RV HOMES is a residential apartment project in RAMANTHAPUR KHALSA, Uppal, Medchal-Malkajgiri, on a registered site extent of 445.58 sq.m. The registered promoter is M/S MMR INFRAA. The project comprises one residential building with 1 Stilt + 5 upper floors and 10 apartments: five 2BHK and five 3BHK, with RERA-filed saleable areas of 112.41 sq.m. and 121.7 sq.m., respectively. Its TG-RERA registration number is P02200008063, and the proposed completion date is 5 February 2027.

01What we found

RegisteredTG-RERA - valid till 5 Feb 2027
15documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

FieldProject record
Registered project nameRV HOMES RERA record
Project typeResidential apartment project RERA record
Phase / registered portionPhase not separately identified in the supplied registration record; the record describes one residential building RERA record
TG-RERA registrationP02200008063 Approvals record
Registration validity19 April 2024 to 5 February 2027, unless extended by the Authority Approvals record
Registered promoterM/S MMR INFRAA RERA record Corporate record
RERA statusRegistered; the project record labels it “New Project” RERA record Approvals record

Land and geographic identity

FieldProject record
Locality / site addressRERA location: RAMANTHAPUR KHALSA; the filed building-permit extraction also identifies SRINIVASAPURAM. The registration certificate gives Ramanthapur-A. RERA record Land records
Revenue village(s)Ramanthapur-A in the RERA identity; the building-permit extraction names RAMANTHAPUR KHALSA(VILLAGE). RERA record RERA filing
Mandal / district / PINUppal / Medchal-Malkajgiri / 500013 RERA record
Survey number(s) and subdivisionsSurvey No. 203 (also recorded as SY NO.203); no project subdivision is specified in the RERA identity. Land records
Registered site extent445.58 sq.m.; total and net area are each recorded as 445.58 sq.m. RERA filing
BoundariesEast: PLOT NO 3; West: PLOT NO 1; North: RATAN SINGH LAND; South: 30 WIDE ROAD RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building permit5520/GHMC/LBN/2024-BP, dated 05 February 2024 Approvals record
Approved buildingA1 (RESIDENTIAL BUILDING); one building, recorded as 1 Stilt + 5 upper floors
Sanctioned floor configurationStilt plus five upper floors; the plan description identifies the fifth floor as a TDR FLOOR. The supplied record does not detail a basement or podium.
HeightBuilding-permit extraction records 14.99; the plan extraction separately lists Total Ht. 19.99mt.
Approved built-up area1,170.65 sq.m. excluding parking; 1,415.95 sq.m. including parking is listed in the plan extraction. That extraction also records TOTAL BUA: 1428.20, DEDUCTIONS: 17.59, and NET BUA: 1170.65.
Parking provision in approval recordsBuilding-permit extraction: Total Parking Area 144.1; plan extraction: RESI. PARKING: 10 and PARKING AREA: 245.30.
Units10 units in the building-permit/layout records and 10 units in the RERA unit schedule: five 2BHK and five 3BHK. RERA unit table

Offering and status

FieldProject record
Configurations2BHK and 3BHK apartments RERA unit table
RERA-filed saleable areas2BHK: 112.41 sq.m.; 3BHK: 121.7 sq.m. RERA unit table
Booked / availableRERA portal snapshot: 2 booked and 8 available (one booked and four available in each configuration). The portal record supplied has no as-of date; treat counts as indicative. RERA unit table
RERA-stated completion date5 February 2027 RERA record
Occupancy certificate statusAn OC record is supplied for the residential building, issued by GHMC under 002736/GHMC/01466/SWOC/LBN2/2025 dated 07/08/2025, with completion date 30/05/2025.
Registration validity vs completion / OCRegistration validity runs to 5 February 2027; the RERA Form-B declaration states completion by that date. The supplied OC record concerns the single residential building and is described further below.

The project story

  • RV HOMES is recorded with TG-RERA as a residential apartment project at Survey No. 203, with a registered site extent of 445.58 sq.m. and one building. The GHMC building-permit record describes the building as A1 (RESIDENTIAL BUILDING) with 1 Stilt + 5 upper floors. The RERA schedule lists ten homes: five 2BHK and five 3BHK apartments. RERA record Land records RERA unit table
  • The project’s Form-B declaration by the promoter undertakes completion by 5 February 2027. A GHMC occupancy-certificate record is also supplied for the residential building; it records completion on 30/05/2025 and an OC dated 07/08/2025. The document reports a 38.63 deviated built-up area and compounding fees. These are document-recorded matters, not an independent site inspection or confirmation of the present physical condition.
  • The RERA portal unit counts are a snapshot without an as-of date. They indicate two booked and eight available apartments, but should not be treated as a live inventory confirmation. RERA unit table

