq.m. RERA filing Layout record |
| RERA land-area entry | Total area 31331 sq.m; area affected in road widening/FTL/Nala widening 959.91 sq.m; net area 30371.09 sq.m. RERA filing |
| Boundaries | East: OTHERS LAND; West: HITENSION LINE AND OTHERS LAND; North: OTHERS LAND; South: OTHERS LAND. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal approval | Draft layout Letter / Layout Permit 000125/LO/Plg/HMDA/2022, approved 23 November 2022. Approvals record |
| Application number | 050454/SKP/LT/U6/HMDA/23112021 Approvals record |
| Approved built-up area | 15592.42 sq.m is listed in the RERA land record as approved built-up area; the supplied project description is an open-plot layout, and the evidence does not provide a building schedule. RERA filing |
| Buildings, floors and parking levels | Not disclosed in the supplied project record; this is a plotted layout rather than a documented apartment-building scheme. RERA filing |
| RERA-declared plot count and plot-size schedule | Not available in the supplied RERA fields. The approved drawing-derived record has no complete plot schedule or plot sizes. Layout record |
Offering and status
| Field | Project record |
|---|---|
| Offering | Plots within an HMDA draft open-plot layout; the RERA evidence supplied does not give a complete plot inventory, plot-size schedule, or booked/available counts. Layout record |
| Development status | RERA project status is “New Project.” The supplied RERA amenity record reports percentages for some layout works, but these are reported progress figures, not independent site verification. RERA filing RERA amenities |
| Completion date | The promoter’s Form B declaration states project completion by 23.11.2024; the RERA registration certificate also ends on 23/11/2024. |
| Occupancy/completion certificate | Not shown in the supplied evidence. The records provided do not establish issuance of a project completion certificate. Document index Approvals record |
2. The project story
- PEARL CITY is registered as a plotted-development project on Survey No. 34 PART at MOHDSHAPUR, in the Sangareddy area. HMDA’s 23 November 2022 draft layout approval describes an open-plot layout with a net site area of 30371.09 sq.m and a total site area of 31331 sq.m. The approval identifies roads, parks/open space and social infrastructure, and sets out infrastructure and handover conditions for progressing from draft approval to final layout release. RERA record RERA filing
- The RERA filing does not provide a complete plot schedule or booked/available inventory. A layout-drawing analysis identifies 17 mortgaged plots, numbered 1–17 (with plot 17 partly mortgaged), and reports a plotted area of 15592.42 sq.m; the drawing-derived plot count and measurements are not a substitute for a complete, verified sale inventory. Layout record
- The supplied RERA amenity record lists reported completion percentages for certain works, including internal roads and footpaths, water supply, sewerage, storm-water drains and green/open-space works. These are filing-based progress entries; no independent site inspection or completion certification is included. RERA amenities
3. Master plan, architecture & building design
The HMDA draft layout record describes 31331 sq.m total site area and 30371.09 sq.m net site area. Its land-use figures include 15592.42 sq.m plotted area, 11470.01 sq.m layout road area, 2533.29 sq.m park area and 775.78 sq.m social infrastructure area; amenities area is recorded as 0. The approval also identifies a 959.91 sq.m HT-line buffer area. Layout record
| Layout component | Area / record | Evidence status |
|---|---|---|
| Total site area | 31331 sq.m | HMDA approval / RERA filing RERA filing |
| Net site area | 30371.09 sq.m | HMDA approval / RERA filing RERA filing |
| Plotted area | 15592.42 sq.m | HMDA approval; also listed as approved built-up area in the RERA land fields RERA filing |
| Layout road area | 11470.01 sq.m | HMDA approval |
| Park area | 2533.29 sq.m | HMDA approval |
| Social infrastructure area | 775.78 sq.m | HMDA approval |
| Amenities area | 0 | HMDA approval |
| HT-line buffer area | 959.91 sq.m | HMDA approval and RERA land record RERA filing |
The layout drawing is one sheet. Its software-derived land-use readout is based on the drawing’s area statement; plot counts and sizes are not complete, and no plots with sizes are available in that extraction. No apartment towers, floor configuration, building footprint, or building-level plans are established in the supplied record. Layout record Floor plans
HMDA’s approval specifies roads 18 mts and above and 60 feet and above, and states a maximum residential building height of 15 mtrs with residential building ground coverage not exceeding 25%. These are approval conditions; the supplied evidence does not establish that buildings have been constructed or that these parameters describe any completed building.
