Arma Realty
ARMA (KILARU VENTURES) LLP AND MADHAVA HYTECH INFRASTRUCTURES INDIA PRIVATE LIMITED · Yadadri Bhuvanagiri · RERA P02000010210
ARMA REALTY is a plotted development in Raigiri Revenue Village, Bhongir Mandal, Yadadri Bhuvanagiri District. It is being developed by ARMA (KILARU VENTURES) LLP AND MADHAVA HYTECH INFRASTRUCTURES INDIA PRIVATE LIMITED. The layout has a total site area of 36,833.66 sq.mt and comprises 97 open plots; plot sizes are 124.94–1349.9 sq.mt. It is registered under TG-RERA number P02000010210, and the promoter’s stated completion date is 03 February 2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project | ARMA REALTY RERA record |
| Project type | Plotted development / layout with open plots RERA record |
| Phase / registered portion | No separate phase name is disclosed; the registration is for the ARMA REALTY project. RERA record |
| TG-RERA registration | P02000010210 RERA record |
| Registration validity | 03/02/2024 to 03/02/2026, unless extended by the Authority under the Act and rules. This is the registration-validity period, not a statement of current registration status. RERA record |
| Registered promoter | ARMA (KILARU VENTURES) LLP AND MADHAVA HYTECH INFRASTRUCTURES INDIA PRIVATE LIMITED RERA record Corporate record |
| RERA status in supplied record | Registered; current status or any extension after 03/02/2026 is not established by the supplied record. RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Raigiri Revenue Village (also rendered as “Raigir” in filed documents) RERA record Land records |
| Mandal | Bhongir RERA record Land records |
| District | Yadadri Bhuvanagiri RERA record Land records |
| PIN | 508286 RERA record |
| Project survey numbers | 727/P and 728/P RERA record Land records |
| Total site area | 36,833.66 sq.mt Land records |
| Net layout area | 36,067.58 sq.mt Land records |
| Area affected by nala widening / stated as nala area | 766.08 sq.mt RERA filing |
| Boundaries | East: neighbours’ land; west: 30 feet wide road; north: existing 100 feet wide road; south: neighbours’ land. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Bhongir Municipality (YTDA); the filed layout document identifies TS-DTCP as authority and states delegation to Bhongir Municipality (YTDA). |
| Principal layout approval | Tentative Layout Plan 0003/LO/3153/2024, dated 03 February 2024. The related application number is 010407/LO/DTCP/3153/0006/2023. Approvals record |
| Development form | Layout with open plots; the approval records 97 plots. |
| Approved built-up area / building configuration | Not applicable or not disclosed for this plotted layout. Approvals record |
| Roads in layout plan | 9.14 m and 12 m internal roads; the drawing also identifies existing and proposed 30.00 m roads and a 9.14 m access road. |
| Layout land-use areas | Plotted area: 21,802.87 sq.mt (60.45%); road area: 9,185.52 sq.mt (25.47%); organized open space/park: 3,290.40 sq.mt (9.12%); social infrastructure: 902.17 sq.mt (2.50%); utility area: 360.94 sq.mt (1.00%); buffer zone: 525.68 sq.mt (1.46%); total net layout: 36,067.58 sq.mt (100.00%). |
| Mortgage provision shown in approval | Four plots—Nos. 03, 04, 05 and 06—are identified for mortgage to the Municipality; the filed approval states a proposed mortgage area of 3690.71 sq.mt. |
Offering and status
| Field | Record |
|---|---|
| Unit type and count | 97 open plots, according to the filed layout approval. |
| Plot-size range | Software-read from the approved layout drawing: 124.94–1349.9 sq.mt (approximately 149.4–1614.5 sq.yd as supplied). Verify against the drawing. Layout record |
| Booked / available plots | Counts are not supplied. RERA record |
| Development stage | RERA filing labels the project “New Project”; no independent site-progress verification is supplied. RERA record RERA amenities |
| Completion date stated by promoter | 03 February 2026, in the Form-B completion undertaking. This is distinct from the registration-validity end date. |
| Completion / occupancy certificate | No completion certificate or occupancy certificate is established in the supplied evidence. Document index |
The project story
ARMA REALTY is registered as a plotted layout in Raigiri Revenue Village, Bhongir Mandal, Yadadri Bhuvanagiri District. The filed tentative layout approval describes 97 open plots over a site stated as 36,833.66 sq.mt, with a net layout area of 36,067.58 sq.mt. The proposed use is residential plots; the approval says only detached dwelling houses designed for single-family occupation may be built on sites, subject to prior competent-authority approval for future development. RERA record Land records
The drawing allocates land for plots, internal roads, park/open space, social infrastructure, utilities and a buffer zone. The approval places responsibility for completing layout infrastructure and amenities on the applicant and requires roads to remain accessible to neighbouring sites. The record describes a tentative layout approval; it does not establish that the infrastructure works are complete or that plots have been released for building permissions.
