Maple Crown
NVR INFRA PROJECTS · Medchal-Malkajgiri · RERA P02200002055
MAPLE CROWN is a residential apartment project in Arun Nagar, Kapra mandal, Medchal-Malkajgiri district, developed by registered promoter NVR INFRA PROJECTS, partnership. The project site is 742.81 sq. m and comprises one residential building, Stilt + 5, with 15 apartments: 10 2BHK units with saleable area 83.64 sq. m each and 5 3BHK units with saleable area 108.55 sq. m each. It is registered with TG-RERA under P02200002055, and the promoter’s stated completion date is 09 March 2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name and type | MAPLE CROWN; residential apartment project. RERA record RERA filing |
| Registered portion / phase | One building is recorded; no phase name or separate phase description is disclosed. RERA filing |
| TG-RERA registration | P02200002055; Form C issued 24/08/2020; stated validity from 24/08/2020 to 09/03/2024. The certificate records no extension. Registration validity is distinct from the completion undertaking and from occupancy certification. Approvals record |
| Registered promoter | NVR INFRA PROJECTS, partnership. RERA filing Corporate record |
| RERA project status | The supplied record labels the project “New Project.” It does not provide a current construction-stage assessment. RERA filing |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Locality Arun Nagar; revenue village Kapra. RERA record RERA filing |
| Mandal / district / PIN | Kapra mandal; Medchal-Malkajgiri district; 500062. RERA record RERA filing |
| Project survey numbers | 366, 367, 368, 390, 391, 392, 396, 397, 398, 399. No project-specific subdivisions are disclosed in the registration identity. RERA record RERA filing |
| Registered plot / site extent | Plot 142; 742.81 sq. m total and net area; road-affected area recorded as 0.00 sq. m. RERA filing |
| Boundaries | East: road width 12 mts; west: other land; north: other land; south: other park. RERA filing |
| Cadastral record | A Bhu Bharati GIS record is supplied for survey 366 as a whole survey, with extent 6,959.62 sq. m; this is a survey-level record, not the registered project-site extent. Cadastral map |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building approval | Building Permit Order 2/C1/04239/2018, file 2/EZ/14727/2017, dated 09 March 2018. Approvals record |
| Building / floors | One residential building, Stilt + 5; sanctioned height 15 m. |
| Approved area figures | Sanctioned parameters state area 2,034.30 m², parking floors area 327.18 m², site area 742.81 m², and net area 742.81 m². The project information fields separately record approved built-up area 2,372.04 sq. m; these are reported as separately labelled filed figures, not treated as interchangeable. RERA filing |
| Sanctioned / RERA-declared units | GHMC order conditions refer to the sanctioned number of units but the supplied extraction does not state that count. TG-RERA records 15 units: one building and one proposed building unit as entered in the land details. RERA filing RERA unit table |
| Parking / site provisions | GHMC records the cellar and stilt approved for parking, and lists a tot-lot, transformer space, garbage house and rainwater-harvesting structure. The supplied material does not state a parking-space count. |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configurations | 2BHK: 10 units, saleable area 83.64 sq. m each; 3BHK: 5 units, saleable area 108.55 sq. m each. RERA unit table |
| Booked / available | Portal figures read as 0 booked / 10 available for 2BHK and 0 booked / 5 available for 3BHK. The portal record has no as-of date, so these counts are indicative. RERA unit table |
| Completion deadline | Promoter’s Form B declaration states 09 March 2024 as the project completion date; the RERA registration certificate also ends on that date. |
| Construction stage | No construction progress percentage or dated, independently verified site-status report is supplied. RERA amenity progress entries are recorded as 0%; they do not establish the overall construction stage. RERA amenities |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is included in the supplied project evidence. The GHMC permit says an Occupancy Certificate is compulsory before occupation. |
2. The project story
MAPLE CROWN is a single-building residential apartment project registered with TG-RERA for Plot 142 in Kapra village, Kapra mandal, Medchal-Malkajgiri district. The registered project site is 742.81 sq. m and is identified across survey numbers 366, 367, 368, 390, 391, 392, 396, 397, 398 and 399. RERA record RERA filing
The GHMC building permit describes one residential building as Stilt + 5, with a sanctioned height of 15 m. TG-RERA records 15 apartments: ten 2BHK and five 3BHK. The supplied evidence does not establish the present construction stage or verify that any part is complete. The Form B completion date and the registration certificate’s validity end date are both 09 March 2024; neither is evidence that construction was completed or that an occupancy certificate was issued. RERA unit table
3. Master plan, architecture & building design
The GHMC order sanctions a single residential building on a 742.81 m² site, with Stilt + 5 floors and a stated height of 15 m. Its sanctioned parameters list 2,034.30 m² as “Area” and 327.18 m² as “Parking floors Area.” The project information fields separately report 2,372.04 sq. m as approved built-up area; the supplied extracts do not explain the relationship between these area labels. RERA filing
The permit lists setbacks of Front 3.18 m; Rear 3.5 m; Side I 4.5 m; Side II 2.53 m. It records a 252.19 m² tot-lot and 35 Trees. No extracted drawing details establish the building footprint, apartment count per floor, lift or stair configuration, internal circulation, or residential/common-area distribution.
