Pranavas Temple Square Bajjuri
BOORUGU INFRA PROJECTS PRIVATE LIMITED · Yadadri Bhuvanagiri · RERA P02000006027
PRANAVAS TEMPLE SQUARE BAJJURI is a plotted development / residential layout in Raigiri Revenue Village, Bhongir Mandal, Yadadri Bhuvanagiri District. It is being developed by BOORUGU INFRA PROJECTS PRIVATE LIMITED. The draft technically approved layout records 21 Acres, 02 Guntas and a total area of 82,463.20; the project is for residential plots, and the supplied records do not state a plot count or plot-size configurations. Its TG-RERA registration is P02000006027, and the promoter’s Form B declaration states a proposed completion of 10 - MAR - 2025.
More from Boorugu Infra Projects Pvt Ltd · 5 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | PRANAVAS TEMPLE SQUARE BAJJURI RERA record |
| Project type | Plotted development / residential layout RERA record RERA filing |
| Phase or registered portion | Phase not separately identified; the RERA certificate registers the project under one registration number |
| TG-RERA registration | P02000006027; certificate issued 06/04/2023, valid through 10/03/2025; the supplied certificate records no extension |
| RERA status in supplied record | Registration validity ended 10/03/2025. A later architect’s certificate reports project completion and an occupancy certificate; this overview does not treat that as an extension of the registration |
| Registered promoter | BOORUGU INFRA PROJECTS PRIVATE LIMITED, a company RERA record Corporate record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Raigiri (also rendered “Raigir” in filed documents); the records identify Raigiri Revenue Village RERA record |
| Mandal | Bhongir RERA record |
| District | Yadadri Bhuvanagiri RERA record |
| PIN | 508116 RERA record |
| Project survey numbers | 808, 813, 814, 815, 816, 817 and 818 RERA record |
| Survey subdivisions | No project-specific subdivisions are identified in the supplied RERA identity record. The filing names the survey numbers without subdivisions RERA record Land records |
| Site extent | The draft technically approved layout records 21 Acres, 02 Guntas and 82,463.20 as total area. The RERA land fields state total area 85,455.95 sq.mts, affected area 2,879.74 sq.mts, and net area 82,576.21 sq.mts RERA filing |
| Boundaries in RERA land fields | East: Neighbours Land; West: Neighbours Land; North: Neighbours Land; South: Road Width - 60 RERA filing |
| Cadastral reference | Bhu Bharati GIS supplies a whole-survey record for Sy. No. 808 with extent 84,163.61 sq.m and centroid 17.54233002624699, 78.93666251755572. This is a survey-level record, not a verified measurement of the project parcel Cadastral map |
Development identity
| Item | Project record |
|---|---|
| Principal layout approval | DT LP NO 3149/2019/0018; draft technical layout plan, with the related proceedings dated 26.02.2022 |
| Authorities named in the records | The draft plan names YTDA; the proceedings identify Bhongir Municipality, and the later layout communication is from DTCP |
| Approved plotted area | 49,926.34; the plan labels this as “PLOTTED” and 60.46% of the recorded total area |
| Other land-use areas in the draft plan | Open space 6,193.27 (7.50%); social infrastructure 2,062.55 (2.50%); utility 868.24 (1.05%); roads 23.413.20 (28.35%) as printed in the extraction |
| Building count / floor configuration | Not disclosed in the supplied records; this is a plotted layout, and no residential building schedule or floor configuration is provided |
| Parking | The layout records a mortgage over plots 1–9, 10–36 and 124–127, with extent 7597.31 sq.mts; this is not a stated parking provision |
| Approved versus RERA-declared plot count | Not established by the supplied extracts. The approved layout land-use analysis gives area, but no plot-count schedule or plot inventory is supplied |
Offering and status
| Item | Project record |
|---|---|
| Offering | Residential plots; the RERA-filed agreement form describes a residential plot and a developer-share plot |
| Plot size range | Not disclosed in the supplied TG-RERA project records. A third-party vendor listing states “saleable 1350 - 3600 sq.ft”; this is not a RERA-filed size range Promoter website |
| Booked / available counts | Not supplied RERA record Document index |
| Original completion undertaking | 10 - MAR - 2025, as stated in the promoter’s Form B declaration |
| Registration validity | Through 10/03/2025, separately recorded on the TG-RERA certificate |
| Completion / OC record | A layout occupancy certificate is reported as Lr.D.Dis.No.463/2022/YTDA, dated 11/03/2026. The architect’s Form–1A certificate dated 16-03-2026 certifies completion in all aspects of the registered project |
| OC scope | The supplied certificate concerns the layout; no building- or tower-specific OC scope applies or is identified in the supplied records |
2. The project story
PRANAVAS TEMPLE SQUARE BAJJURI is a residential plotted layout in Raigiri Revenue Village, Bhongir Mandal, Yadadri Bhuvanagiri District. Its registered land identity covers survey numbers 808, 813, 814, 815, 816, 817 and 818. The RERA records identify Boorugu Infra Projects Private Limited as promoter and list five landowners in the project declaration RERA record.
