Orchid Edifice
Edifice Projects Private Limited · Hyderabad · RERA P02500001059
Orchid Edifice is a residential apartment project in Quli Qutub Shah Layout, Gandipet mandal, Hyderabad district. The registered promoter is Edifice Projects Private Limited. The project covers 747.60 sq. m and comprises one building with 1 stilt and 5 upper floors, with 15 homes: 10 two-bedroom units of 127.7 sq. m and 5 three-bedroom units of 162.81 sq. m. It is registered under TG-RERA number P02500001059, issued 23/07/2019, with a proposed completion date of 31-March-2022.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered name and type | Orchid Edifice; residential apartment project. RERA record |
| Phase / registered portion | Phase not separately identified. The RERA-filed land description identifies Plot Nos. 35, 36, 37 and 38 in Survey No. 250. Land records |
| TG-RERA registration | P02500001059, issued 23/07/2019, valid through 31/03/2022 according to the registration certificate. Registration validity is distinct from the project’s declared completion deadline. Approvals record |
| Registered promoter and status | Edifice Projects Private Limited, a private limited company. The supplied registration record identifies the project as New Project; no current RERA status is supplied. RERA record Corporate record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | Quli Qutub Shah Layout; the RERA-filed approval and title documents also identify the site as plots in Quli Qutub Shah Colony, Puppalguda. RERA record Land records |
| Revenue village | Puppalguda / Poppalguda is named in the filed approval and title documents. The project record’s village field is not disclosed; the correspondence between those village-name forms should be confirmed against parcel records. |
| Mandal / district / PIN | Mandal: Gandipet in the technical approval; the project record does not disclose a mandal. District: Hyderabad in the project record, while the approval identifies Ranga Reddy District. PIN: 500089. RERA record Land records |
| Survey / plot identity | Survey No. 250; no subdivision is stated. Plot Nos. 35, 36, 37 and 38. Land records |
| Site area | Project record: total area 747.60 sq. m and net area 747.60 sq. m. The technical approval states an extent of 747.60 Sq. Mt. Land records |
| Boundaries | East: 30 ft Wide Road; West: Plot No 39; North: 35 ft Wide Road; South: Neighbors. Land records |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority / principal approval | HMDA technical approval, number 004847/SKP/R1/U6/HMDA/07112017, dated 30/01/2019; it directs the applicant to approach the Puppalguda Gram Panchayat Executive Authority for sanction and release. Approvals record |
| Approved built-up area | 1859.05 is recorded as the approved built-up area in the project record and as a sanctioned parameter. The technical approval separately lists Total Built up Area (In Sq.mts) 2259.9; these are distinct figures in the supplied record. RERA record |
| Building / floors | One proposed residential building: 1Stilt + 5 Upper floors. The technical approval states building height 14.9; no unit for that figure is supplied. Land records |
| Units | The record lists 15 total units in one building: 10 two-bedroom and 5 three-bedroom units. The approval document’s extracted text does not state an approved unit count. RERA unit table |
| Parking / mortgage | The project record lists 198.30 as mortgage area. The technical approval records 10% of Built Up Area mortgaged to HMDA, described as 198.30 Sq.mtrs in the second floor. No parking-space count or parking level plan is supplied. RERA record Land records |
Offering and status
| Item | Record |
|---|---|
| RERA-filed configurations | TWO BEDROOM: 10 units; THREE BEDROOM: 5 units. RERA unit details |
| RERA-filed saleable areas | TWO BEDROOM: 127.7 sq. m; THREE BEDROOM: 162.81 sq. m. RERA unit details |
| Booked / available | Portal figures show 0 booked and 10 available two-bedroom units, and 0 booked and 5 available three-bedroom units. These counts are indicative: the supplied portal record has no as-of date. RERA unit table RERA unit details |
| Construction stage | No independently verified site-progress report or current construction-stage evidence is supplied. The RERA registration certificate records the registration period, not physical completion. Approvals record Document index |
| Completion deadline | The promoter’s Form B declares completion by 31-March-2022. This is a promoter-declared deadline, separate from registration validity. |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is supplied in the reviewed project documents. The technical approval requires an occupancy certificate before occupation. Document index |
The project story
- Orchid Edifice is registered as a residential apartment project on plots 35–38 in Survey No. 250, at Quli Qutub Shah Layout, with the filed approval documents locating the plots in Puppalguda/Poppalguda. The project record identifies one building and 15 proposed homes; the RERA filing lists 10 two-bedroom and 5 three-bedroom units. RERA record Land records RERA unit table RERA unit details
- HMDA’s document is a technical approval for a proposed building of one stilt and five upper floors. It directs the applicant to obtain building-plan sanction and release from the Puppalguda Gram Panchayat Executive Authority; the supplied documents do not establish that final local-body sanction was issued. The promoter’s Form B declares a completion deadline of 31-March-2022, but no independently verified construction progress or occupancy/completion certificate is provided.
