Sign in

Ark Meadows

MOHAMMED · Nizamabad · RERA P03100010692

ARK MEADOWS is a residential plotted development in DUBBA, Nizamabad Mandal, Nizamabad District. The registered promoter is MOHAMMED ABDUL SAMAD. The tentative residential layout has a registered land area of 12591.24 sq.m and 37 residential plots, with drawing-derived plot areas ranging from 123.09 sq.m to 364.52 sq.m; no tower, block or floor configuration is stated. Its TG-RERA registration number is P03100010692, and the promoter’s declared completion date is 30/12/2025.

01What we found

RegisteredTG-RERA
13documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Dubba, Nizamabad East, Nizamabad · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered nameARK MEADOWS RERA record
Project typePlotted development; residential layout RERA record RERA filing
Phase / registered portionNo phase designation is stated. The RERA record identifies the project with Survey Nos. 3277 and 3276/A RERA record
TG-RERA registrationP03100010692 Approvals record
Registration validity31/12/2023 to 30/12/2025, as stated on Form C; no extension is recorded in the supplied certificate
Registered promoterMOHAMMED ABDUL SAMAD; the RERA filing describes him as a sole proprietor
RERA statusThe project evidence labels it “On-Going Project.” The certificate records the stated registration period above; current registration status is not established by the supplied certificate RERA record

Land and geographic identity

ItemProject record
Locality / addressDUBBA; NIZAMABAD MANDAL; NIZAMABAD REVENUE VILLAGE; PIN 503001 RERA record RERA filing
Revenue village as recorded in layout approvalNIZAMABAD Revenue Village
Mandal / districtNizamabad Mandal / Nizamabad District
Survey numbers and subdivisionsSurvey Nos. 3277 and 3276/A RERA record Land records
Registered site extent3 Acer 4.45 Gts 15059 Sq. Yds, as stated in the tentative layout approval
RERA land-area fieldsTotal area 12591.24 sq.m; net area 12591.24 sq.m; affected area 0 sq.m RERA filing
Boundaries in RERA filingNorth: BY PASS 150 ROAD; South: OTHERS LAND; East: 80 PROPESED; West: OTHERS LAND RERA filing

Development identity

ItemProject record
Sanctioning authorityNizamabad Municipality/Municipal Corporation
Principal layout approvalTentative Layout Plan No. 0074/LO/3072/2023; approved 31 December 2023 Approvals record
Application number011594/LO/DTCP/3072/0094/2023 Approvals record
Development scale37 plots in the tentative residential layout Layout record
Approved built-up areaNot disclosed in the supplied layout approval; the RERA filing lists “Approved Built up Area” as 7602.07 sq.m, but its scope is not clarified in the supplied material RERA filing
Buildings / floorsNo building count or floor configuration is stated. The layout approval describes a plotted layout, not a multi-storey building scheme
ParkingNo parking-space count or parking-level details are supplied. The approval identifies five mortgaged plots, not parking bays

Offering and status

ItemProject record
Unit typeResidential plots Promoter website
Plot count and sizes37 plots; drawing-derived sizes range from 123.09 sq.m to 364.52 sq.m (147.2 to 436.0 sq.yd); median 196.52 sq.m (235.0 sq.yd). These are software-read from the layout drawing and should be checked against it Layout record
Booked / availableNot disclosed in the supplied evidence Document index
Construction / development stageThe promoter’s Form B undertakes completion by 30/12/2025. No independently verified site-progress evidence or completion confirmation is supplied
Completion datePromoter-declared completion undertaking: 30/12/2025
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The project is a plotted layout; the supplied record does not establish completion or occupancy certification Document index

2. The project story

ARK MEADOWS is registered as a residential plotted development in the DUBBA / Nizamabad area, on Survey Nos. 3277 and 3276/A. Its tentative layout approval records 37 plots and provides for plot land, internal roads, open space, social-infrastructure land and utility land. The RERA-filed location identifies DUBBA, Nizamabad Mandal, Nizamabad District, PIN 503001; the layout approval names NIZAMABAD Revenue Village and Nizamabad Mandal RERA record RERA filing.

The layout drawing’s schedule is software-read as showing 37 plots, with individual areas between 123.09 and 364.52 sq.m. These are drawing-derived measurements, not a RERA-filed unit schedule. The supplied materials do not include booked or available plot counts, verified on-site construction progress, or evidence that the layout-development works have been completed Layout record Document index.

The promoter’s Form B declares that the project will be completed by 30/12/2025. That is a promoter undertaking, not independent confirmation of completed works. The supplied record does not include an occupancy or completion certificate Document index.

