Pvr Prime

P V R CONSTRUCTIONS · Rangareddy · RERA P02400003728

PVR PRIME is a residential apartment project in Madhava Hills, Serilingampally Mandal, Ranga Reddy District. The registered promoter is P V R CONSTRUCTIONS. The project occupies 394.83 m² and comprises one building with 1 stilt + 5 upper floors and 10 3BHK apartments, each with a recorded saleable area of 58.76 m². Its TG-RERA registration number is P02400003728, and the proposed completion date is 07/10/2024.

01What we found

Period endedTG-RERA registration ran to 7 Oct 2024 - check its extension on TG-RERA
8documents on file - each fact links to its page
9court cases on this project's land (survey 88, 89, Kondapur)
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered projectPVR PRIME RERA record
Project typeResidential apartment project RERA filing
Phase / registered portionRegistered record identifies the building as Building - PROP-1 (VENKATESHWAR REDDY); no separate phase name is disclosed.
TG-RERA registrationP02400003728 RERA record
Registration validity20/12/2021 to 07/10/2024 on the supplied Form C certificate; no extension is recorded on that certificate. This is registration validity, not an occupancy certificate or proof of completion.
RERA status in supplied recordThe project is registered; the certificate’s stated validity ended on 07/10/2024. Current registration status is not established by the supplied certificate.
Registered promoterP V R CONSTRUCTIONS (also styled “P V R Constructions” in project documents); entity type: Partnership. RERA record RERA filing

Land and geographic identity

FieldRecord
LocalityMadhava Hills RERA record RERA filing
Revenue villageKondapur RERA record RERA filing
Mandal / district / PINSerilingampally / Ranga Reddy / 500084 RERA record RERA filing
Project survey numbers88 PART and 89 PART RERA filing
PlotPlot No. 116 RERA filing
Registered site extent394.83 m² RERA filing
Total / net areaTotal area 394.83 m²; net area 394.83 m² in the RERA land record and building-permit extraction. RERA filing
Boundaries in RERA land recordNorth: Plot No. 115; South: Plot No. 117; East: Plot No. 109; West: 40 wide road. RERA filing

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building-permit approval2/C20/09896/2021, dated 07 October, 2021; associated file no. 2/C20/08095/2021. Approvals record
Approved built-up area1,410.18 m² in the RERA project fields. The permit extraction separately states 1,175.15 m² upper floors area; these are distinct labels in the supplied records. RERA filing
Building countOne building / one tower is recorded. RERA unit table RERA filing
Sanctioned configuration1 stilt + 5 upper floors; permit extraction states building height 14.75 m.
Parking levels / provisionOne stilt parking floor is identified in the permit parameters; the permit conditions refer to cellar and stilt parking, but the supplied parameters do not identify a cellar. Parking counts are not disclosed.
Unit countGHMC permit condition says the sanctioned number of units must not be increased, but the extracted permit does not state that number. RERA records 10 units. RERA unit table

Offering and status

FieldRecord
RERA-filed configuration3BHK; 10 units, 0 booked and 10 available in the portal data supplied. Booking counts have no stated as-of date and are indicative. RERA unit table RERA unit details
RERA-filed saleable area58.76 m² for the recorded 3BHK configuration. RERA unit table RERA unit details
Construction stageRERA-derived completion percentage is 90%, with no stated measurement date or independent site verification in the supplied evidence. RERA record
Completion datesPromoter’s Form B undertaking states 07/10/2024 as the project completion period; the RERA header also records proposed completion 07/10/2024. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied; the building-permit extraction records completion_certified: false.

