SAFFIRE 1 is a residential apartment project in Lingampally, Hyderabad, Telangana; the mandal is not stated. The registered promoter is Udumala Balaswamy Reddy. The project covers 601.59 sq. m. and comprises one building, Building A (NEW GACHIBOWLI 10), with Stilt + 5 floors and 15 apartments: 10 two-bedroom and 5 three-bedroom units. Registered with TG-RERA as P02500001002, the project has a proposed completion date of 30/06/2024.

01What we found

Period endedTG-RERA registration ran to 30 Jun 2024 - check its extension on TG-RERA
13documents on file - each fact links to its page
45court cases on this project's land (survey 87, 88, 89, Lingampally)
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

FieldRecord
Registered project nameSAFFIRE 1 RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNo separate phase name is disclosed. The registration covers the project at Plot No. 10, with survey numbers 87, 88/2 and 89/2. RERA filing
TG-RERA registrationP02500001002
Registration validity12/07/2019 to 30/06/2024; the supplied certificate says four years and no extension is recorded in the supplied evidence. Registration validity is not the same as the construction-completion deadline or an occupancy certificate.
Registered promoterUdumala Balaswamy Reddy, as named on the certificate. Entity type is not disclosed. Corporate record
RERA / project statusThe RERA record labels the project “New Project.” The supplied registration certificate’s validity ended on 30/06/2024; current registration status is not established by the supplied documents. RERA filing

Land and geographic identity

FieldRecord
Locality / streetLingampally; Sudharshan Nagar is listed in the project address. RERA filing
Revenue villageSerilingampally Village is named in the building permit and title materials; the RERA project record labels the village Lingampally. RERA filing
MandalNot disclosed in the supplied project identity fields. Land records
District / PINHyderabad, Telangana / 500019. RERA filing
Survey numbers and subdivisions87, 88/2 and 89/2. RERA filing
Plot referencePlot No. 10. RERA filing
Registered site extent601.59 sq. m. in the RERA land record and permit extraction. RERA filing
Total / net area and road-affected areaRERA records total area 601.59 sq. m., net area 601.59 sq. m. and affected area 0 sq. m. The permit extraction separately records a road-affected area of 11.95 sq. m.; details of this record are indexed below. RERA filing
Boundaries in RERA recordEast: road width 9; West: others’ land; North: others’ open land; South: Jai Bharathi Housing. RERA filing

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal building permit1/C20/10916/2018, dated 30 June 2018. The permit extraction also lists file number 1/C11/00850/2017. Approvals record
BuildingOne residential building: Building A (NEW GACHIBOWLI 10).
Sanctioned configurationStilt + 5 floors; stated height 14.95 m.
Approved built-up areaThe permit extraction lists residential area of 1,305.95 sq. m. and commercial area of 0.00 sq. m. The separate RERA field for approved built-up area is 601.59 sq. m. These labels are reproduced as recorded; they are not treated as interchangeable area measures. RERA filing
UnitsThe RERA unit record lists 15 units: 10 two-bedroom and 5 three-bedroom apartments. The permit extraction does not state an approved apartment count. RERA unit table RERA unit table
Parking levels / countThe permit describes a stilt, but the supplied evidence does not give a sanctioned parking-space count or a unit-wise parking allocation. RERA filing

Offering and status

FieldRecord
RERA-filed configurations2BHK and 3BHK apartments. RERA unit table
RERA-filed saleable area2BHK: 94.76 sq. m.; 3BHK: 134.24 sq. m. RERA unit table
Booked / availablePortal-derived counts show 0 booked and 10 available 2BHKs; 0 booked and 5 available 3BHKs. The record has no as-of date, so counts are indicative, not a current inventory confirmation. RERA unit table RERA unit table
Construction progressThe RERA record reports 90% completeness, but the supplied evidence does not establish the date or independently verify that figure. RERA record
Completion deadlineThe RERA registration and promoter’s Form B state 30/06/2024 as the completion date.
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied documents; the permit requires an occupancy certificate before occupation. Document index

