BRINDAVANAM is a residential apartment project in Hyder Nagar (Circle 14A), Balanagar, Medchal-Malkajgiri. The registered promoter is DHANU CONSTRUCTIONS PRIVATE LIMITED. The project is on 681.44 sq. m and comprises one building, Building A, with 1 stilt + 5 upper floors and 15 apartments: 5 × 2BHK and 10 × 3BHK. Its TG-RERA registration is P02200001387, and its proposed completion date is 11/02/2025.

More from Dhanu Constructions Pvt Ltd · 2 projects →

01What we found

Period endedTG-RERA registration ran to 11 Feb 2025 - check its extension on TG-RERA
8documents on file - each fact links to its page
0court cases on this project's land in the court records searched
5items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

5 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered nameBRINDAVANAM RERA record
Project typeResidential apartment project RERA record
Phase / registered portionA single proposed building, identified as Building A; no separate phase name is disclosed.
TG-RERA registrationP02200001387 RERA record
Registration validity13 November 2019 to 11 February 2025; the certificate states five years’ validity unless extended. Registration validity is separate from the construction-completion deadline.
Registered promoterDHANU CONSTRUCTIONS PRIVATE LIMITED, a company. RERA record Corporate record
RERA status in supplied recordThe registration certificate gives the validity dates above; no extension is recorded in the supplied certificate. The portal record was captured on 30 September 2026. Approvals record

Land and geographic identity

ItemProject record
Locality / revenue villageHyder Nagar (Circle 14A); the supplied records use this as the village/locality label. A separate revenue-village name is not disclosed. RERA record
Mandal / district / PINBalanagar / Medchal-Malkajgiri / 500072. RERA record
Survey number and subdivisionSurvey No. 163 PART; also rendered as Survey No. 163Part in the title records. Land records
Registered site extent681.44 sq. m (also recorded as 681.44 SQ.MT.). Land records
Total and net areaBoth are recorded as 681.44 sq. m; the building-permit record also gives road-affected area as 0.
Boundaries in RERA recordEast: ROAD WIDTH 12; West: NEIGHBOURS LAND; North: ROAD WIDTH 9; South: SOCIETY LAND. Land records

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC).
Principal building approvalApproval No. 2/C23/00796/2019, dated 11-01-2019; application/file No. 2/C23/20435/2018. Approvals record
Building count and approved configurationOne proposed residential apartment building, Building A: 1 stilt + 5 upper floors.
Approved area figuresGHMC plan extracts separately record Total Built Up Area: 2005.38 Sq.mt., Proposed Net Built up Area: 1648.65 Sq.mt., and Total Net Built up Area: 1672.61 Sq.mt. These are document-reported area categories and are not interchangeable.
Height14.99 MT excluding Stilt Floor; Total height: 19.89 mt.
Parking shown in extracted approval parametersProposed Number of Parkings 0 in the extracted parameter list. The same plan conditions state that approved cellar and stilt areas are for parking; no parking count is established by the supplied record.
Approved / RERA-filed homes15 dwelling units in the GHMC plan and RERA project record. RERA unit table

Offering and status

ItemProject record
RERA-filed configurations5 × 2BHK and 10 × 3BHK. RERA unit table
RERA-filed saleable areas2BHK: 104.52 sq. m; 3BHK: 143.99 sq. m. RERA unit table
Booked / availablePortal-read counts show 0 booked and 5 available 2BHKs; 0 booked and 10 available 3BHKs. The portal data has no as-of date, so counts are indicative. RERA unit table
Construction stageNo construction-progress percentage or independently verified site-status evidence is supplied. RERA amenities
Completion datesThe RERA record gives proposed completion 11/02/2025; the GHMC permit extract says construction was to be completed before 11 January 2025. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied documents; status is not established by this record. Document index

2. The project story

BRINDAVANAM is recorded with TG-RERA as a residential apartment project on Survey No. 163 PART in Hyder Nagar (Circle 14A), Balanagar, Medchal-Malkajgiri. The project record describes one building, Building A, comprising a stilt level and five upper floors, with 15 apartments. The GHMC building-permit material identifies the same survey number, site extent of 681.44 sq. m, and sanctioned apartment count. RERA record Land records

The RERA filing lists five 2BHK and ten 3BHK apartments. Its portal-derived booking counts indicate all 15 as available, but no as-of date is provided. The supplied evidence does not establish the present physical construction stage, completion of any tower or facility, or issuance of an occupancy certificate. The recorded RERA completion date and the completion deadline printed in the GHMC permit are stated separately above. RERA unit table

3. Master plan, architecture & building design

The approved building-plan extracts describe a single residential building, Building A, on a 681.44 sq. m site, configured as 1 stilt + 5 upper floors. The permit extract records a building height of 14.99 MT excluding Stilt Floor and total height of 19.89 mt. It also reports Proposed Coverage Area (52.35%), Vacant Plot Area 322.85, and AccessoryUse Area 1.86; the supplied extract does not state units alongside those two latter figures.

