Premium Park
MYSPACE VENTURES PRIVATE LIMITED · Rangareddy · RERA P02400001486
PREMIUM PARK is a plotted development at Adibatla Village, Ibrahimpatnam Mandal, Ranga Reddy District, developed by MYSPACE VENTURES PRIVATE LIMITED. The layout drawing records a total site area of 95,584.47 sq.m and a net layout area of 87,996.35 sq.m, with residential plots; the supplied record does not state a total plot count or plot-size configurations. The project is registered with TG-RERA under P02400001486, with proposed completion on 15/11/2022.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | PREMIUM PARK RERA record |
| Project type / registered portion | Plotted development; the available record identifies a plotted layout, but does not specify a separate phase name or phase number. RERA record RERA filing |
| TG-RERA registration | P02400001486; Form C registration issued 27/12/2019, valid through 15/11/2022. The certificate records no extension. Registration validity is distinct from the project completion deadline and from any occupancy/completion certification. RERA record |
| Registered promoter | MYSPACE VENTURES PRIVATE LIMITED (company). RERA record Corporate record |
| RERA status in supplied record | Registered; the stated registration period has ended, and no extension is recorded in the supplied certificate. |
Land and geographic identity
| Item | Project record |
|---|---|
| Revenue village | Adibatla Village is stated in the layout-related records and title documents. |
| Locality / mandal / district / PIN | Locality: Ibrahimpatnam (RERA certificate); mandal: Ibrahimpatnam; district: Ranga Reddy; PIN: 501510. |
| All project survey numbers and subdivisions | 551P, 552, 553P and 564P (RERA registration, HMDA intimation and municipality layout order). The title material also refers to underlying survey/subdivision descriptions; see Land & Title for the deed-by-deed schedule. Land records |
| Registered site extent | Not stated in the supplied RERA certificate. |
| Site-area figures in filed layout records | The municipality order concerns 95,584.47 Sq.mtrs.; the HMDA intimation describes 87,542.10 Sq. Mt. |
| Net layout area / road-widening area | Drawing-derived layout area statement: net layout area 87,996.35 sq.m; road-widening area 7,588.11 sq.m; total site area 95,584.47 sq.m. These are software-read values from the layout drawing’s area statement. Layout record |
| Boundaries | East: land of Ramidi Ail Reddy; west: neighbours’ land; north: land of K Bharathi and others; south: Kongarakhrudu Shivar. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authorities | HMDA is identified in the RERA project information; the supplied layout-release order is from Adibatla Municipality and refers to an HMDA draft layout permit. RERA filing |
| Principal layout reference | HMDA Draft Layout Permit 000274/LO/Plg/HMDA/2018, dated 21.12.2018, cited in Adibatla Municipality’s order TPS/Adibatla/ 704/39/ /2019, approved 02.12.2019. Approvals record |
| HMDA application / intimation | Application 012650/SMD/LT/U6/HMDA/13062018; the supplied HMDA document is an intimation to pay charges and fulfil precedent conditions and expressly says it is not approval or development permission. Approvals record |
| Approved built-up area | 87,996.35 sq.m is recorded in the RERA fields as “Approved Built up Area”; the supplied project is a plotted layout, and no building-by-building or plot-level building sanction schedule is provided here. RERA filing |
| Buildings / floors / parking levels | No building count, floor configuration, parking levels or building-specific commencement certificates are established by the supplied material. Document index |
| Layout land-use statement | Plots 49,404.23 sq.m (56.1%); roads 24,746.47 sq.m (28.1%); parks/open space 11,198.66 sq.m (12.7%); social infrastructure 2,192.29 sq.m (2.5%); amenities 0.00 sq.m (0.0%). Software-measured from the drawing’s area statement. Layout record |
| Mortgage area recorded in RERA fields and layout drawing | 7,475.24 sq.m, corresponding to plots 163–197; the drawing describes these as 35 plots mortgaged to the approving authority pending completion of layout works. RERA filing Layout record |
Offering and status
| Item | Project record |
|---|---|
| Purchase type | Residential plots; the supplied RERA material does not include a complete RERA-filed unit/plot inventory or plot-size schedule. RERA filing |
| Plot size range / count | Not established from the supplied RERA-filed unit data. A third-party vendor record lists plot sizes, but these are not used here as RERA-filed offering figures. Promoter website |
| Booked / available counts | Not available in the supplied evidence. Document index |
| RERA completion date | The project header records proposed completion 15/11/2022. RERA record |
| Promoter-declared completion undertaking | Form B, dated 11 March 2019, undertakes completion by 31-03-2020. |
