Sign in

Sai Elina

SRI SAI KRUPA CONSTRUCTIONS · Rangareddy · RERA P02400000879

SAI ELINA is a residential apartment project near Miyapur Metro Station, in Serilingampally, Ranga Reddy. It is being developed by the registered promoter, SRI SAI KRUPA CONSTRUCTIONS, on a site of 668.50 sq. m. The project comprises one residential building, Building-A, with Stilt + 5 floors and 15 apartments: five 2BHK units of 76.32 sq. m. each and ten 3BHK units of 102.81 sq. m. each. Its TG-RERA registration is P02400000879, and the proposed completion date is 22 May 2024.

More from Sri Sai Krupa Constructions · 2 projects →

01What we found

Period endedTG-RERA registration ran to 22 May 2024 - check its extension on TG-RERA
8documents on file - each fact links to its page
157court cases on this project's land (survey 44, Near Miyapur Metro Station)
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameSAI ELINA
Project typeResidential apartment project
Phase / registered portionOne registered residential building, identified in the GHMC records as Building-A / A (RESI BUILD); separate phase details are not disclosed.
TG-RERA registrationP02400000879
Registration validity13 June 2019 to 22 May 2024; the certificate states four years and says validity was subject to extension by the Authority. No extension is recorded in the supplied certificate. Registration validity is distinct from the project’s completion date and occupancy certification.
Registered promoterSRI SAI KRUPA CONSTRUCTIONS
RERA status in the supplied project recordListed as “On-Going Project.” The record also includes a GHMC occupancy certificate for the building; see the scope and document index below.

RERA record RERA filing Approvals record

Land and geographic identity

ItemProject record
LocalityNear Miyapur Metro Station
Revenue villageMiyapur village is named in the title report and GHMC occupancy certificate. The RERA header separately records the village/locality as “NEAR MIYAPUR METRO STATION”; the exact revenue-village identity should therefore be confirmed against official land records.
Mandal / district / PINSerilingampally / Ranga Reddy / 500049
Survey number(s) and subdivisionsSy. No. 44/1; no further subdivision is disclosed.
Registered site extent668.50 sq. m.
Total / net areaTotal area 668.50 sq. m.; net area 668.50 sq. m.; road-affected area recorded as 0.
Plot referencePlot No. 149
Boundaries recorded in the RERA land detailsEast: Road width 148; West: Plot No. 150; North: Plot No. 142; South: Road width 9. The supplied record does not specify units for these boundary road-width figures.

RERA record RERA filing Land records

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building permitApproval No. 2/C12/08715/2018, dated 22 May 2018; file No. 2/C12/19101/2017
Approved built-up area1,567.95 sq. m. residential upper-floor area recorded in the building permit. The permit separately records a stilt area of 373.59 sq. m.
Building count and configurationOne residential building, Building-A / A (RESI BUILD), sanctioned as Stilt + 5 floors. The permit records a height of 14.95 m.
Parking levels / provisionGHMC permit conditions require approved cellar and stilt areas to be used exclusively for vehicle parking. The supplied material does not establish a sanctioned count of parking spaces.
Unit countRERA record: 15 units. GHMC permit condition: sanctioned unit count must not be increased without prior GHMC approval.
Layout reference2209/MP2/HUDA/90 is recorded in the permit as a layout / sub-division number.

Approvals record RERA filing

Offering and status

ItemProject record
Configurations and RERA-filed saleable areas2BHK: 5 units, 76.32 sq. m. each; 3BHK: 10 units, 102.81 sq. m. each.
Booked / availablePortal-derived counts show 15 booked and 0 available: 5 of 5 2BHK and 10 of 10 3BHK. These counts are indicative; the portal record has no stated as-of date.
Construction stage in RERA header“On-Going Project.”
Completion datesGHMC permit: construction to be completed before 22 May 2024. RERA header: proposed and revised proposed completion both 22 May 2024. The Form B declaration separately undertakes completion by 24 December 2023.
Occupancy certificateGHMC occupancy certificate No. 2/C21/07814/2021, application No. 2/C21/06306/2021-OC, dated 23 June 2021, for the residential building at Plot 149, Sy. No. 44/1, Miyapur. It records completion on 15 February 2021. The certificate’s scope is this identified building; no separate phase or tower is disclosed.

