Sign in

Rams Abode East

KSR PROJECTS · Medchal-Malkajgiri · RERA P02200000997

RAMS ABODE EAST is a residential apartment project in Kompally, Medchal-Malkajgiri District; the mandal is not disclosed. It is being developed by the registered promoter, KSR PROJECTS. The project is on a 587.07 sq. m site and comprises one building with 1Stilt + 5 floors and 10 3BHK apartments. Its TG-RERA registration number is P02200000997, and its proposed completion date is 30/10/2019.

More from Ksr Projects · 4 projects →

01What we found

Period endedTG-RERA registration ran to 30 Oct 2019 - check its extension on TG-RERA
13documents on file - each fact links to its page
23court cases on this project's land (survey 105, 107, Kompally)
13items to check - 7 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

13 items to check before you pay, 7 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from housing.com

1. Project at a glance

Project identity

FieldProject record
Registered nameRAMS ABODE EAST RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionThe record identifies the project as RAMS ABODE EAST; a separate phase name or phase number is not disclosed. RERA record
TG-RERA registrationP02200000997 RERA record
Registration validityCertificate states valid from 08/07/2019 to 30/10/2019, subject to extension by the Authority. The certificate shows no extension. This is registration validity, not an occupancy certificate or proof of completion. Approvals record
Registered promoterKSR PROJECTS; entity type recorded as Partnership. RERA record RERA filing Corporate record
RERA statusRecorded as On-Going Project. RERA record RERA filing

Land and geographic identity

FieldProject record
LocalityKompally / KOMPALLY RERA record RERA filing
Revenue villageKompally; the HMDA approval uses the spelling “Kompalle.” RERA record Land records
MandalNot disclosed in the RERA land record. The HMDA technical approval identifies Dundigal/Gandimaisamma. Land records
DistrictMedchal-Malkajgiri RERA record Land records
PIN500014 RERA record
Project survey numbers105P and 107P RERA record Approvals record
Site extent587.07 sq. m; RERA land record gives total area and net area as 587.07 sq. m. RERA filing Land records
BoundariesEast: 40 FT ROAD; West: K SHIRISHA REDDY LAND; North: LAND OF GAJANAND REDDY; South: OPEN PLACE OF RAJITHA REDDY. RERA filing Land records

Development identity

FieldProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the technical approval refers to building-plan sanction and release by the Executive Authority of Kompalle Gram Panchayath. Approvals record
Principal approval009118/MED/R1/U6/HMDA/05032018, dated 24/04/2018. Approvals record
Approved built-up areaThe RERA record lists 1428 sq. m as approved built-up area. The HMDA technical approval extraction separately records 1709.22 sq. m as total/proposed built-up area and 1424.35 sq. m as a built-up-area figure. RERA filing
Building countOne building / one proposed building unit. RERA filing
Sanctioned configuration1Stilt + 5 floors; the approval extraction records building height as 14.9 (unit not stated in the extracted field).
Parking levelsStilt/cellar use is addressed in the approval conditions, which specify that silts/cellar areas are exclusively for vehicle parking; a separate number of parking levels or parking spaces is not disclosed in the available record.
UnitsApproved-plan total: 1 building unit; proposed units as per agreement: 1. The RERA unit inventory records 10 3BHK apartments. RERA filing RERA unit table RERA unit details

Offering and status

FieldProject record
Unit type3BHK apartments RERA unit table RERA unit details
RERA-filed saleable area142.0 sq. m per unit RERA unit table RERA unit details
Booked / available0 booked; 10 available, as read from the TG-RERA portal; the record does not provide an as-of date, so counts are indicative. RERA unit table RERA unit details
Construction stageRERA status is On-Going; the supplied evidence does not establish current physical construction progress through an independent site inspection. RERA record RERA amenities
Original / revised proposed completion30/10/2019 / 30/10/2019 in the RERA project record. RERA record RERA filing
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied project records. The evidence does not establish the OC status for the building. Document index Approvals record

2. The project story

RAMS ABODE EAST is registered as a residential apartment project at Kompally, Medchal-Malkajgiri District, on land recorded under survey numbers 105P and 107P. The RERA land record describes a 587.07 sq. m site, with a single proposed building and ten filed 3BHK units. RERA record RERA filing RERA unit table

