Milestone Luxor
MILESTONE DEVELOPERS AND OTHERS · Rangareddy · RERA P02400007602
MILESTONE LUXOR is a residential apartment project in Papi Reddy Colony, Serilingampally Mandal, Ranga Reddy District, developed by MILESTONE DEVELOPERS AND OTHERS. The site covers 1619.07 sq. m. and has one proposed residential building with 2 Cellars + 1 Ground + 4 upper floors and 5 homes: one 3BHK and four 4BHK. The project is registered under TG-RERA number P02400007602, with proposed completion recorded as 05/01/2027.
More from Milestone Developers · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | MILESTONE LUXOR RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | A single proposed building is shown in the supplied plan; a separately named phase is not disclosed. |
| TG-RERA registration | P02400007602 RERA record |
| Registration validity | Certificate states validity from 20/01/2024 to 05/09/2026, unless extended by the Authority. This is the registration period, not a statement of completion or occupancy. |
| Registered promoter | MILESTONE DEVELOPERS AND OTHERS in the project record; the registration certificate names Milestone Developers as promoter. RERA record RERA filing |
| RERA status | The supplied record identifies the project as registered. The registration capture is dated 2026-09-10 15:24:13; it does not establish whether an extension was subsequently granted. RERA record Approvals record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / registered location | Papi Reddy Colony; the RERA certificate gives Papi Reddy Colony, Serilingampally, Ranga Reddy, 500019. RERA record |
| Revenue village | Serilingampally Village is named in the title and sanctioned-plan records; the project record also identifies Papi Reddy Colony as the locality. Land records |
| Mandal | Serilingampally RERA record Land records |
| District | Ranga Reddy RERA record Land records |
| PIN | 500019 RERA record |
| Survey number(s) | Survey No. 51; no subdivision is disclosed in the supplied project record. Land records |
| Site extent | 1619.07 sq. m. The GHMC plan states both minimum plot area and net plot area as 1619.07 sq. m. RERA filing |
| Boundaries recorded in RERA | North: ROAD WIDTH - 30; South, East and West: NEIGHBOURS LAND. RERA filing |
| Road references in plan | 30.00 MT WIDE EXISTING ROAD, 30.00 MT WIDE PROPOSED ROAD, and an 18 mt. road width reference appear in the plan record. |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building-permit reference | 3288/GHMC/SLP/2023-BP, dated 06 September, 2023 Approvals record |
| Additional plan/application reference | TS/009649/2023; the drawing records approval date 04-02-2023. Approvals record |
| Building count and configuration | One proposed residential building: 2 Cellars + 1 Ground + 4 upper floors. |
| Building height | Plan records 14.90 MT building height and 17.80mt. total height. |
| Built-up area | The plan records TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING 3620.68, TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING 5761.78, and MORTGAGE AREA 367.52 (areas are stated in sq. m. in the plan). |
| Approved / filed unit count | GHMC plan: 05 units; RERA unit record: 5 units—one 3BHK and four 4BHK. RERA unit table |
| Parking provision | The plan records cellars for parking and PROPOSED NUMBER OF PARKINGS 1; the building-permit order also records Total Parking Area 2181.9. The supplied extracts do not clarify a vehicle-space count beyond the plan’s stated “1”. |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configurations | 3BHK: 1 unit; 4BHK: 4 units RERA unit table |
| RERA-filed saleable areas | 3BHK: 582.47 sq. m.; 4BHK: 689.8 sq. m. RERA unit table |
| Booking / availability | Portal-derived record shows 0 booked and 5 available (one 3BHK and four 4BHK); no as-of date is supplied, so these counts are indicative. RERA unit table |
| Construction stage | No independently verified site-progress record is supplied. The RERA amenities record shows water supply at 10% and several listed work items at 0%; these are reported percentages, not independent site verification. RERA amenities |
| Completion dates | Form B undertaking states completion by 5/09/2026; the project header records proposed completion as 05/01/2027. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied documents. The GHMC permit states that an occupancy certificate is required before occupation. |
2. The project story
MILESTONE LUXOR is registered as a residential apartment development on Survey No. 51 at Papi Reddy Colony, Serilingampally, Ranga Reddy District. The sanctioned scheme is a single building with two cellar levels, a ground floor and four upper floors, intended for residential use. RERA record Land records
The RERA unit schedule contains five homes: one 3BHK and four 4BHK. The portal-derived booking snapshot lists all five as available and none booked, but its extraction has no as-of date. RERA unit table The supplied material does not verify construction completion or occupation; the GHMC permit makes occupancy certification a condition before occupation.
