RAMNARAYAN RESIDENCY is a residential apartment project in Lalitha Nagar / Lalithanagar, Adikmet, Musheerabad mandal, Hyderabad district. It is being developed by registered promoter R R KONSTRUCTIONS, a partnership, on 347.59 sq. m. of land, with one building comprising 1 Stilt + 5 upper floors and 10 2BHK apartments. The project is registered with TG-RERA as P02500007729, with proposed completion on 16/04/2027.

01What we found

RegisteredTG-RERA - valid till 16 Dec 2026
15documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered nameRAMNARAYAN RESIDENCY RERA record
Project type / statusResidential apartment project; filed as a new project RERA record RERA filing
Phase / registered portionNo separate phase name is disclosed. The registration identifies the project across Survey Nos. 55, 59, 60, 64, 66, 67 and 104/P RERA record
TG-RERA registrationP02500007729 RERA record
Registration validity20 February 2024 to 16 December 2026, as recorded on the Form C certificate RERA record
Registered promoterR R KONSTRUCTIONS, a partnership RERA record Corporate record
RERA statusRegistration certificate on file; the portal record labels the project “New Project.” RERA record Approvals record

Land and geographic identity

FieldProject record
LocalityLalitha Nagar / Lalithanagar, Adikmet RERA record RERA filing
Revenue villageZamistanpur Village; the RERA locality field also records Lalitha Nagar RERA record
MandalMusheerabad in the GHMC building permit order; the RERA land identity does not disclose a mandal Land records
District / PINHyderabad / 500044 RERA record
Project survey numbers55, 59, 60, 64, 66, 67 and 104/PART; the RERA certificate records 104/P RERA record
Site extent347.59 sq. m. RERA filing
Net / total areaRERA land details record total and net area as 347.59 sq. m.; the GHMC permit records plot area and net plot area as 347.59 sq. m. and road-affected area as 0.0 sq. m. RERA filing
Boundaries in RERA recordEast: others’ land; West: road; North: others’ land; South: others’ land RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building permit4796/GHMC/SEC/2023-BP, dated 16 December 2023; file no. 007465/GHMC/3709/SEC2/2023-BP Approvals record
Approved developmentOne residential building, 1 Stilt + 5 upper floors
Approved built-up areaThe permit states 931.00 sq. m. residential upper-floor area and 186.2 sq. m. stilt area; total proposed built-up area including parking is recorded as 1117.20 sq. m. in the extracted permit data.
Building / block countOne building / block RERA unit table
Approved versus RERA-declared homesThe GHMC permit extraction records 10 units; the RERA unit record also lists 10 apartments. RERA unit table
Parking provision in permit2 proposed parking spaces; the permit also records parking area as 186.20 sq. m.

Offering and status

FieldProject record
Unit type2BHK apartments RERA unit table
RERA saleable area119.84 sq. m. per unit, as filed RERA unit table
Booked / available2 booked; 8 available, according to the portal record read for this report. The record does not provide an as-of date, so these counts are indicative. RERA unit table
Construction stageThe filing describes a new project; the supplied permit establishes permission, not current construction progress. No independently verified site-progress evidence is supplied. RERA record
Completion datesThe RERA header records proposed completion as 16/04/2027. The promoter’s Form B declaration records 16/01/2026 as its completion undertaking. RERA record
Occupancy / completion certificateThe supplied GHMC permit extraction records completion_certified: false; no occupancy or completion certificate is supplied in the reviewed documents.

2. The project story

RAMNARAYAN RESIDENCY is a single-building residential apartment development registered with TG-RERA as P02500007729. The registered site is 347.59 sq. m. in the Lalitha Nagar / Lalithanagar area of Adikmet, Zamistanpur Village, Hyderabad, across Survey Nos. 55, 59, 60, 64, 66, 67 and 104/PART. The GHMC permit is for one building with a stilt level and five upper floors. RERA record Land records

The project record lists ten 2BHK homes, with two booked and eight available in the portal data supplied. The booking figures have no stated retrieval date. The project is registered and has a building permit, but the supplied evidence does not independently establish construction progress or delivery of facilities. The RERA record’s proposed completion date and the promoter’s Form B completion undertaking are separately reported above; neither is an occupancy certificate. RERA unit table RERA record

3. Master plan, architecture & building design

The sanctioned scheme is one residential building on a 347.59 sq. m. site, configured as 1 Stilt + 5 upper floors. The GHMC permit records 931.00 sq. m. of residential upper-floor built-up area and 186.2 sq. m. of stilt area. Its extracted figures include total proposed built-up area including parking of 1117.20 sq. m.; the permit extraction also separately lists “TOTAL BUA 1119.23.” These are reproduced as recorded and should not be treated as interchangeable area measures.