HMDA’s technical approval describes a residential building of 1Stilt + 5 floors. The registration certificate gives a project completion deadline of 30/10/2019, while the project record continues to show “On-Going Project.” The evidence supplied here does not include independently verified construction progress or an occupancy/completion certificate, so it does not establish which works are complete or whether the building has been occupied. RERA record Document index

3. Master plan, architecture & building design

The RERA filing describes one building and a 587.07 sq. m site. HMDA’s technical approval identifies a residential building with 1Stilt + 5 floors. The supplied extraction does not provide a building footprint, flats per floor, detailed floor-by-floor arrangement, lift or stair count, or an approved residential/common-area breakdown. RERA filing

Area figures are recorded in different ways: the RERA form lists 1428 sq. m approved built-up area; the HMDA approval extraction lists 1709.22 sq. m total/proposed built-up area and 1424.35 sq. m as a built-up-area figure. These are reproduced as recorded, without treating them as interchangeable area measures. RERA filing

The available floor-plan file set contains two drawings, but neither is recorded as measured and both are classified as having no flats in the drawing-measurement record. Accordingly, no drawing-derived room layout, footprint, circulation arrangement, or carpet-area measurement is available for this overview. Floor plans

4. Homes, configurations & floor plans

TG-RERA records ten 3BHK apartments, with 0 booked and 10 available in the portal snapshot; no snapshot date is supplied. The filed saleable area is 142.0 sq. m per apartment. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010142.0 sq. mNot measured from supplied drawingsNot supplied

The filed figure is saleable area, not a carpet-area measurement. No software-measured carpet area or room dimensions are available: the supplied drawing record reports two drawings, zero measured, and no flats in the drawings. RERA unit table Floor plans

5. Parking & vehicle circulation

The HMDA approval conditions specify that stilt/cellar areas are to be used exclusively for vehicle parking, without partition walls or rolling shutters. They also state that no parking or construction is to be placed in setback areas. The approval extraction does not specify the number of car or two-wheeler spaces, visitor or accessible spaces, or any unit-wise parking allocation.

The approval calls for one entry and one exit, each with a minimum width of 4.5 meters and height clearance of 5 meters. No driveway layout, ramp configuration, pedestrian separation, or EV-charging provision is established by the supplied records.

6. Amenities, recreation & open spaces

The TG-RERA amenity record lists project infrastructure and facilities with declared progress percentages. The supplied information does not independently verify completion.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Water supplyListed as available: YES; no source, storage or capacity details suppliedRERA amenities0%; not independently verified
Sewerage / sewage and sullage treatmentSewerage (chamber, lines, septic tank, STP) and treatment/disposal are listed; no capacity details suppliedRERA amenities0%; not independently verified
Storm-water drainsListed; no size or design details suppliedRERA amenities0%; not independently verified
Green strip / TOT LOT / parkListed as available: YES; no area or component details suppliedRERA amenities0%; not independently verified
Water conservation / rainwater harvestingListed as available: YESRERA amenities70% in the RERA amenity record; not independently verified
Internal roads and footpathsListed; no dimensions suppliedRERA amenities0%; not independently verified
Street lightingListed; no specifications suppliedRERA amenities0%; not independently verified
Community buildingsListed; no description or size suppliedRERA amenities0%; not independently verified
Solid-waste management and disposalListed; no system or capacity suppliedRERA amenities0%; not independently verified
Energy managementListed; no system details suppliedRERA amenities0%; not independently verified
Fire protection and fire safetyListed in the RERA amenity record; approval conditions also specify fire-safety provisionsRERA amenities0% in the RERA amenity record; not independently verified
Electrical meter room / sub-station / receiving stationListed; no capacity suppliedRERA amenities0%; not independently verified
Recreational open spaceAggregate area listed without a supplied area figureRERA amenities0%; not independently verified

No clubhouse, indoor recreation facility, sports facility, or facility size/capacity is established by the supplied RERA amenity record. Marketing-site amenity listings are not treated here as RERA-filed or verified facilities. RERA amenities Promoter website

7. Utilities, building services & safety

HMDA’s technical approval conditions require provision for a transformer and a garbage house within the premises, a generator as an alternate electricity source, emergency lighting in corridors/common passages and staircases, and a manually operated alarm system in the building. The approval also specifies fire-resistant swing doors for collapsible lifts and directs the applicant to follow Fire Service Department norms. These are approval conditions, not evidence that the facilities have been installed or inspected.

