Sign in

Dharani Elite

DHARANI INFRA · Yadadri Bhuvanagiri · RERA P02000006515

DHARANI ELITE is a plotted development at Raigiri Revenue Village, Bhongir Mandal, Yadadri Bhuvanagiri District. The registered promoter is DHARANI INFRA. The project has a registered site extent of 27822.95 sq m and a tentative layout approval recording 98 plots; drawing-derived plot sizes are 120.7–287.52 sq m. Its TG-RERA registration number is P02000006515, and the RERA project record gives proposed completion as 28/02/2025.

01What we found

Period endedTG-RERA registration ran to 28 Feb 2025 - check its extension on TG-RERA
14documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Raigiri, Bhongir, Yadadri Bhuvanagiri · geocoded — approximate.

Project at a glance

Project identity

FieldRecord
Registered projectDHARANI ELITE — plotted development RERA record
Registered portion / phaseRegistered project is described as the proposed layout in the stated survey numbers; a separate phase identifier is not disclosed RERA record
TG-RERA registrationP02000006515; granted 07/07/2023; certificate validity stated through 28/02/2025
Registered promoterDharani Infra / DHARANI INFRA; the Form B identifies Sunkari Kishore as sole proprietor
RERA status in supplied recordCertificate records registration under section 5. No extension is recorded on the certificate; the registration’s stated validity period has ended
RERA project status“New Project” in the project record RERA filing

Land and geographic identity

FieldRecord
Locality / revenue villageRaigiri, Raigiri Revenue Village RERA record
MandalBhongir RERA record
DistrictYadadri Bhuvanagiri; approval document styles this as Yadadri-Bhuvanagiri RERA record
PIN508116 RERA record
Project survey numbers606, 607, 608 and 612 Land records
SubdivisionsThe registration and layout-approval records supplied identify the project surveys without project-specific subdivisions. Land records
Registered site extent27822.95 sq m RERA filing
Layout approval extent6 Acer 35.01 Gts 33277 Sq. Yds
Net / total land areaRERA land details state 27822.95 sq m as both total and net area, with 0 affected area stated for road widening/FTL/nala widening RERA filing Land records
BoundariesNorth: land of Srihari and Vinodjha; South: land of Ennaboina Srisailu; East: land of Uday Krishna Myneni; West: land of Pochampally Ravinder RERA filing

Development identity

FieldRecord
Sanctioning authorityBhongir Municipality/Municipal Corporation Approvals record
Principal approvalApplication No. 005747/LO/DTCP/3153/0007/2022, approved 01 March, 2023; instrument is an approval for a tentative layout plan Approvals record
Approved built-up area16003.71 sq m is recorded as approved built-up area; the supplied records do not identify a building count or floor configuration for this plotted layout RERA filing
Layout planApproval document records 98 No’s plots and allocates land to plots, roads, open space, social infrastructure, utilities and mortgage plots
Buildings / floors / parking levelsNot disclosed in the supplied project records; this is a plotted development, not a documented apartment-building scheme RERA filing

Offering and status

FieldRecord
Unit typePlots; the RERA-filed layout approval records 98 plots RERA record
Plot size rangeSoftware-measured from the approved drawing: 120.7–287.52 sq m (98 plots with sizes extracted); not a RERA-filed unit schedule Layout record
Booked / available countsNot established by the supplied evidence; no dated inventory count is provided Document index
Construction / development stageRERA project information says “New Project”; progress percentages are reported in the RERA amenities record, but no independent site verification is supplied RERA filing RERA amenities
Completion undertaking / proposed completionPromoter’s Form B undertakes completion by 28th February 2A25 (as printed); RERA project record gives proposed completion 28/02/2025 RERA record
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied records. The layout approval is described as tentative, not as a completion certificate Document index

The project story

DHARANI ELITE is registered as a plotted development at Raigiri Revenue Village, Bhongir Mandal, Yadadri Bhuvanagiri District, on survey numbers 606, 607, 608 and 612. The RERA-filed tentative layout approval describes a 98-plot residential layout and assigns portions of the site to roads, parks/open space, social infrastructure, utilities and plots. The approved layout’s conditions provide for detached dwelling houses for single-family occupation on individual sites and do not permit shops, business premises or industrial units except on sites specifically reserved for such uses in the draft layout. RERA record Land records

The promoter’s Form B declares a completion date of 28 February 2025, while the RERA record also gives 28/02/2025 as the proposed completion date. The supplied evidence does not establish the current on-site completion status or provide an occupancy/completion certificate. The RERA amenities record reports differing progress percentages for listed infrastructure items; those are reported figures, not independent verification of work completed. RERA record RERA amenities Document index