The layout plan allocates area to plots, roads, open space, social infrastructure and utilities. The draft proceedings set conditions for completing infrastructure and handing over specified areas to the local body. The later DTCP communication records gift deeds for roads and other areas, and relinquishment of mortgaged plots; the architect’s certificate subsequently reports overall completion and cites a layout occupancy certificate dated 11/03/2026. These are documentary certifications, not an independent site inspection in this report.
The RERA certificate’s registration period ended on 10/03/2025, while the completion and OC documents are dated March 2026. Registration validity, the promoter’s stated completion deadline, and the later completion/OC evidence are distinct record items.
3. Master plan, architecture & building design
The supplied plan evidence is for a plotted layout, not a multi-storey building scheme. The draft technically approved layout identifies a total area of 82,463.20, with 49,926.34 labelled as plotted land, 6,193.27 as open space, 2,062.55 as social infrastructure, 868.24 as utility land and 23.413.20 as roads, using the figures and formatting shown in the plan extraction.
The draft proceedings specify road widths of 18 mts and above; the layout-plan extraction separately records 60.00M (200-0"). No building footprints, floor configuration, tower heights, apartment plans, or phase-by-phase building schedule are supplied.
The proceedings require development of infrastructure and, before final layout release, transfer by registered gift deed of the stated open-space, social-infrastructure, road and utility areas to the local body. The later layout communication records a gift settlement deed numbered 7891/2025 and a relinquishment deed numbered 1218 /2026.
4. Homes, configurations & floor plans
This is a plotted project; the supplied RERA extracts do not provide a plot-count schedule, individual plot sizes, booked/available inventory, or a plot-size-band table. Accordingly, a RERA unit table cannot be populated from the available records RERA record Document index.
Two drawing records are listed for floor-plan measurement, but both are pending scanning and none has been measured. No software-measured carpet or room dimensions are available. The third-party vendor listing’s stated plot size range is not a RERA-filed measurement Floor plans Promoter website.
5. Parking & vehicle circulation
No parking-space count, visitor or accessible parking provision, parking level, vehicle ramp arrangement, EV charging provision, or unit-specific parking allocation is established by the supplied records. The 7597.31 sq.mts associated with plots 1–9, 10–36 and 124–127 is described as a mortgage in favour of YTDA, not as parking.
The draft layout conditions require roads to remain open for access to neighbouring land and prohibit construction of a compound wall around the layout site and roads in a manner that blocks such access. The final-layout communication also requires roads to be opened to access neighbouring land.
6. Amenities, recreation & open spaces
Layout amenities and community facilities
| Description / size | Layout roads; the plan records 23.413.20 as road area |
|---|---|
| Evidence source | RERA project amenity record; draft layout plan |
| Declared progress / verified status | RERA-recorded progress: 90%; not independently verified RERA amenities |
| Description / size | 6,193.27 open-space area in the draft plan; RERA record also lists green strip/TOT LOT/park |
|---|---|
| Evidence source | Draft layout plan; RERA project amenity record |
| Declared progress / verified status | RERA-recorded progress for green strip/TOT LOT/park: 50%; not independently verified RERA amenities |
| Description / size | 2,062.55 social-infrastructure area in the plan |
|---|---|
| Evidence source | Draft layout plan; RERA project amenity record |
| Declared progress / verified status | RERA-recorded progress for community buildings: 70%; no independently verified completion evidence supplied RERA amenities |
| Description / size | 868.24 |
|---|---|
| Evidence source | Draft layout plan |
| Declared progress / verified status | Area identified in plan; no independent status supplied |
| Description / size | RERA amenity record lists a compound wall RERA amenities |
|---|---|
| Evidence source | RERA project amenity record |
| Declared progress / verified status | RERA-recorded progress: 90%; not independently verified RERA amenities |
Third-party vendor-listed facilities—not established as RERA-filed or delivered
| Description / size | No sizes or capacities supplied |
|---|---|
| Evidence source | Third-party vendor listing Promoter website |
| Declared progress / verified status | Vendor-listed; no RERA-filed progress or independent completion verification supplied Promoter website |
| Description / size | No specifications supplied |
|---|---|
| Evidence source | Third-party vendor listing Promoter website |
| Declared progress / verified status | Vendor-listed; no RERA-filed progress or independent completion verification supplied Promoter website |
7. Utilities, building services & safety
The RERA project amenity record gives progress figures for the listed infrastructure; these are filed progress figures, not independent verification. The draft layout proceedings also set out proposed infrastructure and handover requirements RERA amenities.