The supplied RERA registration certificate records validity from 03/02/2024 to 03/02/2026, while the promoter’s Form-B states a completion undertaking of 03 February 2026. Neither date establishes actual completion. No project-specific completion/occupancy certificate or independently verified construction-progress record is included.
Master plan, architecture & building design
This is a plotted layout rather than a multi-storey building project. The filed plan identifies 97 individual plots and provides a land-use statement for a 36,067.58 sq.mt net layout: 21,802.87 sq.mt plotted area, 9,185.52 sq.mt roads, 3,290.40 sq.mt organized open space/park, 902.17 sq.mt social infrastructure, 360.94 sq.mt utilities and 525.68 sq.mt buffer zone.
The drawing identifies 9.14 m and 12 m internal roads, as well as existing and proposed 30.00 m roads and a 9.14 m access road. It also marks a 4 m nala/canal buffer and nala-buffer areas of 274.96 sq.mt and 250.72 sq.mt, totaling the stated 525.68 sq.mt buffer zone. These are drawing/approval details; the record does not provide building designs, building footprints, floor configurations or approved built-up area.
The plot schedule was software-read from the approved layout drawing: 97 plots, with sizes from 124.94 sq.mt to 1349.9 sq.mt. The software extraction notes that the sizes should be verified against the drawing. Layout record
Homes, configurations & floor plans
The offering in the filed layout is open plots, not apartments. The approved layout records 97 plots. Software-measured plot-size bands from the drawing are shown below; they are drawing-derived, not separate RERA-filed unit-area disclosures. Booked and available counts are not supplied. Layout record
| Plot-size band | Plot count |
|---|---|
| 100–150 sq.yd (84–125 sq.mt) | 3 |
| 150–200 sq.yd (125–167 sq.mt) | 60 |
| 200–250 sq.yd (167–209 sq.mt) | 20 |
| 250–300 sq.yd (209–251 sq.mt) | 2 |
| 300–400 sq.yd (251–334 sq.mt) | 4 |
| 500–1000 sq.yd (418–836 sq.mt) | 1 |
| 1000+ sq.yd (836+ sq.mt) | 7 |
The supplied measured range is 124.94–1349.9 sq.mt; the supplied median is 147.72 sq.mt. These are software readings from the layout drawing and should be checked against the approved plot schedule. Apartment carpet-area, balcony, loading and floor-plan information is not applicable or not provided. Layout record Floor plans
Parking & vehicle circulation
The filed land-use statement shows 0.00 sq.mt as common parking area. The layout approval identifies four plots—Nos. 03, 04, 05 and 06—as mortgaged plots, not as designated parking. No sanctioned parking-space count, visitor or accessible parking provision, parking allocation to individual plots, or vehicle-pedestrian separation details are supplied.