Master plan, architecture & building design
- The technical approval describes one proposed residential building with 1 stilt + 5 upper floors, on a stated site extent of 747.60 Sq. Mt. It records height 14.9 (unit not supplied), approved built-up area 1859.05, total built-up area 2259.9, and a required 10% mortgage area of 185.905, with 198.3 provided. The approval also identifies a mortgage of 10% of built-up area in the second floor.
- The supplied material does not include readable floor-by-floor drawings or enough extracted plan information to describe building footprint, flats per floor, lift and stair arrangement, entries, internal circulation, open-space layout, or residential/common-area distribution. The floor-plan review record reports two drawings, with zero measured, one scan pending and one marked as having no flats. No FSI-counted area or carpet-area measurement is supplied. Floor plans
- The technical approval calls for the stilt/cellar to be used exclusively for vehicle parking, without partition walls or rolling shutters, and lists a transformer and garbage house within the premises. It also specifies a tot-lot to be fenced and maintained as greenery; the available record does not establish that these features have been completed.
Homes, configurations & floor plans
The RERA filing lists 15 homes in two configurations. Booked and available counts below are portal-record figures without a supplied as-of date. No software-measured carpet areas, room dimensions or loading figures are available; the supplied drawing set has not produced measurements. RERA unit details RERA unit table Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK (filed as TWO BEDROOM) | 10 | 0 | 10 | 127.7 sq. m | Not supplied | Not supplied |
| 3BHK (filed as THREE BEDROOM) | 5 | 0 | 5 | 162.81 sq. m | Not supplied | Not supplied |
RERA-filed saleable area is not a carpet-area measurement. The supplied records do not provide a project-specific breakdown of carpet area, balcony/utility area or common-area loading. RERA unit details Floor plans
Parking & vehicle circulation
The technical approval requires the stilt/cellar to be used exclusively for vehicle parking and records a second-floor built-up-area mortgage; it does not provide a count of car or two-wheeler spaces, nor identify resident, visitor or accessible bays. No parking layout, ramp or internal-driveway details, EV provision or unit-wise parking allocation are supplied. A parking requirement in the approval does not establish the number of spaces delivered or their allocation to a particular home.
Amenities, recreation & open spaces
The following are listed in the RERA amenities record. The percentages are the supplied declared-progress values; they are not independent verification of completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water supply | No source, storage capacity or system details supplied | RERA amenities record | Available: YES; 100% declared; not independently verified |
| Sewerage (chamber, lines, septic tank, STP) | No system details or capacity supplied | RERA amenities record | Available: YES; 0% declared; not independently verified |
| Storm-water drains | No further details supplied | RERA amenities record | 0% declared; not independently verified |
| Green strip / tot lot / park | No size supplied; approval also calls for a fenced tot-lot maintained as greenery | RERA amenities record; HMDA technical approval | 0% declared; completion not verified |
| Community buildings | No further details supplied | RERA amenities record | 0% declared; not independently verified |
| Street lighting | No further details supplied | RERA amenities record | Available: YES; 0% declared; not independently verified |
| Solid-waste management and disposal | No further details supplied; approval calls for a garbage house within the premises | RERA amenities record; HMDA technical approval | Available: YES; 0% declared; not independently verified |
| Water conservation / rainwater harvesting | No capacity or system details supplied; approval calls for rainwater-harvesting structures | RERA amenities record; HMDA technical approval | Available: YES; 0% declared; not independently verified |
| Electrical meter room / sub-station / receiving station | No further details supplied | RERA amenities record | Available: YES; 0% declared; not independently verified |
| Aggregate recreational open space | No area supplied | RERA amenities record | 0% declared; not independently verified |
| Generator | No capacity supplied | RERA amenities record | Available: YES; progress percentage not supplied; not independently verified |
| Lift | No count or capacity supplied | RERA amenities record | Available: YES; progress percentage not supplied; not independently verified |