Master plan, architecture & building design

  • The GHMC building-permit record identifies one residential building on a 445.58 sq.m. plot, with 1 Stilt + 5 upper floors. The layout-plan extraction describes the proposal as “STILT+ FOUR UPPER FLOORS + FIFTH FLOOR (TDR FLOOR).” The supplied records do not provide a verified building footprint, flats-per-floor schedule, lift count, stair count, internal circulation plan or phase-wise building arrangement.
  • The plan extraction lists TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING: 1170.65, TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING: 1415.95, TOTAL BUA: 1428.20, DEDUCTIONS: 17.59, and NET BUA: 1170.65. These are reproduced as separately labelled plan figures; the supplied data does not establish that they are interchangeable area measures.
  • The plan record lists a vacant plot area of 194.91 and a residential parking area of 245.30. It also records greenery requirements, a tot-lot condition and rainwater-harvesting provisions. The supplied extracts do not establish the completed extent or current condition of landscaping or open space.

Homes, configurations & floor plans

RERA-filed unit counts and saleable areas are shown below. The 2BHK drawing measurement is a software measurement from the approved floor-plan drawing, not a RERA-filed carpet-area disclosure; the supplied records contain no comparable measured carpet area for the 3BHK. RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK514112.41 sq.m.83.7–100.5 sq.m.; median 93.2 sq.m. (software-measured from six drawing designs)17% (drawing-measurement record)
3BHK514121.7 sq.m.Not suppliedNot supplied
  • The measured 2BHK drawing example shows a living/drawing room, dining room, kitchen, wash area, bedrooms, toilets, study room and balcony. In the measured example, the balcony is separately identified and excluded from the software-measured carpet area. The figures are drawing-based measurements and are flagged in the source as needing review. RERA unit details Floor plans
  • Carpet area refers to the measured internal dwelling area in the drawing record. Saleable area is the RERA-filed area and may include the home’s share of common areas; it is not a substitute for carpet area. The supplied evidence does not provide unit-specific balcony, utility or common-area loading breakdowns beyond the 2BHK drawing measurement notes. Floor plans RERA unit table

Parking & vehicle circulation

  • The building-permit extraction records a Total Parking Area 144.1; the layout-plan extraction records RESI. PARKING: 10 and PARKING AREA: 245.30. The records identify the stilt as a parking level and state that approved cellar and stilt parking (where shown in the plan) is to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied data does not establish the number of visitor, accessible or two-wheeler spaces, unit-wise parking allocations, or whether any particular bay is exclusively assigned to a buyer.
  • The plan requires one entry and one exit with a minimum width of 4.5mts. and height clearance of 5mts. It also states that parking places are to provide Electric Vehicle Charging Infrastructure in accordance with the referenced requirements. This is an approval condition, not confirmation that charging equipment has been installed.

Amenities, recreation & open spaces

The RERA amenity record lists fourteen infrastructure and facility categories, each with 0% progress recorded in the supplied data. That is a filed progress snapshot, not independent verification of construction status. The building-permit and plan extracts also state specific provisions and conditions. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads and footpathsSize not suppliedRERA amenitiesRERA record: 0%; not independently verified
Water supplySize/capacity not supplied hereRERA amenitiesRERA record: 0%; not independently verified
Sewerage / sewage treatment and disposalRERA category includes chamber, lines, septic tank and STP; no capacity suppliedRERA amenitiesRERA record: 0%; not independently verified
Storm-water drainsSize not suppliedRERA amenitiesRERA record: 0%; not independently verified
Green strip / tot-lot / parkPlan conditions require periphery greenery and a fenced, maintained tot-lot; permit extraction records “Tot Lot NA”RERA amenitiesRERA record: 0%; not independently verified
Street lightingDetails not suppliedRERA amenitiesRERA record: 0%; not independently verified
Community buildingsDetails not suppliedRERA amenitiesRERA record: 0%; not independently verified
Solid-waste management and disposalPlan requires a garbage house within the premisesRERA amenitiesRERA record: 0%; not independently verified
Rainwater harvesting / water conservationPlan records rainwater harvesting and a percolating well; the OC extraction records one rainwater-harvesting pitRERA amenitiesRERA record: 0%; OC document records one pit; current condition not independently verified
Energy managementDetails not suppliedRERA amenitiesRERA record: 0%; not independently verified
Fire protection and fire safetyApproval conditions specify fire-safety provisions, including extinguishers, alarm system and water storageRERA amenitiesRERA record: 0%; installation not independently verified
Electrical meter room / substation / receiving stationPlan provides transformer space; permit extraction lists space for transformerRERA amenitiesRERA record: 0%; not independently verified
Recreational open spaceAggregate area not suppliedRERA amenitiesRERA record: 0%; not independently verified

