Mahadevheights
M/s Manik infra · Nizamabad · RERA P03100006505
MAHADEVHEIGHTS is a residential apartment project in NEAR TRS PARTY OFFICE, NIZAMABAD EAST (NEW), Nizamabad district, developed by registered promoter M/s Manik infra. The project occupies 3,344.50 sq. m and comprises one residential building with 1 Stilt + 5 upper floors and 60 homes: 2BHK and 3BHK, with RERA-filed saleable areas of 80.99 sq. m and 110.11 sq. m, respectively. Its TG-RERA registration number is P03100006505, and the proposed completion date is 19/07/2028.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | MAHADEVHEIGHTS RERA record |
| Project type | Residential apartment project RERA filing |
| Phase / registered portion | No phase name or separate phase description disclosed; registration is for the project identified against Survey Nos. 234 and 251/A |
| TG-RERA registration | P03100006505 |
| Registration validity | 7 July 2023 to 19 March 2028 |
| Registered promoter | M/s Manik infra; partnership Corporate record RERA filing |
| RERA status | Recorded as “On-Going Project” RERA filing |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | NEAR TRS PARTY OFFICE RERA record RERA filing |
| Revenue village | Not disclosed in the RERA land record. The filed title report identifies Kanteshwar / Kanteshwar Shivar, Nizamabad; the building-permit extraction names Nizambad. Land records |
| Mandal | NIZAMABAD EAST (NEW) RERA record |
| District | Nizamabad RERA record |
| PIN | 503002 RERA record |
| Survey numbers and subdivisions | 234 and 251/A Land records |
| Registered site extent | 3,344.50 sq. m Land records |
| Total / net area | Total area 3,344.50 sq. m; net area 3,344.50 sq. m. Road-affected area is recorded as 0. RERA filing |
| Boundaries | East: 12M WIDE ROAD; West: OPEN PLACE; North: HOUSE OF AKULA SUBHASH AND OPEN PLACE; South: LAND OF OWNERS RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Nizamabad Urban Development Authority; the RERA record’s authority field says DTCP Approvals record |
| Principal approval | Building Permit Order No. 3146/Nizambad/2021/0577, approved 19 March 2022 Approvals record |
| Approved building | One residential building, “Building - MANIK (INFRA)” |
| Sanctioned floor configuration | 1 Stilt + 5 upper floors; the supplied extraction does not specify a basement, podium or ground-floor configuration separately |
| Height | 14.5 m |
| Approved built-up area | 8,408.90 sq. m residential; stilt area separately listed as 1,862.62 sq. m |
| RERA-recorded units | 60 total units in one building RERA unit table |
| Sanctioned versus RERA unit count | The approval extraction does not provide a unit count; a direct sanctioned-versus-filed count comparison cannot be made from the supplied details. |
| Parking levels | Stilt is approved for parking; the supplied approval extraction does not identify a basement or other parking level. |
Offering and status
| Field | Project record |
|---|---|
| Unit types | 2BHK and 3BHK RERA unit table |
| RERA-filed saleable areas | 2BHK: 80.99 sq. m; 3BHK: 110.11 sq. m RERA unit table |
| Portal unit counts | 60 total; 0 booked and 60 available as last read from the TG-RERA portal. The portal record provides no as-of date, so counts are indicative. RERA unit table |
| Construction stage | RERA record identifies the project as “On-Going Project”; no independently verified site-progress assessment is supplied. RERA filing |
| Completion dates | Promoter-declared completion and revised completion: 19/07/2028 RERA record |
| Occupancy certificate (OC) | The supplied building-permit extraction says an OC is required before occupation and records completion as not certified. No project OC is supplied in the reviewed documents. |
| Registration validity, completion deadline and OC | These are separate records: RERA registration is valid through 19 March 2028; the project completion date is declared as 19/07/2028; the reviewed building-permit extraction does not certify completion or provide an OC. RERA record |
2. The project story
- MAHADEVHEIGHTS is registered as a residential apartment project by M/s Manik infra, on land recorded under Survey Nos. 234 and 251/A in Nizamabad district. The RERA record gives the locality as NEAR TRS PARTY OFFICE and mandal as NIZAMABAD EAST (NEW); it does not disclose a revenue village. The filed title report refers to Kanteshwar / Kanteshwar Shivar, Nizamabad. RERA record RERA filing Land records
- The building permit sanctions one residential building with a stilt and five upper floors, at a height of 14.5 m. The RERA filing records 60 homes: 20 two-bedroom and 40 three-bedroom units. The project is marked “On-Going Project,” but the supplied materials do not establish an independently inspected construction stage or confirm completion. The building-permit extraction states that an occupancy certificate must be obtained before occupation; no OC is included in the documents reviewed. RERA unit table RERA filing
3. Master plan, architecture & building design
- The supplied building-permit extraction records a site area and net area of 3,344.5 sq. m, no road-affected area, one residential building and a total height of 14.5 m. It lists 8,408.90 sq. m as residential area and 1,862.62 sq. m as stilt area; these are reported as separately labelled in the permit extraction and are not treated here as interchangeable area measures. The permit also records a 202.65 sq. m tot-lot.