The drawing identifies internal roads of 9.14 m and 12 m, a 9.14 m access road, and existing/proposed 30.00 m roads. A vendor record describes open parking, but gives no count or allocation details; this is not evidence of a sanctioned or plot-specific parking entitlement. Promoter website
Amenities, recreation & open spaces
The layout approval allocates 3,290.40 sq.mt (9.12%) to organized open space/park, 902.17 sq.mt (2.50%) to social infrastructure and 360.94 sq.mt (1.00%) to utilities. The approval also lists a tot-lot, rainwater-harvesting pit and septic tank among the layout amenities/utilities. These are approved-plan or filed-list items; the evidence does not independently verify completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Organized open space / park | 3,290.40 sq.mt (9.12%) | Filed layout plan | Reserved in plan; completion not independently verified. |
| Social infrastructure | 902.17 sq.mt (2.50%) | Filed layout plan | Area reserved; facility details and completion status not supplied. |
| Tot-lot | Size not supplied | Filed layout amenity list | Listed; completion not independently verified. |
| Internal roads and footpaths | Road area 9,185.52 sq.mt (25.47%); internal roads shown as 9.14 m and 12 m wide | Filed layout plan; RERA amenities record RERA amenities | RERA amenities record reports 100%; independent verification is not supplied. |
| Green strip / tot-lot / park | Size not separately stated beyond park area above | RERA amenities record RERA amenities | Reported at 95%; this is a filed progress figure, not independent verification. |
No clubhouse or community-building facility is identified in the supplied record; the RERA amenities record shows community buildings at 0%. RERA amenities
Utilities, building services & safety
The tentative layout approval requires development works to include road formation with blacktop, storm-water drains, underground drainage lines and a common septic tank/STP, internal water-supply pipelines and an overhead tank, an assured water-supply source, electrical supply lines and street lights, a transformer, avenue planting, park development and rainwater-harvesting pits. These are approval conditions and listed works, not confirmation that they have been completed.
| Evidence in the project record | Water-supply pipelines, overhead tank and an assured source are required by the approval; the RERA amenities record lists water supply. RERA amenities |
|---|---|
| Status / limitation | RERA amenities record reports 100%; source, storage capacity and independent completion verification are not supplied. |
| Evidence in the project record | Approval calls for underground drainage and a common septic tank/STP; storm-water drains are also required. |
|---|---|
| Status / limitation | RERA amenities record reports sewerage and sewage treatment/disposal at 100%; capacity and independent verification are not supplied. |
| Evidence in the project record | Rainwater-harvesting pits are listed in the approval. |
|---|---|
| Status / limitation | RERA amenities record reports 95%; installation/completion is not independently verified. |
| Evidence in the project record | Electrical supply lines, street lights and a transformer are required by the approval. |
|---|---|
| Status / limitation | RERA amenities record reports street lighting at 100% and electrical meter room/sub-station/receiving station at 95%; independent verification is not supplied. |
| Evidence in the project record | Solid-waste management is listed in the approval. |
|---|---|
| Status / limitation | RERA amenities record reports 95%; operating arrangements and independent completion verification are not supplied. |
| Evidence in the project record | No project-specific fire-safety facilities are evidenced; the RERA amenities record shows this item at 0%. RERA amenities |
|---|---|
| Status / limitation | No fire-system details or compliance evidence supplied. |
| Evidence in the project record | Not applicable to the open-plot layout or not disclosed. |
|---|---|
| Status / limitation | No details supplied. |
Location, access & connectivity
The registered project location is Raigiri Revenue Village, Bhongir Mandal, Yadadri Bhuvanagiri District, Telangana, PIN 508286. The project parcel centroid supplied in the cadastral record is 17.53412795922462, 78.92640380069716. RERA record Land records Cadastral map
The filed layout identifies an existing 100-foot-wide road to the north and a 30-foot-wide road to the west, alongside proposed and internal roads. The location record gives the nearest sampled Outer Ring Road interchange at approximately 27.8 km; no travel time or public-transport information is supplied. RERA filing Location record
Developer & development status
The registered promoters are ARMA (KILARU VENTURES) LLP and MADHAVA HYTECH INFRASTRUCTURES INDIA PRIVATE LIMITED. The supplied corporate record identifies the combined promoter name as an LLP and gives GSTIN 36ACHFA0227C1Z1; the RERA certificate lists both named promoters and gives Hyderabad, PIN 500082, as their address. The record does not provide an official website or contact details. RERA record Corporate record
Form-B is a promoter declaration signed by Pradeep Kilaru as an authorized signatory. It states a completion undertaking of 03 February 2026 and declares that 70% of amounts realized will be deposited in a separate scheduled-bank account, with withdrawals in proportion to project completion and professional certification. These are promoter declarations, not independent findings about performance.
