Mv Residency
MYSIGARI · Medchal-Malkajgiri · RERA P02200005654
MV RESIDENCY is a residential apartment project in BAHADUPALLY, Dundigal Gandimaisamma, Medchal-Malkajgiri. The registered promoter is Mysigari Venkatesh. The project has a registered site extent of 836 sq. m, one building with 1 Stilt + 5 upper floors, and 20 2BHK units. It is registered under TG-RERA number P02200005654, with proposed completion on 04/11/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | MV RESIDENCY |
| Project type / registered portion | Residential apartment project; phase or separately registered portion is not disclosed. RERA record |
| TG-RERA registration | P02200005654, granted under section 5; recorded as valid from 06/01/2023 to 04/11/2025. The certificate records no extension. Registration validity is distinct from the completion deadline and from occupancy certification. |
| Registered promoter | Mysigari Venkatesh on the TG-RERA certificate; other filed records identify MYSIGARI VENKATESH. Legal entity type is not disclosed. |
| RERA status in supplied record | The registration certificate records the validity period above; no extension is recorded on that certificate. The supplied evidence does not establish a current registration status beyond that record. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | BAHADUPALLY; the building approval also uses BAHADURPALLY. RERA record |
| Revenue village | Bahadupally (also recorded as BAHADURPALLY Village in title material). Land records |
| Mandal / district / PIN | Dundigal Gandimaisamma / Medchal-Malkajgiri / 500043. RERA record |
| Project survey number and subdivision | 62/1/A. Land records |
| Plots identified in the filed record | 18, 21. |
| Registered site extent | 836 sq. m (also shown as 1000.0 Sq-yards in the sale-deed extraction). |
| Net area / road-affected area | Net Area 687.43 m²; Road affected area 148.57 m². The approval records surrender of the road-affected portion. |
| Boundaries | North: ROAD; South: ROAD; East and West: NEIGHBOURS LAND. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | DUNDIGAL Municipality/Municipal Corporation. The RERA record separately lists the authority name as DTCP. RERA record |
| Principal building approval | 0027/BP/3144/2022, approved 04 November, 2022; file no. 010282/BP/DTCP/3144/0042/2022. |
| Approved built-up area | 1388.55 m² in the project record. The building-permit extraction separately states residential upper-floor area 1,376.55 m² and stilt area 279.71 m²; these are the figures as recorded, not interchangeable area measures. RERA filing |
| Building count / configuration | 1 building; approval describes 1 Stilt + 5 upper floors and a height of 14.99 m. RERA filing |
| Parking levels | Stilt is approved for parking; a cellar is mentioned in a permit condition, but the supplied extracted floor configuration does not specify a cellar level. |
| Unit counts | The filed project record shows 20 units; the approval data also records 1 total building unit, so the meaning of that approval-field count is not clear from the supplied extract. RERA unit table RERA filing |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configuration | 2BHK, 20 units; filed saleable area 77.57 m² per unit. RERA unit table |
| Booking snapshot | 0 booked / 20 available, as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative. RERA unit table |
| Completion date | Project header records proposed completion 04/11/2025. The Form B completion undertaking is OCR-truncated and not reliably readable. RERA record |
| Construction stage | The supplied RERA amenities snapshot reports internal roads and footpaths at 10% and water supply at 100%; these are portal-reported figures, not independent site verification. RERA amenities |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied documents. The building permit requires an occupancy certificate before occupation. Document index |
2. The project story
MV RESIDENCY is a single-building residential apartment project registered under TG-RERA number P02200005654, at Bahadupally, Dundigal Gandimaisamma Mandal, Medchal-Malkajgiri District, PIN 500043. Its registered parcel is identified as Survey No. 62/1/A, Plots 18 and 21. The building approval describes one residential building with a stilt and five upper floors.
The RERA filing lists twenty 2BHK units, with none booked and twenty available in the portal snapshot; because that snapshot is undated, it should not be treated as a current inventory confirmation. The project header gives 04/11/2025 as the proposed completion date. Portal-reported infrastructure progress is partial in the supplied snapshot; no independent construction inspection or occupancy certification is provided here. RERA unit table RERA record RERA amenities Document index
3. Master plan, architecture & building design
The building-permit extraction describes one residential building, 1 Stilt + 5 upper floors, with a stated height of 14.99 m. It records a site area of 836 m², a net area of 687.43 m², and a road-affected area of 148.57 m². The permit records surrender of the road-affected area.