The permit identifies cellar and stilt areas for parking, but the supplied extraction does not specify the number of parking bays or give floor-by-floor parking layouts. The GHMC conditions also identify a space for a transformer and require the tot-lot to be fenced and maintained as greenery before issue of the occupancy certificate.
4. Homes, configurations & floor plans
The following table presents TG-RERA unit counts, booking figures and saleable areas. The separately identified carpet-area estimates come from software measurement of the approved floor-plan drawing geometry; they are not RERA-filed carpet areas and are subject to drawing review. RERA unit table Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 83.64 sq. m | 62.4–77.8 sq. m; median 69.9 sq. m | 16% |
| 3BHK | 5 | 0 | 5 | 108.55 sq. m | 77.6 sq. m | 28% |
Drawing measurements cover six 2BHK designs and one 3BHK design. A measured 2BHK plan shows a hall, dining area, kitchen, two bedrooms and an attached toilet; the utility is excluded from the measured carpet area. The measured 3BHK plan shows a hall, dining area, kitchen, two bedrooms, attached toilets and a utility; the utility is excluded from the measured carpet area. Dimensions vary by room and plan; these are drawing measurements, not a guarantee of a particular buyer’s unit layout. RERA unit details Floor plans
Carpet area is the software-measured internal area described above; saleable area is the RERA-filed area and may include the home’s share of common areas. They are distinct measures and should not be substituted for one another. The supplied record does not provide a unit-specific balcony schedule or a complete allocation of common-area loading. Floor plans RERA unit details RERA unit table
5. Parking & vehicle circulation
The GHMC permit identifies the cellar and stilt as parking areas and states that they are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The sanctioned parameters record 327.18 m² as parking floors area.
The supplied evidence does not state the number of car or two-wheeler spaces, visitor or accessible parking provision, ramp arrangement, EV charging, or a unit-wise parking allocation. A sanctioned parking area alone does not establish an exclusive parking entitlement for a particular apartment.