RERA unit table RERA unit details RERA record

2. The project story

SAI ELINA is registered as a residential apartment project on a 668.50 sq. m. site at Plot No. 149, Sy. No. 44/1, Miyapur, Serilingampally, Ranga Reddy. The GHMC building permit describes one residential building, Building-A, with stilt and five upper floors. The RERA unit schedule records 15 homes: five 2BHK and ten 3BHK apartments. RERA record RERA filing RERA unit table

The project record labels the project “On-Going,” while the supplied GHMC occupancy certificate identifies the same plot, survey number, promoter and residential building, and states that the building was inspected and declared fit for occupation. This Overview reports both records and the certificate’s stated building scope; it does not independently verify present site conditions, occupation, or completion of every project obligation. RERA filing

3. Master plan, architecture & building design

The GHMC permit records one residential building, Building-A, on a 668.5 sq. m. site, with Stilt + 5 floors, a stated height of 14.95 m, and residential upper-floor area of 1,567.95 sq. m. It separately records a stilt area of 373.59 sq. m. These are permit figures; the supplied materials do not provide a verified FSI calculation or a complete schedule distinguishing all gross, common-area and other built-up measurements. RERA filing

The permit references layout / sub-division number 2209/MP2/HUDA/90. The supplied project record does not include an accessible approved-layout drawing or enough drawing-derived data to describe building footprint, flats per floor, entrances, stairs, lifts, internal circulation, landscaping or the distribution of common and private areas. HMDA Document index

The building permit records 0 sq. m. road-affected area, 0 sq. m. tot-lot, six rainwater-harvesting pits and 30 trees.

4. Homes, configurations & floor plans

The TG-RERA schedule records 15 apartments across two configurations. The floor-plan drawing for document 24218 was measured by software for unit geometry; those measurements are not RERA-filed carpet-area disclosures and are flagged for review. The RERA-filed figures below are saleable area. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK55076.32 sq. m.Software-measured: median 64.1 sq. m.; range 64.0–64.2 sq. m.16%
3BHK10100102.81 sq. m.Software-measured: median 95.2 sq. m.; range 94.2–95.7 sq. m.Not supplied

RERA unit table RERA unit details Floor plans

The drawing-based room schedule includes, for one measured 2BHK plan, bedrooms, living, toilet, dining/kitchen and utility areas. One measured 3BHK plan includes bedrooms, living, dining, kitchen, toilets and a utility area. These room labels and dimensions are drawing measurements, not RERA disclosures; review them against the filed drawing before relying on them. RERA unit details

Carpet area is the apartment’s net usable floor area as defined in the Act; exclusive balcony/verandah and open-terrace areas are excluded, while internal partition walls are included. Saleable area is the RERA-filed figure in this record and should not be treated as carpet area. The supplied unit details do not separately quantify balcony or common-area loading components. § Act s.2 RERA unit table Floor plans

5. Parking & vehicle circulation

The GHMC permit requires the approved cellar and stilt areas to be used exclusively for vehicle parking, without partition walls or rolling shutters. The permit records parking area figures in the occupancy-certificate record, but the supplied material does not establish a count of parking spaces, resident or visitor allocations, accessible spaces, mechanical parking, EV charging, or a legally documented allocation to individual apartments. A parking area shown or reserved in an approval is not, by itself, evidence of exclusive ownership or allotment.

The project’s internal vehicle routes, ramp arrangement, entry/exit configuration and pedestrian separation are not described in the supplied records. Document index

6. Amenities, recreation & open spaces

The RERA amenity record lists the following project infrastructure and progress entries. These entries are record disclosures, not independent site verification.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Water supplyNo source, storage or capacity specifiedRERA amenitiesRERA record: available YES; 100%; not independently verified
Sewerage (chamber, lines, septic tank, STP)No capacity or system details specifiedRERA amenitiesRERA record: available YES; 100%; not independently verified
Storm-water drainsNo further details specifiedRERA amenities0%; completion not established
Rainwater harvesting / water conservationGHMC permit specifies 6 rainwater-harvesting pits; occupancy certificate also refers to rainwater harvestingRERA amenitiesRERA record: available YES; 100%; not independently verified
Electrical meter room / substation / receiving stationNo capacity specifiedRERA amenitiesRERA record: available YES; 100%; not independently verified
Internal roads and footpathsNo dimensions or layout details suppliedRERA amenities0%; completion not established
Green strip / tot-lot / parkGHMC permit records tot-lot area of 0 sq. m.RERA amenitiesRERA record: 0%; completion not established
Street lightingNo further details specifiedRERA amenities0%; completion not established
Community buildingsNo facility or size specifiedRERA amenities0%; completion not established
Sewage and sullage treatment/disposalNo treatment details or capacity specifiedRERA amenities0%; completion not established
Solid-waste management and disposalNo details specifiedRERA amenities0%; completion not established
Energy managementNo details specifiedRERA amenities0%; completion not established
Fire protection and fire-safety requirementsNo system details specifiedRERA amenities0%; completion not established
Recreational open spaceNo area specifiedRERA amenities0%; completion not established