| Construction / development stage | No independently verified current site-progress record is supplied. The municipality order describes development obligations and a three-year period for completing layout works; it does not establish present completion. |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied evidence. For this plotted layout, the evidence does not establish an OC or completion-certificate status for the overall layout or any phase. Document index |
2. The project story
PREMIUM PARK is registered with TG-RERA as a plotted-development project promoted by MYSPACE VENTURES PRIVATE LIMITED. The RERA certificate identifies the project as being in Ibrahimpatnam, Ranga Reddy district, PIN 501510; the layout and title records identify the revenue village as Adibatla and list surveys 551P, 552, 553P and 564P. RERA record
The filed layout material describes a residential open-plotted layout rather than an apartment or multi-tower development. Its drawing-derived land-use statement allocates land to plots, internal roads, parks/open space and social infrastructure; the statement records no separate amenity area. Layout record The municipality’s order records conditions for roads, drainage, water supply, electrical infrastructure, parks, rainwater harvesting and handover of specified layout areas. These are approval-condition descriptions, not proof that the works have since been completed.
The supplied documents do not provide a current, independently verified construction-progress assessment or an occupancy/completion certificate. RERA record Document index
3. Master plan, architecture & building design
This is a plotted layout, so the supplied design evidence concerns land subdivision and shared layout infrastructure, not apartment plans, tower arrangements or residential floor configurations. The layout drawing’s area statement gives a total site area of 95,584.47 sq.m, a net layout area of 87,996.35 sq.m and a road-widening area of 7,588.11 sq.m. The figures are software-read from the drawing and should be treated as drawing-derived measurements. Layout record
| Layout use | Drawing-stated area | Share of drawing’s base |
|---|---|---|
| Plots | 49,404.23 sq.m | 56.1% |
| Roads | 24,746.47 sq.m | 28.1% |
| Parks / open space | 11,198.66 sq.m | 12.7% |
| Social infrastructure | 2,192.29 sq.m | 2.5% |
| Amenities | 0.00 sq.m | 0.0% |
Layout record
The layout drawing identifies plots 163–197, 35 plots in total, as the mortgage area, covering 7,475.24 sq.m. The HMDA intimation describes the mortgage as a condition before release of plans; the municipality order also states that mortgaged plots are not to be sold. Layout record
The HMDA intimation refers to a proposed 24 mtrs master-plan road and a 30 Mtrs condition in relation to the compound wall; it expressly states that the intimation itself is not approval or permission for development. The municipality’s order describes internal roads as 18 mts and above and requires B.T. roads before release of the final layout plan.
No project-specific building footprint, building count, floor plan, building height or FSI-counted area is established in the supplied material. The RERA field’s “Approved Built up Area” is 87,996.35 sq.m; it is reported as filed and is not treated as carpet, saleable or FSI area. RERA filing
4. Homes, configurations & floor plans
The RERA-filed evidence identifies a plotted project but does not provide a complete plot inventory with plot numbers, counts by size, booked/available status or RERA-filed saleable areas. The supplied floor-plan review records two layout sheets but no measured unit plans; it therefore does not establish plot-by-plot or house-level carpet areas. RERA filing Floor plans Document index
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | Not available | Not available | Not available | Not available | Not applicable / not supplied | Not supplied |
A plot’s area is not an apartment carpet area. The supplied evidence does not provide a RERA-filed plot-size schedule suitable for listing plot-size bands. Document index Floor plans
5. Parking & vehicle circulation
No RERA-filed parking count, visitor or accessible parking allocation, parking-level plan, or plot-specific parking entitlement is established in the supplied evidence. As a plotted layout, individual building parking arrangements are not specified in the layout records provided here. The drawing shows internal road area, but the material does not establish a sanctioned vehicle-circulation plan with driveway, ramp or entry/exit details. Layout record Document index
6. Amenities, recreation & open spaces
The layout drawing records 11,198.66 sq.m of parks/open space and 2,192.29 sq.m of social infrastructure, with 0.00 sq.m shown as a separate amenity-area allocation. Layout record The municipality order lists layout infrastructure and community provisions as development or handover conditions; the available evidence does not verify delivery or completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Parks / open space | Drawing-stated 11,198.66 sq.m | Layout record | Area appears in the layout drawing; completion not independently verified. |