| Evidence in the project record | The draft proceedings list internal water-supply pipelines, an overhead tank, an assured water-supply source, protected water supply and sumps. The RERA record lists water supply |
|---|---|
| Status shown in supplied material | RERA-recorded progress: 50%; source, storage capacity and delivery status are not independently verified RERA amenities |
| Evidence in the project record | The draft proceedings list underground drainage lines, common septic tank / STP, independent sewerage disposal and storm-water drains |
|---|---|
| Status shown in supplied material | RERA-recorded progress: sewerage 75% and storm-water drains 75%. The separate “Treatment And Disposal Of Sewage And Sullage Water” entry shows 0% RERA amenities |
| Evidence in the project record | Draft proceedings list electrical supply lines, a transformer, street lights and underground ducting of utilities |
|---|---|
| Status shown in supplied material | RERA-recorded progress: street lighting 30%; electrical meter room/sub-station/receiving station 20% RERA amenities |
| Evidence in the project record | Draft proceedings list rainwater-harvesting pits |
|---|---|
| Status shown in supplied material | RERA-recorded progress for water conservation/rainwater harvesting: 20% RERA amenities |
| Evidence in the project record | No delivered system is established in the supplied records |
|---|---|
| Status shown in supplied material | RERA record lists solid-waste management and disposal at 0% RERA amenities |
| Evidence in the project record | No project-specific fire-system details are supplied |
|---|---|
| Status shown in supplied material | RERA record lists fire protection and fire-safety requirements at 0% RERA amenities |
| Evidence in the project record | No project-specific accessible routes, ramps, or security-system specifications are supplied |
|---|---|
| Status shown in supplied material | Not disclosed in the supplied RERA records Document index |
8. Location, access & connectivity
The registered location is Raigiri, Bhongir Mandal, Yadadri Bhuvanagiri District, PIN 508116. The RERA land fields describe neighbouring land to the east, west and north, and “Road Width - 60” to the south RERA record RERA filing.
The location record gives a cadastral parcel centroid of 17.54233002624699, 78.93666251755572. It also gives the nearest sampled Outer Ring Road interchange at approximately 29.1 km; this is the supplied measured distance, not a travel-time estimate Location record Cadastral map.
The draft plan records a 60.00M (200-0") road width, while the layout proceedings identify road widths of 18 mts and above. The supplied records do not identify a public-transport service, other verified nearby landmarks, or travel times.
9. Developer & development status
The registered promoter is BOORUGU INFRA PROJECTS PRIVATE LIMITED, a company; its GSTIN is 36AAGCB5911J1ZN Corporate record RERA filing. The promoter address shown in the project record is H NO 8-2-293/A/1355B, ROAD NO 45, Raigiri, Raigiri, Bhongir, Yadadri Bhuvanagiri, 508116 Parties record RERA filing. No official project website or contact details are supplied.
The Form B declaration, made by authorized signatory Boorugu Ravi Kumar in August 2022, states that the project would be completed by 10 - MAR - 2025. The later architect’s certificate, dated 16-03-2026, certifies completion in all aspects and records a layout occupancy certificate dated 11/03/2026. No independent site-progress inspection is supplied.