RERA amenities

7. Utilities, building services & safety

The RERA amenity record marks water supply, sewerage infrastructure, rainwater harvesting and an electrical meter room/substation/receiving station as available at 100%. It does not specify water sources or storage capacity, an STP capacity or reuse arrangement, drainage design, electrical supply capacity, backup power, lift specifications, or security systems. RERA amenities

The GHMC building permit requires a transformer space, a garbage house within the premises and a rainwater-harvesting percolation pit. The occupancy certificate lists conditions concerning rainwater harvesting, twin waste bins, onsite composting encouragement, worker toilets and a working fire extinguisher on each floor. These are authority-recorded requirements or conditions; the supplied material does not independently establish that each has been installed or is operating.

The supplied record does not document lift numbers or capacities, fire-engine access, escape-stair details, CCTV installation, accessible routes or ramps. The occupancy certificate includes a condition requiring CCTV installation, but the evidence pack does not verify installation or operation. Document index

8. Location, access & connectivity

The project is identified in the RERA record as near Miyapur Metro Station, in Serilingampally mandal, Ranga Reddy district, PIN 500049. The title report and GHMC occupancy certificate identify Miyapur village and Plot No. 149, Sy. No. 44/1. The supplied locality wording is not sufficient to establish a street address or a verified route to the metro station. RERA record RERA filing

A supplied parcel-centroid record gives coordinates 17.41528, 78.35459. The location data also lists the Financial District (Nanakramguda) at 1.2 km; no route or measurement method is supplied. Location record

9. Developer & development status

The registered promoter is SRI SAI KRUPA CONSTRUCTIONS, identified in the project record as a partnership. The supplied promoter details name Nakkala Durga Reddy and Sadu Pratap Reddy as authorized signatories. A promoter office address is recorded as SVS Nilayam, Chandanagar, Matrusri Nagar, near Miyapur Metro Station, Serilingampally, Ranga Reddy, 500049. A corporate registration identifier and official contact details or website are not disclosed in the supplied records. Parties record Corporate record RERA filing

The RERA Form B declaration states that the promoter has legal title to the project land and that the land is free from encumbrances; it also declares the project completion undertaking as 24 December 2023. These are promoter declarations. The RERA header records 22 May 2024 as both the proposed and revised proposed completion date. RERA record

The GHMC occupancy certificate is for the one identified residential building at Plot 149, Sy. No. 44/1. No separate phase-wise development or independently verified current construction-progress report is supplied. RERA filing

10. Approvals, official records & documents

RecordSupplied reference and scope
TG-RERA registration certificateForm C; project SAI ELINA, registration P02400000879, promoter Sri Sai Krupa Constructions; valid 13 June 2019–22 May 2024.
GHMC building permitApproval 2/C12/08715/2018, dated 22 May 2018; file 2/C12/19101/2017; Building-A, residential, Sy. No. 44/1, Stilt + 5 floors.
GHMC occupancy certificateApproval 2/C21/07814/2021, dated 23 June 2021; application 2/C21/06306/2021-OC; residential building, Plot 149, Sy. No. 44/1, Miyapur.
Title reportAdvocate’s title scrutiny report dated 5 March 2019 for Plot No. 149, Sy. No. 44/1, Miyapur; deed references are indexed in the Land & Title section.
Encumbrance statementProject-filed encumbrance statement, document 24212; its recorded search period is 1 January 1989–29 November 2018.
Floor-plan drawingDocument 24218; used for software-measured unit-plan areas, which are not RERA-filed disclosures.
Form B declarationPromoter declaration filed for the project, including stated title, encumbrance and completion undertakings.

A public HMDA approved-layout lookup was unavailable in the supplied research record; this is a source-access limitation, not evidence of approval or refusal. HMDA

Frequently asked questions

Is SAI ELINA registered with Telangana RERA?

Yes. SAI ELINA is registered with the Telangana Real Estate Regulatory Authority as P02400000879; the registration status is On-Going Project.

Who is the developer of SAI ELINA?

The promoter named in the RERA registration is SRI SAI KRUPA CONSTRUCTIONS.

Where is SAI ELINA located?

SAI ELINA is in NEAR MIYAPUR METRO STATION, Serilingampally, Rangareddy, Telangana (500049).

When will SAI ELINA be completed?

The promoter's proposed date of completion filed with RERA is 22/05/2024. This is the promoter's declaration, not a guarantee.

More projects in Serilingampally