The project story

SAFFIRE 1 is a residential apartment project registered with TG-RERA as P02500001002, at Plot No. 10 in Lingampally, Hyderabad, on survey numbers 87, 88/2 and 89/2. The GHMC permit identifies the site as part of Serilingampally Village and sanctions one building, Building A (NEW GACHIBOWLI 10), for residential use. RERA record

The RERA inventory describes 15 apartments—10 two-bedroom and 5 three-bedroom units. The portal-derived booking record shows all 15 as available and none booked, but its as-of date is not supplied. RERA unit table RERA unit table

The promoter undertook to complete the project by 30/06/2024, and the registration certificate also ended on that date. The RERA record reports 90% completeness, but the supplied material does not date or independently verify that progress figure. No occupancy or completion certificate is supplied, so the materials do not establish that the building is complete or approved for occupation. RERA record Document index

Master plan, architecture & building design

The supplied GHMC permit extraction describes one residential building, Building A (NEW GACHIBOWLI 10), with a Stilt + 5 configuration and a stated height of 14.95 m. It records a site area of 601.59 sq. m., residential area of 1,305.95 sq. m., and commercial and other areas of 0.00 sq. m. The RERA record separately lists approved built-up area as 601.59 sq. m. The supplied evidence does not provide a drawing-based reconciliation of these differently labelled figures, so they are kept separate rather than treated as equivalent. RERA filing

The project has one building and one tower in the RERA record. The permit’s floor description identifies a stilt and five floors above; no basement, podium, floor-by-floor apartment arrangement, building footprint, lift or stair configuration, or internal circulation drawing is supplied. RERA unit table Document index

A building permit is available, but the supplied project documents do not include an extractable approved floor plan or layout drawing. Accordingly, arrangement of apartments, open spaces and common areas cannot be described from the available drawings. Document index

Homes, configurations & floor plans

TG-RERA records 15 apartments across two configurations. The available unit record has no as-of date. RERA unit table RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1001094.76 sq. m.Not measured in supplied drawingsNot supplied
3BHK505134.24 sq. m.Not measured in supplied drawingsNot supplied

The RERA-filed saleable figures are distinct from carpet area. The supplied floor-plan review says drawing-based software measurements were not completed; one drawing is pending scanning and another contains no flats. No software-measured carpet area, room dimensions, balcony or utility measurements, or loading figures are therefore available. RERA unit details Floor plans

Parking & vehicle circulation

The building permit describes a stilt, but the supplied records do not establish the number of sanctioned parking spaces, whether spaces are for residents or visitors, any accessible or mechanical parking, or the existence of a basement or podium parking level. The RERA project record lists a mortgage area of 141.01 sq. m.; the permit extraction separately describes a mortgaged built-up area of 141.55 without a unit of area in that extracted field. Neither figure establishes a buyer’s exclusive parking allocation. RERA filing

A vendor listing mentions covered car parking, but no supplied TG-RERA or sanctioned-plan extract establishes its count or allocation. Promoter website

Amenities, recreation & open spaces

The GHMC permit specifies a tot-lot to be fenced and maintained as greenery before issue of an occupancy certificate. The RERA amenity record lists common infrastructure items and provides declared progress percentages; these are not independent verification of completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot / green areaSize not stated; permit requires fencing and maintenance as greenery before issue of occupancy certificate.GHMC permitNo completion evidence supplied.
Internal roads and footpathsSize not stated.RERA amenities record0% declared. RERA amenities
Green strip / tot-lot / parkSize not stated.RERA amenities record0% declared. RERA amenities
Community buildingsNo further description or size supplied.RERA amenities record0% declared. RERA amenities

No project-specific RERA evidence in the supplied material describes a clubhouse, indoor recreation facilities, sports facilities or other community amenities. Vendor-listed features are not represented as RERA-filed or sanctioned facilities here.

Utilities, building services & safety

The GHMC permit requires a rainwater-harvesting structure (percolation pit), space for a transformer, a garbage house within the premises and an ETP to standard specifications. These are permit conditions; the supplied evidence does not establish that they have been installed or completed.