4. Homes, configurations & floor plans
This is a plotted layout, not an apartment configuration in the supplied RERA record. No complete RERA-filed plot inventory, plot-size schedule, or booked and available plot counts is provided. RERA filing Layout record
The layout drawing extraction reports 17 mortgaged plots, Plot Nos. 1 to 17, with Plot No. 17 partly mortgaged, covering 2411.82 sq.m. HMDA’s approval states that the applicant may not sell the mortgaged plots/area until release, and permits sale of plots other than those mortgaged to HMDA. This is an approval condition, not evidence of individual plot allotment or ownership. Layout record
No measured carpet-area or room-configuration analysis applies to the plotted offering. The supplied floor-plan records comprise three drawings: two scans pending measurement, one without flats and one layout sheet. Floor plans
5. Parking & vehicle circulation
The supplied project evidence does not establish a sanctioned count of resident, visitor or accessible parking spaces, parking allocation to individual plots, or mechanical/building parking. It also does not establish parking levels or EV-charging provision. RERA filing
For vehicle circulation, the HMDA approval identifies layout roads 18 mts and above and 60 feet and above and requires all roads to be opened for access to neighbouring sites. The approval also requires footpaths to be paved and cycling tracks to be developed; the supplied record does not independently verify delivery of those works.
6. Amenities, recreation & open spaces
The HMDA draft approval specifies layout infrastructure and facilities. Separately, the RERA amenity record gives reported completion percentages for selected works; those percentages are filing-based and are not independently verified completion findings. RERA amenities
| Description / size | Park area 2533.29 sq.m; the approval also requires open space to be handed over to the Local Body. |
|---|---|
| Evidence source | HMDA draft approval |
| Declared progress / verified status | RERA amenity record: Green Strip/TOT LOT/Park 80%; not independently verified. RERA amenities |
| Description / size | 775.78 sq.m |
|---|---|
| Evidence source | HMDA draft approval |
| Declared progress / verified status | No separate completion status supplied. |
| Description / size | Required within the median on 60-feet-and-above roads and by footpaths towards plot boundaries. |
|---|---|
| Evidence source | HMDA draft approval |
| Declared progress / verified status | No independently verified completion status supplied. |
| Description / size | Required within the layout. |
|---|---|
| Evidence source | HMDA draft approval |
| Declared progress / verified status | No independently verified completion status supplied. |
| Description / size | RERA amenity record lists “Community Buildings.” |
|---|---|
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | 0% recorded; not independently verified. |
| Description / size | Promoter-marketed amenities, not established as sanctioned or delivered by the supplied project approval. |
|---|---|
| Evidence source | Vendor listing Promoter website |
| Declared progress / verified status | No RERA progress or independent verification supplied. |
7. Utilities, building services & safety
The HMDA draft approval requires utility and environmental infrastructure measures for the layout. The RERA amenity record includes progress entries for selected services, but the supplied evidence does not include capacity details or independent commissioning evidence. RERA amenities
| Evidence in the record | HMDA requires internal water-supply pipelines and an overhead tank, with connectivity to Mission Bhagiratha or another approved trunk/connecting pipeline. RERA records Water Supply at 90%. RERA amenities |
|---|---|
| Status / limitation | Approval requirement plus filed progress; source, storage capacity and independent completion verification are not supplied. |
| Evidence in the record | HMDA lists a common septic tank/STP and requires septage treatment for layouts under 10 acres, with treated sewerage connected to the existing public sewerage system as specified. RERA records sewerage works at 80% and treatment/disposal at 60%. RERA amenities |
|---|---|
| Status / limitation | No capacity, commissioning certificate or independent verification supplied. |
| Evidence in the record | HMDA requires underground storm-water drainage and lists rainwater-harvesting pits. RERA records Storm Water Drains at 80% and Water Conservation/Rain water Harvesting at 60%. RERA amenities |
|---|---|
| Status / limitation | Filing progress only; no independent completion evidence supplied. |
| Evidence in the record | HMDA requires a transformer yard in the area earmarked for utilities and LED street lighting. RERA records Electrical Meter Room/Sub-Station/Receiving Station at 60% and Street Lighting at 70%. RERA amenities |
|---|---|
| Status / limitation | No power-supply, backup or commissioning details supplied. |
