Sign in

Nanda Arcadia

Nanda Infra · Medchal-Malkajgiri · RERA P02200001524

Nanda Arcadia is a residential apartment project in Nacharam, Medchal-Malkajgiri district; the mandal is not disclosed. The registered promoter is Nanda Infra, recorded as a partnership. The project has a site extent of 513.28 m² and one proposed building with 1 stilt + 5 upper floors; the RERA unit record lists 10 3BHK apartments. It is registered under TG-RERA number P02200001524, and the Form B declaration states completion by 24/09/2025.

More from Nanda Infra · 2 projects →

01What we found

Period endedTG-RERA registration ran to 24 Sep 2024 - check its extension on TG-RERA
11documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered nameNanda Arcadia RERA record
Project typeResidential apartment project; the TG-RERA record identifies it as “Residential.” RERA record RERA filing
Phase / registered portionPhase designation not disclosed; the registration is for Nanda Arcadia.
TG-RERA registrationP02200001524
Registration validity27/12/2019 to 24/09/2024, as stated in the registration certificate; no extension is recorded in the supplied certificate extraction. Registration validity is separate from the completion undertaking and occupancy-certificate status.
Registered promoterNanda Infra; entity type recorded as partnership. RERA record RERA filing
RERA status in supplied recordRegistration end date was 24/09/2024. The supplied material does not establish a later extension, a current registration status, or an occupancy certificate.

Land and geographic identity

ItemProject record
Locality / revenue villageNacharam / Nacharam RERA record RERA filing
MandalNot disclosed in the project identity record. Land records
DistrictMedchal-Malkajgiri RERA record RERA filing
PIN500076 RERA record
All project survey numbers153, 155, 163, 164 and 165; the RERA certificate records “153,” “155” and “163 to 165.” No subdivision is supplied.
Site extent513.28 m²; the registered land details give total area and net area as 513.28 m², with affected area recorded as 0. RERA filing
BoundariesNorth: 30-foot road; east and south: St Peters school; west: open plot. RERA filing
Plot / premises identifier4-7-19/43, as shown in the registration certificate; the project record also gives 4-7-19/43. RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building permitPermit No. 2/C1/14191/2019, dated 24 September 2019; file No. 2/C1/13749/2019.
Sanctioned developmentProposed residential building, described in the permit as 1 stilt + 5 upper floors; stated height 15 m.
Approved built-up areaResidential upper-floors area: 1,258.45 m². The permit separately lists stilt parking area of 237.94 m².
Building / block countOne proposed building is identified in the project record. RERA filing
Approved versus RERA-declared unitsThe project fields give one total building unit and one proposed building unit; the RERA configuration record lists 10 3BHK apartments. The supplied material does not explain the “building units” field. RERA filing RERA unit details
Parking levelsStilt is identified as a parking floor; the permit requires the approved stilt parking area to remain for vehicle parking. A parking-space count is not supplied.

Offering and status

ItemProject record
RERA-filed configuration3BHK; 10 units. RERA unit details
RERA-filed saleable area125.84 m² per unit. RERA unit details
Booking record10 booked; 0 available, as last read from the TG-RERA portal. The portal record has no stated as-of date, so these figures are indicative rather than current unit availability. RERA unit table RERA unit details
Construction stageRERA registration fields report 80% completeness, but the supplied record does not provide an as-of date for that figure. It is a recorded progress figure, not independent site verification. RERA record
Completion datesThe registration certificate ends on 24/09/2024. The Form B declaration states completion by 24/09/2025. Neither date, by itself, establishes completed construction or an extension of registration.
Occupancy / completion certificateNo occupancy certificate or completion certificate is included in the supplied project evidence; status is therefore not established. The permit states an occupancy certificate is compulsory before occupation.

2. The project story

Nanda Arcadia is recorded with TG-RERA as a residential apartment project at premises 4-7-19/43 in Nacharam, Medchal-Malkajgiri district. The registered parcel is identified across Survey Nos. 153, 155, 163, 164 and 165, with a site extent of 513.28 m². The GHMC permit describes one proposed stilt-plus-five-upper-floor residential building. RERA record RERA filing

The RERA unit record lists ten 3BHK apartments, all recorded as booked when the portal data was read; that record has no as-of date. The project’s structured record reports 80% completeness, also without a stated as-of date. These are project-record statements, not independent confirmation of present construction conditions. The supplied evidence does not establish whether construction is now complete, whether any portion has been offered for occupation under an occupancy certificate, or whether the project has a current registration extension. RERA unit details RERA unit table RERA record

The registration certificate’s validity ended on 24/09/2024, while the Form B declaration gives a completion undertaking of 24/09/2025. These are different record entries and neither confirms an occupancy certificate.