3. Master plan, architecture & building design

The approval is for a tentative 37-plot residential layout, not a building plan for a tower or apartment scheme. The layout drawing’s area statement gives a net layout area of 12,590.55 sq.m and allocates 7,601.62 sq.m to plots, 3,286.28 sq.m to roads, 1,259.96 sq.m to parks/open space, 127.07 sq.m to utilities and 315.69 sq.m to social infrastructure. Those figures are drawing-derived; the approval also states its own area allocations Layout record.

The drawing schedule is software-read as containing 37 plots. Plot areas range from 123.09 sq.m to 364.52 sq.m, with a median of 196.52 sq.m. The source notes that the count and sizes were read by software from the drawing and should be verified against the drawing Layout record.

No tower or block count, building footprint, floor configuration, building height, apartment distribution, or internal building circulation is evidenced. The layout approval requires roads to remain accessible to neighbouring sites and describes road formation, storm-water drains, underground drainage, internal water lines, lighting, avenue planting, park development and rainwater-harvesting pits as layout-development works.

4. Homes, configurations & floor plans

This is a plotted development, so the offering is plots rather than apartment configurations. The available layout schedule is software-measured from the drawing; it is not a RERA-filed booked/available inventory schedule Layout record Document index.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Residential plots37Not disclosedNot disclosedNot disclosed as a plot-by-plot RERA scheduleNot applicableNot supplied

Drawing-derived plot areas are software-read as ranging from 123.09 sq.m to 364.52 sq.m (147.2 to 436.0 sq.yd), with a median of 196.52 sq.m (235.0 sq.yd). The drawing schedule’s plot-area total matches its stated plotted area. These measurements should be verified against the drawing Layout record.

The supplied floor-plan record contains two drawing sheets, both identified as layout sheets with no flats; it does not provide apartment floor plans or room measurements Floor plans.

5. Parking & vehicle circulation

The supplied material does not establish a parking-space count, visitor or accessible spaces, parking levels, parking allocation to individual plots, EV charging, or a legally documented parking entitlement. The five plots identified as mortgaged in the tentative layout approval are security for layout-development obligations, not parking bays.

The layout approval describes internal roads and requires roads to remain open for access to neighbouring sites. It does not provide road widths, vehicle-entry details, ramps, or a pedestrian-separation plan in the supplied extract.

6. Amenities, recreation & open spaces

The layout approval describes certain works as required development works; the RERA amenities record marks selected facilities “YES” at 100%, but that is not independent confirmation of physical completion. The supplied evidence does not report independently verified completion status RERA amenities.

Park / open space
Description / size1,259.96 sq.m in the layout drawing; approval states 10.01%
Evidence sourceLayout record
Declared progress / verified statusRERA amenities record marks green strip/tot lot/park “YES,” 100%; independent completion verification not supplied RERA amenities
Social infrastructure land
Description / size315.69 sq.m in the layout drawing
Evidence sourceLayout record
Declared progress / verified statusLand allocation shown; specific facility or delivery status not supplied
Internal roads and footpaths
Description / sizeRoad area 3,286.28 sq.m in the layout drawing
Evidence sourceLayout record
Declared progress / verified statusRERA amenities record marks internal roads and footpaths “YES,” 100%; independent completion verification not supplied RERA amenities
Street lighting
Description / sizeNo quantity or capacity supplied
Evidence sourcePromoter website
Declared progress / verified statusIncluded in the approval’s described layout works; RERA amenities record marks “YES,” 100%; completion not independently verified RERA amenities
Avenue plantation
Description / sizeNo quantity or area supplied
Declared progress / verified statusApproval describes it as a layout-development work; completion not independently verified
Community buildings
Description / sizeNo size or facility details supplied
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenities record lists 0%; no facility details supplied
Sports / indoor recreation
Description / sizeNot disclosed
Evidence sourceRERA amenities Document index
Declared progress / verified statusNot established in supplied evidence

7. Utilities, building services & safety

The tentative layout approval describes a planned utility and infrastructure package. This is evidence of what the approval calls for, not proof that each item is installed or operating.