The registration certificate records validity through 03/02/2026. The supplied evidence does not establish whether the registration was extended, whether the layout works are complete, or whether a completion/occupancy certificate has been issued.
Approvals, official records & documents
| Identifier / date | P02000010210; valid 03/02/2024–03/02/2026 unless extended |
|---|---|
| What it establishes | Registration of ARMA REALTY and its named promoters; the certificate is not a sale agreement or conveyance. |
| Identifier / date | 0003/LO/3153/2024, 03 February 2024 |
|---|---|
| What it establishes | Tentative approval for a 97-plot layout in Survey Nos. 727/P and 728/P, Raigiri Revenue Village. The filed approval states that layout approval is not proof of land title. |
| Identifier / date | 010407/LO/DTCP/3153/0006/2023 |
|---|---|
| What it establishes | Application identifier associated with the filed layout plan. Approvals record |
| Identifier / date | Document 605122 |
|---|---|
| What it establishes | Plan-derived land-use areas, 97-plot schedule, road widths, nala-buffer markings and listed amenities/utilities. |
| Identifier / date | September 2025 |
|---|---|
| What it establishes | Promoter’s declared completion date and project undertakings. |
| Identifier / date | Not supplied |
|---|---|
| What it establishes | No completion or occupancy certification is established in the evidence reviewed. Document index |
The approval document also records mortgage deed No. 417, dated 19 January 2024, for plots 03, 04, 05 and 06 in favour of the Municipality as security for layout-development conditions.
Project at a glance
Project identity
Registered project: ARMA REALTY
Project type: Plotted development / layout with open plots
Phase / registered portion: No separate phase name is disclosed; the registration is for the ARMA REALTY project.
TG-RERA registration: P02000010210
Registration validity: 03/02/2024 to 03/02/2026, unless extended by the Authority under the Act and rules. This is the registration-validity period, not a statement of current registration status.
Registered promoter: ARMA (KILARU VENTURES) LLP AND MADHAVA HYTECH INFRASTRUCTURES INDIA PRIVATE LIMITED
RERA status in supplied record: Registered; current status or any extension after 03/02/2026 is not established by the supplied record.
Land and geographic identity
Locality / revenue village: Raigiri Revenue Village (also rendered as “Raigir” in filed documents)
Mandal: Bhongir
District: Yadadri Bhuvanagiri
PIN: 508286
Project survey numbers: 727/P and 728/P
Total site area: 36,833.66 sq.mt
Net layout area: 36,067.58 sq.mt
Area affected by nala widening / stated as nala area: 766.08 sq.mt
Boundaries: East: neighbours’ land; west: 30 feet wide road; north: existing 100 feet wide road; south: neighbours’ land.
Development identity
Sanctioning authority: Bhongir Municipality (YTDA); the filed layout document identifies TS-DTCP as authority and states delegation to Bhongir Municipality (YTDA).
Principal layout approval: Tentative Layout Plan 0003/LO/3153/2024, dated 03 February 2024. The related application number is 010407/LO/DTCP/3153/0006/2023.