6. Amenities, recreation & open spaces
The GHMC permit identifies site provisions including a tot-lot, transformer space, garbage house and rainwater-harvesting structure. The RERA amenity record lists the facilities below and records 0% progress for each listed item; this is a portal entry, not independent verification of site delivery. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Sanctioned tot-lot 252.19 m²; permit also records 35 Trees and requires the tot-lot to be fenced and maintained as greenery before occupancy certification. | RERA amenities | RERA progress 0%; completion not independently verified. |
| Internal roads and footpaths | Listed; no dimensions supplied. | RERA amenities | RERA progress 0%. |
| Community buildings | Listed; no size or facility detail supplied. | RERA amenities | RERA progress 0%. |
| Water supply | Listed as available “YES”; no source, capacity or delivery details supplied. | RERA amenities | RERA progress 0%; operating status not independently verified. |
| Sewerage and sewage/sullage treatment and disposal | Listed; no system capacity or treatment details supplied. | RERA amenities | RERA progress 0%. |
| Storm-water drains | Listed; no design or capacity supplied. | RERA amenities | RERA progress 0%. |
| Rainwater harvesting / water conservation | Listed as available “YES”; GHMC permit specifies a rainwater-harvesting structure (percolation pit). | RERA amenities | RERA progress 0%; completion not independently verified. |
| Street lighting | Listed; no specifications supplied. | RERA amenities | RERA progress 0%. |
| Solid-waste management and disposal | Listed; GHMC permit also identifies a garbage house. | RERA amenities | RERA progress 0%. |
| Energy management | Listed; no system details supplied. | RERA amenities | RERA progress 0%. |
| Fire protection and fire-safety requirements | Listed; no system or equipment details supplied. | RERA amenities | RERA progress 0%. |
| Electrical meter room / substation / receiving station | Listed; GHMC permit separately requires space for a transformer. | RERA amenities | RERA progress 0%. |
| Aggregate recreational open space | Listed; no area supplied in the amenity record. | RERA amenities | RERA progress 0%. |
No clubhouse or indoor recreation schedule, sports facilities, or stated facility capacities are supplied in the reviewed records. RERA amenities
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage, sewage and sullage treatment/disposal, storm-water drains, rainwater harvesting, solid-waste management, energy management, fire protection and electrical facilities. It does not state capacities, connection sources, equipment specifications, or whether these systems are operational. RERA amenities
The GHMC permit specifies a rainwater-harvesting structure (percolation pit), a garbage house and transformer space. It also requires that the sanctioned plan be followed, that construction workers’ safety be ensured, and that an Occupancy Certificate be obtained before occupation. The supplied documents do not give lift or service-lift details, backup-power provision, fire-system specifications, accessibility arrangements, or a verified safety/compliance inspection.
8. Location, access & connectivity
The registered location is Arun Nagar, Kapra, in Kapra mandal, Medchal-Malkajgiri district, Telangana, PIN 500062. The supplied geocode describes the location as Saket Road, Arun Nagar, Kapra. RERA record RERA filing Location record
The project boundary description records a 12 mts road to the east. The available connectivity record gives the nearest sampled Outer Ring Road interchange at approximately 5.7 km; no travel time or public-transport detail is supplied. RERA filing Location record
9. Developer & development status
The registered promoter is NVR INFRA PROJECTS, recorded as a partnership. The filed partnership deed identifies Gurrala Nageshwar Reddy, Kanukula Venkat Reddy, Gurrala Shoba Rani and Kanukula Veena Reddy as partners; the RERA record identifies Gurrala Nageshwar Reddy as authorized signatory. Corporate record Parties record
The promoter’s Form B affidavit declares a completion date of 09 March 2024 and includes declarations concerning project funds, approvals and land. These are promoter declarations, not independent findings of completion or construction progress. No current progress percentage, revised completion date, or occupancy/completion certificate is supplied. Document index Approvals record
10. Approvals, official records & documents
| Identifier / date | P02200002055, Form C; issued 24/08/2020 |
|---|---|
| What the supplied record establishes | Registers MAPLE CROWN under section 5 for the stated period ending 09/03/2024; certificate records no extension. |
| Identifier / date | Approval 2/C1/04239/2018; file 2/EZ/14727/2017; dated 09 March 2018 |
|---|---|
| What the supplied record establishes | Building Permit Order for one Stilt + 5 residential building at Kapra; includes conditions and sanctioned parameters. |
| Identifier / date | 40615/08/05/2013/3052 |
|---|---|
| What the supplied record establishes | Reference appears in the GHMC permit extraction; an approved layout plan or separate layout approval document is not included in the supplied evidence. |
| Identifier / date | Verified at Hyderabad, 19 November 2019 (date text is partly garbled in the extraction) |
|---|---|
| What the supplied record establishes | Promoter declaration for MAPLE CROWN, including the stated completion undertaking. |
| Identifier / date | Document 88322 |
|---|---|
| What the supplied record establishes | Floor-plan source used for software measurements; the supplied document record identifies it as a floor-plan approval-related upload, but the extraction does not provide a complete drawing set. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No certificate is included in the reviewed project documents. The GHMC order requires an Occupancy Certificate before occupation. |
The supplied material does not include a complete extracted layout-plan set, or a current independent construction-status record.