| Evidence in the record | HMDA requires space for solid-waste disposal, source segregation and a bio-compost unit. |
|---|---|
| Status / limitation | RERA records Solid Waste Management and Disposal at 0%; no independent verification supplied. RERA amenities |
| Evidence in the record | HMDA requires paved footpaths and avenue planting while leaving footpath space for pedestrians. |
|---|---|
| Status / limitation | RERA records Internal Roads & Footpaths at 90%; no independent verification supplied. RERA amenities |
| Evidence in the record | No project-specific fire system, fire clearance or safety-completion evidence is supplied. |
|---|---|
| Status / limitation | RERA amenity record lists Fire Protection and Fire Safety Requirements at 0%. RERA amenities |
8. Location, access & connectivity
The registered project location is MOHDSHAPUR, Survey No. 34 PART, in Sangareddy Mandal and Sangareddy District; the HMDA approval describes the site as being in Mohammad Shapur Village. The RERA record gives PIN 502306. RERA record RERA filing RERA filing
The location record gives the nearest sampled Outer Ring Road interchange at approximately 21.4 km from the cadastral parcel centroid. This is a supplied mapped-distance estimate, not a travel-time claim. Location record Cadastral map
HMDA’s approval specifies internal layout roads of 18 mts and above and 60 feet and above, with road access to neighbouring sites. No project-specific public-transport stop, railway station, approach-road distance, or travel time is established in the supplied project evidence. Location record
9. Developer & development status
The registered promoter is V SRINIVAS AND OTHERS. The RERA record describes the organization type as “Others”; the legal-entity form, corporate identification number, registered office and official contact details are not established in the supplied evidence. RERA record Corporate record RERA filing
The RERA registration certificate records the promoter’s office as Village/Mandal: Kukatpally, District: Medchal-Malkajgiri, PIN 500072. No official promoter website or project contact details are supplied as part of the RERA record.
The Form B affidavits identify six declarants and state that they have legal title to the project land and that an authenticated development agreement is enclosed. They state a completion undertaking of 23.11.2024 and make declarations concerning the separate account, audits and pending approvals. These are promoter-side declarations in the filed document.
The supplied record does not establish a revised completion date, independently verified construction progress, or a completion/occupancy certificate. Approvals record Document index RERA amenities
10. Approvals, official records & documents
| Identifier / date | P01100005882, issued 28/03/2023; stated validity to 23/11/2024 |
|---|---|
| What the supplied evidence establishes | Registration under section 5 for PEARL CITY and recorded promoter obligations. |
| Identifier / date | 000125/LO/Plg/HMDA/2022, 23 November 2022 |
|---|---|
| What the supplied evidence establishes | Technical approval for a draft open-plot layout on Survey No. 34 PART; the document states that the permission is not proof of title and sets conditions before final layout release. |
| Identifier / date | 050454/SKP/LT/U6/HMDA/23112021, application dated 23 November 2021 |
|---|---|
| What the supplied evidence establishes | Application reference recorded in the HMDA approval document. |
| Identifier / date | Document No. 21957, dated 16/6/2022 |
|---|---|
| What the supplied evidence establishes | Approval document identifies mortgage of Plot Nos. 1 to 16 and Plot No. 17 partly, extent 2411.82 sq.m, in favour of the Metropolitan Commissioner, HMDA. |
| Identifier / date | Document No. 21956/22, dated 16.06.2022 |
|---|---|
| What the supplied evidence establishes | Approval document refers to a gift deed for the 959.91 sq.m HT-line buffer area. |
| Identifier / date | Document 302581 |
|---|---|
| What the supplied evidence establishes | Six declarants’ affidavits and project-related undertakings; the extracted text does not state a project registration number. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied evidence establishes | No completion or occupancy certificate is established by the supplied documents. Document index Approvals record |
The supplied HMDA document is a draft layout approval. Its conditions include development works, handing over specified roads/open space/social infrastructure to the Local Body by registered gift deed, and seeking final layout release after the required works and handover.
1. Project at a glance
Project identity
Registered project name: PEARL CITY
Project type: Plotted development / open-plot layout
Phase / registered portion: Phase not stated; TG-RERA registration is for the project identified as PEARL CITY
TG-RERA registration number: P01100005882
Registration validity: 28/03/2023 to 23/11/2024; certificate says “1 years.” The supplied certificate records no extension.