The completion dates in the project record are not uniform: Form B records 5/09/2026, while the project header gives 05/01/2027 as proposed completion. They are presented here as separate record entries; no conclusion about the current construction or registration timeline is established by the supplied evidence. RERA record
3. Master plan, architecture & building design
The GHMC plan describes a single proposed residential building on a site of 1619.07 sq. m., with 2 Cellars + 1 Ground + 4 upper floors. It records a PROPOSED COVERAGE AREA (45.9%) 743.13, VACANT PLOT AREA 875.94, residential net BUA of 3620.68, proposed built-up area excluding parking of 3620.68, and proposed built-up area including parking of 5761.78. These are distinct plan figures; the supplied extract does not identify a separate FSI-counted area or provide a carpet-area total for the building.
The plan also lists PARKING AREA 2141.10, MORTGAGE AREA 367.52, building height of 14.90 MT, and total height of 17.80mt. The building-permit order records total parking area as 2181.9. The supplied extracts do not provide a reliably interpretable floor-by-floor common-area schedule, flat-per-floor count, lift or stair details, or a complete circulation and landscape plan. The plan does identify a tot-lot and periphery greenery, alongside requirements concerning rainwater harvesting, transformer space and a garbage house.
The approved floor-plan drawing is identified as document 372643. Its drawing-derived unit measurements are software-measured and marked as needing review; they are not RERA-filed area disclosures. Floor plans
4. Homes, configurations & floor plans
RERA records the unit counts and saleable areas below. Drawing-based carpet-area figures are software measurements from the approved floor-plan drawing, not RERA-filed disclosures; the measurements are flagged as needing review. RERA unit table Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 1 | 0 | 1 | 582.47 sq. m. | 449.9 sq. m. (software-measured; one design) | 23% (software-derived) |
| 4BHK | 4 | 0 | 4 | 689.8 sq. m. | 524.5–525.6 sq. m. (software-measured; median 525.1 sq. m., two designs) | 24% (software-derived) |
The floor-plan extraction labels the 3BHK drawing “GROUND FLOOR PLAN” and the 4BHK drawings “TYPICAL - 2, 3, 4 FLOOR PLAN.” The extracted 3BHK room schedule includes bedrooms, living/kitchen, lobby, servant room, toilets, sitout and utility; the utility is marked excluded from the measured carpet area. The extracted 4BHK schedule includes bedrooms, foyer, puja, living/kitchen, servant room and toilets. These room labels and measurements come from drawing analysis, not a separately verified unit specification. RERA unit details
Carpet area is a drawing-based measurement of the home’s internal area in this analysis; RERA saleable area is the filed unit area and is not interchangeable with carpet area. The supplied records do not provide a separately filed balcony area or a unit-specific common-area allocation. RERA unit details Floor plans
5. Parking & vehicle circulation
The sanctioned plan shows 2 Cellars and states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking. It records PROPOSED NUMBER OF PARKINGS 1 and a parking area of 2141.10; the building-permit order separately records Total Parking Area 2181.9. The extracts do not establish the number of individual car or two-wheeler spaces, visitor or accessible spaces, or a parking allocation to any particular unit.
The RERA unit record marks the four 4BHK units as mortgaged and the 3BHK as not mortgaged; this is not evidence of individual parking ownership or allocation. RERA unit table The supplied plan extract does not provide details of ramps, vehicle entry/exit arrangements, pedestrian separation, mechanical parking or EV-charging provision.
