Sadhana
MAGNA INFRATECH LLP · Rangareddy · RERA P02400007174
SADHANA is a residential apartment project in Nallagandla Village, Serilingampally Mandal, Ranga Reddy District, being developed by MAGNA INFRATECH LLP. The registered site area is 540.96 sq. m, with one building, A (BLOCK C), configured as 1 Stilt + 4 upper floors. The RERA filing lists 10 homes: 5 2BHK and 5 3BHK. The project is registered under TG-RERA number P02400007174, granted 23 October 2023, with proposed completion recorded as 12/01/2027.
More from Magna Infratech LLP · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | SADHANA RERA record |
| Project type / use | Residential apartment project RERA record |
| Phase / registered portion | One registered portion is identified in the supplied record; the building is named A (BLOCK C) in the GHMC permit. No separate phase name is disclosed. |
| TG-RERA registration | P02400007174; granted 23 October 2023; captured on the TG-RERA record 10 September 2026. RERA record |
| Registration validity | Certificate states validity from 23/10/2023 to 12/09/2026, unless extended by the Authority. Extension status is not established in the supplied evidence. |
| Registered promoter | MAGNA INFRATECH LLP, an LLP. RERA record Corporate record |
| RERA status | Registered project; current status after the certificate’s stated end date is not established by the supplied record. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Nallagandla Village (also rendered in source records as NALLAGANDLA); locality: Nallagandla. RERA record RERA filing |
| Mandal | Serilingampally RERA record |
| District | Ranga Reddy (permit extraction renders it “Rangareddy”). RERA record |
| PIN | 500019 RERA record |
| Project survey identifier(s) | Survey No. 176p in the TG-RERA identity and registration records; Survey No. 176/PART in the GHMC building permit. RERA record |
| Registered site extent | 540.96 sq. m; total area and net area are each recorded as 540.96 sq. m. RERA filing |
| Road-affected / nala-affected area | 00 sq. m in the permit extraction. |
| Boundaries in project filing | East: “naighbours land”; west: 9 mtr wide road; north: “others land”; south: “naighbours land.” RERA filing |
| Permit road-width entry | 18 mt. is also listed in the GHMC permit extraction; its specific road reference is not clarified in the extracted field. |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building permit | 3388/GHMC/SLP/2023-BP, approved 12 September 2023; file no. 008203/GHMC/4067/SLP2/2023-BP. Approvals record |
| Other layout / subdivision identifier recorded with permit | C/GHMC/013883/2020 |
| Approved built-up area | 1,306 sq. m in the project filing. The permit extraction separately lists 1,045.04 Sq.Mt. for “Residential 4 upper floors” and 246.92 Sq.Mt. for “Stilt parking area.” These are distinct permit-extracted entries; no further area reconciliation is supplied here. RERA filing |
| Building / tower count | 1 building/unit in the filed project data; one tower is recorded in the unit summary. RERA filing RERA unit table |
| Sanctioned configuration | 1 Stilt + 4 upper floors; permit identifies A (BLOCK C) and building height 12.00 m. |
| Parking | Permit records 261.3 as total parking area and 246.92 Sq.Mt. as stilt parking area. Parking space counts and allocation are not stated in the supplied extracts. |
| Approved vs. RERA-filed unit count | 10 units in the RERA unit record; the permit condition says sanctioned unit numbers must not be increased without GHMC approval, but the extracted permit data does not give a numeric sanctioned dwelling-unit count. RERA unit table |
Offering and status
| Item | Record |
|---|---|
| RERA-filed configurations | 2BHK: 5 units; 3BHK: 5 units. RERA unit table RERA unit details |
| RERA-filed saleable area | 2BHK: 136.4 sq. m each; 3BHK: 152.4 sq. m each. RERA unit table |
| Booked / available | Portal-derived counts show 0 booked / 5 available for each configuration, 10 available in total. The portal record has no as-of date, so these counts are indicative. RERA unit table |
| Construction stage | A project construction-stage percentage is not supplied. The RERA amenity/infrastructure record lists 0% for its listed items; this is not an independently verified site inspection. RERA amenities |
