Rachakonda Green Hill

BADDAM · Yadadri Bhuvanagiri · RERA P02000008920

RACHAKONDA GREEN HILL is a plotted development in Venkambavi Thanda, Narayanpur Mandal, Yadadri Bhuvanagiri. The registered promoter is Baddam Ashok Reddy. The project has a registered land area of 61,613 sq. m and the draft layout records 168 plots; plot configurations are not stated. It is registered under TG-RERA number P02000008920, with a proposed completion date of 30/11/2026.

01What we found

Period endedTG-RERA registration ran to 9 May 2026 - check its extension on TG-RERA
20documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldTG-RERA / filed record
Registered project nameRACHAKONDA GREEN HILL RERA record
Project typePlotted development RERA record RERA filing
Phase / registered portionPhase not separately identified; registration is for the project at the stated survey numbers
TG-RERA registrationP02000008920
Registration validity09/05/2024 to 09/05/2026; validity is distinct from the project completion undertaking
Registered promoterBaddam Ashok Reddy
RERA project status in supplied record“New Project”; registration certificate captured 10/09/2026, after its stated validity end date. No extension record is supplied, so current registration status is unverified. RERA filing Approvals record

Land and geographic identity

FieldRecord
Locality / project addressVenkambavi Thanda; the layout record also identifies Venkambavi Thanda G.P. RERA record
Revenue villageMahamadabad Revenue Village (also written “Mahamadabad Rev.Village”); the RERA project address separately says Venkambai Thanda.
MandalNarayanpur (layout document: Narayanapur Mandal) RERA record
DistrictYadadri Bhuvanagiri RERA record
PIN508253 RERA record
Project survey numbers216/P, 217/P and 220/P RERA record
Registered project land area61,613 sq. m total and net area, as recorded in the RERA land fields RERA filing
Area stated in layout approval documentsAc.15.225 Cents / 15.225 acres; 73,689.00 sq. yds
Boundaries (RERA-filed)East: ROAD; North: ROAD; West: OTHERS LAND; South: OTHERS LAND RERA filing

Development identity

FieldRecord
Sanctioning authorityDirector of Town and Country Planning; delegated to Venkambavi Thanda Gram Panchayat for the layout
Principal layout approval referenceDraft-TLP.No.63/2024/H, dated 09-05-2024; file reference Lr.Roc.No.18941/111/2024/H
Layout approval status described by documentDraft Technical Layout Pattern—Approved; the document states that final layout release follows fulfilment of conditions.
Layout scale168 plots in the draft layout
Approved built-up area / building count / floorsNot disclosed in the supplied layout and RERA records; this is a plotted layout, not a documented apartment-building scheme. RERA filing
Parking provisionNot disclosed in the supplied layout approval or RERA records.

Offering and status

FieldRecord
OfferingPlots; the draft layout records 168 plots. Plot sizes and unit-by-unit availability are not supplied.
RERA-declared booked / available plotsNot provided in the supplied evidence. RERA record
Completion undertakingForm B declares completion by 09TH-05- 2026.
Proposed completion date in RERA project information30/11/2026 RERA filing
Registration validity end date09/05/2026; this is a separate registration-validity date, not an occupancy or completion certificate.
Construction / development stageNo independently verified site progress is supplied. The layout approval sets out development conditions; it does not establish which works are complete.
Occupancy / completion certificateNo OC or completion certificate is supplied. For a plotted layout, the supplied record instead refers to draft-layout execution and final layout release. Document index

2. The project story

RACHAKONDA GREEN HILL is registered as a plotted development in the Venkambavi Thanda area, on survey numbers 216/P, 217/P and 220/P, identified in the layout record as part of Mahamadabad Revenue Village, Narayanapur Mandal. The draft layout approval describes 168 plots across a site stated as 15.225 acres, with roads, an open-space park and a portion reserved as mortgage security to the Gram Panchayat. RERA record

The approval describes planned layout infrastructure—including roads and drains, storm-water channelisation, rainwater-harvesting pits, greenery, street lighting, electricity, sewerage disposal and protected water supply. These are approval conditions or provisions, not evidence that the works have been completed. No site inspection, verified progress report, plot inventory status or completion certificate is included in the supplied material.