Development form: Layout with open plots; the approval records 97 plots.
Approved built-up area / building configuration: Not applicable or not disclosed for this plotted layout.
Roads in layout plan: 9.14 m and 12 m internal roads; the drawing also identifies existing and proposed 30.00 m roads and a 9.14 m access road.
Layout land-use areas: Plotted area: 21,802.87 sq.mt (60.45%); road area: 9,185.52 sq.mt (25.47%); organized open space/park: 3,290.40 sq.mt (9.12%); social infrastructure: 902.17 sq.mt (2.50%); utility area: 360.94 sq.mt (1.00%); buffer zone: 525.68 sq.mt (1.46%); total net layout: 36,067.58 sq.mt (100.00%).
Mortgage provision shown in approval: Four plots—Nos. 03, 04, 05 and 06—are identified for mortgage to the Municipality; the filed approval states a proposed mortgage area of 3690.71 sq.mt.
Offering and status
Unit type and count: 97 open plots, according to the filed layout approval.
Plot-size range: Software-read from the approved layout drawing: 124.94–1349.9 sq.mt (approximately 149.4–1614.5 sq.yd as supplied). Verify against the drawing.
Booked / available plots: Counts are not supplied.
Development stage: RERA filing labels the project “New Project”; no independent site-progress verification is supplied.
Completion date stated by promoter: 03 February 2026, in the Form-B completion undertaking. This is distinct from the registration-validity end date.
Completion / occupancy certificate: No completion certificate or occupancy certificate is established in the supplied evidence.
The project story
ARMA REALTY is registered as a plotted layout in Raigiri Revenue Village, Bhongir Mandal, Yadadri Bhuvanagiri District. The filed tentative layout approval describes 97 open plots over a site stated as 36,833.66 sq.mt, with a net layout area of 36,067.58 sq.mt. The proposed use is residential plots; the approval says only detached dwelling houses designed for single-family occupation may be built on sites, subject to prior competent-authority approval for future development.
The drawing allocates land for plots, internal roads, park/open space, social infrastructure, utilities and a buffer zone. The approval places responsibility for completing layout infrastructure and amenities on the applicant and requires roads to remain accessible to neighbouring sites. The record describes a tentative layout approval; it does not establish that the infrastructure works are complete or that plots have been released for building permissions.
The supplied RERA registration certificate records validity from 03/02/2024 to 03/02/2026, while the promoter’s Form-B states a completion undertaking of 03 February 2026. Neither date establishes actual completion. No project-specific completion/occupancy certificate or independently verified construction-progress record is included.
Master plan, architecture & building design
This is a plotted layout rather than a multi-storey building project. The filed plan identifies 97 individual plots and provides a land-use statement for a 36,067.58 sq.mt net layout: 21,802.87 sq.mt plotted area, 9,185.52 sq.mt roads, 3,290.40 sq.mt organized open space/park, 902.17 sq.mt social infrastructure, 360.94 sq.mt utilities and 525.68 sq.mt buffer zone.
The drawing identifies 9.14 m and 12 m internal roads, as well as existing and proposed 30.00 m roads and a 9.14 m access road. It also marks a 4 m nala/canal buffer and nala-buffer areas of 274.96 sq.mt and 250.72 sq.mt, totaling the stated 525.68 sq.mt buffer zone. These are drawing/approval details; the record does not provide building designs, building footprints, floor configurations or approved built-up area.
The plot schedule was software-read from the approved layout drawing: 97 plots, with sizes from 124.94 sq.mt to 1349.9 sq.mt. The software extraction notes that the sizes should be verified against the drawing.
Homes, configurations & floor plans
The offering in the filed layout is open plots, not apartments. The approved layout records 97 plots. Software-measured plot-size bands from the drawing are shown below; they are drawing-derived, not separate RERA-filed unit-area disclosures. Booked and available counts are not supplied.
