Mukunda Nilayam
S L CONSTRUCTIONS · Hyderabad · RERA P02500003951
MUKUNDA NILAYAM is a residential apartment project in Ammuguda, Malkajgiri mandal, Hyderabad district. The registered promoter is S L CONSTRUCTIONS. The project occupies 445.67 sq. m and comprises one residential building with 1 stilt + 4 upper floors and 10 3BHK apartments, each with a RERA saleable area of 123.84 m². It is registered with TG-RERA under P02500003951, and its proposed completion date is 11/09/2027.
More from S L Constructions · 7 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | MUKUNDA NILAYAM RERA record |
| Project type / phase | Residential apartment project; phase or separately identified registered portion is not specified in the supplied record. RERA record RERA filing |
| TG-RERA registration | P02500003951; certificate issued 17/01/2022; valid 17/01/2022–11/05/2027 unless extended by the Authority. Registration validity is distinct from the project’s completion undertaking. RERA record Approvals record |
| RERA status | Registered project; the supplied certificate says it is not extended. The register does not provide a separate current-status label. |
| Registered promoter | S L CONSTRUCTIONS; organization type recorded as Partnership. RERA record RERA filing Corporate record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / site description | AMMUGUDA; the building-plan description identifies Plot Nos. 32 AND 33, in the rest of Area of Block 2 of Ammuguda, Kapra Municipality. RERA record RERA filing |
| Revenue village | Ammuguda. RERA record |
| Mandal | Malkajgiri in the building-plan record; the RERA land record does not disclose a mandal. Land records |
| District | RERA project record: Hyderabad. Building-plan records state Ranga Reddy; the registration certificate states Medchal-Malkajgiri. RERA record |
| PIN | 500056 in the RERA project record and registration certificate. RERA record |
| Project survey numbers and subdivisions | 5, 6, 7, 10, 10/1, 11/1, 12/1, 12/42 and 13/2. These are the complete survey identifiers stated in the registration certificate and building-plan documents. |
| Registered site extent | 445.67 sq. m; RERA land record gives total and net area as 445.67 sq. m, with affected area 0. RERA record Land records |
| Boundaries | North: ROAD WIDTH - 12; South: PLOT NO - 28 AND 29; East: PLOT NO - 31; West: PLOT NO - 34. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building permission | Permit No. 2/C1/06748/2021, dated 11 May 2021; file No. 2/C1/12560/2017. Approvals record |
| Approved building configuration | One residential building, 1 stilt + 4 upper floors; stated height 11.95 m. |
| Approved area figures | The extracted permit records residential upper-floor built-up area 990.72 m², stilt parking area 323.63 m², site area 445.67 m², and a separate 107.86 m² “Floor handed over Area” entry for the second floor. The plan extraction also lists built-up area 1017.03, 1250.63, and mortgage area 107.86; these labels are retained as recorded and are not interchangeable area measures. |
| Parking | Building-plan extraction states PROPOSED NUMBER OF PARKINGS 8; the permit identifies a stilt parking floor. |
| Units | RERA unit record: 10 total units, one building, all recorded available and none booked in the portal data supplied. The permit extraction does not state a unit count. RERA unit table RERA unit details |
Offering and status
| Item | Project record |
|---|---|
| Unit type | 3BHK apartments. RERA unit table RERA unit details |
| RERA saleable area | 123.84 m² per filed configuration. RERA unit table RERA unit details |
| Booked / available | 0 booked / 10 available, as last read from TG-RERA portal data; no as-of date is supplied, so these counts are indicative. RERA unit table RERA unit details |
| Completion date | Form B promoter declaration states 11/05/2027. The project header separately records proposed completion 11/09/2027. RERA record |
| Occupancy certificate | No occupancy certificate is included in the supplied project documents. GHMC permit conditions require an occupancy certificate before occupation; this is not evidence that one has been issued. |
| Construction stage | No independently verified or dated site-progress measurement is supplied. The RERA amenity progress fields are recorded as 0; they do not establish the building’s physical construction stage. RERA amenities |
2. The project story
MUKUNDA NILAYAM is registered as a residential apartment project on Plot Nos. 32 and 33 in Ammuguda, with the RERA record identifying one building and ten 3BHK apartments. The GHMC building-permit record describes a single residential building with one stilt level and four upper floors. RERA record RERA unit table
The project registration identifies the site as Ammuguda, Hyderabad district, while the supplied building-plan records name Malkajgiri mandal and Ranga Reddy district. The full survey-number set is stated in the identity table above. RERA record
The promoter’s Form B gives 11/05/2027 as its completion undertaking, while the project header records 11/09/2027 as the proposed completion date. The supplied documents do not include a verified construction-progress report or an occupancy certificate; therefore, no completion or occupancy status is asserted here. RERA record
3. Master plan, architecture & building design
The GHMC building-permit material describes one residential building on a 445.67 m² site, with 1 stilt + 4 upper floors and a stated height of 11.95 m. The plan extraction records proposed coverage area 247.68, vacant plot area 197.99, and residential net built-up area 990.72. These are drawing/permit figures as labelled in the supplied extraction.