| Social infrastructure | Drawing-stated 2,192.29 sq.m | Layout record | Area appears in the layout drawing; facility type and completion status not established. |
| Separate amenity area | Drawing-stated 0.00 sq.m | Layout record | No separate area allocated in the drawing’s land-use statement. |
| Park development / avenue plantation | Listed as layout infrastructure | Approval-order condition; completion not verified. | |
| Community buildings | Listed in RERA amenity fields | RERA amenities | Progress shown as 0%; no completed facility verified. |
| Green strip / TOT LOT / park | Listed in RERA amenity fields | RERA amenities | Marked “YES”; progress shown as 0%; completion not verified. |
7. Utilities, building services & safety
The municipality’s layout order lists storm-water drains; underground drainage lines and a common septic tank/STP; internal water-supply pipelines and an overhead tank; electrical supply lines with streetlights and a transformer; avenue plantation; park development; rainwater-harvesting pits; underground ducting for utilities; independent sewerage disposal; and protected water supply including an overhead tank and sumps. These are described as layout-development requirements, not independently verified completed services.
The HMDA intimation also specifies an STP and septic tank and refers to fire-service department norms; that document expressly says it is not approval of the proposal or permission for development. RERA amenity fields list water supply, sewerage, storm-water drainage, sewage treatment/disposal, solid-waste management, rainwater harvesting, energy management, fire safety and electrical meter/substation/receiving facilities, but the supplied progress values are 0%. RERA amenities The evidence does not specify capacities, water source, backup-power provision, security systems, accessibility provisions or completed fire-safety installations.
8. Location, access & connectivity
The official project records place PREMIUM PARK at Adibatla Village, Ibrahimpatnam Mandal, Ranga Reddy District, Telangana, PIN 501510. The supplied cadastral parcel-centroid coordinate is 17.41528, 78.35459. Location record
No verified approach-road description, public-transport information or measured distance to local services is provided in the project’s official-record material supplied here. A location record lists Financial District (Nanakramguda) at 1.2 km from the stated parcel-centroid reference; it does not provide a travel time. Location record
9. Developer & development status
The registered legal promoter is MYSPACE VENTURES PRIVATE LIMITED, a company. The RERA records identify Vamshidhar Reddy K as an authorized signatory. Corporate record Parties record The project certificate lists a promoter-office address as “Village: Mandal: District: Hyderabad, Pin: 500104”; the supplied material does not provide a completed village or mandal field for that address.
The promoter’s Form B affidavit declares title, states that the land is free from encumbrances and undertakes completion by 31-03-2020. These are promoter declarations in the filed affidavit, not independent verification of title, encumbrance status or project completion. The RERA project header gives proposed completion as 15/11/2022; no current project-progress certificate or OC/completion certificate is supplied. RERA record Document index
10. Approvals, official records & documents
| Record | What the supplied evidence establishes |
|---|---|
| TG-RERA registration certificate | Form C for PREMIUM PARK, P02400001486, issued 27/12/2019 and valid through 15/11/2022; the certificate records no extension. |
| HMDA layout application/intimation | Application 012650/SMD/LT/U6/HMDA/13062018 for a residential draft open-plotted layout. The document requests charges and compliance with conditions and expressly states that it is not approval or development permission. |
| HMDA draft layout permit reference | 000274/LO/Plg/HMDA/2018, dated 21.12.2018, cited in the municipality order. |
| Adibatla Municipality layout order | TPS/Adibatla/ 704/39/ /2019, approved 02.12.2019; described as release of a draft residential layout previously sanctioned by HMDA, subject to development, mortgage and handover conditions. |
| RERA Form B | Promoter affidavit by K Vamshidhar Reddy for MYSPACE Ventures Private Limited, dated 11 March 2019, including a completion undertaking of 31-03-2020. |
| Layout drawing and area statement | Two layout sheets are recorded; the area statement is software-read, and the plotted layout’s area allocations are summarized above. Layout record |
| Occupancy/completion certificate | No such certificate is included in the supplied evidence. Document index |
| Public layout lookup | The HMDA DPMS approved-layout lookup is reported as unavailable through the public internet; this is an access limitation, not evidence of approval or refusal. HMDA |
1. Project at a glance
Project identity
Registered project name: PREMIUM PARK
Project type / registered portion: Plotted development; the available record identifies a plotted layout, but does not specify a separate phase name or phase number.