1. Project at a glance
Project identity
Registered name and type: MAPLE CROWN; residential apartment project.
Registered portion / phase: One building is recorded; no phase name or separate phase description is disclosed.
TG-RERA registration: P02200002055; Form C issued 24/08/2020; stated validity from 24/08/2020 to 09/03/2024. The certificate records no extension. Registration validity is distinct from the completion undertaking and from occupancy certification.
Registered promoter: NVR INFRA PROJECTS, partnership.
RERA project status: The supplied record labels the project “New Project.” It does not provide a current construction-stage assessment.
Land and geographic identity
Locality / revenue village: Locality Arun Nagar; revenue village Kapra.
Mandal / district / PIN: Kapra mandal; Medchal-Malkajgiri district; 500062.
Project survey numbers: 366, 367, 368, 390, 391, 392, 396, 397, 398, 399. No project-specific subdivisions are disclosed in the registration identity.
Registered plot / site extent: Plot 142; 742.81 sq. m total and net area; road-affected area recorded as 0.00 sq. m.
Boundaries: East: road width 12 mts; west: other land; north: other land; south: other park.
Cadastral record: A Bhu Bharati GIS record is supplied for survey 366 as a whole survey, with extent 6,959.62 sq. m; this is a survey-level record, not the registered project-site extent.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building approval: Building Permit Order 2/C1/04239/2018, file 2/EZ/14727/2017, dated 09 March 2018.
Building / floors: One residential building, Stilt + 5; sanctioned height 15 m.
Approved area figures: Sanctioned parameters state area 2,034.30 m², parking floors area 327.18 m², site area 742.81 m², and net area 742.81 m². The project information fields separately record approved built-up area 2,372.04 sq. m; these are reported as separately labelled filed figures, not treated as interchangeable.
Sanctioned / RERA-declared units: GHMC order conditions refer to the sanctioned number of units but the supplied extraction does not state that count. TG-RERA records 15 units: one building and one proposed building unit as entered in the land details.
Parking / site provisions: GHMC records the cellar and stilt approved for parking, and lists a tot-lot, transformer space, garbage house and rainwater-harvesting structure. The supplied material does not state a parking-space count.
Offering and status
RERA-filed configurations: 2BHK: 10 units, saleable area 83.64 sq. m each; 3BHK: 5 units, saleable area 108.55 sq. m each.
Booked / available: Portal figures read as 0 booked / 10 available for 2BHK and 0 booked / 5 available for 3BHK. The portal record has no as-of date, so these counts are indicative.
Completion deadline: Promoter’s Form B declaration states 09 March 2024 as the project completion date; the RERA registration certificate also ends on that date.
Construction stage: No construction progress percentage or dated, independently verified site-status report is supplied. RERA amenity progress entries are recorded as 0%; they do not establish the overall construction stage.
Occupancy / completion certificate: No occupancy certificate or completion certificate is included in the supplied project evidence. The GHMC permit says an Occupancy Certificate is compulsory before occupation.
2. The project story
MAPLE CROWN is a single-building residential apartment project registered with TG-RERA for Plot 142 in Kapra village, Kapra mandal, Medchal-Malkajgiri district. The registered project site is 742.81 sq. m and is identified across survey numbers 366, 367, 368, 390, 391, 392, 396, 397, 398 and 399.
The GHMC building permit describes one residential building as Stilt + 5, with a sanctioned height of 15 m. TG-RERA records 15 apartments: ten 2BHK and five 3BHK. The supplied evidence does not establish the present construction stage or verify that any part is complete. The Form B completion date and the registration certificate’s validity end date are both 09 March 2024; neither is evidence that construction was completed or that an occupancy certificate was issued.