The permit extraction identifies 323.63 m² of stilt parking area. It also lists 1017.03, 1250.63, and a 107.86 m² mortgage area in the plan data. The supplied material does not provide a complete, consistently labelled area schedule for every figure, so these should be checked against the stamped plan rather than treated as equivalent measures.
The plan records a 12m wide road and a 4.5m wide driveway. It also contains conditions concerning a tot-lot, tree planting/greenery, transformer space, rainwater harvesting, a garbage house, and exclusive parking use of the approved stilt/parking area. These are plan requirements or plan entries, not confirmation of completed facilities.
The supplied extracts do not establish the number of apartments per floor, lift or stair arrangements, detailed entry/exit circulation, or a complete common-area schedule.
4. Homes, configurations & floor plans
The TG-RERA filing records ten 3BHK units, none booked and ten available in the portal data supplied. Its filed saleable area is 123.84 m² per unit. Booked and available counts have no stated as-of date and should be treated as indicative. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 123.84 m² | Software-measured median 100.6 m²; range 92.3–103.5 m² | 19% |
Carpet-area figures above are software measurements from approved floor-plan drawing geometry, not RERA-filed disclosures; the measurement record says two designs need review and one implausible measurement was held back. The measured drawing sample covers three flat designs. Verify the measurements against the plan. RERA saleable area is a separate filed measure and includes the home’s share of common areas; it should not be read as carpet area. RERA unit details Floor plans
A measured typical plan identifies kitchen, living/dining, three bedrooms, two toilets, a puja room, and a balcony. The recorded balcony dimensions are 1.42 × 4.0 m (area 5.68 m²) and it is excluded from the software-measured carpet area. These are drawing measurements, not RERA-filed room-area disclosures. RERA unit details
5. Parking & vehicle circulation
The building-plan extraction records 8 proposed parking spaces and a stilt parking level. The GHMC permit states that approved stilt/parking areas are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied records do not establish visitor or accessible-space counts, two-wheeler provision, parking allocation to individual apartments, or an EV-charging facility.
The plan also records a 4.5m wide driveway and a 12m wide road. No separate evidence is supplied for ramp design, pedestrian separation, or the legal allocation of specific bays to buyers.