The approval calls for a septic tank and sets conditions for treated-sewage connection to a nearby Gram Panchayat drain where one exists, or to a natural drain/nala where applicable; it also requires that sewage or drainage not overflow onto a road or public place. Rainwater-harvesting structures are required by the approval conditions. The available records do not give water-source or storage capacity, sewage-treatment capacity, generator capacity, lift count/capacity, or an installed-system status.

For fire provisions, the approval extraction specifies two water-type fire extinguishers for every 600 sq mts of floor area, a minimum of four fire extinguishers per floor, and at least two 5kgs DCP extinguishers at the generator and transformer area. It states that an automatic sprinkler system is to be provided if the basement area exceeds 200 Sq.Mts. These extracted conditions do not independently establish implementation or statutory compliance.

8. Location, access & connectivity

The registered project location is Kompally, revenue village recorded as Kompally, in Medchal-Malkajgiri District, PIN 500014. The supplied RERA boundary description identifies a 40 FT ROAD on the east. RERA record RERA filing

The supplied location record gives a cadastral parcel-centroid coordinate of 17.41528, 78.35459. No other measured access distance or public-transport detail is available in the project location record. Location record

9. Developer & development status

The registered promoter is KSR PROJECTS, recorded as a partnership. The project record names K VIJAYENDER REDDY as authorized signatory and lists five partners: K SATHYANARAYANA REDDY, K RAVI KUMAR, K BHARATHI REDDY, K SOWJANYA REDDY and K SHIRISHA REDDY. Corporate record Parties record

The promoter address recorded in the project data is LAXMI NIVAS APARTMENTS, CHANDRAPURI ROAD NO 3, MAIN ROAD, KOMPALLY, Medchal-Malkajgiri, 500014. The supplied information does not identify an official website or project contact details. Parties record

The RERA record shows a proposed and revised completion date of 30/10/2019 and project status “On-Going Project.” The Form B declaration by K. Vijayender Reddy states a completion undertaking of 30/09/2019. The available evidence does not establish current construction progress, completion, or an occupancy certificate. RERA record Document index

10. Approvals, official records & documents

TG-RERA registration certificate (Form C)
Identifier / dateP02200000997; issued 08/07/2019; validity to 30/10/2019
What the supplied record establishesRegistration of RAMS ABODE EAST under section 5, subject to extension by the Authority; no extension is recorded on the certificate.
HMDA technical building approval
Identifier / date009118/MED/R1/U6/HMDA/05032018; 24/04/2018
What the supplied record establishesTechnical approval for a residential building described as 1Stilt + 5 floors, on survey numbers 105/P and 107/P, with conditions for further sanction/release by the Executive Authority of Kompalle Gram Panchayath.
Registered mortgage document cited in the HMDA approval
Identifier / date4149/2018; dated 29/03/2018
What the supplied record establishesApproval extraction records a mortgage of 149.38 sq.mts of built-up area in favour of the Metropolitan Commissioner, HMDA.
Promoter’s Form B declaration
Identifier / dateVerified at Hyderabad on 18 November 2018
What the supplied record establishesPromoter declaration addressing title basis, encumbrances, completion undertaking, separate-account obligations and pending approvals.
Occupancy / completion certificate
Identifier / dateNot identified in supplied records
What the supplied record establishesOC/CC status is not established by the documents supplied for this overview. Document index Approvals record

Frequently asked questions

Is RAMS ABODE EAST registered with Telangana RERA?

Yes. RAMS ABODE EAST is registered with the Telangana Real Estate Regulatory Authority as P02200000997; the registration status is On-Going Project.

Who is the developer of RAMS ABODE EAST?

The promoter named in the RERA registration is KSR PROJECTS.

Where is RAMS ABODE EAST located?

RAMS ABODE EAST is in KOMPALLY, Medchal-Malkajgiri, Telangana (500014).

When will RAMS ABODE EAST be completed?

The promoter's proposed date of completion filed with RERA is 30/10/2019. This is the promoter's declaration, not a guarantee.

More projects in Medchal-Malkajgiri