2. The project story

PVR PRIME is recorded with TG-RERA as a residential apartment project at Plot No. 116, Madhava Hills, Kondapur, Serilingampally Mandal, Ranga Reddy District. The registered land identity is Survey Nos. 88 PART and 89 PART, and the RERA site area is 394.83 m². RERA record RERA filing

GHMC’s building-permit order identifies one residential building, Building - PROP-1 (VENKATESHWAR REDDY), and authorizes 1 stilt + 5 upper floors. The RERA unit record lists ten 3BHK apartments. The supplied portal data shows 0 booked and 10 available, but carries no as-of date. RERA unit table

The project record reports 90% completion, while the promoter’s stated completion date was 07/10/2024. The completion percentage is not supported here by an independently verified site inspection, and no occupancy/completion certificate is supplied. The permit requires a completion notice and occupancy certificate before occupation. RERA record

3. Master plan, architecture & building design

The GHMC permit extraction describes a single residential building on a site of 394.83 m², with 1 stilt + 5 upper floors and a stated height of 14.75 m. The permit parameters state 1,175.15 m² upper floors area and 221.44 m² tot-lot; the RERA project fields separately list approved built-up area of 1,410.18 m². These figures retain their respective source labels and are not interchangeable. RERA filing

The permit extraction lists setbacks as “77.36 RM,” Front 4, Rear 2, Side I 2 and Side II 2; the supplied extract does not explain the units or meaning of “77.36 RM.” It records 15 trees and requires a tot-lot to be fenced and maintained as greenery before issue of the occupancy certificate.

The available extracted material does not establish the building footprint, apartment arrangement per floor, lift or stair count, internal circulation, or a detailed residential/common-area schedule. The layout-plan document is listed in the RERA file, but its extraction is unavailable.

4. Homes, configurations & floor plans

The RERA unit record lists 10 3BHK apartments, with 0 booked and 10 available in the supplied portal data; no as-of date is provided for those counts. The filing gives 58.76 m² as saleable area. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK1001058.76 m²Not measured in the supplied drawing recordsNot supplied

The available drawing-based measurement is for a 2BHK, not the RERA-filed 3BHK configuration: software measurement from drawing document 202638 gives a carpet-area median of 39.2 m² (422 sq ft) for one flat design. This is a drawing measurement, not a RERA-filed configuration or area, and is marked as needing review. The supplied data does not provide a measured 3BHK plan. RERA unit details Floor plans

Carpet area and saleable area are different measures: the drawing-measured carpet figure relates to net usable internal area, while the supplied floor-plan note states that RERA saleable area also includes the home’s share of common areas. Balcony or utility dimensions and a loading figure are not supplied here. Floor plans RERA unit details

5. Parking & vehicle circulation

The GHMC permit parameters identify 1 stilt parking floor. The permit conditions state that cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not partitioned or converted to another use; the supplied permit parameters do not establish a cellar’s presence or disclose parking-space counts.

The RERA unit record marks the 3BHK units as mortgaged, but does not provide a unit-wise parking allocation. No resident, visitor, accessible or two-wheeler parking counts, ramp details, vehicle-entry arrangements, EV charging provision or spaces-per-home ratio are established in the supplied material. RERA unit table RERA unit table

6. Amenities, recreation & open spaces

The permit extraction identifies a tot-lot, rainwater-harvesting structure (percolation pit), transformer space, garbage house and ETP. The permit parameters specify a 221.44 m² tot-lot and 15 trees; the permit requires the tot-lot to be fenced and maintained as greenery before occupancy certification. These are permit-recorded provisions, not evidence that they have been completed.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot221.44 m²GHMC permit parameters and conditionsRequired by permit; completion not independently verified
Trees15 treesGHMC permit parametersPermit parameter; planting status not supplied
Kids’ play area / sand pitsNo size or quantity suppliedVendor listing Promoter websitePromoter-marketed/vendor-listed; not established as delivered
Indoor gamesNo size or equipment details suppliedVendor listing Promoter websitePromoter-marketed/vendor-listed; not established as delivered
Normal park / central greenNo size suppliedVendor listing Promoter websitePromoter-marketed/vendor-listed; not established as delivered

7. Utilities, building services & safety

The permit records rainwater harvesting by percolation pit, transformer space, a garbage house and an ETP. It also requires water supply and electricity connections to be provided only on production of an occupancy certificate, and requires an occupancy fire NOC before the occupancy certificate. These conditions do not establish completion or operational status of the services.