6. Amenities, recreation & open spaces
The RERA amenity schedule lists 14 items. Its progress values are 0; the schedule does not independently establish whether the facilities have been built or are operational. The building-permit document separately includes plan conditions and utility provisions. RERA amenities
| Description / size | Permit refers to a fenced tot-lot maintained as greenery; another extracted entry gives Tot-lot (m²) 0. |
|---|---|
| Declared progress / verified status | RERA amenity progress 0; completion not verified. |
| Description / size | Permit requires tree planting along the periphery and in front; plan extraction lists 20 Trees and greenery. |
|---|---|
| Declared progress / verified status | Completion not verified. |
| Description / size | Rainwater-harvesting structure/percolation pit; permit extraction lists 1 rainwater-harvesting pit. |
|---|---|
| Declared progress / verified status | RERA schedule marks water conservation/rainwater harvesting available YES, progress 0; installation not verified. |
| Description / size | Plan extraction lists a private well; RERA schedule marks water supply YES. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress 0; supply status not independently verified. |
| Description / size | RERA schedule marks sewerage and treatment/disposal of sewage and sullage water YES. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress 0; facility and operation not verified. |
| Description / size | Listed in RERA amenity schedule. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress 0; completion not verified. |
| Description / size | Listed in RERA amenity schedule. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress 0; completion not verified. |
| Description / size | Listed in RERA amenity schedule; permit requires a garbage house and plan extraction lists a garbage bin. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress 0; provision and operation not verified. |
| Description / size | RERA schedule marks this item YES; plan extraction lists a distribution transformer and space for a transformer. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress 0; installation not verified. |
| Description / size | Listed in RERA amenity schedule; no size or facility details are supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress 0; completion not verified. |
| Description / size | Listed in RERA amenity schedule. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress 0; completion not verified. |
7. Utilities, building services & safety
Water and drainage: The building-plan extraction lists a private well, overhead water tank, and rainwater harvesting/percolation pit. The RERA schedule marks water supply, sewerage, storm-water drains, sewage/sullage treatment and water conservation/rainwater harvesting as available YES, while progress fields show 0. No storage, treatment, STP capacity, reuse or storm-water capacity is supplied. RERA amenities
Electrical: Plan material lists a distribution transformer and transformer space; the RERA schedule marks the electrical meter room/substation/receiving-station item YES. No supply capacity, backup-power system or EV charging details are documented in the supplied RERA records. RERA amenities
Building services and safety: The GHMC permit makes sanitation, plumbing, fire-safety requirements, lifts and electrical installations subject to execution under qualified technical supervision, and states that an occupancy certificate is compulsory before occupation. The permit also requires an occupancy fire NOC before issue of the occupancy certificate. These are recorded conditions; the supplied documents do not establish completion, clearance, lift capacity, fire-system installation or issuance of the required certificates.
Waste and access: The permit requires a garbage house within the premises. The supplied material does not specify CCTV, security arrangements, accessibility features, or an accessible circulation design.
8. Location, access & connectivity
The registered project location is Ammuguda, PIN 500056; the building-plan description places Plot Nos. 32 and 33 in the rest of Area of Block 2 of Ammuguda, Kapra Municipality. The plan records a 12m wide road and a 4.5m wide driveway. RERA record RERA filing
The supplied location data lists Financial District (Nanakramguda) — 1.2 km, from a cadastral-parcel-centroid geocode. No public-transport or other landmark distances are provided in the structured location data. Location record
9. Developer & development status
The registered promoter is S L CONSTRUCTIONS, recorded as a Partnership. Its RERA-recorded address is B, PREMNAGAR COLONY, AMMUGUDA, AMMUGUDA, Hyderabad, 500056; GSTIN is 36ABTFS6407R1Z4. The supplied data does not give a verified company website or official contact details. Corporate record RERA filing Parties record
The RERA portal data records one building and ten 3BHK units. The promoter’s Form B declares completion by 11/05/2027; the header records proposed completion as 11/09/2027. No independently verified construction-stage assessment or occupancy certificate is supplied, and the records do not establish a completed or occupancy-certified tower or phase. RERA unit table RERA record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C for MUKUNDA NILAYAM, registration P02500003951, issued 17/01/2022, valid through 11/05/2027 unless extended. |
| GHMC building permission | Permit No. 2/C1/06748/2021, dated 11 May 2021; file No. 2/C1/12560/2017; one building, 1 stilt + 4 upper floors. |
| Building-plan / approval material | Proposed residential building on Plot Nos. 32 and 33, with the project survey numbers and site area set out in the plan extraction. |
| Promoter declaration | Form B by K. PRAMOD, authorized signatory, includes a completion undertaking of 11/05/2027, a declaration concerning encumbrances, and undertakings on the separate account and audits. |
| Title-report material filed with RERA | Legal-title-report documents include the Development Agreement-cum-GPA and prior title instruments. |
| Occupancy / completion certificate | Not present in the supplied project documents. The GHMC permit states an occupancy certificate is required before occupation. |
1. Project at a glance
Project identity
Registered name: MUKUNDA NILAYAM
Project type / phase: Residential apartment project; phase or separately identified registered portion is not specified in the supplied record.