| Completion dates | TG-RERA registration certificate and Form B undertaking state 12 September 2026; the GHMC permit states construction to be completed before 12 September 2026. The project header separately records proposed completion 12/01/2027. The supplied evidence does not establish an approved extension or explain the relationship between these dates. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied documents. The GHMC permit says an occupancy certificate is compulsory before occupation and requires a fire NOC before its issue. |
2. The project story
SADHANA is filed with TG-RERA as a residential apartment project on a 540.96 sq. m site in Nallagandla Village, Serilingampally Mandal, Ranga Reddy District, identified as Survey No. 176p in the RERA record and Survey No. 176/PART in the GHMC permit. The sanctioned building is A (BLOCK C): one stilt level and four upper floors, for residential use. RERA record RERA filing
The RERA unit record lists ten homes: five 2BHK and five 3BHK. The registration certificate is dated 23 October 2023 and states validity through 12 September 2026 unless extended. The supplied record does not establish the project’s current construction stage, an extension, or issuance of an occupancy/completion certificate. The amenity progress fields show 0%; these are filed status entries, not independent confirmation of site conditions. RERA unit table RERA amenities
3. Master plan, architecture & building design
The GHMC building permit covers a 540.96 sq. m plot and records the same net plot area, with zero road-affected and zero nala-affected area in its extracted land-area fields. It permits one residential block, A (BLOCK C), configured as 1 Stilt + 4 upper floors, with a recorded building height of 12.00 m.
The permit extraction lists 1,045.04 Sq.Mt. for residential four upper floors and 246.92 Sq.Mt. for stilt parking. Separately, the project filing records approved built-up area as 1,306 sq. m. The supplied material does not provide a drawing-based breakdown of footprint, floor-by-floor areas, flat count per floor, lifts, stairs, entries/exits, internal circulation, landscaping or open-space dimensions. The permit lists a tot-lot and a greenery strip, but dimensions and completion status are not supplied. RERA filing
The RERA-filed unit areas below are saleable areas. They are not identified as carpet areas in the supplied record. RERA unit table RERA unit details
4. Homes, configurations & floor plans
The RERA filing lists five 2BHK and five 3BHK homes. Software measurement of the approved floor-plan drawing 357181 gives the carpet-area ranges below; these are drawing-based measurements, not RERA-filed carpet disclosures, and the source notes that measurements need review. The RERA saleable area includes a different area basis and should not be read as carpet area. RERA unit details Floor plans
| Configuration | Units | Booked | Available* | RERA saleable area | Measured carpet area** | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 136.4 sq. m | 91.0–93.4 sq. m; median 92.2 sq. m (993 sq. ft median) | 32% |
| 3BHK | 5 | 0 | 5 | 152.4 sq. m | 104.3–105.2 sq. m; median 104.8 sq. m (1,128 sq. ft median) | 31% |
\Portal-derived; no as-of date is supplied, so counts are indicative. \*Software-measured from approved floor-plan drawing 357181; not a RERA disclosure. RERA unit table Floor plans
The measured 2BHK plan includes living/kitchen, bedrooms, a study, toilets and a utility area; the measured 3BHK plan includes living/kitchen, bedrooms, toilets and a balcony. The drawing extraction gives room dimensions for the sampled plans, but the measurements are not a substitute for verification against the approved drawing and unit-specific documents. RERA unit details
5. Parking & vehicle circulation
GHMC’s permit extraction lists a stilt parking area of 246.92 Sq.Mt. and total parking area of 261.3; the unit for the latter entry is not stated in the extracted field. The permit condition requires cellar and stilt areas approved for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied record does not provide parking-space counts, visitor or accessible-bay counts, a parking layout, ramp details, two-wheeler provision, EV-charging provision, or unit-specific parking allocations. A parking area provision does not by itself establish exclusive allocation to a buyer.