The project record gives approved built-up area as 1388.55 m². The permit extraction also lists 1,376.55 m² for residential upper floors and 279.71 m² for the stilt; the supplied material does not provide a drawing-based reconciliation of these area categories. RERA filing
The supplied material does not establish the building footprint, flats per floor, number or capacity of lifts, stair arrangement, internal circulation, landscaping area, or residential/common-area distribution. The permit calls for a tot-lot to be fenced and maintained as greenery and for peripheral greenery, but no supplied drawing or independent evidence establishes delivery.
4. Homes, configurations & floor plans
The RERA filing records twenty 2BHK units, with filed saleable area 77.57 m². The booking counts are an undated portal snapshot. RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 77.57 m² | 34.8–63.4 m²; median 47.9 m² | 38% |
The carpet-area figures and 38% loading are software measurements from approved floor-plan drawing geometry, not RERA-filed disclosures; the drawing-based measurements need review. The record includes eight measured flat designs. The supplied sample drawing labels a bedroom, wash area, living/kitchen and second bedroom, but does not provide a complete verified room schedule for all units. Floor plans RERA unit details
Saleable area and measured carpet area are different measures: the drawing-measured carpet figure describes internal floor-plan geometry, while the RERA-filed saleable area is the filed unit-area figure. The supplied material does not separately quantify balcony or utility area. Floor plans RERA unit table
5. Parking & vehicle circulation
The building permit states that the stilt and any cellar approved for parking must be used exclusively for vehicle parking and not partitioned or converted to another use. The extracted floor configuration identifies one stilt; it does not confirm a cellar level in the approved configuration.
No parking-space count, resident-versus-visitor allocation, accessible spaces, ramp or driveway details, EV charging provision, or unit-specific parking allocation is established by the supplied evidence. A permit condition requiring parking use does not establish an individual buyer’s exclusive parking rights.
6. Amenities, recreation & open spaces
The following are portal-reported infrastructure items and percentages. They are not independent verification of completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | Size not stated | TG-RERA project record | 10% reported; not independently verified |
| Water Supply | Source and storage capacity not stated | TG-RERA project record | 100% reported; not independently verified |
| Green Strip/TOT LOT/Park | Size not stated; permit also requires a fenced tot-lot and peripheral greenery | TG-RERA project record; building permit | 0% reported for the portal item; delivery not independently verified |
| Water Conservation, Rain water Harvesting | Permit requires a rainwater-harvesting percolation pit | TG-RERA project record; building permit | 0% reported; completion not independently verified |
| Sewerage (Chamber, Lines, Septic Tank, STP) | System or capacity not specified | TG-RERA project record | 0% reported |
| Storm Water Drains | Details not specified | TG-RERA project record | 0% reported |
| Community Buildings | Type and size not specified | TG-RERA project record | 0% reported |
| Street Lighting | Details not specified | TG-RERA project record | 0% reported |
| Solid Waste Management and Disposal | Details not specified | TG-RERA project record | 0% reported |
| Electrical Meter Room, Sub-Station, Receiving Station | Permit requires space for a transformer; the portal field names an electrical facility | TG-RERA project record; building permit | 0% reported; completion not independently verified |
| Aggregate area of recreational Open Space | Area not stated | TG-RERA project record | 0% reported |
7. Utilities, building services & safety
The TG-RERA amenities snapshot reports water supply at 100%, but does not identify the source, storage, treatment or capacity. It reports sewerage and storm-water drainage at 0% and water conservation/rainwater harvesting at 0%. The permit requires a rainwater-harvesting structure; the supplied evidence does not confirm its installation. RERA amenities
The permit requires space for a transformer and says services including sanitation, plumbing, fire safety, lifts and electrical installations are to be executed under qualified technical supervision. It also places responsibility for structural and fire safety on the owner/developer and relevant technical personnel. These conditions do not establish that the systems are installed or operational. No capacities, system drawings, fire clearance, lift details, backup-power information, CCTV, waste-management arrangements or accessibility features are established in the project-filed evidence supplied here.
8. Location, access & connectivity
The registered project location is BAHADUPALLY, Bahadupally revenue village, Dundigal Gandimaisamma Mandal, Medchal-Malkajgiri District, PIN 500043. The building permit identifies the site as Bahadurpally and records roads on the north and south boundaries. RERA record RERA filing
The supplied location record gives a cadastral parcel centroid at 17.41528, 78.35459 and lists Financial District (Nanakramguda) — 1.2 km. The source does not specify the measurement method; no travel time or public-transport distance is supplied. Location record
9. Developer & development status
The TG-RERA certificate names Mysigari Venkatesh as promoter; the building approval identifies Sri MYSIGARI VENKATESH as applicant. The supplied record does not establish the promoter’s legal entity type, corporate identifier, registered office or official contact details. Corporate record
The Form B declaration is attributed to MYSIGARI VENKATESH as an authorized signatory and includes undertakings concerning title, project completion, separate-account funds, audit and pending approvals. Its completion-date text is OCR-truncated, so it cannot be reliably quoted from that document.