- The approved configuration is 1 Stilt + 5 upper floors. The available extraction does not provide a detailed floor-by-floor plan, building footprint, flats per floor, lifts, stairs, internal circulation layout or landscape plan. It lists setbacks as Front 4.4, Front 4.66, Rear 6.05 and Side I 6.15; units are not specified in the supplied extraction.
- The registration file includes a layout-plan document entry, but the document was not extracted. Two floor-plan drawings are listed; neither was measured and both are recorded as having no flats identified in the supplied drawing review. Document index RERA unit details
4. Homes, configurations & floor plans
- RERA records 20 two-bedroom homes and 40 three-bedroom homes. The filed saleable areas are 80.99 sq. m for 2BHK and 110.11 sq. m for 3BHK. Booked and available counts are based on the portal record as last read; the record gives no as-of date. The floor-plan review records two drawings, with none measured and no flats identified in either. Therefore, no drawing-based carpet-area or room-dimension figures are available. The measurement notes distinguish carpet area from RERA saleable area, which includes a home’s share of common areas; no project-specific loading figure is supplied. RERA unit details RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 80.99 sq. m | Not measured from supplied drawings | Not supplied |
| 3BHK | 40 | 0 | 40 | 110.11 sq. m | Not measured from supplied drawings | Not supplied |
5. Parking & vehicle circulation
- The building permit identifies the stilt as approved for parking and says that any cellar and stilts approved in the plan must be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied permit extraction does not specify the number of parking spaces, parking allocation by unit, visitor or accessible spaces, ramps, vehicle entries/exits, internal driveways or EV charging. A documented unit-level parking allocation is not available in the reviewed material.
6. Amenities, recreation & open spaces
- The building-permit extraction specifies a tot-lot and requires it to be fenced and maintained as greenery before an occupancy certificate is issued. The amenity records list additional facilities, but the supplied data does not establish that they are completed or independently verified. RERA amenities
| Description / size | Permit extraction records 202.65 sq. m; it also requires fencing and greenery maintenance. |
|---|---|
| Evidence source | Sanctioned building-permit extraction |
| Declared progress / verified status | Required by permit; completion not verified. |
| Description / size | Listed as available in the RERA amenity data; no separate size is supplied there. |
|---|---|
| Evidence source | RERA amenity data RERA amenities |
| Declared progress / verified status | Progress recorded as 0%; not independently verified. |
| Description / size | Listed in RERA amenity data; no size supplied. |
|---|---|
| Evidence source | RERA amenity data RERA amenities |
| Declared progress / verified status | Progress recorded as 0%; not independently verified. |
| Description / size | Listed in RERA amenity data; no description or size supplied. |
|---|---|
| Evidence source | RERA amenity data RERA amenities |
| Declared progress / verified status | Progress recorded as 0%; not independently verified. |
7. Utilities, building services & safety
- The building permit lists a rainwater-harvesting percolation pit, transformer space and a garbage house as site requirements. It specifies nine rainwater-harvesting structures and requires the tot-lot to be maintained as greenery. The permit also states that public water and electricity connections will be provided only on production of an occupancy certificate. These are permit conditions; the supplied evidence does not confirm installation or operation.