6. Amenities, recreation & open spaces
The project’s RERA amenity record lists the following items and records 0% progress for each listed entry. Availability marked “YES” is a filed entry, not confirmation of installation or operation. The building permit also lists a tot-lot and transformer space. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings | Listed; no size or description supplied | RERA amenities | 0%; no independent completion verification |
| Green strip / tot-lot / park | Listed in RERA amenities; permit separately lists “Tot-lot” and requires a peripheral greenery strip | RERA amenities | RERA progress 0%; completed status not verified |
| Internal roads & footpaths | Listed; no dimensions supplied | RERA amenities | 0%; not independently verified |
| Street lighting | Listed; no specification supplied | RERA amenities | 0%; not independently verified |
| Water supply | Listed as available “YES”; no source, storage or capacity stated | RERA amenities | 0% progress entry; not independently verified |
| Sewerage / treatment and disposal | Sewerage (chamber, lines, septic tank, STP) and treatment/disposal of sewage and sullage water are listed | RERA amenities | Sewerage marked “YES”; progress entries 0%; not independently verified |
| Storm-water drains | Listed; no design or capacity supplied | RERA amenities | 0%; not independently verified |
| Solid-waste management and disposal | Listed as available “YES” | RERA amenities | 0% progress entry; not independently verified |
| Water conservation / rainwater harvesting | Listed as available “YES”; permit lists Rain Water Harvesting Pits 1 and requires a rainwater-harvesting structure | RERA amenities | 0% progress entry; completed status not verified |
| Energy management | Listed as available “YES”; no system description supplied | RERA amenities | 0% progress entry; not independently verified |
| Fire protection and fire-safety requirements | Listed as available “YES”; permit requires an occupancy fire NOC before OC | RERA amenities | 0% progress entry; no completed-system or clearance evidence supplied |
| Electrical meter room / sub-station / receiving station | Listed as available “YES”; permit requires space for a transformer | RERA amenities | 0% progress entry; not independently verified |
| Garbage house | Listed in the GHMC permit extraction; no size supplied | Completion status not supplied |
Swimming pool, gym, clubhouse, children’s play area and other facilities appear in a third-party vendor listing, not in the supplied TG-RERA amenity record or permit extraction; they are therefore not presented here as RERA-filed or sanctioned facilities. Promoter website
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage, storm-water drains, solid-waste management, rainwater harvesting, energy management, fire protection and an electrical meter room/sub-station/receiving station. It does not supply capacities, water source or storage details, STP capacity, reuse arrangements, electrical backup capacity, lift details, or security-system specifications. RERA amenities
The GHMC permit requires a rainwater-harvesting structure and transformer space; it also specifies CCTV installation and linkage to the concerned SHO, a dust-mitigation/control plan during construction, and a fire NOC before occupancy-certificate issue. These are permit conditions, not evidence that the systems have been installed, tested or cleared. The supplied extracts do not establish lift or service-lift provision, fire-escape configuration, accessibility features, or completed safety systems.
8. Location, access & connectivity
The registered project location is Nallagandla Village, Serilingampally Mandal, Ranga Reddy District, Telangana 500019. The filed west boundary is a 9 mtr wide road. RERA record RERA filing RERA filing
A supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 6.8 km. No other measured road, public-transport or landmark distances are provided in the project evidence. Location record
9. Developer & development status
The registered promoter is MAGNA INFRATECH LLP, an LLP with GSTIN 36ABHFM8444L1ZP. The project filing identifies Madadi Sriman as authorized signatory and MADADI KONDAL RAO as a partner; the GHMC permit names MAGNA INFRATECH LLP as applicant, represented by MADADI KONDAL RAO. The promoter’s registration-certificate office address is recorded as Village Gachi Bowli, Serilingampally Mandal, Ranga Reddy District, PIN 500032. Corporate record Parties record
The promoter’s Form B declaration undertakes completion by 12-09-2026. The GHMC permit also states completion before 12 September 2026, while the project header records proposed completion 12/01/2027. The evidence supplied does not establish a revised approval or extension. No construction-progress percentage or occupancy certificate is evidenced in the supplied documents. RERA record
10. Approvals, official records & documents
| Record | What the supplied project file establishes |
|---|---|
| TG-RERA registration certificate | Form C registration for SADHANA, P02400007174, granted 23 October 2023; stated validity to 12 September 2026, unless extended. |
| GHMC building permit | Building Permit Order 3388/GHMC/SLP/2023-BP, approved 12 September 2023, file no. 008203/GHMC/4067/SLP2/2023-BP; covers 1 Stilt + 4 upper floors on the recorded site and identifies Survey No. 176/PART. |
| Other approval identifier | C/GHMC/013883/2020, recorded as “Approved Layout No. / LRS Proceeding No./Sub division No” in the permit extraction. |
| Promoter declaration | Form B for SADHANA, signed by authorized signatory SRIMAN MADADI; includes the promoter’s completion undertaking and project-fund and other declarations. |
| Approved floor-plan drawing | Drawing record 357181 is the source for software-measured unit-plan areas and room descriptions; the measurements are not RERA-filed carpet-area disclosures. |
| Occupancy / completion record | No occupancy or completion certificate is included in the supplied project documents. The permit states that an occupancy certificate is required before occupation. |
1. Project at a glance
Project identity
Registered project name: SADHANA
Project type / use: Residential apartment project
Phase / registered portion: One registered portion is identified in the supplied record; the building is named A (BLOCK C) in the GHMC permit. No separate phase name is disclosed.
