S S Landing
SINGAM SATHAIAH AND OTHERS · Medchal-Malkajgiri · RERA P02200003392
S S LANDING is a residential apartment project in Kapra, Kapra mandal, Medchal-Malkajgiri district. The registered promoter is SINGAM SATHAIAH AND OTHERS. The project is on 550.57 sqmts of land and comprises one building with 1 Stilt + 5 upper floors and 10 homes, all 3BHK, with a filed saleable area of 76.64 sqm. It is registered under TG-RERA number P02200003392, with a proposed completion date of 18/05/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | S S LANDING RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase is not separately identified in the TG-RERA record. The registration covers the project at Plot No. 3, Survey No. 569P. |
| TG-RERA registration | P02200003392 |
| Registration validity | 24/09/2021 to 18/01/2027, unless extended by the Authority; the certificate says the term is five years. This is registration validity, not a completion certificate. |
| Registered promoter | SINGAM SATHAIAH AND OTHERS RERA record |
| RERA status | The supplied certificate records registration granted under section 5. No extension is recorded in the supplied certificate. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | Kapra RERA record |
| Revenue village | Kapra; the building-permit extraction also uses “Khapra.” RERA record |
| Mandal / district / PIN | Kapra / Medchal-Malkajgiri / 500062 RERA record |
| Project survey number(s) | 569P in the RERA certificate and project record; the GHMC permit says 569part. |
| Registered site extent | 550.57 m2 in the building-permit extraction; the RERA land record gives total and net area as 550.57 sqmts. RERA filing |
| Boundaries | East: ROAD WIDTH 9; West: PLOT NO 3 EAST PART; North: ROAD WIDTH 7; South: NEIGHBOURS PLOT. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Building Permit No. 2/C1/00548/2021, File No. 2/C1/12989/2020, dated 18 January, 2021 Approvals record |
| Approved built-up area | 1,327.14 m2 approved built-up area in the project record; the permit extraction labels 1,327.14 m2 as residential upper-floor area and separately records 250.36 m2 stilt area. RERA filing |
| Buildings | One building / Building A-1 (residential) RERA filing |
| Sanctioned configuration | 1 Stilt + 5 upper floors; permit extraction states height 14.75 m. |
| Parking levels / provision | Stilt is approved for parking under the permit conditions. A sanctioned parking-space count and unit-wise parking allocation are not established in the supplied records. |
| Units | RERA record: 10 total units, all 3BHK. The land record separately shows one total building unit; the meaning of that field is not clarified in the supplied evidence. RERA unit table RERA filing |
Offering and status
| Item | Record |
|---|---|
| RERA-filed configuration | 3BHK; filed saleable area 76.64 sqm RERA unit table |
| Booked / available | 0 booked / 10 available, as last read from the TG-RERA portal; the portal record supplied has no as-of date, so these counts are indicative. RERA unit table |
| Completion undertaking / date | Promoter’s Form B undertaking states completion by 18th January, 2027. |
| Other completion date in project record | Proposed completion date 18/05/2027. RERA record |
| Construction stage | No independently verified site-progress evidence or construction-stage percentage is supplied. The amenity record reports 0% for its listed items. RERA amenities |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied records; the supplied GHMC permit requires completion notice and an occupancy certificate before occupation. Document index |
2. The project story
S S LANDING is registered as a residential apartment project in Kapra, Medchal-Malkajgiri district. The registered land record identifies Survey No. 569P; the GHMC building permit identifies the site as Survey No. 569part and sanctions Building A-1 on a 550.57 m2 site. The recorded boundaries identify roads on the east and north sides. RERA record RERA filing
The sanctioned development is one residential building with one stilt and five upper floors. The RERA unit schedule records ten 3BHK units, with zero booked and ten available in the portal snapshot supplied; the booking record has no as-of date. The supplied evidence does not establish the construction stage through an independent site inspection, nor does it include an occupancy/completion certificate. The promoter’s Form B declares a completion undertaking of 18 January 2027; the project record separately gives a proposed completion date of 18/05/2027. RERA unit table RERA record
3. Master plan, architecture & building design
The GHMC permit sanctions a single residential building, A-1, on 550.57 m2 of site, with 1 Stilt + 5 upper floors and stated height 14.75 m. The permit records residential upper-floor area of 1,327.14 m2 and stilt area of 250.36 m2. These are permit figures; the supplied evidence does not provide a separate FSI-counted area, gross built-up area, floor-by-floor layout, or a verified building footprint.