The approval materials contain several distinct built-up-area entries: Total Built Up Area: 2005.38 Sq.mt., Residential Net BUA 1648.65, Proposed Net Built up Area: 1648.65 Sq.mt., and Total Net Built up Area: 1672.61 Sq.mt. The extracts do not reconcile these categories, so each is reported as recorded rather than treated as equivalent.

The drawing-derived record indicates typical floor plans for floors 2–5, but the supplied material does not establish a complete architectural schedule for lifts, stairs, number of homes per floor, entrances, internal circulation or common-area distribution. The approval extracts mention a green strip, percolation pit, transformer and septic tank; a GHMC condition also calls for a tot-lot to be fenced and maintained as greenery before occupancy certification. These are approval-record features or conditions, not evidence that they have been completed.

4. Homes, configurations & floor plans

RERA-filed unit counts and saleable areas are set out below. Carpet-area figures are software-measured from the approved floor-plan drawings, not RERA-filed measurements; the supplied measurement record says they need review and are smaller than saleable area, which includes the home’s share of common areas. Balcony area is excluded from the measured carpet area where identified. RERA unit table Floor plans RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK505104.52 sq. m63.7–64.5 sq. m; median 64.1 sq. m39%
3BHK10010143.99 sq. m88.9–101.9 sq. m; median 96.4 sq. m33%

The measured 2BHK drawing example includes a living/kitchen, wash area, two bedrooms and two toilets, plus a balcony excluded from carpet. The measured 3BHK example includes living, kitchen, dining, wash area, three bedrooms and three toilets, plus a balcony excluded from carpet. Room dimensions are drawing-software measurements, not RERA disclosures. The 3BHK measurement record flags four measured designs as needing review. RERA unit details Floor plans

5. Parking & vehicle circulation

The extracted GHMC approval parameters state Proposed Number of Parkings 0. Separately, the plan conditions say that cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not converted or misused. The supplied documents do not provide a verified number of parking spaces, distinguish resident from visitor or accessible spaces, or establish parking allocations to individual apartments. A drawn or described parking area does not by itself establish exclusive ownership or allocation.

The plan conditions also specify one entry and one exit, each with a minimum width of 4.5mts. and height clearance of 5mts. The supplied evidence does not describe a ramp, internal driveway arrangement, pedestrian separation, mechanical parking or EV charging provision.

6. Amenities, recreation & open spaces

The RERA amenity record lists 14 categories, but reports 0% progress for each. The approval material also identifies certain site features and utilities. No supplied evidence independently verifies completion or operation of these facilities. RERA amenities

Internal roads & footpaths
Description / sizeListed; no size or specification supplied
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified status0%; completion not independently verified
Green strip / tot-lot / park
Description / sizeGreen strip and periphery greenery are referenced; plan condition calls for a fenced tot-lot maintained as greenery. No area is established.
Evidence sourceRERA amenity record RERA amenities; GHMC plan
Declared progress / verified status0% in amenity record; completion not independently verified
Community buildings
Description / sizeListed; no facility description or size supplied
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified status0%; completion not independently verified
Water supply
Description / sizeListed as “YES”; no source, capacity or operating details supplied
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified status0%; completion not independently verified
Sewerage / septic tank / STP category
Description / sizeSewerage category listed; approval extract identifies a septic tank. No STP capacity or treatment details supplied.
Evidence sourceRERA amenity record RERA amenities; GHMC plan
Declared progress / verified status0%; completion not independently verified
Storm-water drains
Description / sizeListed as “YES”; no design details supplied
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified status0%; completion not independently verified
Rainwater harvesting / water conservation
Description / sizeListed as “YES”; plan refers to a rainwater-harvesting structure/percolation pit.
Evidence sourceRERA amenity record RERA amenities; GHMC plan
Declared progress / verified status0% in amenity record; completion not independently verified
Street lighting
Description / sizeListed; no details supplied
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified status0%; completion not independently verified
Solid-waste management and disposal
Description / sizeListed; GHMC plan refers to a garbage house.
Evidence sourceRERA amenity record RERA amenities; GHMC plan
Declared progress / verified status0%; completion not independently verified
Aggregate recreational open space
Description / sizeListed; no area supplied
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified status0%; completion not independently verified