Utilities, building services & safety

  • Water and drainage: The plan requires a separate underground static water-storage tank of 25,000 litres and a separate residential terrace tank of 25,000 litres. It also records rainwater harvesting and a percolating well. The RERA amenity register lists water supply, sewerage and storm-water drains at 0% progress; the supplied data does not establish the water source, STP capacity, reuse system or current installation status. RERA amenities
  • Electrical and vertical transport: The plan lists a distribution transformer, transformer space and a lift. It requires a generator as an alternative electricity supply, emergency lighting in corridors/common passages and staircases, and fire-resistant swing doors for collapsible lifts. Lift count, capacity, generator capacity and present installation status are not supplied.
  • Fire and life safety: The GHMC permit states that an occupancy Fire NOC is to be obtained before issue of an Occupancy Certificate. The plan includes fire-safety conditions, including an alarm system, hose reel/down corner, specified extinguishers, protected transformer construction, and sprinkler provision if basement area exceeds 200 Sq.mts. It also requires fire-vehicle manoeuvrability space with neighbouring open areas and prescribes entry/exit dimensions. These are recorded conditions; the supplied evidence does not independently verify installed systems or compliance.
  • Waste and accessibility: The plan requires a garbage house within the premises and directs construction-and-demolition waste to the designated collection point. No project-specific CCTV, access-control or accessible-circulation details are supplied.

Location, access & connectivity

  • The RERA-recorded location is Ramanthapur-A, Uppal Mandal, Medchal-Malkajgiri district, PIN 500013; the site is identified by Survey No. 203. The building-permit/layout extracts also use Ramanthapur Khalsa and Srinivasapuram in their location descriptions. RERA record Land records
  • The project boundary record identifies a 30 WIDE ROAD on the south, while the plan extraction lists a 9.00 MT WIDE EXISTING ROAD, a 9.00 MT WIDE PROPOSED ROAD, and 18 mt. road width. The supplied geospatial connectivity record gives the nearest sampled Outer Ring Road interchange as approximately 12.4 km. No RERA-filed public-transport schedule or independently verified travel-time information is supplied. RERA filing Location record

Developer & development status

  • The registered promoter is M/S MMR INFRAA, identified in the RERA record as a Partnership. The RERA corporate identifier supplied is GSTIN 36ABXFM1451H1ZX. The registered office/address field gives MANJULA, GOKHALE NAGAR ROAD, SRINIVASAPURAM, RAMANTHAPUR KHALSA, Uppal, Medchal-Malkajgiri, 500013. No official website or contact details are provided in the supplied evidence. RERA record Corporate record Parties record
  • The Form-B declaration dated 10-04-2024, signed by authorised signatory Girimaji Manjula, states a completion undertaking of 5 February 2027. The supplied RERA record does not provide a construction-progress percentage. The separate GHMC occupancy-certificate record is for the single residential building; it records completion on 30/05/2025 and certificate date 07/08/2025.

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200008063; valid 19 April 2024–5 February 2027 unless extended
Scope and evidenceForm-C registration for RV HOMES naming M/S Mmr Infraa as promoter.
GHMC building permit
Identifier / date5520/GHMC/LBN/2024-BP; 05 February 2024
Scope and evidenceBuilding-permit order for the residential building; file no. 012663/GHMC/6236/LBN2/2023-BP.
Approved plan / layout-plan extract
Identifier / dateLayout record includes TS/069245/2023 and survey 203
Scope and evidenceFiled layout/building-plan information, including the A1 residential building and plan conditions.
GHMC occupancy certificate
Identifier / date002736/GHMC/01466/SWOC/LBN2/2025; 07/08/2025
Scope and evidenceOC record for the residential building; completion date 30/05/2025.
RERA Form-B declaration
Identifier / date10-04-2024
Scope and evidencePromoter declaration covering project completion undertaking and project obligations.
RERA unit schedule
Identifier / dateNo separate document identifier supplied
Scope and evidenceTen units: five 2BHK and five 3BHK, with portal booking counts reported as indicative. RERA unit table
RERA amenities progress record
Identifier / dateNo separate document identifier supplied
Scope and evidenceFourteen listed amenity/infrastructure categories; each supplied progress entry is 0%. RERA amenities

Frequently asked questions

Is RV HOMES registered with Telangana RERA?

Yes. RV HOMES is registered with the Telangana Real Estate Regulatory Authority as P02200008063; the registration status is New Project.

Who is the developer of RV HOMES?

The promoter named in the RERA registration is M/S MMR INFRAA.

Where is RV HOMES located?

RV HOMES is in RAMANTHAPUR KHALSA, Ramanthapur-A, Uppal, Medchal-Malkajgiri, Telangana (500013).

When will RV HOMES be completed?

The promoter's proposed date of completion filed with RERA is 05/02/2027. This is the promoter's declaration, not a guarantee.