6. Amenities, recreation & open spaces
The project’s RERA amenity record lists progress percentages, but does not provide independent verification of completed facilities. The sanctioned building-plan documents include certain site provisions and utilities; vendor-listed features are identified separately below. RERA amenities Promoter website
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Clubhouse / indoor | |||
| Club House / clubhouse | No size or capacity supplied | Vendor listing Promoter website | Marketing/listing claim; no completion status supplied |
| Gym | No size supplied | Vendor listing Promoter website | Marketing/listing claim; no completion status supplied |
| Sports / recreation | |||
| Tot-lot / green strip | GHMC permit records Tot Lot 143.56; plan requires the tot-lot to be fenced and maintained as greenery | RERA amenity entry “Green Strip/TOT LOT/Park”: 0%; not independently verified complete RERA amenities | |
| Children’s play area / sand pits; swimming pool | No sizes or capacities supplied | Vendor listing Promoter website | Marketing/listing claims; no completion status supplied |
| Landscape / open space | |||
| Vacant plot area | 875.94 as recorded in the plan (area figure) | Plan figure; the supplied data does not confirm delivered landscaping | |
| Periphery greenery | Plan calls for a strip of greenery around the site and tree plantation | Sanction condition; RERA green-strip/tot-lot/park progress 0% RERA amenities | |
| Convenience / community | |||
| Community buildings | No description or size supplied | RERA amenities record RERA amenities | 0% declared |
| Security, intercom, CCTV | No specifications supplied | Vendor listing Promoter website | Marketing/listing claims; no completion status supplied |
7. Utilities, building services & safety
The GHMC plan identifies water-storage provisions, rainwater harvesting, fire-safety systems, a generator and emergency lighting. These are plan-listed provisions, not evidence that the systems have been installed, tested or commissioned.
| Service | Supplied evidence |
|---|---|
| Water | Plan lists a separate underground static water-storage tank of 25,000 lits. and a separate residential terrace tank of 25,000lits capacity. The RERA amenity record marks water supply “YES” with 10% progress; the source does not establish the supply source. RERA amenities |
| Sewerage and drainage | RERA amenities list sewerage (chambers, lines, septic tank, STP) as “YES” with 0% progress, and storm-water drains as “YES” with 0% progress. Sewage treatment and disposal is listed at 0%. RERA amenities The vendor listing mentions an STP, without capacity or verified operating status. Promoter website |
| Rainwater harvesting | Plan lists rainwater harvesting and the permit records 1 rainwater-harvesting pit; the RERA amenity entry is marked “YES” with 0% progress. RERA amenities |
| Electrical supply / backup | Plan lists distribution-transformer space and a generator; the RERA record lists an electrical meter room/sub-station/receiving station as “YES” with 0% progress. No capacity or installed-status evidence is supplied. RERA amenities |
| Lifts | Vendor listing mentions a lift; the supplied plan extracts do not state lift count, capacity or service-lift provision. Promoter website |
| Fire and life safety | Plan lists hose reel, down corner, automatic sprinkler system, emergency lighting and fire-fighting installations. The building-permit order says a Fire NOC from the Director (EV&DM) is to be obtained before issue of the occupancy certificate. No Fire NOC is supplied. |
| Waste management | Plan requires a garbage house within the premises. RERA lists solid-waste management and disposal at 0% progress; the vendor listing mentions waste management without specifications. RERA amenities Promoter website |
| Accessibility | No project-specific accessible-ramp or accessible-circulation details are supplied in the extracted records. |
8. Location, access & connectivity
The registered project location is Papi Reddy Colony, Serilingampally, Ranga Reddy District, Telangana 500019, on Survey No. 51, Serilingampally Village. The plan records road references of 30.00 MT WIDE EXISTING ROAD, 30.00 MT WIDE PROPOSED ROAD and 18 mt. road width; the supplied extracts do not establish the project’s precise access arrangement to each road. RERA record Land records
The supplied location record lists HITEC City — 4.7 km. Location record No measured distance or travel-time evidence is supplied for public transport or other landmarks. A vendor listing refers generally to bus stops and railway stations being in close proximity, but supplies no distances. Promoter website
9. Developer & development status
The project record identifies the registered promoter as MILESTONE DEVELOPERS AND OTHERS, organization type “Others,” with GSTIN 36ABCFM7496H1ZT. The registration certificate names Milestone Developers; the GHMC permit identifies M/s MILESTONE DEVELOPERS and its representative, Gaddam Ramakrishna Reddy. The supplied material does not provide a verified legal-entity registration number, complete registered-office details or official contact details. RERA record Corporate record RERA filing
Form B, signed by Gaddam Ramakrishna Reddy as authorized signatory, declares completion by 5/09/2026 and makes statements concerning project funds and approvals. This is a promoter declaration, not independent confirmation of completion. The project header separately records proposed completion as 05/01/2027. RERA record No construction-progress inspection, completion certificate or occupancy certificate is supplied.