Master plan, architecture & building design

The approved drawing is a tentative layout plan, not a building plan for apartments. It records a site extent of 6 Acer 35.01 Gts 33277 Sq. Yds and 98 No’s plots. The software-measured plot schedule also contains 98 plots with sizes; the smallest is 120.7 sq m, the median 155.05 sq m, and the largest 287.52 sq m. These drawing-derived measurements are not RERA-filed carpet or saleable areas. Layout record

The layout drawing’s land-use statement, measured against the stated net layout area of 27822.95 sq m, records:

UseAreaShare
Plots16003.71 sq m57.52%
Roads8315.66 sq m29.89%
Parks / open space2514.27 sq m9.04%
Utilities284.18 sq m1.02%
Social infrastructure705.17 sq m2.53%
Amenities0.00 sq m0.00%

Layout record

The approval document separately identifies Plots 97, 96, 95, 94, 93, 92, 91, 90, 89, 88 and 87—0 Acer 24.29 Gts 2939 Sq. Yds—as mortgage plots in favour of the Municipality/Municipal Corporation. It states that open space, utilities and roads are to be handed over to the Municipality by registered gift deed before release of the tentative layout, subject to the stated approval conditions.

No apartment floor plans, tower arrangement, building footprint, floor configuration or building-level phase organization are evidenced in the supplied material. The two supplied drawing sheets are layout sheets, not flat floor plans; no carpet-area measurements were produced from them. Floor plans Layout record

Homes, configurations & floor plans

This is a plotted offering, not an apartment configuration schedule. The following sizes and bands are software-measured from the layout drawing and are not a RERA-filed saleable-area schedule. Booked and available plot counts are not established by the supplied evidence. Layout record Document index

Plot informationCount / size
Plots in layout approval98
Drawing-derived plot sizes120.7–287.52 sq m
Smallest plot120.7 sq m
Median plot155.05 sq m
Largest plot287.52 sq m
100–150 sq yd band (84–125 sq m)25 plots
150–200 sq yd band (125–167 sq m)26 plots
200–250 sq yd band (167–209 sq m)38 plots
250–300 sq yd band (209–251 sq m)8 plots
300–400 sq yd band (251–334 sq m)1 plot

Layout record

The plot schedule’s software-measured areas sum to the plotted area in the drawing’s area statement. No apartment carpet area, balcony, utility area or common-area loading applies to this plotted schedule. Layout record Floor plans

Parking & vehicle circulation

The supplied layout record identifies roads and plots but does not establish a sanctioned parking-space count, visitor or accessible parking provision, or plot-specific parking allocation. It also does not describe parking levels, ramps, vehicle-entry arrangements or EV charging. The layout approval states that roads are to be opened for accessibility to neighbouring sites and that a compound wall or fencing around the site is not to be constructed. The approval document’s condition describes the layout mortgage as security for completion of development conditions; it does not establish an individual purchaser’s exclusive parking rights or allocation. Document index

Amenities, recreation & open spaces

The RERA-filed layout approval reserves land for open space, social infrastructure and utilities. The amenities record gives progress percentages for infrastructure items; the supplied material does not independently verify completion. RERA amenities

Parks / open space
Description / size2514.27 sq m; approval document states 9.04% of layout area
Evidence sourceLayout record
Declared progress / verified statusGreen Strip/TOT LOT/Park: 20% reported in RERA amenities record; not independently verified RERA amenities
Social infrastructure
Description / size705.17 sq m reserved; no specific facility or building is identified
Evidence sourceLayout record
Declared progress / verified statusCommunity Buildings: 0% reported; no completion verification supplied RERA amenities
Internal roads and footpaths
Description / sizeRoads: 8315.66 sq m; approval conditions describe road formation and accessibility
Evidence sourceLayout record
Declared progress / verified statusInternal Roads & Footpaths: 60% reported; not independently verified RERA amenities
Avenue plantation
Description / sizeApproval conditions list avenue plantation
Declared progress / verified statusNo separate verified completion evidence supplied
Children’s play area, gated community, 24 x 7 security and large green area
Description / sizePromoter-marketed claims; no sizes or capacities supplied
Evidence sourcePromoter website
Declared progress / verified statusMarketing claims only; not established as approved or delivered

Utilities, building services & safety

The approval conditions describe proposed layout infrastructure including road formation with blacktop, storm-water drains, underground drainage, a common septic tank/STP, internal water-supply pipelines, an overhead tank, an assured water-supply source, electrical supply lines, street lights, a transformer, rainwater-harvesting pits and park development. The same document makes the layout applicant responsible for carrying out the infrastructure and amenities. These are approval-condition descriptions of required/proposed works, not evidence that each service is complete or operational.