TG-RERA registration: P02400001486; Form C registration issued 27/12/2019, valid through 15/11/2022. The certificate records no extension. Registration validity is distinct from the project completion deadline and from any occupancy/completion certification.
Registered promoter: MYSPACE VENTURES PRIVATE LIMITED (company).
RERA status in supplied record: Registered; the stated registration period has ended, and no extension is recorded in the supplied certificate.
Land and geographic identity
Revenue village: Adibatla Village is stated in the layout-related records and title documents.
Locality / mandal / district / PIN: Locality: Ibrahimpatnam (RERA certificate); mandal: Ibrahimpatnam; district: Ranga Reddy; PIN: 501510.
All project survey numbers and subdivisions: 551P, 552, 553P and 564P (RERA registration, HMDA intimation and municipality layout order). The title material also refers to underlying survey/subdivision descriptions; see Land & Title for the deed-by-deed schedule.
Registered site extent: Not stated in the supplied RERA certificate.
Site-area figures in filed layout records: The municipality order concerns 95,584.47 Sq.mtrs.; the HMDA intimation describes 87,542.10 Sq. Mt.
Net layout area / road-widening area: Drawing-derived layout area statement: net layout area 87,996.35 sq.m; road-widening area 7,588.11 sq.m; total site area 95,584.47 sq.m. These are software-read values from the layout drawing’s area statement.
Boundaries: East: land of Ramidi Ail Reddy; west: neighbours’ land; north: land of K Bharathi and others; south: Kongarakhrudu Shivar.
Development identity
Sanctioning authorities: HMDA is identified in the RERA project information; the supplied layout-release order is from Adibatla Municipality and refers to an HMDA draft layout permit.
Principal layout reference: HMDA Draft Layout Permit 000274/LO/Plg/HMDA/2018, dated 21.12.2018, cited in Adibatla Municipality’s order TPS/Adibatla/ 704/39/ /2019, approved 02.12.2019.
HMDA application / intimation: Application 012650/SMD/LT/U6/HMDA/13062018; the supplied HMDA document is an intimation to pay charges and fulfil precedent conditions and expressly says it is not approval or development permission.
Approved built-up area: 87,996.35 sq.m is recorded in the RERA fields as “Approved Built up Area”; the supplied project is a plotted layout, and no building-by-building or plot-level building sanction schedule is provided here.
Buildings / floors / parking levels: No building count, floor configuration, parking levels or building-specific commencement certificates are established by the supplied material.
Layout land-use statement: Plots 49,404.23 sq.m (56.1%); roads 24,746.47 sq.m (28.1%); parks/open space 11,198.66 sq.m (12.7%); social infrastructure 2,192.29 sq.m (2.5%); amenities 0.00 sq.m (0.0%). Software-measured from the drawing’s area statement.
Mortgage area recorded in RERA fields and layout drawing: 7,475.24 sq.m, corresponding to plots 163–197; the drawing describes these as 35 plots mortgaged to the approving authority pending completion of layout works.
Offering and status
Purchase type: Residential plots; the supplied RERA material does not include a complete RERA-filed unit/plot inventory or plot-size schedule.
Plot size range / count: Not established from the supplied RERA-filed unit data. A third-party vendor record lists plot sizes, but these are not used here as RERA-filed offering figures.
Booked / available counts: Not available in the supplied evidence.
RERA completion date: The project header records proposed completion 15/11/2022.
Promoter-declared completion undertaking: Form B, dated 11 March 2019, undertakes completion by 31-03-2020.
Construction / development stage: No independently verified current site-progress record is supplied. The municipality order describes development obligations and a three-year period for completing layout works; it does not establish present completion.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied evidence. For this plotted layout, the evidence does not establish an OC or completion-certificate status for the overall layout or any phase.