10. Approvals, official records & documents
| Identifier / date | P02400007602; validity stated 20/01/2024–05/09/2026 |
|---|---|
| What the supplied record establishes | Registration certificate for MILESTONE LUXOR; names Milestone Developers as promoter and identifies Survey No. 51 and the stated project location. |
| Identifier / date | 3288/GHMC/SLP/2023-BP, 06 September, 2023 |
|---|---|
| What the supplied record establishes | Permit for the proposed residential building; includes sanctioned configuration, site area and conditions. |
| Identifier / date | TS/009649/2023, drawing approval date 04-02-2023 |
|---|---|
| What the supplied record establishes | Supplied plan for the proposed residential building on Survey No. 51. |
| Identifier / date | GHMC permit and plan documents |
|---|---|
| What the supplied record establishes | Include commencement/completion notices, an occupancy certificate before occupation, parking use restrictions, fire-NOC condition before OC, and specified site provisions. |
| Identifier / date | Not supplied as a separate commencement notice or occupancy/completion certificate |
|---|---|
| What the supplied record establishes | The permit document is a building-permit order; it does not itself establish that construction is complete or that an occupancy certificate has been issued. |
| Identifier / date | Form B declaration (372656); unit/allotment-related filings (380593, 380594); registration certificate (REGCERT-53661) |
|---|---|
| What the supplied record establishes | Filed project disclosures and registration evidence; the supplied allotment and agreement templates contain unfilled unit/allottee particulars. |
| Identifier / date | HMDA master-plan sheets are available as image-only zoning sheets; no survey-level zoning reading is supplied. HMDA |
|---|---|
| What the supplied record establishes | The supplied material does not provide a parcel-specific zoning determination. |
1. Project at a glance
Project identity
Registered project name: MILESTONE LUXOR
Project type: Residential apartment project
Phase / registered portion: A single proposed building is shown in the supplied plan; a separately named phase is not disclosed.
TG-RERA registration: P02400007602
Registration validity: Certificate states validity from 20/01/2024 to 05/09/2026, unless extended by the Authority. This is the registration period, not a statement of completion or occupancy.
Registered promoter: MILESTONE DEVELOPERS AND OTHERS in the project record; the registration certificate names Milestone Developers as promoter.
RERA status: The supplied record identifies the project as registered. The registration capture is dated 2026-09-10 15:24:13; it does not establish whether an extension was subsequently granted.
Land and geographic identity
Locality / registered location: Papi Reddy Colony; the RERA certificate gives Papi Reddy Colony, Serilingampally, Ranga Reddy, 500019.
Revenue village: Serilingampally Village is named in the title and sanctioned-plan records; the project record also identifies Papi Reddy Colony as the locality.
Mandal: Serilingampally
District: Ranga Reddy
PIN: 500019
Survey number(s): Survey No. 51; no subdivision is disclosed in the supplied project record.
Site extent: 1619.07 sq. m. The GHMC plan states both minimum plot area and net plot area as 1619.07 sq. m.
Boundaries recorded in RERA: North: ROAD WIDTH - 30; South, East and West: NEIGHBOURS LAND.
Road references in plan: 30.00 MT WIDE EXISTING ROAD, 30.00 MT WIDE PROPOSED ROAD, and an 18 mt. road width reference appear in the plan record.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building-permit reference: 3288/GHMC/SLP/2023-BP, dated 06 September, 2023
Additional plan/application reference: TS/009649/2023; the drawing records approval date 04-02-2023.