Registered promoter: V SRINIVAS AND OTHERS
Current RERA status: The recorded validity ended on 23/11/2024; no extension is recorded in the supplied evidence.
Land and geographic identity
Locality: MOHDSHAPUR
Revenue village: The project approval identifies Mohammad Shapur Village; the RERA record identifies SANGAREDDY as the village.
Mandal: SANGAREDDY
District: Sangareddy
PIN: 502306
Project survey number: Survey No. 34 PART
Site area: Total site area: 31331 sq.m; net site area: 30371.09 sq.m.
RERA land-area entry: Total area 31331 sq.m; area affected in road widening/FTL/Nala widening 959.91 sq.m; net area 30371.09 sq.m.
Boundaries: East: OTHERS LAND; West: HITENSION LINE AND OTHERS LAND; North: OTHERS LAND; South: OTHERS LAND.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal approval: Draft layout Letter / Layout Permit 000125/LO/Plg/HMDA/2022, approved 23 November 2022.
Application number: 050454/SKP/LT/U6/HMDA/23112021
Approved built-up area: 15592.42 sq.m is listed in the RERA land record as approved built-up area; the supplied project description is an open-plot layout, and the evidence does not provide a building schedule.
Buildings, floors and parking levels: Not disclosed in the supplied project record; this is a plotted layout rather than a documented apartment-building scheme.
RERA-declared plot count and plot-size schedule: Not available in the supplied RERA fields. The approved drawing-derived record has no complete plot schedule or plot sizes.
Offering and status
Offering: Plots within an HMDA draft open-plot layout; the RERA evidence supplied does not give a complete plot inventory, plot-size schedule, or booked/available counts.
Development status: RERA project status is “New Project.” The supplied RERA amenity record reports percentages for some layout works, but these are reported progress figures, not independent site verification.
Completion date: The promoter’s Form B declaration states project completion by 23.11.2024; the RERA registration certificate also ends on 23/11/2024.
Occupancy/completion certificate: Not shown in the supplied evidence. The records provided do not establish issuance of a project completion certificate.
2. The project story
- PEARL CITY is registered as a plotted-development project on Survey No. 34 PART at MOHDSHAPUR, in the Sangareddy area. HMDA’s 23 November 2022 draft layout approval describes an open-plot layout with a net site area of 30371.09 sq.m and a total site area of 31331 sq.m. The approval identifies roads, parks/open space and social infrastructure, and sets out infrastructure and handover conditions for progressing from draft approval to final layout release.
- The RERA filing does not provide a complete plot schedule or booked/available inventory. A layout-drawing analysis identifies 17 mortgaged plots, numbered 1–17 (with plot 17 partly mortgaged), and reports a plotted area of 15592.42 sq.m; the drawing-derived plot count and measurements are not a substitute for a complete, verified sale inventory.
- The supplied RERA amenity record lists reported completion percentages for certain works, including internal roads and footpaths, water supply, sewerage, storm-water drains and green/open-space works. These are filing-based progress entries; no independent site inspection or completion certification is included.
3. Master plan, architecture & building design
The HMDA draft layout record describes 31331 sq.m total site area and 30371.09 sq.m net site area. Its land-use figures include 15592.42 sq.m plotted area, 11470.01 sq.m layout road area, 2533.29 sq.m park area and 775.78 sq.m social infrastructure area; amenities area is recorded as 0. The approval also identifies a 959.91 sq.m HT-line buffer area.
| Layout component | Area / record | Evidence status |
|---|---|---|
| Total site area | 31331 sq.m | HMDA approval / RERA filing |
| Net site area | 30371.09 sq.m | HMDA approval / RERA filing |
| Plotted area | 15592.42 sq.m | HMDA approval; also listed as approved built-up area in the RERA land fields |
| Layout road area | 11470.01 sq.m | HMDA approval |
| Park area | 2533.29 sq.m | HMDA approval |
| Social infrastructure area | 775.78 sq.m | HMDA approval |
| Amenities area | 0 | HMDA approval |
| HT-line buffer area | 959.91 sq.m | HMDA approval and RERA land record |
The layout drawing is one sheet. Its software-derived land-use readout is based on the drawing’s area statement; plot counts and sizes are not complete, and no plots with sizes are available in that extraction. No apartment towers, floor configuration, building footprint, or building-level plans are established in the supplied record.