10. Approvals, official records & documents
| Identifier / date | P02000006027; issued 06/04/2023; valid through 10/03/2025 |
|---|---|
| What the supplied document establishes | Registration for PRANAVAS TEMPLE SQUARE BAJJURI; the certificate lists conditions including a separate-account requirement |
| Identifier / date | DT LP NO 3149/2019/0018; related YTDA proceedings 463/2022/YTDA |
|---|---|
| What the supplied document establishes | Plan for open land in Sy. Nos. 808, 813, 814, 815, 816, 817 and 818 at Raigir Village; the plan states that its conditions must be fulfilled |
| Identifier / date | TLP.No.3149/Raigir Revenue/2019/0018; proceedings Proc.Roc.No.G1/2474/2021, dated 26.02.2022 |
|---|---|
| What the supplied document establishes | Draft-layout proceedings with infrastructure, mortgage and handover conditions; the document expressly says permission is not proof of title |
| Identifier / date | Roc.No. 3149/Raigiri Revenue/2019/0018, dated 13 December 2019 |
|---|---|
| What the supplied document establishes | Intimation concerning an application and conditions; the extraction states that the application was under process and this was not final layout approval |
| Identifier / date | Lr.D.Dis.No.463/2022/YTDA; certificate dated 16-03-2026 |
|---|---|
| What the supplied document establishes | Architect R. Venkatesh certifies completion in all aspects and cites the layout occupancy certificate dated 11/03/2026 |
| Identifier / date | Lr.D.Dis.No.463/2022/YTDA, dated 11-03-2026 |
|---|---|
| What the supplied document establishes | DTCP communication confirming the technical layout pattern and recording gift of roads, open space, social infrastructure and utility areas, and relinquishment of mortgaged plots |
| Identifier / date | 7891/2025, dated 10-01-2025 |
|---|---|
| What the supplied document establishes | Listed in the later layout communication for roads, open space, social infrastructure and utility areas |
| Identifier / date | 1218 /2026, dated 23-02-2026 |
|---|---|
| What the supplied document establishes | Listed in the later layout communication for relinquishment of mortgaged plots to YTDA |
| Identifier / date | August 2022 |
|---|---|
| What the supplied document establishes | Promoter declaration identifying landowners and the development agreement-cum-GPA 7635/2021, and undertaking completion by 10 - MAR - 2025 |
| Identifier / date | Report dated 30 July 2022; documents include 292059, 292080 and listed deed records |
|---|---|
| What the supplied document establishes | Title-history materials filed with RERA; the supplied report excerpt does not include its final legal opinion |
| Identifier / date | Bhu Bharati GIS survey record for Sy. No. 808, retrieved as supplied Cadastral map |
|---|---|
| What the supplied document establishes | Whole-survey extent and centroid; not a project-parcel boundary verification Cadastral map |
1. Project at a glance
Project identity
Registered project name: PRANAVAS TEMPLE SQUARE BAJJURI
Project type: Plotted development / residential layout
Phase or registered portion: Phase not separately identified; the RERA certificate registers the project under one registration number
TG-RERA registration: P02000006027; certificate issued 06/04/2023, valid through 10/03/2025; the supplied certificate records no extension
RERA status in supplied record: Registration validity ended 10/03/2025. A later architect’s certificate reports project completion and an occupancy certificate; this overview does not treat that as an extension of the registration
Registered promoter: BOORUGU INFRA PROJECTS PRIVATE LIMITED, a company
Land and geographic identity
Locality / revenue village: Raigiri (also rendered “Raigir” in filed documents); the records identify Raigiri Revenue Village
Mandal: Bhongir
District: Yadadri Bhuvanagiri
PIN: 508116
Project survey numbers: 808, 813, 814, 815, 816, 817 and 818
Survey subdivisions: No project-specific subdivisions are identified in the supplied RERA identity record. The filing names the survey numbers without subdivisions
Site extent: The draft technically approved layout records 21 Acres, 02 Guntas and 82,463.20 as total area. The RERA land fields state total area 85,455.95 sq.mts, affected area 2,879.74 sq.mts, and net area 82,576.21 sq.mts
Boundaries in RERA land fields: East: Neighbours Land; West: Neighbours Land; North: Neighbours Land; South: Road Width - 60
Cadastral reference: Bhu Bharati GIS supplies a whole-survey record for Sy. No. 808 with extent 84,163.61 sq.m and centroid 17.54233002624699, 78.93666251755572. This is a survey-level record, not a verified measurement of the project parcel
Development identity
Principal layout approval: DT LP NO 3149/2019/0018; draft technical layout plan, with the related proceedings dated 26.02.2022
Authorities named in the records: The draft plan names YTDA; the proceedings identify Bhongir Municipality, and the later layout communication is from DTCP