2. The project story
PREMIUM PARK is registered with TG-RERA as a plotted-development project promoted by MYSPACE VENTURES PRIVATE LIMITED. The RERA certificate identifies the project as being in Ibrahimpatnam, Ranga Reddy district, PIN 501510; the layout and title records identify the revenue village as Adibatla and list surveys 551P, 552, 553P and 564P.
The filed layout material describes a residential open-plotted layout rather than an apartment or multi-tower development. Its drawing-derived land-use statement allocates land to plots, internal roads, parks/open space and social infrastructure; the statement records no separate amenity area. The municipality’s order records conditions for roads, drainage, water supply, electrical infrastructure, parks, rainwater harvesting and handover of specified layout areas. These are approval-condition descriptions, not proof that the works have since been completed.
The supplied documents do not provide a current, independently verified construction-progress assessment or an occupancy/completion certificate.
3. Master plan, architecture & building design
This is a plotted layout, so the supplied design evidence concerns land subdivision and shared layout infrastructure, not apartment plans, tower arrangements or residential floor configurations. The layout drawing’s area statement gives a total site area of 95,584.47 sq.m, a net layout area of 87,996.35 sq.m and a road-widening area of 7,588.11 sq.m. The figures are software-read from the drawing and should be treated as drawing-derived measurements.
| Layout use | Drawing-stated area | Share of drawing’s base |
|---|---|---|
| Plots | 49,404.23 sq.m | 56.1% |
| Roads | 24,746.47 sq.m | 28.1% |
| Parks / open space | 11,198.66 sq.m | 12.7% |
| Social infrastructure | 2,192.29 sq.m | 2.5% |
| Amenities | 0.00 sq.m | 0.0% |
The layout drawing identifies plots 163–197, 35 plots in total, as the mortgage area, covering 7,475.24 sq.m. The HMDA intimation describes the mortgage as a condition before release of plans; the municipality order also states that mortgaged plots are not to be sold.
The HMDA intimation refers to a proposed 24 mtrs master-plan road and a 30 Mtrs condition in relation to the compound wall; it expressly states that the intimation itself is not approval or permission for development. The municipality’s order describes internal roads as 18 mts and above and requires B.T. roads before release of the final layout plan.
No project-specific building footprint, building count, floor plan, building height or FSI-counted area is established in the supplied material. The RERA field’s “Approved Built up Area” is 87,996.35 sq.m; it is reported as filed and is not treated as carpet, saleable or FSI area.
4. Homes, configurations & floor plans
The RERA-filed evidence identifies a plotted project but does not provide a complete plot inventory with plot numbers, counts by size, booked/available status or RERA-filed saleable areas. The supplied floor-plan review records two layout sheets but no measured unit plans; it therefore does not establish plot-by-plot or house-level carpet areas.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | Not available | Not available | Not available | Not available | Not applicable / not supplied | Not supplied |
A plot’s area is not an apartment carpet area. The supplied evidence does not provide a RERA-filed plot-size schedule suitable for listing plot-size bands.
5. Parking & vehicle circulation
No RERA-filed parking count, visitor or accessible parking allocation, parking-level plan, or plot-specific parking entitlement is established in the supplied evidence. As a plotted layout, individual building parking arrangements are not specified in the layout records provided here. The drawing shows internal road area, but the material does not establish a sanctioned vehicle-circulation plan with driveway, ramp or entry/exit details.
6. Amenities, recreation & open spaces
The layout drawing records 11,198.66 sq.m of parks/open space and 2,192.29 sq.m of social infrastructure, with 0.00 sq.m shown as a separate amenity-area allocation. The municipality order lists layout infrastructure and community provisions as development or handover conditions; the available evidence does not verify delivery or completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Parks / open space | Drawing-stated 11,198.66 sq.m | Area appears in the layout drawing; completion not independently verified. | |
| Social infrastructure | Drawing-stated 2,192.29 sq.m | Area appears in the layout drawing; facility type and completion status not established. | |
| Separate amenity area | Drawing-stated 0.00 sq.m | No separate area allocated in the drawing’s land-use statement. | |
| Park development / avenue plantation | Listed as layout infrastructure | Approval-order condition; completion not verified. | |
| Community buildings | Listed in RERA amenity fields | Progress shown as 0%; no completed facility verified. | |
| Green strip / TOT LOT / park | Listed in RERA amenity fields | Marked “YES”; progress shown as 0%; completion not verified. |
7. Utilities, building services & safety
The municipality’s layout order lists storm-water drains; underground drainage lines and a common septic tank/STP; internal water-supply pipelines and an overhead tank; electrical supply lines with streetlights and a transformer; avenue plantation; park development; rainwater-harvesting pits; underground ducting for utilities; independent sewerage disposal; and protected water supply including an overhead tank and sumps. These are described as layout-development requirements, not independently verified completed services.