3. Master plan, architecture & building design

This is a plotted layout, not a multi-tower building scheme in the supplied approval record. The draft layout identifies 168 plots and divides the land into plotted area, roads, open space and mortgage area. The approval records 8.967 acres (43,400.28 sq. yds) as plotted area (58.90%), 4.736 acres (22,922.24 sq. yds) as roads (31.10%), and 1.522 acres (7,366.48 sq. yds) as open space (10.00%). It separately identifies 1.395 acres (6,751.80 sq. yds) as mortgage area (15.55%).

The approval requires the owner/developer to demarcate plots and open spaces on the ground, provide and form roads and drains, channelise storm water, provide rainwater-harvesting pits, greenery and street lighting, and arrange sewerage disposal and protected water supply. It also states that open-space and road areas are to be transferred to the Gram Panchayat by registered gift deed before final layout release, and that the draft layout is to be executed within two years of Gram Panchayat approval. The supplied record does not include a final layout-release document or evidence of completed works.

No plot-size schedule, plot-by-plot drawing extraction, internal-road dimensions, landscape plan, building footprints or residential/commercial area distribution is supplied. The approval states that shops, business premises and industrial units are not allowed except at sites specially reserved for such proposals in the draft plan; the supplied material does not identify such reserved sites. It also states that only detached dwelling houses designed for single-family occupation are to be built on a site, subject to prior competent-authority approval for future development.

4. Homes, configurations & floor plans

The RERA-filed offering is plots, with 168 plots recorded in the draft layout approval. The supplied records do not provide plot-size bands, plot-wise identifiers, booked or available counts, or RERA-filed saleable areas.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Plots168 in draft layoutNot disclosedNot disclosedNot disclosedNot applicable / not suppliedNot supplied

The floor-plan record contains two drawings, both awaiting scan processing; no software-measured areas are available. The vendor record contains configuration labels and area claims, but these are not RERA-filed plot measurements and are not used here as the registered offering. Floor plans Promoter website

5. Parking & vehicle circulation

No sanctioned car- or two-wheeler-parking count, visitor or accessible parking allocation, parking location, or plot-specific parking entitlement is supplied. The layout approval requires roads to be formed and opened for access to neighbouring sites and prohibits a compound wall or fencing around the site; it does not provide road widths, turning details, entry/exit arrangements or pedestrian-separation information.

6. Amenities, recreation & open spaces

The layout approval describes planned community and open-space provisions. Its conditions do not establish completion, and the supplied material contains no independent verification of delivered facilities.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Open-space park1.522 acres; 7,366.48 sq. yds; 10.00% of the layoutDraft layout approvalApproval provision; registered gift deed and completion status not supplied
Roads4.736 acres; 22,922.24 sq. yds; 31.10%Draft layout approvalApproval provision; gift-deed and construction status not supplied
Greenery / avenue plantingRequired in the layout, including public open spacesDraft layout conditionsRequired; completion not verified
Rainwater-harvesting pitsRequired in the layoutDraft layout conditionsRequired; completion not verified
Street lightingRequiredDraft layout conditionsRequired; completion not verified

The supplied RERA amenity record marks internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/tot lot/park, street lighting and aggregate recreational open space as “YES” at 100%. This is a RERA-recorded declaration/status field; it is not independent evidence of on-site completion. The same record shows 0% for community buildings, sewage/sullage treatment and disposal, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection and safety requirements, and electrical meter room/sub-station/receiving station. RERA amenities

7. Utilities, building services & safety

The draft layout conditions call for protected water supply, sewerage disposal, storm-water drains and nala channelisation, rainwater-harvesting pits, electricity facilities and street lighting. The supplied approval does not state capacities, sources, treatment systems, storage, reuse arrangements, power backup or implementation status.