Approved plotted area: 49,926.34; the plan labels this as “PLOTTED” and 60.46% of the recorded total area
Other land-use areas in the draft plan: Open space 6,193.27 (7.50%); social infrastructure 2,062.55 (2.50%); utility 868.24 (1.05%); roads 23.413.20 (28.35%) as printed in the extraction
Building count / floor configuration: Not disclosed in the supplied records; this is a plotted layout, and no residential building schedule or floor configuration is provided
Parking: The layout records a mortgage over plots 1–9, 10–36 and 124–127, with extent 7597.31 sq.mts; this is not a stated parking provision
Approved versus RERA-declared plot count: Not established by the supplied extracts. The approved layout land-use analysis gives area, but no plot-count schedule or plot inventory is supplied
Offering and status
Offering: Residential plots; the RERA-filed agreement form describes a residential plot and a developer-share plot
Plot size range: Not disclosed in the supplied TG-RERA project records. A third-party vendor listing states “saleable 1350 - 3600 sq.ft”; this is not a RERA-filed size range
Booked / available counts: Not supplied
Original completion undertaking: 10 - MAR - 2025, as stated in the promoter’s Form B declaration
Registration validity: Through 10/03/2025, separately recorded on the TG-RERA certificate
Completion / OC record: A layout occupancy certificate is reported as Lr.D.Dis.No.463/2022/YTDA, dated 11/03/2026. The architect’s Form–1A certificate dated 16-03-2026 certifies completion in all aspects of the registered project
OC scope: The supplied certificate concerns the layout; no building- or tower-specific OC scope applies or is identified in the supplied records
2. The project story
PRANAVAS TEMPLE SQUARE BAJJURI is a residential plotted layout in Raigiri Revenue Village, Bhongir Mandal, Yadadri Bhuvanagiri District. Its registered land identity covers survey numbers 808, 813, 814, 815, 816, 817 and 818. The RERA records identify Boorugu Infra Projects Private Limited as promoter and list five landowners in the project declaration.
The layout plan allocates area to plots, roads, open space, social infrastructure and utilities. The draft proceedings set conditions for completing infrastructure and handing over specified areas to the local body. The later DTCP communication records gift deeds for roads and other areas, and relinquishment of mortgaged plots; the architect’s certificate subsequently reports overall completion and cites a layout occupancy certificate dated 11/03/2026. These are documentary certifications, not an independent site inspection in this report.
The RERA certificate’s registration period ended on 10/03/2025, while the completion and OC documents are dated March 2026. Registration validity, the promoter’s stated completion deadline, and the later completion/OC evidence are distinct record items.
3. Master plan, architecture & building design
The supplied plan evidence is for a plotted layout, not a multi-storey building scheme. The draft technically approved layout identifies a total area of 82,463.20, with 49,926.34 labelled as plotted land, 6,193.27 as open space, 2,062.55 as social infrastructure, 868.24 as utility land and 23.413.20 as roads, using the figures and formatting shown in the plan extraction.
The draft proceedings specify road widths of 18 mts and above; the layout-plan extraction separately records 60.00M (200-0"). No building footprints, floor configuration, tower heights, apartment plans, or phase-by-phase building schedule are supplied.
The proceedings require development of infrastructure and, before final layout release, transfer by registered gift deed of the stated open-space, social-infrastructure, road and utility areas to the local body. The later layout communication records a gift settlement deed numbered 7891/2025 and a relinquishment deed numbered 1218 /2026.
4. Homes, configurations & floor plans
This is a plotted project; the supplied RERA extracts do not provide a plot-count schedule, individual plot sizes, booked/available inventory, or a plot-size-band table. Accordingly, a RERA unit table cannot be populated from the available records.
Two drawing records are listed for floor-plan measurement, but both are pending scanning and none has been measured. No software-measured carpet or room dimensions are available. The third-party vendor listing’s stated plot size range is not a RERA-filed measurement.
5. Parking & vehicle circulation
No parking-space count, visitor or accessible parking provision, parking level, vehicle ramp arrangement, EV charging provision, or unit-specific parking allocation is established by the supplied records. The 7597.31 sq.mts associated with plots 1–9, 10–36 and 124–127 is described as a mortgage in favour of YTDA, not as parking.