The project header records a proposed completion date of 04/11/2025. The supplied evidence includes no independent construction-progress report or occupancy/completion certificate. The portal snapshot’s reported amenity progress is described above; it is not a site inspection. RERA record RERA amenities Document index
10. Approvals, official records & documents
| Identifier / date | P02200005654; issued 06/01/2023 |
|---|---|
| What the supplied record establishes | Form C records MV RESIDENCY, Survey No. 62/1/A, Plots 18, 21, PIN 500043, and validity through 04/11/2025; no extension is recorded on the certificate. |
| Identifier / date | 0027/BP/3144/2022; 04 November, 2022 |
|---|---|
| What the supplied record establishes | Dundigal Municipality/Municipal Corporation approval for a residential building at Bahadurpally; file no. 010282/BP/DTCP/3144/0042/2022. |
| Identifier / date | 20127/LPS/HMDA/Plg./2008; 23/05/2011 |
|---|---|
| What the supplied record establishes | Number and date appear in the building-approval extraction. |
| Identifier / date | Dated 18-04-2017 |
|---|---|
| What the supplied record establishes | Filed advocate’s report concerning Plots 18 and 21, 1000 Sq. Yds. in Survey No. 62/1A, based on listed title documents; the extraction states the opinion is subject to original-document verification. |
| Identifier / date | 1981/2017; 21st day of APRIL, 2017 |
|---|---|
| What the supplied record establishes | Filed deed concerns Plots 18 and 21 in Survey No. 62/1/A, measuring 1000.0 Sq-yards or 836.0 Sq.mts. |
| Identifier / date | Dated 22-12-2022 |
|---|---|
| What the supplied record establishes | Promoter declaration filed for the proposed project; the encumbrance section is present but its details are not populated in the supplied extraction. |
| Identifier / date | Project form, partially filled |
|---|---|
| What the supplied record establishes | Filed template for an apartment project; proposed purchaser and unit particulars are blank. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | The building permit states that an occupancy certificate is required before occupation. |
The supplied evidence does not include an occupancy or completion certificate, or a separate approved-layout document extraction sufficient to describe a layout plan. The permit records conditions applicable to the building; this overview does not assess compliance with those conditions. Document index
1. Project at a glance
Project identity
Registered project name: MV RESIDENCY
Project type / registered portion: Residential apartment project; phase or separately registered portion is not disclosed.
TG-RERA registration: P02200005654, granted under section 5; recorded as valid from 06/01/2023 to 04/11/2025. The certificate records no extension. Registration validity is distinct from the completion deadline and from occupancy certification.
Registered promoter: Mysigari Venkatesh on the TG-RERA certificate; other filed records identify MYSIGARI VENKATESH. Legal entity type is not disclosed.
RERA status in supplied record: The registration certificate records the validity period above; no extension is recorded on that certificate. The supplied evidence does not establish a current registration status beyond that record.
Land and geographic identity
Locality: BAHADUPALLY; the building approval also uses BAHADURPALLY.
Revenue village: Bahadupally (also recorded as BAHADURPALLY Village in title material).
Mandal / district / PIN: Dundigal Gandimaisamma / Medchal-Malkajgiri / 500043.
Project survey number and subdivision: 62/1/A.
Plots identified in the filed record: 18, 21.
Registered site extent: 836 sq. m (also shown as 1000.0 Sq-yards in the sale-deed extraction).
Net area / road-affected area: Net Area 687.43 m²; Road affected area 148.57 m². The approval records surrender of the road-affected portion.
Boundaries: North: ROAD; South: ROAD; East and West: NEIGHBOURS LAND.
Development identity
Sanctioning authority: DUNDIGAL Municipality/Municipal Corporation. The RERA record separately lists the authority name as DTCP.
Principal building approval: 0027/BP/3144/2022, approved 04 November, 2022; file no. 010282/BP/DTCP/3144/0042/2022.
Approved built-up area: 1388.55 m² in the project record. The building-permit extraction separately states residential upper-floor area 1,376.55 m² and stilt area 279.71 m²; these are the figures as recorded, not interchangeable area measures.
Building count / configuration: 1 building; approval describes 1 Stilt + 5 upper floors and a height of 14.99 m.
Parking levels: Stilt is approved for parking; a cellar is mentioned in a permit condition, but the supplied extracted floor configuration does not specify a cellar level.