The RERA land record gives the same total and net site area, 550.57 sqmts, and states zero area affected by road widening/FTL/nala widening. The permit extraction also records road-affected and nala-affected areas as 0 m2. RERA filing
The supplied records do not establish flats per floor, lift or stair arrangements, internal circulation, entrances/exits, landscaping area, or a detailed residential/common-area distribution. The permit lists a tot-lot area of 0 m2, 3 rainwater-harvesting pits, 25 trees, transformer space, a garbage house and an ETP as plan-related items or requirements; completion of these items is not independently verified.
4. Homes, configurations & floor plans
The TG-RERA unit schedule lists ten 3BHK units, with zero booked and ten available in the supplied portal reading. The availability figures are indicative because no portal as-of date is supplied. The filed saleable area is 76.64 sqm. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 76.64 sqm | Not available: no flat design was measured from the supplied drawings. | Not supplied |
Two drawings are recorded as reviewed, but no flat design was measured for the 3BHK configuration. The supplied floor-plan data therefore does not provide software-measured carpet area or room dimensions. The filed saleable area is a RERA figure and should not be treated as a measured carpet area. Floor plans RERA unit details
5. Parking & vehicle circulation
The GHMC permit states that the stilt approved for parking is to be used exclusively for vehicle parking and not partitioned or misused for another purpose. It does not establish the number of car or two-wheeler spaces, visitor or accessible spaces, a parking layout, ramp or driveway arrangements, EV charging, or unit-wise parking allocation. The supplied RERA data marks the units as mortgaged but does not provide an allocation schedule. RERA unit table
6. Amenities, recreation & open spaces
The RERA amenities record lists 14 items. Each listed item has reported progress of 0%; “available: YES” in that record is not evidence of completed, independently verified provision. The GHMC permit also includes site-specific requirements and items, noted below separately. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | Size not supplied | RERA amenities record | 0%; completion not independently verified |
| Water Supply | RERA record says “YES”; details not supplied | RERA amenities record | 0%; completion not independently verified |
| Sewerage (Chamber, Lines, Septic Tank, STP) | System details not supplied | RERA amenities record | 0%; completion not independently verified |
| Storm Water Drains | Size/details not supplied | RERA amenities record | 0%; completion not independently verified |
| Green Strip / TOT LOT / Park | Permit lists tot-lot area 0 m2 and requires greenery; no completed open-space provision verified | RERA amenities record; GHMC permit | 0% in RERA record; completion not independently verified |
| Street Lighting | Details not supplied | RERA amenities record | 0%; completion not independently verified |
| Community Buildings | Type/size not supplied | RERA amenities record | 0%; completion not independently verified |
| Treatment and Disposal of Sewage and Sullage Water | RERA record says “YES”; details not supplied | RERA amenities record | 0%; completion not independently verified |
| Solid Waste Management and Disposal | RERA record says “YES”; details not supplied | RERA amenities record | 0%; completion not independently verified |
| Water Conservation, Rain Water Harvesting | RERA record says “YES”; permit lists 3 rainwater-harvesting pits | RERA amenities record; GHMC permit | 0% in RERA record; completion not independently verified |
| Energy management | RERA record says “YES”; details not supplied | RERA amenities record | 0%; completion not independently verified |
| Fire Protection and Fire Safety Requirements | Details not supplied | RERA amenities record; GHMC permit | 0%; completion not independently verified |
| Electrical Meter Room, Sub-Station, Receiving Station | RERA record says “YES”; permit lists space for transformer | RERA amenities record; GHMC permit | 0% in RERA record; completion not independently verified |
| Aggregate area of recreational Open Space | Area not supplied | RERA amenities record | 0%; completion not independently verified |
| Trees / perimeter greenery | Permit lists 25 Trees and requires greenery along the periphery and in front of the premises | GHMC permit | Required/listed in permit; planting and maintenance not verified |
| Garbage house | Permit requires a garbage house within the premises | GHMC permit | Required; completion not verified |
| ETP | Permit requires an ETP to standard specification | GHMC permit | Required; completion not verified |
7. Utilities, building services & safety
The RERA amenities record marks water supply, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, and electrical meter room/sub-station/receiving station as “YES”; it reports 0% progress for each listed amenity. The GHMC permit specifies three rainwater-harvesting pits, transformer space, a garbage house and an ETP. These are recorded provisions or requirements, not verified completed facilities. RERA amenities
The permit requires compliance with fire-safety and means-of-escape requirements, and states that an occupancy fire NOC is to be obtained before issue of the occupancy certificate. It also requires services including sanitation, plumbing, fire safety, lifts and electrical installations to be executed under qualified technical supervision. The supplied records do not specify water sources or storage, sewerage capacity, electrical backup, lift count or capacity, CCTV, access control, accessibility arrangements, or completed statutory clearances.