| Evidence in the supplied record | RERA amenity data lists water supply; the permit refers to public water connection subject to an OC. |
|---|---|
| Status information available | Amenity progress recorded as 0%; no water source, storage or treatment capacity supplied. RERA amenities |
| Evidence in the supplied record | RERA amenity data lists sewerage (chambers, lines, septic tank, STP). |
|---|---|
| Status information available | Sewerage progress recorded as 1%; no STP capacity, treatment specification or reuse information supplied. RERA amenities |
| Evidence in the supplied record | Storm-water drains are listed in RERA amenity data; the permit requires a rainwater-harvesting percolation pit and records nine RWHPs. |
|---|---|
| Status information available | Storm-water progress recorded as 0%; installation of the harvesting structures is not independently verified. RERA amenities |
| Evidence in the supplied record | Permit requires transformer space; RERA amenity data lists an electrical meter room, sub-station or receiving station. |
|---|---|
| Status information available | Amenity progress recorded as 0%; capacity and completion are not supplied. RERA amenities |
| Evidence in the supplied record | Fire protection and fire-safety requirements are listed in the RERA amenity data; the permit assigns responsibility for fire-safety requirements and requires technical supervision for services. |
|---|---|
| Status information available | Progress recorded as 0%; no system details or clearance evidence supplied. RERA amenities |
| Evidence in the supplied record | Permit requires a garbage house; RERA amenity data lists solid-waste management and disposal. |
|---|---|
| Status information available | Amenity progress recorded as 0%; no operating or segregation details supplied. RERA amenities |
| Evidence in the supplied record | No project-specific capacities, equipment details or completion evidence supplied. |
|---|---|
| Status information available | Not established by the reviewed material. Document index RERA amenities |
8. Location, access & connectivity
- The RERA project identity places MAHADEVHEIGHTS in NEAR TRS PARTY OFFICE, NIZAMABAD EAST (NEW), Nizamabad district, PIN 503002. The RERA land record does not disclose the revenue village; the filed title report identifies Kanteshwar / Kanteshwar Shivar, Nizamabad. The permit describes the site as Maruthi Nagar, Nizambad. RERA record Land records
- The recorded eastern boundary is a 12M WIDE ROAD; the other stated boundaries are OPEN PLACE to the west, HOUSE OF AKULA SUBHASH AND OPEN PLACE to the north, and LAND OF OWNERS to the south. The supplied location record contains no verified public-transport details, measured distances to local landmarks or travel times. RERA filing Location record
9. Developer & development status
- The registered promoter is M/s Manik infra, recorded as a partnership, with GSTIN 36ABQFM1340L1ZZ. The RERA promoter address is MAHADEV HEIGHTS, MARUTHI NAGAR, MARUTHI NAGAR, NEAR TRS PARTY OFFICE, NIZAMABAD EAST (NEW), Nizamabad, 503002. Corporate record Parties record
- The RERA record identifies the project as ongoing and records a proposed and revised completion date of 19/07/2028. The Form B affidavit filed by Bellal Shashank Reddy declares a completion period of 19/03/2028 and includes promoter declarations concerning title basis, encumbrances and project funds. These are promoter-filed declarations, not independent verification of construction progress or completion. RERA filing RERA record
- No separate phase-wise construction status is provided. The reviewed building-permit extraction records that an OC is required before occupation and does not certify completion.