100–150 sq.yd (84–125 sq.mt): 3
150–200 sq.yd (125–167 sq.mt): 60
200–250 sq.yd (167–209 sq.mt): 20
250–300 sq.yd (209–251 sq.mt): 2
300–400 sq.yd (251–334 sq.mt): 4
500–1000 sq.yd (418–836 sq.mt): 1
1000+ sq.yd (836+ sq.mt): 7
The supplied measured range is 124.94–1349.9 sq.mt; the supplied median is 147.72 sq.mt. These are software readings from the layout drawing and should be checked against the approved plot schedule. Apartment carpet-area, balcony, loading and floor-plan information is not applicable or not provided.
Parking & vehicle circulation
The filed land-use statement shows 0.00 sq.mt as common parking area. The layout approval identifies four plots—Nos. 03, 04, 05 and 06—as mortgaged plots, not as designated parking. No sanctioned parking-space count, visitor or accessible parking provision, parking allocation to individual plots, or vehicle-pedestrian separation details are supplied.
The drawing identifies internal roads of 9.14 m and 12 m, a 9.14 m access road, and existing/proposed 30.00 m roads. A vendor record describes open parking, but gives no count or allocation details; this is not evidence of a sanctioned or plot-specific parking entitlement.
Amenities, recreation & open spaces
The layout approval allocates 3,290.40 sq.mt (9.12%) to organized open space/park, 902.17 sq.mt (2.50%) to social infrastructure and 360.94 sq.mt (1.00%) to utilities. The approval also lists a tot-lot, rainwater-harvesting pit and septic tank among the layout amenities/utilities. These are approved-plan or filed-list items; the evidence does not independently verify completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Organized open space / park | 3,290.40 sq.mt (9.12%) | Filed layout plan | Reserved in plan; completion not independently verified. |
| Social infrastructure | 902.17 sq.mt (2.50%) | Filed layout plan | Area reserved; facility details and completion status not supplied. |
| Tot-lot | Size not supplied | Filed layout amenity list | Listed; completion not independently verified. |
| Internal roads and footpaths | Road area 9,185.52 sq.mt (25.47%); internal roads shown as 9.14 m and 12 m wide | Filed layout plan; RERA amenities record | RERA amenities record reports 100%; independent verification is not supplied. |
| Green strip / tot-lot / park | Size not separately stated beyond park area above | RERA amenities record | Reported at 95%; this is a filed progress figure, not independent verification. |
No clubhouse or community-building facility is identified in the supplied record; the RERA amenities record shows community buildings at 0%.
Utilities, building services & safety
The tentative layout approval requires development works to include road formation with blacktop, storm-water drains, underground drainage lines and a common septic tank/STP, internal water-supply pipelines and an overhead tank, an assured water-supply source, electrical supply lines and street lights, a transformer, avenue planting, park development and rainwater-harvesting pits. These are approval conditions and listed works, not confirmation that they have been completed.
| Evidence in the project record | Water-supply pipelines, overhead tank and an assured source are required by the approval; the RERA amenities record lists water supply. |
|---|---|
| Status / limitation | RERA amenities record reports 100%; source, storage capacity and independent completion verification are not supplied. |
| Evidence in the project record | Approval calls for underground drainage and a common septic tank/STP; storm-water drains are also required. |
|---|---|
| Status / limitation | RERA amenities record reports sewerage and sewage treatment/disposal at 100%; capacity and independent verification are not supplied. |
| Evidence in the project record | Rainwater-harvesting pits are listed in the approval. |
|---|---|
| Status / limitation | RERA amenities record reports 95%; installation/completion is not independently verified. |
| Evidence in the project record | Electrical supply lines, street lights and a transformer are required by the approval. |
|---|---|
| Status / limitation | RERA amenities record reports street lighting at 100% and electrical meter room/sub-station/receiving station at 95%; independent verification is not supplied. |
| Evidence in the project record | Solid-waste management is listed in the approval. |
|---|---|
| Status / limitation | RERA amenities record reports 95%; operating arrangements and independent completion verification are not supplied. |
| Evidence in the project record | No project-specific fire-safety facilities are evidenced; the RERA amenities record shows this item at 0%. |
|---|---|
| Status / limitation | No fire-system details or compliance evidence supplied. |
| Evidence in the project record | Not applicable to the open-plot layout or not disclosed. |
|---|---|
| Status / limitation | No details supplied. |
Location, access & connectivity
The registered project location is Raigiri Revenue Village, Bhongir Mandal, Yadadri Bhuvanagiri District, Telangana, PIN 508286. The project parcel centroid supplied in the cadastral record is 17.53412795922462, 78.92640380069716.