8. Location, access & connectivity
The registered location is Kapra, Kapra mandal, Medchal-Malkajgiri district, Telangana, PIN 500062. The recorded site boundaries identify a ROAD WIDTH 9 on the east and ROAD WIDTH 7 on the north. The GHMC permit refers to 18 mt. road widths in a condition concerning sites abutting such roads; the supplied evidence does not establish that this project abuts an 18-metre road. RERA record RERA filing
The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 6.2 km. No public-transport details or verified distances to schools, hospitals or other local landmarks are supplied. Location record
9. Developer & development status
The registered promoter is SINGAM SATHAIAH AND OTHERS. The RERA record describes the organization type as “Others” and further identifies it as a partnership; a separate corporate identifier and a complete legal-entity profile are not supplied. The registration certificate gives the promoter office location as Kapra, Kapra mandal, Medchal-Malkajgiri district, PIN 500062. RERA record RERA filing
The GHMC permit identifies SAI CHARAN CONSTRUCTIONS as developer/builder, represented by Singam Sathaiah. The project’s registration and promoter identity remain those recorded by TG-RERA; the supplied information does not provide further verified corporate details or official contact information for the developer.
The promoter’s Form B affidavit, dated 6th July, 2021, declares that the project will be completed by 18th January, 2027. The project header separately records a proposed completion date of 18/05/2027. No independently verified construction progress or occupancy/completion certificate is included in the supplied evidence. RERA record Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate records registration P02200003392 for S S LANDING, granted under section 5; valid from 24/09/2021 to 18/01/2027 unless extended. |
| GHMC building permit | Permit No. 2/C1/00548/2021, File No. 2/C1/12989/2020, dated 18 January, 2021, for Building A-1, residential, Survey No. 569part, Kapra Village. |
| Promoter declaration | Form B affidavit by Singam Sathaiah, verified at Kapra on 6th July, 2021; includes the promoter’s title, encumbrance, fund-account and completion declarations. |
| Layout approval record | No layout approval number is disclosed in the supplied RERA record; the filed layout-plan document is not extracted. Document index RERA filing |
| Occupancy/completion certificate | Not present in the supplied documents. The GHMC permit states that completion notice and an occupancy certificate are required before occupation. Document index |
| Other cited permit identifiers | Permit extraction also records LRS/6141/CR-1/EZ/GHMC/2008 and contractor’s all-risk policy No. 61290044190300000021. |
1. Project at a glance
Project identity
Registered project name: S S LANDING
Project type: Residential apartment project
Phase / registered portion: Phase is not separately identified in the TG-RERA record. The registration covers the project at Plot No. 3, Survey No. 569P.
TG-RERA registration: P02200003392
Registration validity: 24/09/2021 to 18/01/2027, unless extended by the Authority; the certificate says the term is five years. This is registration validity, not a completion certificate.
Registered promoter: SINGAM SATHAIAH AND OTHERS
RERA status: The supplied certificate records registration granted under section 5. No extension is recorded in the supplied certificate.
Land and geographic identity
Locality: Kapra
Revenue village: Kapra; the building-permit extraction also uses “Khapra.”
Mandal / district / PIN: Kapra / Medchal-Malkajgiri / 500062
Project survey number(s): 569P in the RERA certificate and project record; the GHMC permit says 569part.
Registered site extent: 550.57 m2 in the building-permit extraction; the RERA land record gives total and net area as 550.57 sqmts.
Boundaries: East: ROAD WIDTH 9; West: PLOT NO 3 EAST PART; North: ROAD WIDTH 7; South: NEIGHBOURS PLOT.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit No. 2/C1/00548/2021, File No. 2/C1/12989/2020, dated 18 January, 2021
Approved built-up area: 1,327.14 m2 approved built-up area in the project record; the permit extraction labels 1,327.14 m2 as residential upper-floor area and separately records 250.36 m2 stilt area.
Buildings: One building / Building A-1 (residential)
Sanctioned configuration: 1 Stilt + 5 upper floors; permit extraction states height 14.75 m.
Parking levels / provision: Stilt is approved for parking under the permit conditions. A sanctioned parking-space count and unit-wise parking allocation are not established in the supplied records.
Units: RERA record: 10 total units, all 3BHK. The land record separately shows one total building unit; the meaning of that field is not clarified in the supplied evidence.
Offering and status
RERA-filed configuration: 3BHK; filed saleable area 76.64 sqm
Booked / available: 0 booked / 10 available, as last read from the TG-RERA portal; the portal record supplied has no as-of date, so these counts are indicative.