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C records MAHADEVHEIGHTS, registration P03100006505, valid from 7 July 2023 through 19 March 2028. |
| Principal building approval | Building Permit Order No. 3146/Nizambad/2021/0577, issued by Nizamabad Urban Development Authority, approved 19 March 2022; extraction covers Survey Nos. 234 and 251/A. |
| Building permit conditions | The extracted permit requires adherence to the sanctioned plan, a commencement notice, completion notice and occupancy certificate before occupation; it states that the permission does not confer ownership rights. |
| Layout plan | A layout-plan document is listed in the RERA file, but it was not extracted for this review. Document index |
| Title report | Advocate K. Ganesh’s title investigation report refers to land in Sy.Nos. 234 and 251/A at Kanteshwar, Nizamabad. |
| Encumbrance statement | RERA file lists encumbrance statement 136677824, searched for 15-04-1993 to 13-04-2023. |
| Project Form B | Affidavit-cum-declaration by Bellal Shashank Reddy for M/s MANIK INFRA, verified in Nizamabad on 13 April 2023. |
| Occupancy / completion certificate | No OC or completion certificate is included in the supplied document set; the permit extraction records completion as not certified. |
1. Project at a glance
Project identity
Registered project name: MAHADEVHEIGHTS
Project type: Residential apartment project
Phase / registered portion: No phase name or separate phase description disclosed; registration is for the project identified against Survey Nos. 234 and 251/A
TG-RERA registration: P03100006505
Registration validity: 7 July 2023 to 19 March 2028
Registered promoter: M/s Manik infra; partnership
RERA status: Recorded as “On-Going Project”
Land and geographic identity
Locality: NEAR TRS PARTY OFFICE
Revenue village: Not disclosed in the RERA land record. The filed title report identifies Kanteshwar / Kanteshwar Shivar, Nizamabad; the building-permit extraction names Nizambad.
Mandal: NIZAMABAD EAST (NEW)
District: Nizamabad
PIN: 503002
Survey numbers and subdivisions: 234 and 251/A
Registered site extent: 3,344.50 sq. m
Total / net area: Total area 3,344.50 sq. m; net area 3,344.50 sq. m. Road-affected area is recorded as 0.
Boundaries: East: 12M WIDE ROAD; West: OPEN PLACE; North: HOUSE OF AKULA SUBHASH AND OPEN PLACE; South: LAND OF OWNERS
Development identity
Sanctioning authority: Nizamabad Urban Development Authority; the RERA record’s authority field says DTCP
Principal approval: Building Permit Order No. 3146/Nizambad/2021/0577, approved 19 March 2022
Approved building: One residential building, “Building - MANIK (INFRA)”
Sanctioned floor configuration: 1 Stilt + 5 upper floors; the supplied extraction does not specify a basement, podium or ground-floor configuration separately
Height: 14.5 m
Approved built-up area: 8,408.90 sq. m residential; stilt area separately listed as 1,862.62 sq. m
RERA-recorded units: 60 total units in one building
Sanctioned versus RERA unit count: The approval extraction does not provide a unit count; a direct sanctioned-versus-filed count comparison cannot be made from the supplied details.
Parking levels: Stilt is approved for parking; the supplied approval extraction does not identify a basement or other parking level.
Offering and status
Unit types: 2BHK and 3BHK
RERA-filed saleable areas: 2BHK: 80.99 sq. m; 3BHK: 110.11 sq. m
Portal unit counts: 60 total; 0 booked and 60 available as last read from the TG-RERA portal. The portal record provides no as-of date, so counts are indicative.
Construction stage: RERA record identifies the project as “On-Going Project”; no independently verified site-progress assessment is supplied.
Completion dates: Promoter-declared completion and revised completion: 19/07/2028
Occupancy certificate (OC): The supplied building-permit extraction says an OC is required before occupation and records completion as not certified. No project OC is supplied in the reviewed documents.
Registration validity, completion deadline and OC: These are separate records: RERA registration is valid through 19 March 2028; the project completion date is declared as 19/07/2028; the reviewed building-permit extraction does not certify completion or provide an OC.
2. The project story
- MAHADEVHEIGHTS is registered as a residential apartment project by M/s Manik infra, on land recorded under Survey Nos. 234 and 251/A in Nizamabad district. The RERA record gives the locality as NEAR TRS PARTY OFFICE and mandal as NIZAMABAD EAST (NEW); it does not disclose a revenue village. The filed title report refers to Kanteshwar / Kanteshwar Shivar, Nizamabad.
- The building permit sanctions one residential building with a stilt and five upper floors, at a height of 14.5 m. The RERA filing records 60 homes: 20 two-bedroom and 40 three-bedroom units. The project is marked “On-Going Project,” but the supplied materials do not establish an independently inspected construction stage or confirm completion. The building-permit extraction states that an occupancy certificate must be obtained before occupation; no OC is included in the documents reviewed.