| Transformer | No capacity supplied; approval calls for transformer space within the site | RERA amenities record; HMDA technical approval | Available: YES; progress percentage not supplied; not independently verified |
| Internal roads and footpaths | No further details supplied | RERA amenities record | 0% declared; not independently verified |
| Treatment and disposal of sewage and sullage water | No further details supplied | RERA amenities record | 0% declared; not independently verified |
| Energy management | No further details supplied | RERA amenities record | 0% declared; not independently verified |
| Fire protection and fire-safety requirements | No system specifications supplied | RERA amenities record | 0% declared; not independently verified |
Utilities, building services & safety
- The RERA amenities record marks water supply, sewerage, a generator, a lift, transformer, electrical meter room/sub-station/receiving station, solid-waste management and rainwater harvesting as available, but does not supply capacities or technical specifications; most listed progress values are 0%, and completion is not independently verified. The technical approval calls for rainwater-harvesting structures, a transformer space and a garbage house. RERA amenities
- The approval requires services including sanitation, plumbing, fire-safety requirements, lifts and electrical installations to be executed under qualified technical supervision. It also places structural-safety and fire-safety responsibilities on the owner/developer and relevant design and site professionals, and requires an occupancy certificate before occupation. These approval conditions are not evidence that the systems have been installed, inspected or certified. No water source/storage capacity, STP or reuse details, drainage design, backup capacity, lift capacity, fire-system specifications, security arrangements or accessibility details are supplied.
Location, access & connectivity
- The registered project location is Quli Qutub Shah Layout, Hyderabad, PIN 500089. The approval document places the site at Plot Nos. 35, 36, 37 and 38 in Puppalguda village and lists the adjoining boundaries as 30 ft Wide Road to the east, Plot No. 39 to the west, 35 ft Wide Road to the north, and neighbors to the south. RERA record Land records
- The location record identifies Financial District (Nanakramguda), 1.2 km away, measured from the supplied cadastral parcel centroid. No public-transport information or additional independently sourced approach-road details are supplied. Location record
Developer & development status
- The registered promoter is Edifice Projects Private Limited, identified as a company; the RERA record lists E N Prasad Reddy as managing director and authorized signatory, and Geetha Prasad Erusu and Praneet Reddy Erusu as directors. The supplied promoter address is EN's, Road No 28, Quli Qutub Shah Layout, Hyderabad, 500089. No official website or contact details are supplied. Corporate record Parties record
- In Form B, the promoter declares that the project will be completed by 31-March-2022 and makes declarations concerning title, encumbrances, approvals, project-account use and audits. These are promoter declarations, not independent findings of current construction progress or completion. No current progress certificate or occupancy certificate is supplied. Document index
Approvals, official records & documents
| What it establishes in the supplied material | Registration of Orchid Edifice as P02500001059, commencing 23/07/2019 and ending 31/03/2022 |
|---|
| What it establishes in the supplied material | Technical approval dated 30/01/2019, reference 004847/SKP/R1/U6/HMDA/07112017, for a proposed residential building at Plot Nos. 35–38 in Survey No. 250; directs applicant to approach the Puppalguda Gram Panchayat Executive Authority for sanction and release |
|---|
| What it establishes in the supplied material | Promoter’s filed affidavit for Orchid Edifice, including a declared completion date of 31-March-2022 |
|---|
| What it establishes in the supplied material | Advocate’s opinion concerning the proposed flats on Plots 35–38, Survey No. 250, Poppalguda village; it refers to the 1995 sale, 2016 development agreement/GPA and HMDA mortgage |
|---|
| What it establishes in the supplied material | Filed document concerning development of Plots 35–38 in Survey No. 250, Quli Qutub Shah Colony, Poppalguda village |
|---|
| What it establishes in the supplied material | Filed record of built-up area mortgaged to HMDA |
|---|
| What it establishes in the supplied material | Not supplied in the reviewed project documents |
|---|---|
| Source | Document index |
The review also includes an encumbrance statement, a supplemental agreement, a provisional allotment letter and an agreement for sale among the filed documents. The provisional allotment letter leaves key allottee and unit fields blank; it does not establish a specific buyer’s allotment.