TG-RERA registration: P02500003951; certificate issued 17/01/2022; valid 17/01/2022–11/05/2027 unless extended by the Authority. Registration validity is distinct from the project’s completion undertaking.
RERA status: Registered project; the supplied certificate says it is not extended. The register does not provide a separate current-status label.
Registered promoter: S L CONSTRUCTIONS; organization type recorded as Partnership.
Land and geographic identity
Locality / site description: AMMUGUDA; the building-plan description identifies Plot Nos. 32 AND 33, in the rest of Area of Block 2 of Ammuguda, Kapra Municipality.
Revenue village: Ammuguda.
Mandal: Malkajgiri in the building-plan record; the RERA land record does not disclose a mandal.
District: RERA project record: Hyderabad. Building-plan records state Ranga Reddy; the registration certificate states Medchal-Malkajgiri.
PIN: 500056 in the RERA project record and registration certificate.
Project survey numbers and subdivisions: 5, 6, 7, 10, 10/1, 11/1, 12/1, 12/42 and 13/2. These are the complete survey identifiers stated in the registration certificate and building-plan documents.
Registered site extent: 445.67 sq. m; RERA land record gives total and net area as 445.67 sq. m, with affected area 0.
Boundaries: North: ROAD WIDTH - 12; South: PLOT NO - 28 AND 29; East: PLOT NO - 31; West: PLOT NO - 34.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building permission: Permit No. 2/C1/06748/2021, dated 11 May 2021; file No. 2/C1/12560/2017.
Approved building configuration: One residential building, 1 stilt + 4 upper floors; stated height 11.95 m.
Approved area figures: The extracted permit records residential upper-floor built-up area 990.72 m², stilt parking area 323.63 m², site area 445.67 m², and a separate 107.86 m² “Floor handed over Area” entry for the second floor. The plan extraction also lists built-up area 1017.03, 1250.63, and mortgage area 107.86; these labels are retained as recorded and are not interchangeable area measures.
Parking: Building-plan extraction states PROPOSED NUMBER OF PARKINGS 8; the permit identifies a stilt parking floor.
Units: RERA unit record: 10 total units, one building, all recorded available and none booked in the portal data supplied. The permit extraction does not state a unit count.
Offering and status
Unit type: 3BHK apartments.
RERA saleable area: 123.84 m² per filed configuration.
Booked / available: 0 booked / 10 available, as last read from TG-RERA portal data; no as-of date is supplied, so these counts are indicative.
Completion date: Form B promoter declaration states 11/05/2027. The project header separately records proposed completion 11/09/2027.
Occupancy certificate: No occupancy certificate is included in the supplied project documents. GHMC permit conditions require an occupancy certificate before occupation; this is not evidence that one has been issued.
Construction stage: No independently verified or dated site-progress measurement is supplied. The RERA amenity progress fields are recorded as 0; they do not establish the building’s physical construction stage.
2. The project story
MUKUNDA NILAYAM is registered as a residential apartment project on Plot Nos. 32 and 33 in Ammuguda, with the RERA record identifying one building and ten 3BHK apartments. The GHMC building-permit record describes a single residential building with one stilt level and four upper floors.
The project registration identifies the site as Ammuguda, Hyderabad district, while the supplied building-plan records name Malkajgiri mandal and Ranga Reddy district. The full survey-number set is stated in the identity table above.
The promoter’s Form B gives 11/05/2027 as its completion undertaking, while the project header records 11/09/2027 as the proposed completion date. The supplied documents do not include a verified construction-progress report or an occupancy certificate; therefore, no completion or occupancy status is asserted here.