TG-RERA registration: P02400007174; granted 23 October 2023; captured on the TG-RERA record 10 September 2026.
Registration validity: Certificate states validity from 23/10/2023 to 12/09/2026, unless extended by the Authority. Extension status is not established in the supplied evidence.
Registered promoter: MAGNA INFRATECH LLP, an LLP.
RERA status: Registered project; current status after the certificate’s stated end date is not established by the supplied record.
Land and geographic identity
Locality / revenue village: Nallagandla Village (also rendered in source records as NALLAGANDLA); locality: Nallagandla.
Mandal: Serilingampally
District: Ranga Reddy (permit extraction renders it “Rangareddy”).
PIN: 500019
Project survey identifier(s): Survey No. 176p in the TG-RERA identity and registration records; Survey No. 176/PART in the GHMC building permit.
Registered site extent: 540.96 sq. m; total area and net area are each recorded as 540.96 sq. m.
Road-affected / nala-affected area: 00 sq. m in the permit extraction.
Boundaries in project filing: East: “naighbours land”; west: 9 mtr wide road; north: “others land”; south: “naighbours land.”
Permit road-width entry: 18 mt. is also listed in the GHMC permit extraction; its specific road reference is not clarified in the extracted field.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building permit: 3388/GHMC/SLP/2023-BP, approved 12 September 2023; file no. 008203/GHMC/4067/SLP2/2023-BP.
Other layout / subdivision identifier recorded with permit: C/GHMC/013883/2020
Approved built-up area: 1,306 sq. m in the project filing. The permit extraction separately lists 1,045.04 Sq.Mt. for “Residential 4 upper floors” and 246.92 Sq.Mt. for “Stilt parking area.” These are distinct permit-extracted entries; no further area reconciliation is supplied here.
Building / tower count: 1 building/unit in the filed project data; one tower is recorded in the unit summary.
Sanctioned configuration: 1 Stilt + 4 upper floors; permit identifies A (BLOCK C) and building height 12.00 m.
Parking: Permit records 261.3 as total parking area and 246.92 Sq.Mt. as stilt parking area. Parking space counts and allocation are not stated in the supplied extracts.
Approved vs. RERA-filed unit count: 10 units in the RERA unit record; the permit condition says sanctioned unit numbers must not be increased without GHMC approval, but the extracted permit data does not give a numeric sanctioned dwelling-unit count.
Offering and status
RERA-filed configurations: 2BHK: 5 units; 3BHK: 5 units.
RERA-filed saleable area: 2BHK: 136.4 sq. m each; 3BHK: 152.4 sq. m each.
Booked / available: Portal-derived counts show 0 booked / 5 available for each configuration, 10 available in total. The portal record has no as-of date, so these counts are indicative.
Construction stage: A project construction-stage percentage is not supplied. The RERA amenity/infrastructure record lists 0% for its listed items; this is not an independently verified site inspection.
Completion dates: TG-RERA registration certificate and Form B undertaking state 12 September 2026; the GHMC permit states construction to be completed before 12 September 2026. The project header separately records proposed completion 12/01/2027. The supplied evidence does not establish an approved extension or explain the relationship between these dates.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied documents. The GHMC permit says an occupancy certificate is compulsory before occupation and requires a fire NOC before its issue.
2. The project story
SADHANA is filed with TG-RERA as a residential apartment project on a 540.96 sq. m site in Nallagandla Village, Serilingampally Mandal, Ranga Reddy District, identified as Survey No. 176p in the RERA record and Survey No. 176/PART in the GHMC permit. The sanctioned building is A (BLOCK C): one stilt level and four upper floors, for residential use.