Completion undertaking / date: Promoter’s Form B undertaking states completion by 18th January, 2027.
Other completion date in project record: Proposed completion date 18/05/2027.
Construction stage: No independently verified site-progress evidence or construction-stage percentage is supplied. The amenity record reports 0% for its listed items.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied records; the supplied GHMC permit requires completion notice and an occupancy certificate before occupation.
2. The project story
S S LANDING is registered as a residential apartment project in Kapra, Medchal-Malkajgiri district. The registered land record identifies Survey No. 569P; the GHMC building permit identifies the site as Survey No. 569part and sanctions Building A-1 on a 550.57 m2 site. The recorded boundaries identify roads on the east and north sides.
The sanctioned development is one residential building with one stilt and five upper floors. The RERA unit schedule records ten 3BHK units, with zero booked and ten available in the portal snapshot supplied; the booking record has no as-of date. The supplied evidence does not establish the construction stage through an independent site inspection, nor does it include an occupancy/completion certificate. The promoter’s Form B declares a completion undertaking of 18 January 2027; the project record separately gives a proposed completion date of 18/05/2027.
3. Master plan, architecture & building design
The GHMC permit sanctions a single residential building, A-1, on 550.57 m2 of site, with 1 Stilt + 5 upper floors and stated height 14.75 m. The permit records residential upper-floor area of 1,327.14 m2 and stilt area of 250.36 m2. These are permit figures; the supplied evidence does not provide a separate FSI-counted area, gross built-up area, floor-by-floor layout, or a verified building footprint.
The RERA land record gives the same total and net site area, 550.57 sqmts, and states zero area affected by road widening/FTL/nala widening. The permit extraction also records road-affected and nala-affected areas as 0 m2.
The supplied records do not establish flats per floor, lift or stair arrangements, internal circulation, entrances/exits, landscaping area, or a detailed residential/common-area distribution. The permit lists a tot-lot area of 0 m2, 3 rainwater-harvesting pits, 25 trees, transformer space, a garbage house and an ETP as plan-related items or requirements; completion of these items is not independently verified.
4. Homes, configurations & floor plans
The TG-RERA unit schedule lists ten 3BHK units, with zero booked and ten available in the supplied portal reading. The availability figures are indicative because no portal as-of date is supplied. The filed saleable area is 76.64 sqm.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 76.64 sqm | Not available: no flat design was measured from the supplied drawings. | Not supplied |
Two drawings are recorded as reviewed, but no flat design was measured for the 3BHK configuration. The supplied floor-plan data therefore does not provide software-measured carpet area or room dimensions. The filed saleable area is a RERA figure and should not be treated as a measured carpet area.
5. Parking & vehicle circulation
The GHMC permit states that the stilt approved for parking is to be used exclusively for vehicle parking and not partitioned or misused for another purpose. It does not establish the number of car or two-wheeler spaces, visitor or accessible spaces, a parking layout, ramp or driveway arrangements, EV charging, or unit-wise parking allocation. The supplied RERA data marks the units as mortgaged but does not provide an allocation schedule.
6. Amenities, recreation & open spaces
The RERA amenities record lists 14 items. Each listed item has reported progress of 0%; “available: YES” in that record is not evidence of completed, independently verified provision. The GHMC permit also includes site-specific requirements and items, noted below separately.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | Size not supplied | RERA amenities record | 0%; completion not independently verified |
| Water Supply | RERA record says “YES”; details not supplied | RERA amenities record | 0%; completion not independently verified |
| Sewerage (Chamber, Lines, Septic Tank, STP) | System details not supplied | RERA amenities record | 0%; completion not independently verified |
| Storm Water Drains | Size/details not supplied | RERA amenities record | 0%; completion not independently verified |
| Green Strip / TOT LOT / Park | Permit lists tot-lot area 0 m2 and requires greenery; no completed open-space provision verified | RERA amenities record; GHMC permit | 0% in RERA record; completion not independently verified |
| Street Lighting | Details not supplied | RERA amenities record | 0%; completion not independently verified |
| Community Buildings | Type/size not supplied | RERA amenities record | 0%; completion not independently verified |
| Treatment and Disposal of Sewage and Sullage Water | RERA record says “YES”; details not supplied | RERA amenities record | 0%; completion not independently verified |
| Solid Waste Management and Disposal | RERA record says “YES”; details not supplied | RERA amenities record | 0%; completion not independently verified |
| Water Conservation, Rain Water Harvesting | RERA record says “YES”; permit lists 3 rainwater-harvesting pits | RERA amenities record; GHMC permit | 0% in RERA record; completion not independently verified |
| Energy management | RERA record says “YES”; details not supplied | RERA amenities record | 0%; completion not independently verified |
| Fire Protection and Fire Safety Requirements | Details not supplied | RERA amenities record; GHMC permit | 0%; completion not independently verified |
| Electrical Meter Room, Sub-Station, Receiving Station | RERA record says “YES”; permit lists space for transformer | RERA amenities record; GHMC permit | 0% in RERA record; completion not independently verified |
| Aggregate area of recreational Open Space | Area not supplied | RERA amenities record | 0%; completion not independently verified |
| Trees / perimeter greenery | Permit lists 25 Trees and requires greenery along the periphery and in front of the premises | GHMC permit | Required/listed in permit; planting and maintenance not verified |
| Garbage house | Permit requires a garbage house within the premises | GHMC permit | Required; completion not verified |
| ETP | Permit requires an ETP to standard specification | GHMC permit | Required; completion not verified |
7. Utilities, building services & safety
The RERA amenities record marks water supply, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, and electrical meter room/sub-station/receiving station as “YES”; it reports 0% progress for each listed amenity. The GHMC permit specifies three rainwater-harvesting pits, transformer space, a garbage house and an ETP. These are recorded provisions or requirements, not verified completed facilities.