Building count and configuration: One proposed residential building: 2 Cellars + 1 Ground + 4 upper floors.
Building height: Plan records 14.90 MT building height and 17.80mt. total height.
Built-up area: The plan records TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING 3620.68, TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING 5761.78, and MORTGAGE AREA 367.52 (areas are stated in sq. m. in the plan).
Approved / filed unit count: GHMC plan: 05 units; RERA unit record: 5 units—one 3BHK and four 4BHK.
Parking provision: The plan records cellars for parking and PROPOSED NUMBER OF PARKINGS 1; the building-permit order also records Total Parking Area 2181.9. The supplied extracts do not clarify a vehicle-space count beyond the plan’s stated “1”.
Offering and status
RERA-filed configurations: 3BHK: 1 unit; 4BHK: 4 units
RERA-filed saleable areas: 3BHK: 582.47 sq. m.; 4BHK: 689.8 sq. m.
Booking / availability: Portal-derived record shows 0 booked and 5 available (one 3BHK and four 4BHK); no as-of date is supplied, so these counts are indicative.
Construction stage: No independently verified site-progress record is supplied. The RERA amenities record shows water supply at 10% and several listed work items at 0%; these are reported percentages, not independent site verification.
Completion dates: Form B undertaking states completion by 5/09/2026; the project header records proposed completion as 05/01/2027.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied documents. The GHMC permit states that an occupancy certificate is required before occupation.
2. The project story
MILESTONE LUXOR is registered as a residential apartment development on Survey No. 51 at Papi Reddy Colony, Serilingampally, Ranga Reddy District. The sanctioned scheme is a single building with two cellar levels, a ground floor and four upper floors, intended for residential use.
The RERA unit schedule contains five homes: one 3BHK and four 4BHK. The portal-derived booking snapshot lists all five as available and none booked, but its extraction has no as-of date. The supplied material does not verify construction completion or occupation; the GHMC permit makes occupancy certification a condition before occupation.
The completion dates in the project record are not uniform: Form B records 5/09/2026, while the project header gives 05/01/2027 as proposed completion. They are presented here as separate record entries; no conclusion about the current construction or registration timeline is established by the supplied evidence.
3. Master plan, architecture & building design
The GHMC plan describes a single proposed residential building on a site of 1619.07 sq. m., with 2 Cellars + 1 Ground + 4 upper floors. It records a PROPOSED COVERAGE AREA (45.9%) 743.13, VACANT PLOT AREA 875.94, residential net BUA of 3620.68, proposed built-up area excluding parking of 3620.68, and proposed built-up area including parking of 5761.78. These are distinct plan figures; the supplied extract does not identify a separate FSI-counted area or provide a carpet-area total for the building.
The plan also lists PARKING AREA 2141.10, MORTGAGE AREA 367.52, building height of 14.90 MT, and total height of 17.80mt. The building-permit order records total parking area as 2181.9. The supplied extracts do not provide a reliably interpretable floor-by-floor common-area schedule, flat-per-floor count, lift or stair details, or a complete circulation and landscape plan. The plan does identify a tot-lot and periphery greenery, alongside requirements concerning rainwater harvesting, transformer space and a garbage house.
The approved floor-plan drawing is identified as document 372643. Its drawing-derived unit measurements are software-measured and marked as needing review; they are not RERA-filed area disclosures.
4. Homes, configurations & floor plans
RERA records the unit counts and saleable areas below. Drawing-based carpet-area figures are software measurements from the approved floor-plan drawing, not RERA-filed disclosures; the measurements are flagged as needing review.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 1 | 0 | 1 | 582.47 sq. m. | 449.9 sq. m. (software-measured; one design) | 23% (software-derived) |
| 4BHK | 4 | 0 | 4 | 689.8 sq. m. | 524.5–525.6 sq. m. (software-measured; median 525.1 sq. m., two designs) | 24% (software-derived) |
The floor-plan extraction labels the 3BHK drawing “GROUND FLOOR PLAN” and the 4BHK drawings “TYPICAL - 2, 3, 4 FLOOR PLAN.” The extracted 3BHK room schedule includes bedrooms, living/kitchen, lobby, servant room, toilets, sitout and utility; the utility is marked excluded from the measured carpet area. The extracted 4BHK schedule includes bedrooms, foyer, puja, living/kitchen, servant room and toilets. These room labels and measurements come from drawing analysis, not a separately verified unit specification.