HMDA’s approval specifies roads 18 mts and above and 60 feet and above, and states a maximum residential building height of 15 mtrs with residential building ground coverage not exceeding 25%. These are approval conditions; the supplied evidence does not establish that buildings have been constructed or that these parameters describe any completed building.
4. Homes, configurations & floor plans
This is a plotted layout, not an apartment configuration in the supplied RERA record. No complete RERA-filed plot inventory, plot-size schedule, or booked and available plot counts is provided.
The layout drawing extraction reports 17 mortgaged plots, Plot Nos. 1 to 17, with Plot No. 17 partly mortgaged, covering 2411.82 sq.m. HMDA’s approval states that the applicant may not sell the mortgaged plots/area until release, and permits sale of plots other than those mortgaged to HMDA. This is an approval condition, not evidence of individual plot allotment or ownership.
No measured carpet-area or room-configuration analysis applies to the plotted offering. The supplied floor-plan records comprise three drawings: two scans pending measurement, one without flats and one layout sheet.
5. Parking & vehicle circulation
The supplied project evidence does not establish a sanctioned count of resident, visitor or accessible parking spaces, parking allocation to individual plots, or mechanical/building parking. It also does not establish parking levels or EV-charging provision.
For vehicle circulation, the HMDA approval identifies layout roads 18 mts and above and 60 feet and above and requires all roads to be opened for access to neighbouring sites. The approval also requires footpaths to be paved and cycling tracks to be developed; the supplied record does not independently verify delivery of those works.
6. Amenities, recreation & open spaces
The HMDA draft approval specifies layout infrastructure and facilities. Separately, the RERA amenity record gives reported completion percentages for selected works; those percentages are filing-based and are not independently verified completion findings.
| Description / size | Park area 2533.29 sq.m; the approval also requires open space to be handed over to the Local Body. |
|---|---|
| Evidence source | HMDA draft approval |
| Declared progress / verified status | RERA amenity record: Green Strip/TOT LOT/Park 80%; not independently verified. |
| Description / size | 775.78 sq.m |
|---|---|
| Evidence source | HMDA draft approval |
| Declared progress / verified status | No separate completion status supplied. |
| Description / size | Required within the median on 60-feet-and-above roads and by footpaths towards plot boundaries. |
|---|---|
| Evidence source | HMDA draft approval |
| Declared progress / verified status | No independently verified completion status supplied. |
| Description / size | Required within the layout. |
|---|---|
| Evidence source | HMDA draft approval |
| Declared progress / verified status | No independently verified completion status supplied. |
| Description / size | RERA amenity record lists “Community Buildings.” |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | 0% recorded; not independently verified. |
| Description / size | Promoter-marketed amenities, not established as sanctioned or delivered by the supplied project approval. |
|---|---|
| Evidence source | Vendor listing |
| Declared progress / verified status | No RERA progress or independent verification supplied. |
7. Utilities, building services & safety
The HMDA draft approval requires utility and environmental infrastructure measures for the layout. The RERA amenity record includes progress entries for selected services, but the supplied evidence does not include capacity details or independent commissioning evidence.
| Evidence in the record | HMDA requires internal water-supply pipelines and an overhead tank, with connectivity to Mission Bhagiratha or another approved trunk/connecting pipeline. RERA records Water Supply at 90%. |
|---|---|
| Status / limitation | Approval requirement plus filed progress; source, storage capacity and independent completion verification are not supplied. |
| Evidence in the record | HMDA lists a common septic tank/STP and requires septage treatment for layouts under 10 acres, with treated sewerage connected to the existing public sewerage system as specified. RERA records sewerage works at 80% and treatment/disposal at 60%. |
|---|---|
| Status / limitation | No capacity, commissioning certificate or independent verification supplied. |
| Evidence in the record | HMDA requires underground storm-water drainage and lists rainwater-harvesting pits. RERA records Storm Water Drains at 80% and Water Conservation/Rain water Harvesting at 60%. |
|---|---|
| Status / limitation | Filing progress only; no independent completion evidence supplied. |
| Evidence in the record | HMDA requires a transformer yard in the area earmarked for utilities and LED street lighting. RERA records Electrical Meter Room/Sub-Station/Receiving Station at 60% and Street Lighting at 70%. |
|---|---|
| Status / limitation | No power-supply, backup or commissioning details supplied. |
| Evidence in the record | HMDA requires space for solid-waste disposal, source segregation and a bio-compost unit. |
|---|---|
| Status / limitation | RERA records Solid Waste Management and Disposal at 0%; no independent verification supplied. |
| Evidence in the record | HMDA requires paved footpaths and avenue planting while leaving footpath space for pedestrians. |
|---|---|
| Status / limitation | RERA records Internal Roads & Footpaths at 90%; no independent verification supplied. |
| Evidence in the record | No project-specific fire system, fire clearance or safety-completion evidence is supplied. |
|---|---|
| Status / limitation | RERA amenity record lists Fire Protection and Fire Safety Requirements at 0%. |
8. Location, access & connectivity
The registered project location is MOHDSHAPUR, Survey No. 34 PART, in Sangareddy Mandal and Sangareddy District; the HMDA approval describes the site as being in Mohammad Shapur Village. The RERA record gives PIN 502306.