3. Master plan, architecture & building design
The GHMC building-permit material describes one residential building on a 445.67 m² site, with 1 stilt + 4 upper floors and a stated height of 11.95 m. The plan extraction records proposed coverage area 247.68, vacant plot area 197.99, and residential net built-up area 990.72. These are drawing/permit figures as labelled in the supplied extraction.
The permit extraction identifies 323.63 m² of stilt parking area. It also lists 1017.03, 1250.63, and a 107.86 m² mortgage area in the plan data. The supplied material does not provide a complete, consistently labelled area schedule for every figure, so these should be checked against the stamped plan rather than treated as equivalent measures.
The plan records a 12m wide road and a 4.5m wide driveway. It also contains conditions concerning a tot-lot, tree planting/greenery, transformer space, rainwater harvesting, a garbage house, and exclusive parking use of the approved stilt/parking area. These are plan requirements or plan entries, not confirmation of completed facilities.
The supplied extracts do not establish the number of apartments per floor, lift or stair arrangements, detailed entry/exit circulation, or a complete common-area schedule.
4. Homes, configurations & floor plans
The TG-RERA filing records ten 3BHK units, none booked and ten available in the portal data supplied. Its filed saleable area is 123.84 m² per unit. Booked and available counts have no stated as-of date and should be treated as indicative.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 123.84 m² | Software-measured median 100.6 m²; range 92.3–103.5 m² | 19% |
Carpet-area figures above are software measurements from approved floor-plan drawing geometry, not RERA-filed disclosures; the measurement record says two designs need review and one implausible measurement was held back. The measured drawing sample covers three flat designs. Verify the measurements against the plan. RERA saleable area is a separate filed measure and includes the home’s share of common areas; it should not be read as carpet area.
A measured typical plan identifies kitchen, living/dining, three bedrooms, two toilets, a puja room, and a balcony. The recorded balcony dimensions are 1.42 × 4.0 m (area 5.68 m²) and it is excluded from the software-measured carpet area. These are drawing measurements, not RERA-filed room-area disclosures.
5. Parking & vehicle circulation
The building-plan extraction records 8 proposed parking spaces and a stilt parking level. The GHMC permit states that approved stilt/parking areas are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied records do not establish visitor or accessible-space counts, two-wheeler provision, parking allocation to individual apartments, or an EV-charging facility.
The plan also records a 4.5m wide driveway and a 12m wide road. No separate evidence is supplied for ramp design, pedestrian separation, or the legal allocation of specific bays to buyers.
6. Amenities, recreation & open spaces
The RERA amenity schedule lists 14 items. Its progress values are 0; the schedule does not independently establish whether the facilities have been built or are operational. The building-permit document separately includes plan conditions and utility provisions.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Permit refers to a fenced tot-lot maintained as greenery; another extracted entry gives Tot-lot (m²) 0. | RERA amenity progress 0; completion not verified. | |
| Tree planting / greenery | Permit requires tree planting along the periphery and in front; plan extraction lists 20 Trees and greenery. | Completion not verified. | |
| Rainwater harvesting | Rainwater-harvesting structure/percolation pit; permit extraction lists 1 rainwater-harvesting pit. | RERA schedule marks water conservation/rainwater harvesting available YES, progress 0; installation not verified. | |
| Water supply | Plan extraction lists a private well; RERA schedule marks water supply YES. | Progress 0; supply status not independently verified. | |
| Sewerage / sewage treatment | RERA schedule marks sewerage and treatment/disposal of sewage and sullage water YES. | Progress 0; facility and operation not verified. | |
| Storm-water drains | Listed in RERA amenity schedule. | Progress 0; completion not verified. | |
| Street lighting | Listed in RERA amenity schedule. | Progress 0; completion not verified. | |
| Solid-waste management | Listed in RERA amenity schedule; permit requires a garbage house and plan extraction lists a garbage bin. | Progress 0; provision and operation not verified. | |
| Electrical meter room / substation / receiving station | RERA schedule marks this item YES; plan extraction lists a distribution transformer and space for a transformer. | Progress 0; installation not verified. | |
| Community buildings / recreational open space | Listed in RERA amenity schedule; no size or facility details are supplied. | Progress 0; completion not verified. | |
| Internal roads and footpaths | Listed in RERA amenity schedule. | Progress 0; completion not verified. |
7. Utilities, building services & safety
Water and drainage: The building-plan extraction lists a private well, overhead water tank, and rainwater harvesting/percolation pit. The RERA schedule marks water supply, sewerage, storm-water drains, sewage/sullage treatment and water conservation/rainwater harvesting as available YES, while progress fields show 0. No storage, treatment, STP capacity, reuse or storm-water capacity is supplied.