The HMDA intimation also specifies an STP and septic tank and refers to fire-service department norms; that document expressly says it is not approval of the proposal or permission for development. RERA amenity fields list water supply, sewerage, storm-water drainage, sewage treatment/disposal, solid-waste management, rainwater harvesting, energy management, fire safety and electrical meter/substation/receiving facilities, but the supplied progress values are 0%. The evidence does not specify capacities, water source, backup-power provision, security systems, accessibility provisions or completed fire-safety installations.
8. Location, access & connectivity
The official project records place PREMIUM PARK at Adibatla Village, Ibrahimpatnam Mandal, Ranga Reddy District, Telangana, PIN 501510. The supplied cadastral parcel-centroid coordinate is 17.41528, 78.35459.
No verified approach-road description, public-transport information or measured distance to local services is provided in the project’s official-record material supplied here. A location record lists Financial District (Nanakramguda) at 1.2 km from the stated parcel-centroid reference; it does not provide a travel time.
9. Developer & development status
The registered legal promoter is MYSPACE VENTURES PRIVATE LIMITED, a company. The RERA records identify Vamshidhar Reddy K as an authorized signatory. The project certificate lists a promoter-office address as “Village: Mandal: District: Hyderabad, Pin: 500104”; the supplied material does not provide a completed village or mandal field for that address.
The promoter’s Form B affidavit declares title, states that the land is free from encumbrances and undertakes completion by 31-03-2020. These are promoter declarations in the filed affidavit, not independent verification of title, encumbrance status or project completion. The RERA project header gives proposed completion as 15/11/2022; no current project-progress certificate or OC/completion certificate is supplied.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C for PREMIUM PARK, P02400001486, issued 27/12/2019 and valid through 15/11/2022; the certificate records no extension.
HMDA layout application/intimation: Application 012650/SMD/LT/U6/HMDA/13062018 for a residential draft open-plotted layout. The document requests charges and compliance with conditions and expressly states that it is not approval or development permission.
HMDA draft layout permit reference: 000274/LO/Plg/HMDA/2018, dated 21.12.2018, cited in the municipality order.
Adibatla Municipality layout order: TPS/Adibatla/ 704/39/ /2019, approved 02.12.2019; described as release of a draft residential layout previously sanctioned by HMDA, subject to development, mortgage and handover conditions.
RERA Form B: Promoter affidavit by K Vamshidhar Reddy for MYSPACE Ventures Private Limited, dated 11 March 2019, including a completion undertaking of 31-03-2020.
Layout drawing and area statement: Two layout sheets are recorded; the area statement is software-read, and the plotted layout’s area allocations are summarized above.
Occupancy/completion certificate: No such certificate is included in the supplied evidence.
Public layout lookup: The HMDA DPMS approved-layout lookup is reported as unavailable through the public internet; this is an access limitation, not evidence of approval or refusal.
Frequently asked questions
Is PREMIUM PARK registered with Telangana RERA?
Yes. PREMIUM PARK is registered with the Telangana Real Estate Regulatory Authority as P02400001486; the registration status is New Project.
Who is the developer of PREMIUM PARK?
The promoter named in the RERA registration is MYSPACE VENTURES PRIVATE LIMITED.
Where is PREMIUM PARK located?
PREMIUM PARK is in Ibrahimpatnam, Rangareddy, Telangana (501510).
When will PREMIUM PARK be completed?
The promoter's proposed date of completion filed with RERA is 15/11/2022. This is the promoter's declaration, not a guarantee.
More projects in Ibrahimpatnam