Project at a glance
Project identity
Registered name and type: Orchid Edifice; residential apartment project.
Phase / registered portion: Phase not separately identified. The RERA-filed land description identifies Plot Nos. 35, 36, 37 and 38 in Survey No. 250.
TG-RERA registration: P02500001059, issued 23/07/2019, valid through 31/03/2022 according to the registration certificate. Registration validity is distinct from the project’s declared completion deadline.
Registered promoter and status: Edifice Projects Private Limited, a private limited company. The supplied registration record identifies the project as New Project; no current RERA status is supplied.
Land and geographic identity
Locality: Quli Qutub Shah Layout; the RERA-filed approval and title documents also identify the site as plots in Quli Qutub Shah Colony, Puppalguda.
Revenue village: Puppalguda / Poppalguda is named in the filed approval and title documents. The project record’s village field is not disclosed; the correspondence between those village-name forms should be confirmed against parcel records.
Mandal / district / PIN: Mandal: Gandipet in the technical approval; the project record does not disclose a mandal. District: Hyderabad in the project record, while the approval identifies Ranga Reddy District. PIN: 500089.
Survey / plot identity: Survey No. 250; no subdivision is stated. Plot Nos. 35, 36, 37 and 38.
Site area: Project record: total area 747.60 sq. m and net area 747.60 sq. m. The technical approval states an extent of 747.60 Sq. Mt.
Boundaries: East: 30 ft Wide Road; West: Plot No 39; North: 35 ft Wide Road; South: Neighbors.
Development identity
Sanctioning authority / principal approval: HMDA technical approval, number 004847/SKP/R1/U6/HMDA/07112017, dated 30/01/2019; it directs the applicant to approach the Puppalguda Gram Panchayat Executive Authority for sanction and release.
Approved built-up area: 1859.05 is recorded as the approved built-up area in the project record and as a sanctioned parameter. The technical approval separately lists Total Built up Area (In Sq.mts) 2259.9; these are distinct figures in the supplied record.
Building / floors: One proposed residential building: 1Stilt + 5 Upper floors. The technical approval states building height 14.9; no unit for that figure is supplied.
Units: The record lists 15 total units in one building: 10 two-bedroom and 5 three-bedroom units. The approval document’s extracted text does not state an approved unit count.
Parking / mortgage: The project record lists 198.30 as mortgage area. The technical approval records 10% of Built Up Area mortgaged to HMDA, described as 198.30 Sq.mtrs in the second floor. No parking-space count or parking level plan is supplied.
Offering and status
RERA-filed configurations: TWO BEDROOM: 10 units; THREE BEDROOM: 5 units.
RERA-filed saleable areas: TWO BEDROOM: 127.7 sq. m; THREE BEDROOM: 162.81 sq. m.
Booked / available: Portal figures show 0 booked and 10 available two-bedroom units, and 0 booked and 5 available three-bedroom units. These counts are indicative: the supplied portal record has no as-of date.
Construction stage: No independently verified site-progress report or current construction-stage evidence is supplied. The RERA registration certificate records the registration period, not physical completion.
Completion deadline: The promoter’s Form B declares completion by 31-March-2022. This is a promoter-declared deadline, separate from registration validity.
Occupancy / completion certificate: No occupancy certificate or completion certificate is supplied in the reviewed project documents. The technical approval requires an occupancy certificate before occupation.
The project story
- Orchid Edifice is registered as a residential apartment project on plots 35–38 in Survey No. 250, at Quli Qutub Shah Layout, with the filed approval documents locating the plots in Puppalguda/Poppalguda. The project record identifies one building and 15 proposed homes; the RERA filing lists 10 two-bedroom and 5 three-bedroom units.
- HMDA’s document is a technical approval for a proposed building of one stilt and five upper floors. It directs the applicant to obtain building-plan sanction and release from the Puppalguda Gram Panchayat Executive Authority; the supplied documents do not establish that final local-body sanction was issued. The promoter’s Form B declares a completion deadline of 31-March-2022, but no independently verified construction progress or occupancy/completion certificate is provided.