The RERA amenities record marks water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as “YES,” while showing 0% against the listed infrastructure rows. No capacities, water source or storage details, STP specification, reuse arrangements, backup-power capacity, lift details, fire-system specifications, waste-segregation arrangements, CCTV or accessibility features are established in the supplied evidence. RERA amenities

8. Location, access & connectivity

The registered location is Madhava Hills, Kondapur, Serilingampally Mandal, Ranga Reddy District, PIN 500084. The RERA land record gives the western boundary as a 40 wide road; the GHMC permit extract separately refers to 18 mt. road widths in its conditions. RERA record RERA filing

The supplied location record gives HITEC City — 4.3 km. A vendor listing separately names Arbor International School (0.1 km), Sai Neha Hospital (0.4 km), Kotla Vijayabashkar Reddy Botanical Garden (1.8 km) and Old Mumbai Highway (approximately 2.5 km); these are vendor-supplied proximity claims, not independently verified measurements. Location record Promoter website

9. Developer & development status

The registered promoter is P V R CONSTRUCTIONS, recorded as a Partnership, with GSTIN 36AAWFP0077E1ZZ. The RERA promoter address is recorded at the Sri Swamy Ayyappa Cooperative House Building Society, Khanamet Village, Madhava Hills, Serilingampally, Ranga Reddy, PIN 500084. The Form C certificate separately lists the promoter office as Hyderabad, PIN 500081; no official contact details or website are supplied in the project evidence. RERA filing Corporate record

The Form B declaration is made by P. Venkateshwar Reddy as Managing Partner and promoter representative and states a completion period of 07/10/2024. The project header records 90% completion, but the supplied material does not establish an independent inspection date or an occupancy/completion certificate. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate (Form C)
Identifier / dateP02400003728, issued 20/12/2021; validity stated through 07/10/2024
What the supplied record establishesRegistration for PVR PRIME; the supplied certificate records no extension.
GHMC building permit order
Identifier / dateApproval 2/C20/09896/2021; file 2/C20/08095/2021; dated 07 October, 2021
What the supplied record establishesBuilding permission for a residential building identified as Building - PROP-1 (VENKATESHWAR REDDY), on Survey Nos. 88 PART and 89 PART.
Form B promoter declaration
Identifier / dateNo completed declaration date or place stated
What the supplied record establishesPromoter declaration of title, no encumbrances and statutory undertakings, including completion period 07/10/2024.
Legal title report
Identifier / dateDocument 202630
What the supplied record establishesRERA-filed title-report extraction describes the 2018 sale deed for Plot No. 116; the detailed chain is outside this overview.
Prior title document
Identifier / dateDocument 202631
What the supplied record establishesRERA-filed title-report extraction includes a 1999 sale deed and recited earlier title material.
Layout plan
Identifier / dateDocument 202638
What the supplied record establishesListed in the RERA file; extraction is unavailable.
Occupancy/completion certificate
Identifier / dateNot supplied
What the supplied record establishesNo certificate establishing occupancy or completion is available in the supplied project records.

Frequently asked questions

Is PVR PRIME registered with Telangana RERA?

Yes. PVR PRIME is registered with the Telangana Real Estate Regulatory Authority as P02400003728; the registration status is New Project.

Who is the developer of PVR PRIME?

The promoter named in the RERA registration is P V R CONSTRUCTIONS.

Where is PVR PRIME located?

PVR PRIME is in MADHAVA HILLS, Kondapur, Serilingampally, Rangareddy, Telangana (500084).

When will PVR PRIME be completed?

The promoter's proposed date of completion filed with RERA is 07/10/2024. This is the promoter's declaration, not a guarantee.