The draft layout conditions require roads to remain open for access to neighbouring land and prohibit construction of a compound wall around the layout site and roads in a manner that blocks such access. The final-layout communication also requires roads to be opened to access neighbouring land.
6. Amenities, recreation & open spaces
Layout amenities and community facilities
| Description / size | Layout roads; the plan records 23.413.20 as road area |
|---|---|
| Evidence source | RERA project amenity record; draft layout plan |
| Declared progress / verified status | RERA-recorded progress: 90%; not independently verified |
| Description / size | 6,193.27 open-space area in the draft plan; RERA record also lists green strip/TOT LOT/park |
|---|---|
| Evidence source | Draft layout plan; RERA project amenity record |
| Declared progress / verified status | RERA-recorded progress for green strip/TOT LOT/park: 50%; not independently verified |
| Description / size | 2,062.55 social-infrastructure area in the plan |
|---|---|
| Evidence source | Draft layout plan; RERA project amenity record |
| Declared progress / verified status | RERA-recorded progress for community buildings: 70%; no independently verified completion evidence supplied |
| Description / size | 868.24 |
|---|---|
| Evidence source | Draft layout plan |
| Declared progress / verified status | Area identified in plan; no independent status supplied |
| Description / size | RERA amenity record lists a compound wall |
|---|---|
| Evidence source | RERA project amenity record |
| Declared progress / verified status | RERA-recorded progress: 90%; not independently verified |
Third-party vendor-listed facilities—not established as RERA-filed or delivered
| Description / size | No sizes or capacities supplied |
|---|---|
| Evidence source | Third-party vendor listing |
| Declared progress / verified status | Vendor-listed; no RERA-filed progress or independent completion verification supplied |
| Description / size | No specifications supplied |
|---|---|
| Evidence source | Third-party vendor listing |
| Declared progress / verified status | Vendor-listed; no RERA-filed progress or independent completion verification supplied |
7. Utilities, building services & safety
The RERA project amenity record gives progress figures for the listed infrastructure; these are filed progress figures, not independent verification. The draft layout proceedings also set out proposed infrastructure and handover requirements.
| Evidence in the project record | The draft proceedings list internal water-supply pipelines, an overhead tank, an assured water-supply source, protected water supply and sumps. The RERA record lists water supply |
|---|---|
| Status shown in supplied material | RERA-recorded progress: 50%; source, storage capacity and delivery status are not independently verified |
| Evidence in the project record | The draft proceedings list underground drainage lines, common septic tank / STP, independent sewerage disposal and storm-water drains |
|---|---|
| Status shown in supplied material | RERA-recorded progress: sewerage 75% and storm-water drains 75%. The separate “Treatment And Disposal Of Sewage And Sullage Water” entry shows 0% |
| Evidence in the project record | Draft proceedings list electrical supply lines, a transformer, street lights and underground ducting of utilities |
|---|---|
| Status shown in supplied material | RERA-recorded progress: street lighting 30%; electrical meter room/sub-station/receiving station 20% |
| Evidence in the project record | Draft proceedings list rainwater-harvesting pits |
|---|---|
| Status shown in supplied material | RERA-recorded progress for water conservation/rainwater harvesting: 20% |
| Evidence in the project record | No delivered system is established in the supplied records |
|---|---|
| Status shown in supplied material | RERA record lists solid-waste management and disposal at 0% |
| Evidence in the project record | No project-specific fire-system details are supplied |
|---|---|
| Status shown in supplied material | RERA record lists fire protection and fire-safety requirements at 0% |
| Evidence in the project record | No project-specific accessible routes, ramps, or security-system specifications are supplied |
|---|---|
| Status shown in supplied material | Not disclosed in the supplied RERA records |
8. Location, access & connectivity
The registered location is Raigiri, Bhongir Mandal, Yadadri Bhuvanagiri District, PIN 508116. The RERA land fields describe neighbouring land to the east, west and north, and “Road Width - 60” to the south.
The location record gives a cadastral parcel centroid of 17.54233002624699, 78.93666251755572. It also gives the nearest sampled Outer Ring Road interchange at approximately 29.1 km; this is the supplied measured distance, not a travel-time estimate.
The draft plan records a 60.00M (200-0") road width, while the layout proceedings identify road widths of 18 mts and above. The supplied records do not identify a public-transport service, other verified nearby landmarks, or travel times.