Electrical: Plan material lists a distribution transformer and transformer space; the RERA schedule marks the electrical meter room/substation/receiving-station item YES. No supply capacity, backup-power system or EV charging details are documented in the supplied RERA records.
Building services and safety: The GHMC permit makes sanitation, plumbing, fire-safety requirements, lifts and electrical installations subject to execution under qualified technical supervision, and states that an occupancy certificate is compulsory before occupation. The permit also requires an occupancy fire NOC before issue of the occupancy certificate. These are recorded conditions; the supplied documents do not establish completion, clearance, lift capacity, fire-system installation or issuance of the required certificates.
Waste and access: The permit requires a garbage house within the premises. The supplied material does not specify CCTV, security arrangements, accessibility features, or an accessible circulation design.
8. Location, access & connectivity
The registered project location is Ammuguda, PIN 500056; the building-plan description places Plot Nos. 32 and 33 in the rest of Area of Block 2 of Ammuguda, Kapra Municipality. The plan records a 12m wide road and a 4.5m wide driveway.
The supplied location data lists Financial District (Nanakramguda) — 1.2 km, from a cadastral-parcel-centroid geocode. No public-transport or other landmark distances are provided in the structured location data.
9. Developer & development status
The registered promoter is S L CONSTRUCTIONS, recorded as a Partnership. Its RERA-recorded address is B, PREMNAGAR COLONY, AMMUGUDA, AMMUGUDA, Hyderabad, 500056; GSTIN is 36ABTFS6407R1Z4. The supplied data does not give a verified company website or official contact details.
The RERA portal data records one building and ten 3BHK units. The promoter’s Form B declares completion by 11/05/2027; the header records proposed completion as 11/09/2027. No independently verified construction-stage assessment or occupancy certificate is supplied, and the records do not establish a completed or occupancy-certified tower or phase.
10. Approvals, official records & documents
TG-RERA registration: Form C for MUKUNDA NILAYAM, registration P02500003951, issued 17/01/2022, valid through 11/05/2027 unless extended.
GHMC building permission: Permit No. 2/C1/06748/2021, dated 11 May 2021; file No. 2/C1/12560/2017; one building, 1 stilt + 4 upper floors.
Building-plan / approval material: Proposed residential building on Plot Nos. 32 and 33, with the project survey numbers and site area set out in the plan extraction.
Promoter declaration: Form B by K. PRAMOD, authorized signatory, includes a completion undertaking of 11/05/2027, a declaration concerning encumbrances, and undertakings on the separate account and audits.
Title-report material filed with RERA: Legal-title-report documents include the Development Agreement-cum-GPA and prior title instruments.
Occupancy / completion certificate: Not present in the supplied project documents. The GHMC permit states an occupancy certificate is required before occupation.
Frequently asked questions
Is MUKUNDA NILAYAM registered with Telangana RERA?
Yes. MUKUNDA NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P02500003951; the registration status is New Project.
Who is the developer of MUKUNDA NILAYAM?
The promoter named in the RERA registration is S L CONSTRUCTIONS.
Where is MUKUNDA NILAYAM located?
MUKUNDA NILAYAM is in AMMUGUDA, Hyderabad, Telangana (500056).
When will MUKUNDA NILAYAM be completed?
The promoter's proposed date of completion filed with RERA is 11/09/2027. This is the promoter's declaration, not a guarantee.
More projects in Hyderabad