7. Utilities, building services & safety

The RERA amenity record lists water supply, storm-water drains and rainwater harvesting as “YES,” while assigning 0% progress to the listed amenity categories. The plan extracts mention a rainwater-harvesting structure/percolation pit, transformer and septic tank. No source or capacity for water supply, storage, treatment, sewerage treatment, reuse or storm-water infrastructure is established by the supplied records. RERA amenities

The GHMC plan conditions call for a generator as an alternate electricity source, emergency lighting in corridors/common passages and staircases, fire-resistant swing doors for collapsible lifts, and fire-protection equipment and systems. They also specify separate underground and terrace water-storage tanks of 25,000 lits. capacity each, hose reel/down corner, and automatic sprinklers if basement area exceeds 200 sq. m. These are plan conditions; the evidence does not establish installation, capacity in operation, inspection or statutory clearance.

Vertical-transport equipment and accessibility features are not described in the supplied project evidence. The plan requires sanitation, plumbing, fire safety, lifts and electrical installations to be executed under qualified technical supervision, and specifies a safe distance from high-tension and low-tension electrical lines.

8. Location, access & connectivity

The registered project location is Hyder Nagar (Circle 14A), Balanagar mandal, Medchal-Malkajgiri district, PIN 500072. The RERA land record identifies road boundaries to the east (ROAD WIDTH 12) and north (ROAD WIDTH 9). The GHMC permit extracts also refer to road widths of 9.00, 12 and 18 mt.; the supplied material does not establish which frontage corresponds to each width. RERA record Land records

The supplied location data provides mapped distances to selected nearby points: ADP 0.0 km, IndusInd Bank 0.4 km, Nanakramguda Government Primary School 0.5 km, an unnamed bus station 2.2 km, and Financial District (Nanakramguda) 1.2 km. These are location-dataset distances, not travel-time measurements. The additional vendor connectivity list is not used here as a project-recorded location claim. Location record

9. Developer & development status

The registered promoter is DHANU CONSTRUCTIONS PRIVATE LIMITED, recorded as a company. Its project filing names HAJARATH PRASAD AVULA as authorized signatory. The supplied evidence does not include an official promoter website or contact details. Corporate record Parties record

The RERA certificate records validity through 11 February 2025 unless extended, while the project record gives proposed completion as 11 February 2025. The GHMC permit extract separately states a construction-completion deadline before 11 January 2025. No extension order, project construction-progress certificate, or occupancy/completion certificate is included in the supplied materials; actual progress and current completion status are therefore not established here. RERA record Document index

10. Approvals, official records & documents

TG-RERA registration certificate
DetailsForm C; BRINDAVANAM; registration P02200001387; issued 13/11/2019; validity stated through 11/02/2025 unless extended.
GHMC building permit order
DetailsApproval 2/C23/00796/2019, dated 11 January 2019; file 2/C23/20435/2018; Survey No. 163 PART; Building A, 1 stilt + 5 upper floors.
GHMC building-plan extracts
DetailsBuilding permission for plots 88, 89 and 90, Survey No. 163 PART; 15 dwelling units; site extent 681.44 sq. m; approval 2/C23/00796/2019.
Title report filed with RERA
DetailsAdvocate K. Lakshmi’s title investigation report dated 11-10-2019 for plots 88, 89 and 90 in Survey No. 163Part; it records the title-chain material and GHMC mortgage area.
Form B promoter declaration
DetailsPromoter-filed declaration dated 30 September 2019, including declarations concerning title, encumbrances, project funds and completion.
Occupancy / completion certificate
DetailsNot present in the supplied document set; status not established by this evidence.
SourceDocument index

Frequently asked questions

Is BRINDAVANAM registered with Telangana RERA?

Yes. BRINDAVANAM is registered with the Telangana Real Estate Regulatory Authority as P02200001387; the registration status is New Project.

Who is the developer of BRINDAVANAM?

The promoter named in the RERA registration is DHANU CONSTRUCTIONS PRIVATE LIMITED.

Where is BRINDAVANAM located?

BRINDAVANAM is in Hyder Nagar (Circle 14A), Balanagar, Medchal-Malkajgiri, Telangana (500072).

When will BRINDAVANAM be completed?

The promoter's proposed date of completion filed with RERA is 11/02/2025. This is the promoter's declaration, not a guarantee.

More projects in Balanagar