The permit requires compliance with fire-safety and means-of-escape requirements, and states that an occupancy fire NOC is to be obtained before issue of the occupancy certificate. It also requires services including sanitation, plumbing, fire safety, lifts and electrical installations to be executed under qualified technical supervision. The supplied records do not specify water sources or storage, sewerage capacity, electrical backup, lift count or capacity, CCTV, access control, accessibility arrangements, or completed statutory clearances.
8. Location, access & connectivity
The registered location is Kapra, Kapra mandal, Medchal-Malkajgiri district, Telangana, PIN 500062. The recorded site boundaries identify a ROAD WIDTH 9 on the east and ROAD WIDTH 7 on the north. The GHMC permit refers to 18 mt. road widths in a condition concerning sites abutting such roads; the supplied evidence does not establish that this project abuts an 18-metre road.
The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 6.2 km. No public-transport details or verified distances to schools, hospitals or other local landmarks are supplied.
9. Developer & development status
The registered promoter is SINGAM SATHAIAH AND OTHERS. The RERA record describes the organization type as “Others” and further identifies it as a partnership; a separate corporate identifier and a complete legal-entity profile are not supplied. The registration certificate gives the promoter office location as Kapra, Kapra mandal, Medchal-Malkajgiri district, PIN 500062.
The GHMC permit identifies SAI CHARAN CONSTRUCTIONS as developer/builder, represented by Singam Sathaiah. The project’s registration and promoter identity remain those recorded by TG-RERA; the supplied information does not provide further verified corporate details or official contact information for the developer.
The promoter’s Form B affidavit, dated 6th July, 2021, declares that the project will be completed by 18th January, 2027. The project header separately records a proposed completion date of 18/05/2027. No independently verified construction progress or occupancy/completion certificate is included in the supplied evidence.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate records registration P02200003392 for S S LANDING, granted under section 5; valid from 24/09/2021 to 18/01/2027 unless extended.
GHMC building permit: Permit No. 2/C1/00548/2021, File No. 2/C1/12989/2020, dated 18 January, 2021, for Building A-1, residential, Survey No. 569part, Kapra Village.
Promoter declaration: Form B affidavit by Singam Sathaiah, verified at Kapra on 6th July, 2021; includes the promoter’s title, encumbrance, fund-account and completion declarations.
Layout approval record: No layout approval number is disclosed in the supplied RERA record; the filed layout-plan document is not extracted.
Occupancy/completion certificate: Not present in the supplied documents. The GHMC permit states that completion notice and an occupancy certificate are required before occupation.
Other cited permit identifiers: Permit extraction also records LRS/6141/CR-1/EZ/GHMC/2008 and contractor’s all-risk policy No. 61290044190300000021.
Frequently asked questions
Is S S LANDING registered with Telangana RERA?
Yes. S S LANDING is registered with the Telangana Real Estate Regulatory Authority as P02200003392; the registration status is New Project.
Who is the developer of S S LANDING?
The promoter named in the RERA registration is SINGAM SATHAIAH AND OTHERS.
Where is S S LANDING located?
S S LANDING is in KAPRA, Medchal-Malkajgiri, Telangana (500062).
When will S S LANDING be completed?
The promoter's proposed date of completion filed with RERA is 18/05/2027. This is the promoter's declaration, not a guarantee.