The RERA unit record lists ten homes: five 2BHK and five 3BHK. The registration certificate is dated 23 October 2023 and states validity through 12 September 2026 unless extended. The supplied record does not establish the project’s current construction stage, an extension, or issuance of an occupancy/completion certificate. The amenity progress fields show 0%; these are filed status entries, not independent confirmation of site conditions.
3. Master plan, architecture & building design
The GHMC building permit covers a 540.96 sq. m plot and records the same net plot area, with zero road-affected and zero nala-affected area in its extracted land-area fields. It permits one residential block, A (BLOCK C), configured as 1 Stilt + 4 upper floors, with a recorded building height of 12.00 m.
The permit extraction lists 1,045.04 Sq.Mt. for residential four upper floors and 246.92 Sq.Mt. for stilt parking. Separately, the project filing records approved built-up area as 1,306 sq. m. The supplied material does not provide a drawing-based breakdown of footprint, floor-by-floor areas, flat count per floor, lifts, stairs, entries/exits, internal circulation, landscaping or open-space dimensions. The permit lists a tot-lot and a greenery strip, but dimensions and completion status are not supplied.
The RERA-filed unit areas below are saleable areas. They are not identified as carpet areas in the supplied record.
4. Homes, configurations & floor plans
The RERA filing lists five 2BHK and five 3BHK homes. Software measurement of the approved floor-plan drawing 357181 gives the carpet-area ranges below; these are drawing-based measurements, not RERA-filed carpet disclosures, and the source notes that measurements need review. The RERA saleable area includes a different area basis and should not be read as carpet area.
| Configuration | Units | Booked | Available* | RERA saleable area | Measured carpet area** | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 136.4 sq. m | 91.0–93.4 sq. m; median 92.2 sq. m (993 sq. ft median) | 32% |
| 3BHK | 5 | 0 | 5 | 152.4 sq. m | 104.3–105.2 sq. m; median 104.8 sq. m (1,128 sq. ft median) | 31% |
\Portal-derived; no as-of date is supplied, so counts are indicative. \*Software-measured from approved floor-plan drawing 357181; not a RERA disclosure.
The measured 2BHK plan includes living/kitchen, bedrooms, a study, toilets and a utility area; the measured 3BHK plan includes living/kitchen, bedrooms, toilets and a balcony. The drawing extraction gives room dimensions for the sampled plans, but the measurements are not a substitute for verification against the approved drawing and unit-specific documents.
5. Parking & vehicle circulation
GHMC’s permit extraction lists a stilt parking area of 246.92 Sq.Mt. and total parking area of 261.3; the unit for the latter entry is not stated in the extracted field. The permit condition requires cellar and stilt areas approved for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied record does not provide parking-space counts, visitor or accessible-bay counts, a parking layout, ramp details, two-wheeler provision, EV-charging provision, or unit-specific parking allocations. A parking area provision does not by itself establish exclusive allocation to a buyer.
6. Amenities, recreation & open spaces
The project’s RERA amenity record lists the following items and records 0% progress for each listed entry. Availability marked “YES” is a filed entry, not confirmation of installation or operation. The building permit also lists a tot-lot and transformer space.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings | Listed; no size or description supplied | 0%; no independent completion verification | |
| Green strip / tot-lot / park | Listed in RERA amenities; permit separately lists “Tot-lot” and requires a peripheral greenery strip | RERA progress 0%; completed status not verified | |
| Internal roads & footpaths | Listed; no dimensions supplied | 0%; not independently verified | |
| Street lighting | Listed; no specification supplied | 0%; not independently verified | |
| Water supply | Listed as available “YES”; no source, storage or capacity stated | 0% progress entry; not independently verified | |
| Sewerage / treatment and disposal | Sewerage (chamber, lines, septic tank, STP) and treatment/disposal of sewage and sullage water are listed | Sewerage marked “YES”; progress entries 0%; not independently verified | |
| Storm-water drains | Listed; no design or capacity supplied | 0%; not independently verified | |
| Solid-waste management and disposal | Listed as available “YES” | 0% progress entry; not independently verified | |
| Water conservation / rainwater harvesting | Listed as available “YES”; permit lists Rain Water Harvesting Pits 1 and requires a rainwater-harvesting structure | 0% progress entry; completed status not verified | |
| Energy management | Listed as available “YES”; no system description supplied | 0% progress entry; not independently verified | |
| Fire protection and fire-safety requirements | Listed as available “YES”; permit requires an occupancy fire NOC before OC | 0% progress entry; no completed-system or clearance evidence supplied | |
| Electrical meter room / sub-station / receiving station | Listed as available “YES”; permit requires space for a transformer | 0% progress entry; not independently verified | |
| Garbage house | Listed in the GHMC permit extraction; no size supplied | Completion status not supplied |
Swimming pool, gym, clubhouse, children’s play area and other facilities appear in a third-party vendor listing, not in the supplied TG-RERA amenity record or permit extraction; they are therefore not presented here as RERA-filed or sanctioned facilities.