Water
Evidence in the project recordApproval describes an assured water-supply source, internal water-supply pipelines, and an overhead tank or sump; the utility area includes water-reservoir land
Status limitationSource, storage capacity and completed status are not supplied
Sewerage and drainage
Evidence in the project recordApproval describes underground drainage lines and a common septic tank/STP; storm-water drains are included in the listed works
Status limitationNo capacity, treatment specification, reuse arrangement or independently verified operating status is supplied
Electrical
Evidence in the project recordApproval describes electrical supply lines, street lights and a transformer; RERA amenities lists an electrical meter room/sub-station/receiving station as “YES,” 100% RERA amenities
Status limitationNo load, backup, commissioning evidence or verified completion status is supplied
Rainwater management
Evidence in the project recordRainwater-harvesting pits are included in the approval’s described layout works; RERA amenities lists water conservation/rainwater harvesting as “YES,” 100% RERA amenities
Status limitationNumber, capacity and completed status are not independently established
Solid waste
Evidence in the project recordSolid Waste Management is identified in the approval’s utility list and vendor amenity list Promoter website
Status limitationRERA amenities record shows 0% for solid-waste management and disposal; no system details or completion verification are supplied RERA amenities
Fire and life safety
Evidence in the project recordRERA amenities record shows 0% for fire protection/fire-safety requirements RERA amenities
Status limitationNo project-specific fire-system design or clearance is supplied
Accessibility / lifts
Evidence in the project recordNot applicable to the evidenced plotted-layout scheme; no project-specific accessibility or lift details are supplied
Status limitationNo further details established

8. Location, access & connectivity

The registered project location is DUBBA, Nizamabad Mandal, Nizamabad District, Telangana, PIN 503001. The tentative layout approval identifies NIZAMABAD Revenue Village and Nizamabad Mandal. The RERA-filed north boundary is recorded as “BY PASS 150 ROAD”; the other boundaries are recorded as “OTHERS LAND” on the south and west, and “80 PROPESED” on the east RERA record RERA filing RERA filing.

The supplied location record gives a sampled approximate distance of 120.2 km to an Outer Ring Road interchange. It does not provide a measured distance to a specific stop, station or local landmark Location record. The supplied geocode resolves to a nearby Tata Motors dealer address, not to a verified project entrance; it should not be treated as the project’s surveyed access point Location record.

9. Developer & development status

The registered promoter is MOHAMMED ABDUL SAMAD. A project-registration request letter identifies the business as a sole proprietorship; the evidence does not provide a separate company registration number or establish another legal entity as promoter. The project promoter address in the filing is B, Ayodhya Nagar, Nizamabad Revenue Village, Nizamabad Mandal, Nizamabad East (New), Nizamabad, 503001 Parties record.

The promoter’s Form B declares that the land is free from encumbrances, undertakes project completion by 30/12/2025, and sets out the promoter’s project-account and approval undertakings. These are promoter declarations, not independent verification of title, account compliance, approvals or completion.

The supplied record does not establish the current physical development stage or a completed/occupancy-certified phase. The RERA certificate records validity through 30/12/2025 and no extension; current registration standing is not established by that certificate Document index.

10. Approvals, official records & documents

RecordEvidence and scope
TG-RERA registrationForm C for ARK MEADOWS, registration no. P03100010692; stated validity 31/12/2023–30/12/2025
Tentative layout approvalNizamabad Municipality/Municipal Corporation, Tentative Layout Plan No. 0074/LO/3072/2023, approved 31 December 2023; application no. 011594/LO/DTCP/3072/0094/2023; Survey Nos. 3277 and 3276/A
Mortgage document identified in approvalMortgage Deed No. 11336, dated 18 December 2023; approval extract identifies Plots 30, 1, 2, 3 and 4 as mortgaged to the Municipality/Municipal Corporation
Layout drawingTwo layout sheets; drawing-derived plot schedule and land-use figures are supplied, with software-reading caveat Layout record
Promoter declarationForm B by MOHAMMED ABDUL SAMAD, including declared completion date 30/12/2025 and other promoter undertakings
Title-related filingAdvocate S.B. Raghunandan’s title scrutiny report dated 08-03-2026 and title documents are listed in the supplied project records; detailed title-chain matters are addressed in the title review Document index
Occupancy / completion recordNo occupancy or completion certificate is included in the supplied documents Document index

The approval extract describes a tentative layout and its conditions, including that the applicant is responsible for layout-development works and that specified open space, utilities and roads are to be handed over by registered gift deed before release of the final layout. The supplied materials do not establish that those conditions have been fulfilled or that a final layout has been released.

Frequently asked questions

Is ARK MEADOWS registered with Telangana RERA?

Yes. ARK MEADOWS is registered with the Telangana Real Estate Regulatory Authority as P03100010692; the registration status is On-Going Project.

Who is the developer of ARK MEADOWS?

The promoter named in the RERA registration is MOHAMMED.

Where is ARK MEADOWS located?

ARK MEADOWS is in NIZAMABAD MANDAL, DUBBA, NIZAMABAD EAST (NEW), Nizamabad, Telangana (503001).

When will ARK MEADOWS be completed?

The promoter's proposed date of completion filed with RERA is 30/12/2025. This is the promoter's declaration, not a guarantee.

More projects in Dubba