3. Master plan, architecture & building design

The GHMC building permit describes a single proposed residential building at the Nacharam site, with 1 stilt + 5 upper floors and a stated height of 15 m. It records residential upper-floors area of 1,258.45 m² and a stilt parking area of 237.94 m². The site area and net area are each stated as 513.28 m². The permit also records a compound wall length of 79.05 RM, 25 trees and three rainwater-harvesting structures. These are permit-record details, not confirmation of delivery.

The permit records a proposed covered built-up area of 88,092.00 in its parameter list, but the supplied extraction does not state a unit for that entry. It is therefore not treated here as a verified area measurement. The record does not provide a usable site plan or floor-plan extraction establishing the footprint, flats per floor, lift or stair arrangement, entrances, internal circulation, landscaping dimensions, or any FSI-counted area. The approved built-up area, stilt parking area, RERA saleable area and software-measured carpet area are distinct measures and are not interchangeable. Floor plans RERA unit details

4. Homes, configurations & floor plans

The RERA filing records ten 3BHK apartments, each with a saleable area of 125.84 m². The portal record shows all ten booked and none available, but does not give an as-of date. RERA unit details RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10100125.84 m²Software-measured range: 89.0–97.5 m²; median 94.6 m²25%

The carpet-area range and median are software measurements from approved floor-plan drawing geometry, not RERA-filed carpet-area disclosures; the measurements are flagged as needing review. The RERA saleable area includes the home’s share of common areas and is not the same measure as carpet area. The supplied record does not provide a separately verified balcony or utility-area total. Floor plans RERA unit details

One measured second-floor plan identifies a living/dining room, kitchen, three bedrooms, three toilets, a wash area, utility and balcony. For that plan, the recorded room dimensions include living/dining 7.76 × 4.73 m, kitchen 2.46 × 2.70 m, bedrooms 3.59 × 3.86 m, 3.00 × 3.80 m and 3.86 × 3.00 m, and balcony 1.45 × 1.33 m. These are drawing-based measurements for the identified flat plan, not a statement that every unit has identical room dimensions.

5. Parking & vehicle circulation

The GHMC permit identifies a stilt parking floor of 237.94 m² and requires the approved stilt parking area to be used exclusively for vehicle parking, without partition walls or rolling shutters. The permit also requires a rainwater-harvesting structure and other site provisions, but the supplied evidence does not establish the number of car or two-wheeler spaces, visitor or accessible parking, parking allocation to individual apartments, ramps, or EV charging.

A drawn parking bay or the existence of a parking floor does not, on the available evidence, establish exclusive ownership or allocation to a particular apartment. No parking-space count or unit-wise parking allotment document is supplied. Document index

6. Amenities, recreation & open spaces

The TG-RERA amenity record marks several site works as available at 100%; the supplied data does not give an as-of date or independently verified completion evidence. The GHMC permit separately lists or requires site features. RERA amenities

Internal roads and footpaths
Description / sizeSize not stated
Evidence sourceTG-RERA amenity record RERA amenities
Declared progress / verified statusMarked YES, 100%; independent completion not established
Green strip / tot-lot / park
Description / sizePermit lists tot-lot area as 0 m²; permit conditions require a fenced tot-lot maintained as greenery and a peripheral green strip
Evidence sourceTG-RERA amenity record; GHMC permit RERA amenities
Declared progress / verified statusAmenity record marked YES, 100%; permit condition is not proof of delivery
Community buildings
Description / sizeNo size or facility detail supplied
Evidence sourceTG-RERA amenity record RERA amenities
Declared progress / verified status0% recorded
Recreational open space
Description / sizeAggregate area not stated
Evidence sourceTG-RERA amenity record RERA amenities
Declared progress / verified status0% recorded
Swimming pool, gym and clubhouse
Description / sizeNo sizes or capacities supplied
Evidence sourceThird-party vendor listing only Promoter website
Declared progress / verified statusMarketing/listing claims; not established as RERA-filed, sanctioned or delivered