The filed layout identifies an existing 100-foot-wide road to the north and a 30-foot-wide road to the west, alongside proposed and internal roads. The location record gives the nearest sampled Outer Ring Road interchange at approximately 27.8 km; no travel time or public-transport information is supplied.
Developer & development status
The registered promoters are ARMA (KILARU VENTURES) LLP and MADHAVA HYTECH INFRASTRUCTURES INDIA PRIVATE LIMITED. The supplied corporate record identifies the combined promoter name as an LLP and gives GSTIN 36ACHFA0227C1Z1; the RERA certificate lists both named promoters and gives Hyderabad, PIN 500082, as their address. The record does not provide an official website or contact details.
Form-B is a promoter declaration signed by Pradeep Kilaru as an authorized signatory. It states a completion undertaking of 03 February 2026 and declares that 70% of amounts realized will be deposited in a separate scheduled-bank account, with withdrawals in proportion to project completion and professional certification. These are promoter declarations, not independent findings about performance.
The registration certificate records validity through 03/02/2026. The supplied evidence does not establish whether the registration was extended, whether the layout works are complete, or whether a completion/occupancy certificate has been issued.
Approvals, official records & documents
| Identifier / date | P02000010210; valid 03/02/2024–03/02/2026 unless extended |
|---|---|
| What it establishes | Registration of ARMA REALTY and its named promoters; the certificate is not a sale agreement or conveyance. |
| Identifier / date | 0003/LO/3153/2024, 03 February 2024 |
|---|---|
| What it establishes | Tentative approval for a 97-plot layout in Survey Nos. 727/P and 728/P, Raigiri Revenue Village. The filed approval states that layout approval is not proof of land title. |
| Identifier / date | 010407/LO/DTCP/3153/0006/2023 |
|---|---|
| What it establishes | Application identifier associated with the filed layout plan. |
| Identifier / date | Document 605122 |
|---|---|
| What it establishes | Plan-derived land-use areas, 97-plot schedule, road widths, nala-buffer markings and listed amenities/utilities. |
| Identifier / date | September 2025 |
|---|---|
| What it establishes | Promoter’s declared completion date and project undertakings. |
| Identifier / date | Not supplied |
|---|---|
| What it establishes | No completion or occupancy certification is established in the evidence reviewed. |
The approval document also records mortgage deed No. 417, dated 19 January 2024, for plots 03, 04, 05 and 06 in favour of the Municipality as security for layout-development conditions.
Frequently asked questions
Is ARMA REALTY registered with Telangana RERA?
Yes. ARMA REALTY is registered with the Telangana Real Estate Regulatory Authority as P02000010210; the registration status is New Project.
Who is the developer of ARMA REALTY?
The promoter named in the RERA registration is ARMA (KILARU VENTURES) LLP AND MADHAVA HYTECH INFRASTRUCTURES INDIA PRIVATE LIMITED.
Where is ARMA REALTY located?
ARMA REALTY is in Raigiri, Bhongir, Yadadri Bhuvanagiri, Telangana (508286).
When will ARMA REALTY be completed?
The promoter's proposed date of completion filed with RERA is 03/02/2026. This is the promoter's declaration, not a guarantee.