Master plan, architecture & building design
- The technical approval describes one proposed residential building with 1 stilt + 5 upper floors, on a stated site extent of 747.60 Sq. Mt. It records height 14.9 (unit not supplied), approved built-up area 1859.05, total built-up area 2259.9, and a required 10% mortgage area of 185.905, with 198.3 provided. The approval also identifies a mortgage of 10% of built-up area in the second floor.
- The supplied material does not include readable floor-by-floor drawings or enough extracted plan information to describe building footprint, flats per floor, lift and stair arrangement, entries, internal circulation, open-space layout, or residential/common-area distribution. The floor-plan review record reports two drawings, with zero measured, one scan pending and one marked as having no flats. No FSI-counted area or carpet-area measurement is supplied.
- The technical approval calls for the stilt/cellar to be used exclusively for vehicle parking, without partition walls or rolling shutters, and lists a transformer and garbage house within the premises. It also specifies a tot-lot to be fenced and maintained as greenery; the available record does not establish that these features have been completed.
Homes, configurations & floor plans
The RERA filing lists 15 homes in two configurations. Booked and available counts below are portal-record figures without a supplied as-of date. No software-measured carpet areas, room dimensions or loading figures are available; the supplied drawing set has not produced measurements.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK (filed as TWO BEDROOM) | 10 | 0 | 10 | 127.7 sq. m | Not supplied | Not supplied |
| 3BHK (filed as THREE BEDROOM) | 5 | 0 | 5 | 162.81 sq. m | Not supplied | Not supplied |
RERA-filed saleable area is not a carpet-area measurement. The supplied records do not provide a project-specific breakdown of carpet area, balcony/utility area or common-area loading.
Parking & vehicle circulation
The technical approval requires the stilt/cellar to be used exclusively for vehicle parking and records a second-floor built-up-area mortgage; it does not provide a count of car or two-wheeler spaces, nor identify resident, visitor or accessible bays. No parking layout, ramp or internal-driveway details, EV provision or unit-wise parking allocation are supplied. A parking requirement in the approval does not establish the number of spaces delivered or their allocation to a particular home.
Amenities, recreation & open spaces
The following are listed in the RERA amenities record. The percentages are the supplied declared-progress values; they are not independent verification of completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water supply | No source, storage capacity or system details supplied | RERA amenities record | Available: YES; 100% declared; not independently verified |
| Sewerage (chamber, lines, septic tank, STP) | No system details or capacity supplied | RERA amenities record | Available: YES; 0% declared; not independently verified |
| Storm-water drains | No further details supplied | RERA amenities record | 0% declared; not independently verified |
| Green strip / tot lot / park | No size supplied; approval also calls for a fenced tot-lot maintained as greenery | RERA amenities record; HMDA technical approval | 0% declared; completion not verified |
| Community buildings | No further details supplied | RERA amenities record | 0% declared; not independently verified |
| Street lighting | No further details supplied | RERA amenities record | Available: YES; 0% declared; not independently verified |
| Solid-waste management and disposal | No further details supplied; approval calls for a garbage house within the premises | RERA amenities record; HMDA technical approval | Available: YES; 0% declared; not independently verified |
| Water conservation / rainwater harvesting | No capacity or system details supplied; approval calls for rainwater-harvesting structures | RERA amenities record; HMDA technical approval | Available: YES; 0% declared; not independently verified |
| Electrical meter room / sub-station / receiving station | No further details supplied | RERA amenities record | Available: YES; 0% declared; not independently verified |
| Aggregate recreational open space | No area supplied | RERA amenities record | 0% declared; not independently verified |
| Generator | No capacity supplied | RERA amenities record | Available: YES; progress percentage not supplied; not independently verified |
| Lift | No count or capacity supplied | RERA amenities record | Available: YES; progress percentage not supplied; not independently verified |
| Transformer | No capacity supplied; approval calls for transformer space within the site | RERA amenities record; HMDA technical approval | Available: YES; progress percentage not supplied; not independently verified |
| Internal roads and footpaths | No further details supplied | RERA amenities record | 0% declared; not independently verified |
| Treatment and disposal of sewage and sullage water | No further details supplied | RERA amenities record | 0% declared; not independently verified |
| Energy management | No further details supplied | RERA amenities record | 0% declared; not independently verified |
| Fire protection and fire-safety requirements | No system specifications supplied | RERA amenities record | 0% declared; not independently verified |
Utilities, building services & safety
- The RERA amenities record marks water supply, sewerage, a generator, a lift, transformer, electrical meter room/sub-station/receiving station, solid-waste management and rainwater harvesting as available, but does not supply capacities or technical specifications; most listed progress values are 0%, and completion is not independently verified. The technical approval calls for rainwater-harvesting structures, a transformer space and a garbage house.