The location record gives the nearest sampled Outer Ring Road interchange at approximately 21.4 km from the cadastral parcel centroid. This is a supplied mapped-distance estimate, not a travel-time claim.
HMDA’s approval specifies internal layout roads of 18 mts and above and 60 feet and above, with road access to neighbouring sites. No project-specific public-transport stop, railway station, approach-road distance, or travel time is established in the supplied project evidence.
9. Developer & development status
The registered promoter is V SRINIVAS AND OTHERS. The RERA record describes the organization type as “Others”; the legal-entity form, corporate identification number, registered office and official contact details are not established in the supplied evidence.
The RERA registration certificate records the promoter’s office as Village/Mandal: Kukatpally, District: Medchal-Malkajgiri, PIN 500072. No official promoter website or project contact details are supplied as part of the RERA record.
The Form B affidavits identify six declarants and state that they have legal title to the project land and that an authenticated development agreement is enclosed. They state a completion undertaking of 23.11.2024 and make declarations concerning the separate account, audits and pending approvals. These are promoter-side declarations in the filed document.
The supplied record does not establish a revised completion date, independently verified construction progress, or a completion/occupancy certificate.
10. Approvals, official records & documents
| Identifier / date | P01100005882, issued 28/03/2023; stated validity to 23/11/2024 |
|---|---|
| What the supplied evidence establishes | Registration under section 5 for PEARL CITY and recorded promoter obligations. |
| Identifier / date | 000125/LO/Plg/HMDA/2022, 23 November 2022 |
|---|---|
| What the supplied evidence establishes | Technical approval for a draft open-plot layout on Survey No. 34 PART; the document states that the permission is not proof of title and sets conditions before final layout release. |
| Identifier / date | 050454/SKP/LT/U6/HMDA/23112021, application dated 23 November 2021 |
|---|---|
| What the supplied evidence establishes | Application reference recorded in the HMDA approval document. |
| Identifier / date | Document No. 21957, dated 16/6/2022 |
|---|---|
| What the supplied evidence establishes | Approval document identifies mortgage of Plot Nos. 1 to 16 and Plot No. 17 partly, extent 2411.82 sq.m, in favour of the Metropolitan Commissioner, HMDA. |
| Identifier / date | Document No. 21956/22, dated 16.06.2022 |
|---|---|
| What the supplied evidence establishes | Approval document refers to a gift deed for the 959.91 sq.m HT-line buffer area. |
| Identifier / date | Document 302581 |
|---|---|
| What the supplied evidence establishes | Six declarants’ affidavits and project-related undertakings; the extracted text does not state a project registration number. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied evidence establishes | No completion or occupancy certificate is established by the supplied documents. |
The supplied HMDA document is a draft layout approval. Its conditions include development works, handing over specified roads/open space/social infrastructure to the Local Body by registered gift deed, and seeking final layout release after the required works and handover.
Frequently asked questions
Is PEARL CITY registered with Telangana RERA?
Yes. PEARL CITY is registered with the Telangana Real Estate Regulatory Authority as P01100005882; the registration status is New Project.
Who is the developer of PEARL CITY?
The promoter named in the RERA registration is V SRINIVAS AND OTHERS.
Where is PEARL CITY located?
PEARL CITY is in MOHDSHAPUR, SANGAREDDY, Telangana (502306).
When will PEARL CITY be completed?
The promoter's proposed date of completion filed with RERA is 23/11/2024. This is the promoter's declaration, not a guarantee.