Carpet area is a drawing-based measurement of the home’s internal area in this analysis; RERA saleable area is the filed unit area and is not interchangeable with carpet area. The supplied records do not provide a separately filed balcony area or a unit-specific common-area allocation.
5. Parking & vehicle circulation
The sanctioned plan shows 2 Cellars and states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking. It records PROPOSED NUMBER OF PARKINGS 1 and a parking area of 2141.10; the building-permit order separately records Total Parking Area 2181.9. The extracts do not establish the number of individual car or two-wheeler spaces, visitor or accessible spaces, or a parking allocation to any particular unit.
The RERA unit record marks the four 4BHK units as mortgaged and the 3BHK as not mortgaged; this is not evidence of individual parking ownership or allocation. The supplied plan extract does not provide details of ramps, vehicle entry/exit arrangements, pedestrian separation, mechanical parking or EV-charging provision.
6. Amenities, recreation & open spaces
The project’s RERA amenity record lists progress percentages, but does not provide independent verification of completed facilities. The sanctioned building-plan documents include certain site provisions and utilities; vendor-listed features are identified separately below.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Clubhouse / indoor | |||
| Club House / clubhouse | No size or capacity supplied | Vendor listing | Marketing/listing claim; no completion status supplied |
| Gym | No size supplied | Vendor listing | Marketing/listing claim; no completion status supplied |
| Sports / recreation | |||
| Tot-lot / green strip | GHMC permit records Tot Lot 143.56; plan requires the tot-lot to be fenced and maintained as greenery | RERA amenity entry “Green Strip/TOT LOT/Park”: 0%; not independently verified complete | |
| Children’s play area / sand pits; swimming pool | No sizes or capacities supplied | Vendor listing | Marketing/listing claims; no completion status supplied |
| Landscape / open space | |||
| Vacant plot area | 875.94 as recorded in the plan (area figure) | Plan figure; the supplied data does not confirm delivered landscaping | |
| Periphery greenery | Plan calls for a strip of greenery around the site and tree plantation | Sanction condition; RERA green-strip/tot-lot/park progress 0% | |
| Convenience / community | |||
| Community buildings | No description or size supplied | RERA amenities record | 0% declared |
| Security, intercom, CCTV | No specifications supplied | Vendor listing | Marketing/listing claims; no completion status supplied |
7. Utilities, building services & safety
The GHMC plan identifies water-storage provisions, rainwater harvesting, fire-safety systems, a generator and emergency lighting. These are plan-listed provisions, not evidence that the systems have been installed, tested or commissioned.
Water: Plan lists a separate underground static water-storage tank of 25,000 lits. and a separate residential terrace tank of 25,000lits capacity. The RERA amenity record marks water supply “YES” with 10% progress; the source does not establish the supply source.
Sewerage and drainage: RERA amenities list sewerage (chambers, lines, septic tank, STP) as “YES” with 0% progress, and storm-water drains as “YES” with 0% progress. Sewage treatment and disposal is listed at 0%. The vendor listing mentions an STP, without capacity or verified operating status.
Rainwater harvesting: Plan lists rainwater harvesting and the permit records 1 rainwater-harvesting pit; the RERA amenity entry is marked “YES” with 0% progress.
Electrical supply / backup: Plan lists distribution-transformer space and a generator; the RERA record lists an electrical meter room/sub-station/receiving station as “YES” with 0% progress. No capacity or installed-status evidence is supplied.
Lifts: Vendor listing mentions a lift; the supplied plan extracts do not state lift count, capacity or service-lift provision.
Fire and life safety: Plan lists hose reel, down corner, automatic sprinkler system, emergency lighting and fire-fighting installations. The building-permit order says a Fire NOC from the Director (EV&DM) is to be obtained before issue of the occupancy certificate. No Fire NOC is supplied.