Unit counts: The filed project record shows 20 units; the approval data also records 1 total building unit, so the meaning of that approval-field count is not clear from the supplied extract.
Offering and status
RERA-filed configuration: 2BHK, 20 units; filed saleable area 77.57 m² per unit.
Booking snapshot: 0 booked / 20 available, as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative.
Completion date: Project header records proposed completion 04/11/2025. The Form B completion undertaking is OCR-truncated and not reliably readable.
Construction stage: The supplied RERA amenities snapshot reports internal roads and footpaths at 10% and water supply at 100%; these are portal-reported figures, not independent site verification.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied documents. The building permit requires an occupancy certificate before occupation.
2. The project story
MV RESIDENCY is a single-building residential apartment project registered under TG-RERA number P02200005654, at Bahadupally, Dundigal Gandimaisamma Mandal, Medchal-Malkajgiri District, PIN 500043. Its registered parcel is identified as Survey No. 62/1/A, Plots 18 and 21. The building approval describes one residential building with a stilt and five upper floors.
The RERA filing lists twenty 2BHK units, with none booked and twenty available in the portal snapshot; because that snapshot is undated, it should not be treated as a current inventory confirmation. The project header gives 04/11/2025 as the proposed completion date. Portal-reported infrastructure progress is partial in the supplied snapshot; no independent construction inspection or occupancy certification is provided here.
3. Master plan, architecture & building design
The building-permit extraction describes one residential building, 1 Stilt + 5 upper floors, with a stated height of 14.99 m. It records a site area of 836 m², a net area of 687.43 m², and a road-affected area of 148.57 m². The permit records surrender of the road-affected area.
The project record gives approved built-up area as 1388.55 m². The permit extraction also lists 1,376.55 m² for residential upper floors and 279.71 m² for the stilt; the supplied material does not provide a drawing-based reconciliation of these area categories.
The supplied material does not establish the building footprint, flats per floor, number or capacity of lifts, stair arrangement, internal circulation, landscaping area, or residential/common-area distribution. The permit calls for a tot-lot to be fenced and maintained as greenery and for peripheral greenery, but no supplied drawing or independent evidence establishes delivery.
4. Homes, configurations & floor plans
The RERA filing records twenty 2BHK units, with filed saleable area 77.57 m². The booking counts are an undated portal snapshot.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 77.57 m² | 34.8–63.4 m²; median 47.9 m² | 38% |
The carpet-area figures and 38% loading are software measurements from approved floor-plan drawing geometry, not RERA-filed disclosures; the drawing-based measurements need review. The record includes eight measured flat designs. The supplied sample drawing labels a bedroom, wash area, living/kitchen and second bedroom, but does not provide a complete verified room schedule for all units.
Saleable area and measured carpet area are different measures: the drawing-measured carpet figure describes internal floor-plan geometry, while the RERA-filed saleable area is the filed unit-area figure. The supplied material does not separately quantify balcony or utility area.
5. Parking & vehicle circulation
The building permit states that the stilt and any cellar approved for parking must be used exclusively for vehicle parking and not partitioned or converted to another use. The extracted floor configuration identifies one stilt; it does not confirm a cellar level in the approved configuration.
No parking-space count, resident-versus-visitor allocation, accessible spaces, ramp or driveway details, EV charging provision, or unit-specific parking allocation is established by the supplied evidence. A permit condition requiring parking use does not establish an individual buyer’s exclusive parking rights.
6. Amenities, recreation & open spaces
The following are portal-reported infrastructure items and percentages. They are not independent verification of completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | Size not stated | TG-RERA project record | 10% reported; not independently verified |
| Water Supply | Source and storage capacity not stated | TG-RERA project record | 100% reported; not independently verified |
| Green Strip/TOT LOT/Park | Size not stated; permit also requires a fenced tot-lot and peripheral greenery | TG-RERA project record; building permit | 0% reported for the portal item; delivery not independently verified |
| Water Conservation, Rain water Harvesting | Permit requires a rainwater-harvesting percolation pit | TG-RERA project record; building permit | 0% reported; completion not independently verified |
| Sewerage (Chamber, Lines, Septic Tank, STP) | System or capacity not specified | TG-RERA project record | 0% reported |
| Storm Water Drains | Details not specified | TG-RERA project record | 0% reported |
| Community Buildings | Type and size not specified | TG-RERA project record | 0% reported |
| Street Lighting | Details not specified | TG-RERA project record | 0% reported |
| Solid Waste Management and Disposal | Details not specified | TG-RERA project record | 0% reported |
| Electrical Meter Room, Sub-Station, Receiving Station | Permit requires space for a transformer; the portal field names an electrical facility | TG-RERA project record; building permit | 0% reported; completion not independently verified |
| Aggregate area of recreational Open Space | Area not stated | TG-RERA project record | 0% reported |
7. Utilities, building services & safety
The TG-RERA amenities snapshot reports water supply at 100%, but does not identify the source, storage, treatment or capacity. It reports sewerage and storm-water drainage at 0% and water conservation/rainwater harvesting at 0%. The permit requires a rainwater-harvesting structure; the supplied evidence does not confirm its installation.