Water
Evidence in supplied recordsApproval conditions list an assured water-supply source, internal pipelines, overhead tank and water reservoir
Reported progress / statusWater Supply: 20% reported in RERA amenities record; no independent completion verification RERA amenities
Sewerage and drainage
Evidence in supplied recordsApproval conditions list underground drainage lines, storm-water drains and common septic tank/STP
Reported progress / statusSewerage (Chamber, Lines, Septic Tank, STP): 70%; Storm Water Drains: 50%; both reported, not independently verified RERA amenities
Rainwater harvesting
Evidence in supplied recordsApproval conditions list rainwater-harvesting pits
Reported progress / statusWater Conservation, Rain water Harvesting: 50% reported; not independently verified RERA amenities
Electrical
Evidence in supplied recordsApproval conditions list supply lines, street lights and transformer; a utility area is reserved Layout record
Reported progress / statusStreet Lighting: 10%; Electrical Meter Room, Sub-Station, Receiving Station: 10% reported; not independently verified RERA amenities
Solid waste
Evidence in supplied recordsApproval conditions include solid-waste management among utility works
Reported progress / statusSolid Waste Management and Disposal: 0% reported RERA amenities
Fire/life safety, lifts and accessibility
Evidence in supplied recordsNo project-specific fire system, lift, escape stair or accessible-circulation details are disclosed in the supplied records Document index
Reported progress / statusNot established

Location, access & connectivity

The registered project location is Raigiri, Bhongir Mandal, Yadadri Bhuvanagiri District, PIN 508116, in Raigiri Revenue Village. The supplied cadastral parcel centroid is 17.52897, 78.95420. RERA record Location record

The nearest sampled Outer Ring Road interchange is reported at 30.4 km. The supplied evidence does not provide a project approach-road description or verified public-transport details. Location record

Developer & development status

The registered promoter is DHARANI INFRA, identified in the Form B affidavit as a proprietorship with Sunkari Kishore as sole proprietor. The promoter address in the project record is PATEL ENCLAVE, KANDIGUDA, RAIGIRI, RAIGIRI, Bhongir, Yadadri Bhuvanagiri, 508116. The registration certificate separately prints the promoter office location as “Village: Mandal: District: Medchal-Malkajgiri, Pin: 500087.” No official website or contact details are supplied. Corporate record

The promoter’s Form B declares completion by 28th February 2A25 (as printed), and the RERA record gives 28/02/2025 as the proposed completion date. The certificate records registration through 28/02/2025 and does not record an extension. The supplied records do not establish current construction completion or an occupancy/completion certificate. RERA record Document index

Approvals, official records & documents

RecordDetails
TG-RERA registration certificateForm C; project DHARANI ELITE, registration P02000006515, issued 07/07/2023; validity stated through 28/02/2025
Tentative layout approvalBhongir Municipality/Municipal Corporation; application 005747/LO/DTCP/3153/0007/2022; approved 01 March, 2023; for surveys 606, 607, 608 and 612 at Raigiri Revenue Village
Related receipt numbers in approval documentTS/15936/2022 (31 May, 2022); TS/15937/2022 (31 May, 2022); TS/15938/2022 (01 March, 2023)
Form B declarationPromoter affidavit dated 29-4-2023; includes the promoter’s title, encumbrance and completion declarations
Occupancy/completion certificateNone supplied Document index
Approved layout drawingApproval document records 98 plots, land-use allocation, mortgage plots and development conditions
Layout-plan uploadA RERA document entry requests a stamped layout approval or plan; the supplied document extraction is not available for that entry Document index

Frequently asked questions

Is DHARANI ELITE registered with Telangana RERA?

Yes. DHARANI ELITE is registered with the Telangana Real Estate Regulatory Authority as P02000006515; the registration status is New Project.

Who is the developer of DHARANI ELITE?

The promoter named in the RERA registration is DHARANI INFRA.

Where is DHARANI ELITE located?

DHARANI ELITE is in RAIGIRI, Bhongir, Yadadri Bhuvanagiri, Telangana (508116).

When will DHARANI ELITE be completed?

The promoter's proposed date of completion filed with RERA is 28/02/2025. This is the promoter's declaration, not a guarantee.

More projects in Raigiri