3. Master plan, architecture & building design
The GHMC order sanctions a single residential building on a 742.81 m² site, with Stilt + 5 floors and a stated height of 15 m. Its sanctioned parameters list 2,034.30 m² as “Area” and 327.18 m² as “Parking floors Area.” The project information fields separately report 2,372.04 sq. m as approved built-up area; the supplied extracts do not explain the relationship between these area labels.
The permit lists setbacks of Front 3.18 m; Rear 3.5 m; Side I 4.5 m; Side II 2.53 m. It records a 252.19 m² tot-lot and 35 Trees. No extracted drawing details establish the building footprint, apartment count per floor, lift or stair configuration, internal circulation, or residential/common-area distribution.
The permit identifies cellar and stilt areas for parking, but the supplied extraction does not specify the number of parking bays or give floor-by-floor parking layouts. The GHMC conditions also identify a space for a transformer and require the tot-lot to be fenced and maintained as greenery before issue of the occupancy certificate.
4. Homes, configurations & floor plans
The following table presents TG-RERA unit counts, booking figures and saleable areas. The separately identified carpet-area estimates come from software measurement of the approved floor-plan drawing geometry; they are not RERA-filed carpet areas and are subject to drawing review.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 83.64 sq. m | 62.4–77.8 sq. m; median 69.9 sq. m | 16% |
| 3BHK | 5 | 0 | 5 | 108.55 sq. m | 77.6 sq. m | 28% |
Drawing measurements cover six 2BHK designs and one 3BHK design. A measured 2BHK plan shows a hall, dining area, kitchen, two bedrooms and an attached toilet; the utility is excluded from the measured carpet area. The measured 3BHK plan shows a hall, dining area, kitchen, two bedrooms, attached toilets and a utility; the utility is excluded from the measured carpet area. Dimensions vary by room and plan; these are drawing measurements, not a guarantee of a particular buyer’s unit layout.
Carpet area is the software-measured internal area described above; saleable area is the RERA-filed area and may include the home’s share of common areas. They are distinct measures and should not be substituted for one another. The supplied record does not provide a unit-specific balcony schedule or a complete allocation of common-area loading.
5. Parking & vehicle circulation
The GHMC permit identifies the cellar and stilt as parking areas and states that they are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The sanctioned parameters record 327.18 m² as parking floors area.
The supplied evidence does not state the number of car or two-wheeler spaces, visitor or accessible parking provision, ramp arrangement, EV charging, or a unit-wise parking allocation. A sanctioned parking area alone does not establish an exclusive parking entitlement for a particular apartment.
6. Amenities, recreation & open spaces
The GHMC permit identifies site provisions including a tot-lot, transformer space, garbage house and rainwater-harvesting structure. The RERA amenity record lists the facilities below and records 0% progress for each listed item; this is a portal entry, not independent verification of site delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Sanctioned tot-lot 252.19 m²; permit also records 35 Trees and requires the tot-lot to be fenced and maintained as greenery before occupancy certification. | RERA progress 0%; completion not independently verified. | |
| Internal roads and footpaths | Listed; no dimensions supplied. | RERA progress 0%. | |
| Community buildings | Listed; no size or facility detail supplied. | RERA progress 0%. | |
| Water supply | Listed as available “YES”; no source, capacity or delivery details supplied. | RERA progress 0%; operating status not independently verified. | |
| Sewerage and sewage/sullage treatment and disposal | Listed; no system capacity or treatment details supplied. | RERA progress 0%. | |
| Storm-water drains | Listed; no design or capacity supplied. | RERA progress 0%. | |
| Rainwater harvesting / water conservation | Listed as available “YES”; GHMC permit specifies a rainwater-harvesting structure (percolation pit). | RERA progress 0%; completion not independently verified. | |
| Street lighting | Listed; no specifications supplied. | RERA progress 0%. | |
| Solid-waste management and disposal | Listed; GHMC permit also identifies a garbage house. | RERA progress 0%. | |
| Energy management | Listed; no system details supplied. | RERA progress 0%. | |
| Fire protection and fire-safety requirements | Listed; no system or equipment details supplied. | RERA progress 0%. | |
| Electrical meter room / substation / receiving station | Listed; GHMC permit separately requires space for a transformer. | RERA progress 0%. | |
| Aggregate recreational open space | Listed; no area supplied in the amenity record. | RERA progress 0%. |
No clubhouse or indoor recreation schedule, sports facilities, or stated facility capacities are supplied in the reviewed records.