The permit requires space for a transformer and says services including sanitation, plumbing, fire safety, lifts and electrical installations are to be executed under qualified technical supervision. It also places responsibility for structural and fire safety on the owner/developer and relevant technical personnel. These conditions do not establish that the systems are installed or operational. No capacities, system drawings, fire clearance, lift details, backup-power information, CCTV, waste-management arrangements or accessibility features are established in the project-filed evidence supplied here.
8. Location, access & connectivity
The registered project location is BAHADUPALLY, Bahadupally revenue village, Dundigal Gandimaisamma Mandal, Medchal-Malkajgiri District, PIN 500043. The building permit identifies the site as Bahadurpally and records roads on the north and south boundaries.
The supplied location record gives a cadastral parcel centroid at 17.41528, 78.35459 and lists Financial District (Nanakramguda) — 1.2 km. The source does not specify the measurement method; no travel time or public-transport distance is supplied.
9. Developer & development status
The TG-RERA certificate names Mysigari Venkatesh as promoter; the building approval identifies Sri MYSIGARI VENKATESH as applicant. The supplied record does not establish the promoter’s legal entity type, corporate identifier, registered office or official contact details.
The Form B declaration is attributed to MYSIGARI VENKATESH as an authorized signatory and includes undertakings concerning title, project completion, separate-account funds, audit and pending approvals. Its completion-date text is OCR-truncated, so it cannot be reliably quoted from that document.
The project header records a proposed completion date of 04/11/2025. The supplied evidence includes no independent construction-progress report or occupancy/completion certificate. The portal snapshot’s reported amenity progress is described above; it is not a site inspection.
10. Approvals, official records & documents
| Identifier / date | P02200005654; issued 06/01/2023 |
|---|---|
| What the supplied record establishes | Form C records MV RESIDENCY, Survey No. 62/1/A, Plots 18, 21, PIN 500043, and validity through 04/11/2025; no extension is recorded on the certificate. |
| Identifier / date | 0027/BP/3144/2022; 04 November, 2022 |
|---|---|
| What the supplied record establishes | Dundigal Municipality/Municipal Corporation approval for a residential building at Bahadurpally; file no. 010282/BP/DTCP/3144/0042/2022. |
| Identifier / date | 20127/LPS/HMDA/Plg./2008; 23/05/2011 |
|---|---|
| What the supplied record establishes | Number and date appear in the building-approval extraction. |
| Identifier / date | Dated 18-04-2017 |
|---|---|
| What the supplied record establishes | Filed advocate’s report concerning Plots 18 and 21, 1000 Sq. Yds. in Survey No. 62/1A, based on listed title documents; the extraction states the opinion is subject to original-document verification. |
| Identifier / date | 1981/2017; 21st day of APRIL, 2017 |
|---|---|
| What the supplied record establishes | Filed deed concerns Plots 18 and 21 in Survey No. 62/1/A, measuring 1000.0 Sq-yards or 836.0 Sq.mts. |
| Identifier / date | Dated 22-12-2022 |
|---|---|
| What the supplied record establishes | Promoter declaration filed for the proposed project; the encumbrance section is present but its details are not populated in the supplied extraction. |
| Identifier / date | Project form, partially filled |
|---|---|
| What the supplied record establishes | Filed template for an apartment project; proposed purchaser and unit particulars are blank. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | The building permit states that an occupancy certificate is required before occupation. |
The supplied evidence does not include an occupancy or completion certificate, or a separate approved-layout document extraction sufficient to describe a layout plan. The permit records conditions applicable to the building; this overview does not assess compliance with those conditions.
Frequently asked questions
Is MV RESIDENCY registered with Telangana RERA?
Yes. MV RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02200005654; the registration status is New Project.
Who is the developer of MV RESIDENCY?
The promoter named in the RERA registration is MYSIGARI.
Where is MV RESIDENCY located?
MV RESIDENCY is in BAHADUPALLY, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (500043).
When will MV RESIDENCY be completed?
The promoter's proposed date of completion filed with RERA is 04/11/2025. This is the promoter's declaration, not a guarantee.