The permit extraction records proposed coverage area of 186.20 sq. m. (53.57%), vacant plot area of 161.39 sq. m., and a total height of 20.35 m. It also lists “Height of the Building 15” and “Height(M) 15.00.” The supplied material does not explain the relationship between these height entries.

The site plan identifies a 9.00 m-wide main road and a 7.83 m-wide balcony-side road. The GHMC permit records an 18 m road width. The available extracts do not provide a detailed site circulation plan, lift or stair count, building footprint drawings, or a documented phase arrangement beyond the single building.

The permit lists a distribution transformer, rainwater harvesting and percolation pit; its conditions also require a garbage house within the premises, tree planting and maintenance of greenery, and a tot-lot to be maintained as greenery. These are approval requirements or listed provisions, not evidence that the works are complete.

4. Homes, configurations & floor plans

The RERA filing lists ten 2BHK units with a saleable area of 119.84 sq. m. each. The portal counts supplied for this report show two booked and eight available, without an as-of date. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1028119.84 sq. m.Software-measured: 62.7–68.4 sq. m.; median 65.6 sq. m. (median 706 sq. ft.)45%

Carpet measurements are software-derived from the approved floor-plan drawing geometry in document 391631, are not RERA-filed figures, and are marked as needing review. The floor-plan extraction reports four measured flat designs. RERA unit details Floor plans

One typical-floor-plan measurement identifies two bedrooms, a hall, kitchen, two toilets, a wash area and a utility area. The listed utility area is 3.03 sq. m. and is excluded from the measured carpet area in that extraction. Room dimensions in the drawing-derived record are: hall 6.26 × 4.84 m; bedrooms 3.8 × 2.85 m and 3.8 × 3.0 m; kitchen 3.0 × 2.85 m; toilets 2.12 × 1.5 m and 2.0 × 1.49 m; wash area 2.0 × 1.4 m; utility 3.03 × 1.0 m. RERA unit details

The RERA saleable area and drawing-measured carpet area are distinct measures; the drawing measurement is not a substitute for the filed saleable figure. The supplied evidence does not include a verified allocation of common-area loading to an individual buyer’s agreement. RERA unit table Floor plans

5. Parking & vehicle circulation

The GHMC permit extraction records 2 proposed parking spaces and 186.20 sq. m. of parking area. The sanctioned configuration includes a stilt level; the approval conditions state that the cellar and stilts approved for parking are to be used exclusively for vehicle parking and not partitioned or converted to another use.

The materials do not establish resident-versus-visitor allocation, accessible parking, two-wheeler capacity, bay dimensions, a parking allotment for any particular apartment, or the presence of a ramp, mechanical parking, EV charging or separated pedestrian circulation. A parking provision in a sanctioned plan does not by itself establish exclusive ownership or allocation to a buyer.

6. Amenities, recreation & open spaces

The RERA amenity record marks water supply, sewerage, storm-water drains, green strip/tot-lot/park, rainwater harvesting and an electrical meter room/substation/receiving station as available provisions. Every supplied progress percentage for the listed amenities is 0; the record does not establish completion. RERA amenities

Green strip / tot-lot / park
Description / sizeListed as available; the GHMC permit requires a fenced tot-lot maintained as greenery and tree planting along the periphery and in front of the premises. No size is supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress 0%; no independent completion verification supplied.
Water supply
Description / sizeListed as available; no RERA-filed source or capacity is specified in the supplied amenity record.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress 0%; no independent completion verification supplied.
Sewerage and storm-water drainage
Description / sizeSewerage (chamber, lines, septic tank, STP) and storm-water drains are listed as available; no system capacity or completion evidence is supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress 0%; no independent completion verification supplied.
Rainwater harvesting
Description / sizeListed as available; GHMC permit extraction specifies 4 rainwater-harvesting pits and rainwater harvesting/percolation pit.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress 0%; no independent completion verification supplied.
Electrical meter room / substation / receiving station
Description / sizeListed as available; GHMC conditions call for space for a transformer.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress 0%; no independent completion verification supplied.
Other listed items
Description / sizeInternal roads and footpaths, street lighting, community buildings, sewage treatment/disposal, solid-waste management, energy management, fire protection and recreational open-space aggregate are listed; no supplied size, detail or completion evidence establishes these as delivered facilities.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress 0% where recorded; no independent completion verification supplied.