3. Master plan, architecture & building design
- The supplied building-permit extraction records a site area and net area of 3,344.5 sq. m, no road-affected area, one residential building and a total height of 14.5 m. It lists 8,408.90 sq. m as residential area and 1,862.62 sq. m as stilt area; these are reported as separately labelled in the permit extraction and are not treated here as interchangeable area measures. The permit also records a 202.65 sq. m tot-lot.
- The approved configuration is 1 Stilt + 5 upper floors. The available extraction does not provide a detailed floor-by-floor plan, building footprint, flats per floor, lifts, stairs, internal circulation layout or landscape plan. It lists setbacks as Front 4.4, Front 4.66, Rear 6.05 and Side I 6.15; units are not specified in the supplied extraction.
- The registration file includes a layout-plan document entry, but the document was not extracted. Two floor-plan drawings are listed; neither was measured and both are recorded as having no flats identified in the supplied drawing review.
4. Homes, configurations & floor plans
- RERA records 20 two-bedroom homes and 40 three-bedroom homes. The filed saleable areas are 80.99 sq. m for 2BHK and 110.11 sq. m for 3BHK. Booked and available counts are based on the portal record as last read; the record gives no as-of date. The floor-plan review records two drawings, with none measured and no flats identified in either. Therefore, no drawing-based carpet-area or room-dimension figures are available. The measurement notes distinguish carpet area from RERA saleable area, which includes a home’s share of common areas; no project-specific loading figure is supplied.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 80.99 sq. m | Not measured from supplied drawings | Not supplied |
| 3BHK | 40 | 0 | 40 | 110.11 sq. m | Not measured from supplied drawings | Not supplied |
5. Parking & vehicle circulation
- The building permit identifies the stilt as approved for parking and says that any cellar and stilts approved in the plan must be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied permit extraction does not specify the number of parking spaces, parking allocation by unit, visitor or accessible spaces, ramps, vehicle entries/exits, internal driveways or EV charging. A documented unit-level parking allocation is not available in the reviewed material.
6. Amenities, recreation & open spaces
- The building-permit extraction specifies a tot-lot and requires it to be fenced and maintained as greenery before an occupancy certificate is issued. The amenity records list additional facilities, but the supplied data does not establish that they are completed or independently verified.
| Description / size | Permit extraction records 202.65 sq. m; it also requires fencing and greenery maintenance. |
|---|---|
| Evidence source | Sanctioned building-permit extraction |
| Declared progress / verified status | Required by permit; completion not verified. |
| Description / size | Listed as available in the RERA amenity data; no separate size is supplied there. |
|---|---|
| Evidence source | RERA amenity data |
| Declared progress / verified status | Progress recorded as 0%; not independently verified. |
| Description / size | Listed in RERA amenity data; no size supplied. |
|---|---|
| Evidence source | RERA amenity data |
| Declared progress / verified status | Progress recorded as 0%; not independently verified. |
| Description / size | Listed in RERA amenity data; no description or size supplied. |
|---|---|
| Evidence source | RERA amenity data |
| Declared progress / verified status | Progress recorded as 0%; not independently verified. |
7. Utilities, building services & safety
- The building permit lists a rainwater-harvesting percolation pit, transformer space and a garbage house as site requirements. It specifies nine rainwater-harvesting structures and requires the tot-lot to be maintained as greenery. The permit also states that public water and electricity connections will be provided only on production of an occupancy certificate. These are permit conditions; the supplied evidence does not confirm installation or operation.