The RERA amenity record marks water supply, sewerage/STP, rainwater harvesting and electrical meter room/sub-station/receiving station as available, while recording progress of 15% for water supply, 0% for sewerage, 0% for rainwater harvesting and 10% for the electrical meter room/sub-station/receiving station. These are declared record fields, not independent completion verification. RERA amenities

The permit makes an occupancy certificate compulsory before occupation. The supplied materials do not provide details of water sources or storage, sewage-treatment capacity, drainage or reuse systems, electrical backup, lift number or capacity, fire systems, waste-segregation arrangements, security systems or accessibility provisions. Document index

Location, access & connectivity

The registered project location is Lingampally, Hyderabad, Telangana, PIN 500019; Sudharshan Nagar is listed in the RERA address fields. The permit identifies the site as being in Serilingampally Village and refers to its locality as near Bhagyalaxmi Nagar. RERA filing

The RERA boundary record gives an eastern road width of 9, with other land to the west, other open land to the north, and Jai Bharathi Housing to the south. The permit extraction separately records road widths of 18 mt. RERA filing

The supplied location data lists the Financial District (Nanakramguda) at 1.2 km from the parcel-centroid location. Vendor-provided connectivity details list Lingampalli Railway Station at 1.0 Km, University Of Hyderabad at 2.1 Km, and Sujana Vidya Nikethan at 2.9 Km; these are vendor claims, not independently verified distances. Location record Promoter website

Developer & development status

The TG-RERA certificate names Udumala Balaswamy Reddy as promoter. The project’s Form B declaration is made by U BALASWAMY as the authorized signatory for SAFFIRE 1; the supplied evidence does not identify the promoter’s legal entity type, corporate registration number, registered-office address or official contact details. Corporate record

The promoter’s Form B, dated 04/07/2019, declares that the project land is free from encumbrances and undertakes completion by 30 JUNE 2024. These are promoter declarations. The RERA record’s 90% completeness figure has no supplied as-of date or independent site verification. The supplied registration certificate ends on 30/06/2024, and no extension or occupancy/completion certificate is present in the supplied evidence. RERA record Document index

Approvals, official records & documents

TG-RERA registration certificate
Supplied evidenceForm C; P02500001002, issued 12/07/2019, valid to 30/06/2024.
Scope / noteSAFFIRE 1; survey numbers 87, 88/2 and 89/2. No extension is recorded in the supplied certificate.
GHMC building permit
Supplied evidenceBuilding Permit Order 1/C20/10916/2018, dated 30 June 2018; file number 1/C11/00850/2017.
Scope / noteBuilding A (NEW GACHIBOWLI 10), Stilt + 5, residential use; survey numbers 87, 88/2 and 89/2.
Layout / subdivision reference
Supplied evidenceLRS20092016040102 is listed in the permit extraction.
Scope / noteThe supplied material does not include an extractable stamped layout approval drawing.
Promoter declaration
Supplied evidenceForm B dated 04/07/2019.
Scope / noteIncludes promoter declarations on title, encumbrances, completion date and project-fund obligations.
Occupancy / completion certificate
Supplied evidenceNot supplied. Document index
Scope / noteThe building permit requires an occupancy certificate before occupation.

The supplied material does not include an occupancy certificate, completion certificate, or extractable approved floor-plan drawing. The permit itself records that the building permission does not confer ownership rights and includes conditions concerning commencement and completion notices, rainwater harvesting, transformer space, garbage-house provision and an ETP.

Frequently asked questions

Is SAFFIRE 1 registered with Telangana RERA?

Yes. SAFFIRE 1 is registered with the Telangana Real Estate Regulatory Authority as P02500001002; the registration status is New Project.

Who is the developer of SAFFIRE 1?

The promoter named in the RERA registration is Udumala.

Where is SAFFIRE 1 located?

SAFFIRE 1 is in LINGAMPALLY, Hyderabad, Telangana (500019).

When will SAFFIRE 1 be completed?

The promoter's proposed date of completion filed with RERA is 30/06/2024. This is the promoter's declaration, not a guarantee.

More projects in Hyderabad