The supplied RERA amenity record reports water supply, sewerage, storm-water drains and street lighting at 100%, while water conservation/rainwater harvesting, solid-waste management, energy management, fire protection and electrical meter room/sub-station/receiving station are recorded at 0%. These are recorded status fields; no technical design, capacity data, safety-clearance evidence or independent completion verification is supplied. RERA amenities

8. Location, access & connectivity

The registered project location is Venkambai Thanda, Narayanpur, Yadadri Bhuvanagiri, Telangana 508253; the layout approval identifies Venkambavi Thanda G.P. and Mahamadabad Revenue Village. The project’s RERA-filed boundaries show roads to the east and north, and other land to the west and south. RERA record RERA filing

A supplied geocoding record places the location at Narayanpur, Narayanapoor Mandal, Yadadri Bhuvanagiri, with coordinates 17.1622779, 78.8800765. The nearest sampled Outer Ring Road interchange is recorded at approximately 32.7 km. No public-transport details or additional measured landmark distances are supplied in the registered project records. Location record

9. Developer & development status

The TG-RERA registration certificate identifies Baddam Ashok Reddy as the promoter. The promoter’s entity type is not established in the supplied corporate record; GSTIN 36ADRFS3243B1Z2 is recorded for BADDAM. The certificate lists the promoter address as Flat No. 301, Saroornagar, Ranga Reddy, 500035, Telangana. Corporate record

The filed Form B is a promoter declaration signed by Baddam Ashok Reddy. It undertakes completion by 09TH-05- 2026 and contains declarations about title basis and project-account arrangements; these are promoter declarations, not independent findings. The RERA project information separately records a proposed completion date of 30/11/2026. No RERA quarterly progress reports, verified construction measurements, extension order or completion/occupancy certificate are included in the supplied evidence. RERA filing Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Reference / scopeP02000008920; Form C; project RACHAKONDA GREEN HILL
What the supplied record establishesIdentifies Baddam Ashok Reddy as promoter, the project location and survey numbers, and registration validity of 09/05/2024–09/05/2026.
Draft layout approval
Reference / scopeDraft-TLP.No.63/2024/H; dated 09-05-2024; Director of Town and Country Planning; file Lr.Roc.No.18941/111/2024/H
What the supplied record establishesDescribes the 168-plot draft layout, land-use allocation and conditions for layout development and final release.
Layout approval record
Reference / scopeT.L.P.NO.©3-/2024/H; file C.No.: 18941 / 111 /2024/H; Director of Town and Country Planning
What the supplied record establishesRecords a 15.225-acre layout and land-use entries. The supplied extracted conditions are incomplete/truncated.
Form B declaration
Reference / scopeDated 16-07-2024; signed by Baddam Ashok Reddy
What the supplied record establishesPromoter’s declarations concerning title basis, encumbrances, completion undertaking and project-account arrangements.
Final layout release / OC / completion certificate
Reference / scopeNot supplied Document index
What the supplied record establishesThe available evidence does not establish final layout release or a completion/occupancy certificate.

The public HMDA approved-layout lookup is recorded as unavailable from the supplied evidence; the project is identified in the RERA record as DTCP-approved. The supplied material does not include an HMDA layout lookup result. HMDA Approvals record

Frequently asked questions

Is RACHAKONDA GREEN HILL registered with Telangana RERA?

Yes. RACHAKONDA GREEN HILL is registered with the Telangana Real Estate Regulatory Authority as P02000008920; the registration status is New Project.

Who is the developer of RACHAKONDA GREEN HILL?

The promoter named in the RERA registration is BADDAM.

Where is RACHAKONDA GREEN HILL located?

RACHAKONDA GREEN HILL is in VENKAMBAVI THANDA, VENKAMBAI THANDA, Narayanpur, Yadadri Bhuvanagiri, Telangana (508253).

When will RACHAKONDA GREEN HILL be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.