| Evidence in the supplied record | RERA amenity data lists water supply; the permit refers to public water connection subject to an OC. |
|---|---|
| Status information available | Amenity progress recorded as 0%; no water source, storage or treatment capacity supplied. |
| Evidence in the supplied record | RERA amenity data lists sewerage (chambers, lines, septic tank, STP). |
|---|---|
| Status information available | Sewerage progress recorded as 1%; no STP capacity, treatment specification or reuse information supplied. |
| Evidence in the supplied record | Storm-water drains are listed in RERA amenity data; the permit requires a rainwater-harvesting percolation pit and records nine RWHPs. |
|---|---|
| Status information available | Storm-water progress recorded as 0%; installation of the harvesting structures is not independently verified. |
| Evidence in the supplied record | Permit requires transformer space; RERA amenity data lists an electrical meter room, sub-station or receiving station. |
|---|---|
| Status information available | Amenity progress recorded as 0%; capacity and completion are not supplied. |
| Evidence in the supplied record | Fire protection and fire-safety requirements are listed in the RERA amenity data; the permit assigns responsibility for fire-safety requirements and requires technical supervision for services. |
|---|---|
| Status information available | Progress recorded as 0%; no system details or clearance evidence supplied. |
| Evidence in the supplied record | Permit requires a garbage house; RERA amenity data lists solid-waste management and disposal. |
|---|---|
| Status information available | Amenity progress recorded as 0%; no operating or segregation details supplied. |
| Evidence in the supplied record | No project-specific capacities, equipment details or completion evidence supplied. |
|---|---|
| Status information available | Not established by the reviewed material. |
8. Location, access & connectivity
- The RERA project identity places MAHADEVHEIGHTS in NEAR TRS PARTY OFFICE, NIZAMABAD EAST (NEW), Nizamabad district, PIN 503002. The RERA land record does not disclose the revenue village; the filed title report identifies Kanteshwar / Kanteshwar Shivar, Nizamabad. The permit describes the site as Maruthi Nagar, Nizambad.
- The recorded eastern boundary is a 12M WIDE ROAD; the other stated boundaries are OPEN PLACE to the west, HOUSE OF AKULA SUBHASH AND OPEN PLACE to the north, and LAND OF OWNERS to the south. The supplied location record contains no verified public-transport details, measured distances to local landmarks or travel times.
9. Developer & development status
- The registered promoter is M/s Manik infra, recorded as a partnership, with GSTIN 36ABQFM1340L1ZZ. The RERA promoter address is MAHADEV HEIGHTS, MARUTHI NAGAR, MARUTHI NAGAR, NEAR TRS PARTY OFFICE, NIZAMABAD EAST (NEW), Nizamabad, 503002.
- The RERA record identifies the project as ongoing and records a proposed and revised completion date of 19/07/2028. The Form B affidavit filed by Bellal Shashank Reddy declares a completion period of 19/03/2028 and includes promoter declarations concerning title basis, encumbrances and project funds. These are promoter-filed declarations, not independent verification of construction progress or completion.
- No separate phase-wise construction status is provided. The reviewed building-permit extraction records that an OC is required before occupation and does not certify completion.
10. Approvals, official records & documents
TG-RERA registration: Form C records MAHADEVHEIGHTS, registration P03100006505, valid from 7 July 2023 through 19 March 2028.
Principal building approval: Building Permit Order No. 3146/Nizambad/2021/0577, issued by Nizamabad Urban Development Authority, approved 19 March 2022; extraction covers Survey Nos. 234 and 251/A.
Building permit conditions: The extracted permit requires adherence to the sanctioned plan, a commencement notice, completion notice and occupancy certificate before occupation; it states that the permission does not confer ownership rights.
Layout plan: A layout-plan document is listed in the RERA file, but it was not extracted for this review.
Title report: Advocate K. Ganesh’s title investigation report refers to land in Sy.Nos. 234 and 251/A at Kanteshwar, Nizamabad.
Encumbrance statement: RERA file lists encumbrance statement 136677824, searched for 15-04-1993 to 13-04-2023.
Project Form B: Affidavit-cum-declaration by Bellal Shashank Reddy for M/s MANIK INFRA, verified in Nizamabad on 13 April 2023.
Occupancy / completion certificate: No OC or completion certificate is included in the supplied document set; the permit extraction records completion as not certified.
Frequently asked questions
Is MAHADEVHEIGHTS registered with Telangana RERA?
Yes. MAHADEVHEIGHTS is registered with the Telangana Real Estate Regulatory Authority as P03100006505; the registration status is On-Going Project.
Who is the developer of MAHADEVHEIGHTS?
The promoter named in the RERA registration is M/s Manik infra.
Where is MAHADEVHEIGHTS located?
MAHADEVHEIGHTS is in NEAR TRS PARTY OFFICE, NIZAMABAD EAST (NEW), Nizamabad, Telangana (503002).
When will MAHADEVHEIGHTS be completed?
The promoter's proposed date of completion filed with RERA is 19/07/2028. This is the promoter's declaration, not a guarantee.
More projects in Nizamabad East