- The approval requires services including sanitation, plumbing, fire-safety requirements, lifts and electrical installations to be executed under qualified technical supervision. It also places structural-safety and fire-safety responsibilities on the owner/developer and relevant design and site professionals, and requires an occupancy certificate before occupation. These approval conditions are not evidence that the systems have been installed, inspected or certified. No water source/storage capacity, STP or reuse details, drainage design, backup capacity, lift capacity, fire-system specifications, security arrangements or accessibility details are supplied.
Location, access & connectivity
- The registered project location is Quli Qutub Shah Layout, Hyderabad, PIN 500089. The approval document places the site at Plot Nos. 35, 36, 37 and 38 in Puppalguda village and lists the adjoining boundaries as 30 ft Wide Road to the east, Plot No. 39 to the west, 35 ft Wide Road to the north, and neighbors to the south.
- The location record identifies Financial District (Nanakramguda), 1.2 km away, measured from the supplied cadastral parcel centroid. No public-transport information or additional independently sourced approach-road details are supplied.
Developer & development status
- The registered promoter is Edifice Projects Private Limited, identified as a company; the RERA record lists E N Prasad Reddy as managing director and authorized signatory, and Geetha Prasad Erusu and Praneet Reddy Erusu as directors. The supplied promoter address is EN's, Road No 28, Quli Qutub Shah Layout, Hyderabad, 500089. No official website or contact details are supplied.
- In Form B, the promoter declares that the project will be completed by 31-March-2022 and makes declarations concerning title, encumbrances, approvals, project-account use and audits. These are promoter declarations, not independent findings of current construction progress or completion. No current progress certificate or occupancy certificate is supplied.
Approvals, official records & documents
| What it establishes in the supplied material | Registration of Orchid Edifice as P02500001059, commencing 23/07/2019 and ending 31/03/2022 |
|---|
| What it establishes in the supplied material | Technical approval dated 30/01/2019, reference 004847/SKP/R1/U6/HMDA/07112017, for a proposed residential building at Plot Nos. 35–38 in Survey No. 250; directs applicant to approach the Puppalguda Gram Panchayat Executive Authority for sanction and release |
|---|
| What it establishes in the supplied material | Promoter’s filed affidavit for Orchid Edifice, including a declared completion date of 31-March-2022 |
|---|
| What it establishes in the supplied material | Advocate’s opinion concerning the proposed flats on Plots 35–38, Survey No. 250, Poppalguda village; it refers to the 1995 sale, 2016 development agreement/GPA and HMDA mortgage |
|---|
| What it establishes in the supplied material | Filed document concerning development of Plots 35–38 in Survey No. 250, Quli Qutub Shah Colony, Poppalguda village |
|---|
| What it establishes in the supplied material | Filed record of built-up area mortgaged to HMDA |
|---|
| What it establishes in the supplied material | Not supplied in the reviewed project documents |
|---|
The review also includes an encumbrance statement, a supplemental agreement, a provisional allotment letter and an agreement for sale among the filed documents. The provisional allotment letter leaves key allottee and unit fields blank; it does not establish a specific buyer’s allotment.
Frequently asked questions
Is Orchid Edifice registered with Telangana RERA?
Yes. Orchid Edifice is registered with the Telangana Real Estate Regulatory Authority as P02500001059; the registration status is New Project.
Who is the developer of Orchid Edifice?
The promoter named in the RERA registration is Edifice Projects Private Limited.
Where is Orchid Edifice located?
Orchid Edifice is in Quli Qutub Shah Layout, Hyderabad, Telangana (500089).
When will Orchid Edifice be completed?
The promoter's proposed date of completion filed with RERA is 31/03/2022. This is the promoter's declaration, not a guarantee.
More projects in Hyderabad