The supplied third-party vendor record mentions a pool, gym, clubhouse, children’s play area and other services, but those are not substantiated as sanctioned or delivered facilities in the project records reviewed here. Promoter website

7. Utilities, building services & safety

The RERA amenity record lists water supply, sewerage, storm-water drainage and rainwater harvesting as provisions, without specifying source, capacity, storage, treatment, reuse or completion status. A third-party vendor entry describes water supply as “Corporation and Borewell”; this is not a RERA-filed utility specification. RERA amenities Promoter website

The GHMC permit extraction specifies 4 rainwater-harvesting pits and requires a percolation pit. The RERA amenity list also includes a substation/electrical meter-room/receiving-station provision, while the permit conditions call for space for a transformer. No capacity, backup-power system, lift count or lift capacity is documented in the supplied project approval records. RERA amenities

The permit conditions require sanitation, plumbing, fire-safety requirements, lifts and electrical installations to be carried out under qualified technical personnel’s supervision; they assign structural- and fire-safety responsibilities to the owner, builder/developer, architect and site engineer. The GHMC permit order also specifies that an Occupancy Fire NOC is to be obtained from the Director (EV&DM) before issue of an Occupancy Certificate. These are stated requirements, not evidence of completed installations or clearances.

The supplied records do not establish waste segregation or disposal arrangements, CCTV or access-control systems, accessibility features, or completed fire and life-safety installations. RERA amenities

8. Location, access & connectivity

The registered project location is Lalitha Nagar / Lalithanagar, Adikmet, Zamistanpur Village, Hyderabad, PIN 500044. The GHMC permit identifies the site at Adikmet, Zamistanpur and records Musheerabad mandal. RERA record

The supplied project location record gives the Financial District (Nanakramguda) as an anchor at 1.2 km. This is a recorded distance; no travel time or transport mode is supplied. Location record

The site-plan extraction lists a 9.00MT WIDE MAINROAD and a 7.83 M. WIDE BALC road. The GHMC permit order records an 18 mt. road width. No project-specific public-transport routes or independently sourced distances to other landmarks are provided in the reviewed data.

9. Developer & development status

The registered promoter is R R KONSTRUCTIONS, a partnership, with GSTIN 36AARFR6001K1ZX. The RERA record gives the promoter address as RAGIR SADAN, LALITHA NAGAR, ADIKMET, ZAMISTANPUR VILLAGE, Lalitha Nagar, Hyderabad, 500044. The named partner is RAGIR RAGHURAJ; RAGIR RITESH is recorded as authorized signatory. Corporate record Parties record

The promoter’s Form B declaration dated 2 February 2024 states a completion undertaking of 16/01/2026. The project header records proposed completion as 16/04/2027. These are distinct recorded dates; the supplied evidence does not provide an independently verified construction-progress report to establish the current stage. RERA record

The GHMC building permit is for one building. No separate phase-wise construction, completion or occupancy scope is documented. No occupancy or completion certificate is supplied in the project documents reviewed. Approvals record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02500007729; valid 20 February 2024–16 December 2026
What the supplied record establishesForm C certificate names RAMNARAYAN RESIDENCY and R R Konstructions as promoter and records the project location and survey numbers.
GHMC building permit order
Identifier / date4796/GHMC/SEC/2023-BP; 16 December 2023; file no. 007465/GHMC/3709/SEC2/2023-BP
What the supplied record establishesPermission for residential construction of 1 Stilt + 5 upper floors on a 347.59 sq. m. site, subject to stated conditions.
Site / plan submission
Identifier / dateTS-bPASS reference TS/039658/2023; approval extraction dated 07-06-2023
What the supplied record establishesSubmitted plan record describes proposed S+5 upper floors and identifies Survey Nos. 55, 59, 60, 64, 66, 67 and 104(PART).
Form B declaration
Identifier / date2 February 2024
What the supplied record establishesPromoter declaration concerning title, encumbrances, project funds and completion undertaking.
Letter of allotment
Identifier / dateProject-specific, in the RERA-filed documents
What the supplied record establishesIdentifies the project and the GHMC building permit and refers to registered document no. 2243/2023; it is an allotment letter, not a registered agreement for sale.
Layout approval / plan lookup
Identifier / dateNot established by the supplied materials as a separate approved-layout record
What the supplied record establishesThe RERA-filed layout-plan document is a plan submission/extraction; the HMDA DPMS approved-layout lookup is not publicly reachable in the supplied record. HMDA
Completion / occupancy record
Identifier / dateNot supplied
What the supplied record establishesThe building permit extraction records completion_certified as false; the permit requires an Occupancy Certificate before occupation.

Frequently asked questions

Is RAMNARAYAN RESIDENCY registered with Telangana RERA?

Yes. RAMNARAYAN RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02500007729; the registration status is New Project.

Who is the developer of RAMNARAYAN RESIDENCY?

The promoter named in the RERA registration is R R KONSTRUCTIONS.

Where is RAMNARAYAN RESIDENCY located?

RAMNARAYAN RESIDENCY is in LALITHA NAGAR, Hyderabad, Telangana (500044).

When will RAMNARAYAN RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 16/04/2027. This is the promoter's declaration, not a guarantee.