Waste management: Plan requires a garbage house within the premises. RERA lists solid-waste management and disposal at 0% progress; the vendor listing mentions waste management without specifications.
Accessibility: No project-specific accessible-ramp or accessible-circulation details are supplied in the extracted records.
8. Location, access & connectivity
The registered project location is Papi Reddy Colony, Serilingampally, Ranga Reddy District, Telangana 500019, on Survey No. 51, Serilingampally Village. The plan records road references of 30.00 MT WIDE EXISTING ROAD, 30.00 MT WIDE PROPOSED ROAD and 18 mt. road width; the supplied extracts do not establish the project’s precise access arrangement to each road.
The supplied location record lists HITEC City — 4.7 km. No measured distance or travel-time evidence is supplied for public transport or other landmarks. A vendor listing refers generally to bus stops and railway stations being in close proximity, but supplies no distances.
9. Developer & development status
The project record identifies the registered promoter as MILESTONE DEVELOPERS AND OTHERS, organization type “Others,” with GSTIN 36ABCFM7496H1ZT. The registration certificate names Milestone Developers; the GHMC permit identifies M/s MILESTONE DEVELOPERS and its representative, Gaddam Ramakrishna Reddy. The supplied material does not provide a verified legal-entity registration number, complete registered-office details or official contact details.
Form B, signed by Gaddam Ramakrishna Reddy as authorized signatory, declares completion by 5/09/2026 and makes statements concerning project funds and approvals. This is a promoter declaration, not independent confirmation of completion. The project header separately records proposed completion as 05/01/2027. No construction-progress inspection, completion certificate or occupancy certificate is supplied.
10. Approvals, official records & documents
| Identifier / date | P02400007602; validity stated 20/01/2024–05/09/2026 |
|---|---|
| What the supplied record establishes | Registration certificate for MILESTONE LUXOR; names Milestone Developers as promoter and identifies Survey No. 51 and the stated project location. |
| Identifier / date | 3288/GHMC/SLP/2023-BP, 06 September, 2023 |
|---|---|
| What the supplied record establishes | Permit for the proposed residential building; includes sanctioned configuration, site area and conditions. |
| Identifier / date | TS/009649/2023, drawing approval date 04-02-2023 |
|---|---|
| What the supplied record establishes | Supplied plan for the proposed residential building on Survey No. 51. |
| Identifier / date | GHMC permit and plan documents |
|---|---|
| What the supplied record establishes | Include commencement/completion notices, an occupancy certificate before occupation, parking use restrictions, fire-NOC condition before OC, and specified site provisions. |
| Identifier / date | Not supplied as a separate commencement notice or occupancy/completion certificate |
|---|---|
| What the supplied record establishes | The permit document is a building-permit order; it does not itself establish that construction is complete or that an occupancy certificate has been issued. |
| Identifier / date | Form B declaration (372656); unit/allotment-related filings (380593, 380594); registration certificate (REGCERT-53661) |
|---|---|
| What the supplied record establishes | Filed project disclosures and registration evidence; the supplied allotment and agreement templates contain unfilled unit/allottee particulars. |
| Identifier / date | HMDA master-plan sheets are available as image-only zoning sheets; no survey-level zoning reading is supplied. |
|---|---|
| What the supplied record establishes | The supplied material does not provide a parcel-specific zoning determination. |
Frequently asked questions
Is MILESTONE LUXOR registered with Telangana RERA?
Yes. MILESTONE LUXOR is registered with the Telangana Real Estate Regulatory Authority as P02400007602; the registration status is New Project.
Who is the developer of MILESTONE LUXOR?
The promoter named in the RERA registration is MILESTONE DEVELOPERS AND OTHERS.
Where is MILESTONE LUXOR located?
MILESTONE LUXOR is in SERILINGAMPALLY, Papi Reddy Colony, Rangareddy, Telangana (500019).
When will MILESTONE LUXOR be completed?
The promoter's proposed date of completion filed with RERA is 05/01/2027. This is the promoter's declaration, not a guarantee.