The TG-RERA amenity record lists water conservation/rainwater harvesting as YES, 100%; the permit records three rainwater-harvesting structures. These entries describe the project records and permit provision; the supplied material does not independently verify construction or operation. RERA amenities

7. Utilities, building services & safety

The TG-RERA amenity record marks water supply, sewerage, storm-water drains, street lighting, rainwater harvesting and an electrical meter room/sub-station/receiving station as YES, 100%; it records treatment and disposal of sewage and sullage, solid-waste management, energy management and fire-protection/fire-safety requirements at 0%. The record provides no system capacities or independent completion verification. RERA amenities

The GHMC permit requires rainwater harvesting, space for a transformer, a garbage house and an ETP, and states that sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical supervision. It also states that fire and structural safety are the responsibility of the owner, builder/developer and technical professionals. These are approval conditions, not evidence that the systems have been installed, commissioned or certified.

No project-specific evidence supplied here establishes water source or storage capacity, an operational sewage-treatment plant or reuse system, backup-power capacity, lift count or capacity, fire-service clearances, CCTV, access control, or accessible routes. The permit requires an occupancy certificate before occupation and says public water and electricity connections are to be provided only on production of that certificate.

8. Location, access & connectivity

The registered location is Nacharam village/locality, Medchal-Malkajgiri district, PIN 500076. The building permit gives the project location as Nacharam, and the project record gives the site boundaries as a 30-foot road to the north, St Peters school to the east and south, and an open plot to the west. RERA record RERA filing RERA filing

The supplied project location record contains a geocode labelled “cadastral parcel centroid” at 17.41528, 78.35459 and identifies Financial District (Nanakramguda) at 1.2 km. No route, distance-measurement method or travel time is supplied, so the distance is reported as recorded, not as a verified journey distance. Location record

9. Developer & development status

The registered promoter is Nanda Infra, recorded as a partnership. The project record names the following partnership members: Ganga Prasad Mulka, Goutham Burugu, Venkateshwara Rao Produtri, Tenacious Infrastructures OPC Pvt Ltd and Prasad Jilla. Goutham Burugu and Venkateshwara Rao Produtri are recorded as authorized signatories. The supplied evidence does not identify a registered office address beyond the project-location particulars, nor provide a company-registration identifier or official promoter website/contact details. RERA filing Parties record Corporate record

The RERA project record reports 80% completeness without an as-of date. Form B declares a completion undertaking of 24/09/2025. No independently verified site-progress report, later completion update or occupancy certificate is supplied here; the project’s current construction and occupation status therefore remain unestablished by these materials. RERA record Document index

10. Approvals, official records & documents

RecordWhat the supplied evidence establishes
TG-RERA registration certificate, Form CRegistration of Nanda Arcadia as P02200001524, granted under section 5; validity stated as 27/12/2019–24/09/2024.
GHMC building permitPermit 2/C1/14191/2019, file 2/C1/13749/2019, dated 24 September 2019; proposed stilt-plus-five-floor building and listed conditions.
Form B declarationPromoter affidavit/declaration for the project, including a completion undertaking by 24/09/2025.
Floor-plan recordDrawing record identified as doc 74704; supplied measurement data is software-derived and not a RERA disclosure. Floor plans
Occupancy/completion certificateNot present in the supplied evidence. The GHMC permit requires an occupancy certificate before occupation. Document index
Approved layout planNo layout approval number or extracted approved-layout document is supplied in this overview evidence. HMDA Document index

Frequently asked questions

Is Nanda Arcadia registered with Telangana RERA?

Yes. Nanda Arcadia is registered with the Telangana Real Estate Regulatory Authority as P02200001524; the registration status is New Project.

Who is the developer of Nanda Arcadia?

The promoter named in the RERA registration is Nanda Infra.

Where is Nanda Arcadia located?

Nanda Arcadia is in Nacharam, Medchal-Malkajgiri, Telangana (500076).

When will Nanda Arcadia be completed?

The promoter's proposed date of completion filed with RERA is 24/09/2024. This is the promoter's declaration, not a guarantee.

More projects in Medchal-Malkajgiri