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage, storm-water drains, solid-waste management, rainwater harvesting, energy management, fire protection and an electrical meter room/sub-station/receiving station. It does not supply capacities, water source or storage details, STP capacity, reuse arrangements, electrical backup capacity, lift details, or security-system specifications.
The GHMC permit requires a rainwater-harvesting structure and transformer space; it also specifies CCTV installation and linkage to the concerned SHO, a dust-mitigation/control plan during construction, and a fire NOC before occupancy-certificate issue. These are permit conditions, not evidence that the systems have been installed, tested or cleared. The supplied extracts do not establish lift or service-lift provision, fire-escape configuration, accessibility features, or completed safety systems.
8. Location, access & connectivity
The registered project location is Nallagandla Village, Serilingampally Mandal, Ranga Reddy District, Telangana 500019. The filed west boundary is a 9 mtr wide road.
A supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 6.8 km. No other measured road, public-transport or landmark distances are provided in the project evidence.
9. Developer & development status
The registered promoter is MAGNA INFRATECH LLP, an LLP with GSTIN 36ABHFM8444L1ZP. The project filing identifies Madadi Sriman as authorized signatory and MADADI KONDAL RAO as a partner; the GHMC permit names MAGNA INFRATECH LLP as applicant, represented by MADADI KONDAL RAO. The promoter’s registration-certificate office address is recorded as Village Gachi Bowli, Serilingampally Mandal, Ranga Reddy District, PIN 500032.
The promoter’s Form B declaration undertakes completion by 12-09-2026. The GHMC permit also states completion before 12 September 2026, while the project header records proposed completion 12/01/2027. The evidence supplied does not establish a revised approval or extension. No construction-progress percentage or occupancy certificate is evidenced in the supplied documents.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C registration for SADHANA, P02400007174, granted 23 October 2023; stated validity to 12 September 2026, unless extended.
GHMC building permit: Building Permit Order 3388/GHMC/SLP/2023-BP, approved 12 September 2023, file no. 008203/GHMC/4067/SLP2/2023-BP; covers 1 Stilt + 4 upper floors on the recorded site and identifies Survey No. 176/PART.
Other approval identifier: C/GHMC/013883/2020, recorded as “Approved Layout No. / LRS Proceeding No./Sub division No” in the permit extraction.
Promoter declaration: Form B for SADHANA, signed by authorized signatory SRIMAN MADADI; includes the promoter’s completion undertaking and project-fund and other declarations.
Approved floor-plan drawing: Drawing record 357181 is the source for software-measured unit-plan areas and room descriptions; the measurements are not RERA-filed carpet-area disclosures.
Occupancy / completion record: No occupancy or completion certificate is included in the supplied project documents. The permit states that an occupancy certificate is required before occupation.
Frequently asked questions
Is SADHANA registered with Telangana RERA?
Yes. SADHANA is registered with the Telangana Real Estate Regulatory Authority as P02400007174; the registration status is New Project.
Who is the developer of SADHANA?
The promoter named in the RERA registration is MAGNA INFRATECH LLP.
Where is SADHANA located?
SADHANA is in nallagandla, Serilingampally, Rangareddy, Telangana (500019).
When will SADHANA be completed?
The promoter's proposed date of completion filed with RERA is 12/01/2027. This is the promoter's declaration, not a guarantee.
More projects in Nallagandla