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage, sewage and sullage treatment/disposal, storm-water drains, rainwater harvesting, solid-waste management, energy management, fire protection and electrical facilities. It does not state capacities, connection sources, equipment specifications, or whether these systems are operational.
The GHMC permit specifies a rainwater-harvesting structure (percolation pit), a garbage house and transformer space. It also requires that the sanctioned plan be followed, that construction workers’ safety be ensured, and that an Occupancy Certificate be obtained before occupation. The supplied documents do not give lift or service-lift details, backup-power provision, fire-system specifications, accessibility arrangements, or a verified safety/compliance inspection.
8. Location, access & connectivity
The registered location is Arun Nagar, Kapra, in Kapra mandal, Medchal-Malkajgiri district, Telangana, PIN 500062. The supplied geocode describes the location as Saket Road, Arun Nagar, Kapra.
The project boundary description records a 12 mts road to the east. The available connectivity record gives the nearest sampled Outer Ring Road interchange at approximately 5.7 km; no travel time or public-transport detail is supplied.
9. Developer & development status
The registered promoter is NVR INFRA PROJECTS, recorded as a partnership. The filed partnership deed identifies Gurrala Nageshwar Reddy, Kanukula Venkat Reddy, Gurrala Shoba Rani and Kanukula Veena Reddy as partners; the RERA record identifies Gurrala Nageshwar Reddy as authorized signatory.
The promoter’s Form B affidavit declares a completion date of 09 March 2024 and includes declarations concerning project funds, approvals and land. These are promoter declarations, not independent findings of completion or construction progress. No current progress percentage, revised completion date, or occupancy/completion certificate is supplied.
10. Approvals, official records & documents
| Identifier / date | P02200002055, Form C; issued 24/08/2020 |
|---|---|
| What the supplied record establishes | Registers MAPLE CROWN under section 5 for the stated period ending 09/03/2024; certificate records no extension. |
| Identifier / date | Approval 2/C1/04239/2018; file 2/EZ/14727/2017; dated 09 March 2018 |
|---|---|
| What the supplied record establishes | Building Permit Order for one Stilt + 5 residential building at Kapra; includes conditions and sanctioned parameters. |
| Identifier / date | 40615/08/05/2013/3052 |
|---|---|
| What the supplied record establishes | Reference appears in the GHMC permit extraction; an approved layout plan or separate layout approval document is not included in the supplied evidence. |
| Identifier / date | Verified at Hyderabad, 19 November 2019 (date text is partly garbled in the extraction) |
|---|---|
| What the supplied record establishes | Promoter declaration for MAPLE CROWN, including the stated completion undertaking. |
| Identifier / date | Document 88322 |
|---|---|
| What the supplied record establishes | Floor-plan source used for software measurements; the supplied document record identifies it as a floor-plan approval-related upload, but the extraction does not provide a complete drawing set. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No certificate is included in the reviewed project documents. The GHMC order requires an Occupancy Certificate before occupation. |
The supplied material does not include a complete extracted layout-plan set, or a current independent construction-status record.
Frequently asked questions
Is MAPLE CROWN registered with Telangana RERA?
Yes. MAPLE CROWN is registered with the Telangana Real Estate Regulatory Authority as P02200002055; the registration status is New Project.
Who is the developer of MAPLE CROWN?
The promoter named in the RERA registration is NVR INFRA PROJECTS.
Where is MAPLE CROWN located?
MAPLE CROWN is in Arun Nagar, Kapra, Medchal-Malkajgiri, Telangana (500062).
When will MAPLE CROWN be completed?
The promoter's proposed date of completion filed with RERA is 09/03/2024. This is the promoter's declaration, not a guarantee.