9. Developer & development status
The registered promoter is BOORUGU INFRA PROJECTS PRIVATE LIMITED, a company; its GSTIN is 36AAGCB5911J1ZN. The promoter address shown in the project record is H NO 8-2-293/A/1355B, ROAD NO 45, Raigiri, Raigiri, Bhongir, Yadadri Bhuvanagiri, 508116. No official project website or contact details are supplied.
The Form B declaration, made by authorized signatory Boorugu Ravi Kumar in August 2022, states that the project would be completed by 10 - MAR - 2025. The later architect’s certificate, dated 16-03-2026, certifies completion in all aspects and records a layout occupancy certificate dated 11/03/2026. No independent site-progress inspection is supplied.
10. Approvals, official records & documents
| Identifier / date | P02000006027; issued 06/04/2023; valid through 10/03/2025 |
|---|---|
| What the supplied document establishes | Registration for PRANAVAS TEMPLE SQUARE BAJJURI; the certificate lists conditions including a separate-account requirement |
| Identifier / date | DT LP NO 3149/2019/0018; related YTDA proceedings 463/2022/YTDA |
|---|---|
| What the supplied document establishes | Plan for open land in Sy. Nos. 808, 813, 814, 815, 816, 817 and 818 at Raigir Village; the plan states that its conditions must be fulfilled |
| Identifier / date | TLP.No.3149/Raigir Revenue/2019/0018; proceedings Proc.Roc.No.G1/2474/2021, dated 26.02.2022 |
|---|---|
| What the supplied document establishes | Draft-layout proceedings with infrastructure, mortgage and handover conditions; the document expressly says permission is not proof of title |
| Identifier / date | Roc.No. 3149/Raigiri Revenue/2019/0018, dated 13 December 2019 |
|---|---|
| What the supplied document establishes | Intimation concerning an application and conditions; the extraction states that the application was under process and this was not final layout approval |
| Identifier / date | Lr.D.Dis.No.463/2022/YTDA; certificate dated 16-03-2026 |
|---|---|
| What the supplied document establishes | Architect R. Venkatesh certifies completion in all aspects and cites the layout occupancy certificate dated 11/03/2026 |
| Identifier / date | Lr.D.Dis.No.463/2022/YTDA, dated 11-03-2026 |
|---|---|
| What the supplied document establishes | DTCP communication confirming the technical layout pattern and recording gift of roads, open space, social infrastructure and utility areas, and relinquishment of mortgaged plots |
| Identifier / date | 7891/2025, dated 10-01-2025 |
|---|---|
| What the supplied document establishes | Listed in the later layout communication for roads, open space, social infrastructure and utility areas |
| Identifier / date | 1218 /2026, dated 23-02-2026 |
|---|---|
| What the supplied document establishes | Listed in the later layout communication for relinquishment of mortgaged plots to YTDA |
| Identifier / date | August 2022 |
|---|---|
| What the supplied document establishes | Promoter declaration identifying landowners and the development agreement-cum-GPA 7635/2021, and undertaking completion by 10 - MAR - 2025 |
| Identifier / date | Report dated 30 July 2022; documents include 292059, 292080 and listed deed records |
|---|---|
| What the supplied document establishes | Title-history materials filed with RERA; the supplied report excerpt does not include its final legal opinion |
| Identifier / date | Bhu Bharati GIS survey record for Sy. No. 808, retrieved as supplied |
|---|---|
| What the supplied document establishes | Whole-survey extent and centroid; not a project-parcel boundary verification |
Frequently asked questions
Is PRANAVAS TEMPLE SQUARE BAJJURI registered with Telangana RERA?
Yes. PRANAVAS TEMPLE SQUARE BAJJURI is registered with the Telangana Real Estate Regulatory Authority as P02000006027; the registration status is New Project.
Who is the developer of PRANAVAS TEMPLE SQUARE BAJJURI?
The promoter named in the RERA registration is BOORUGU INFRA PROJECTS PRIVATE LIMITED.
Where is PRANAVAS TEMPLE SQUARE BAJJURI located?
PRANAVAS TEMPLE SQUARE BAJJURI is in Raigiri, Bhongir, Yadadri Bhuvanagiri, Telangana (508116).
When will PRANAVAS TEMPLE SQUARE BAJJURI be completed?
The promoter's proposed date of completion filed with RERA is 10/03/2025. This is the promoter's declaration, not a guarantee.