Sign in

M G Castle

M.A. GLOBAL · Hyderabad · RERA P02500008858

M G CASTLE is a residential apartment project in SHIVRAMPALLY JAGIR, Rajendranagar Mandal, Hyderabad district, developed by M.A. Global. It covers 1916.91 sq. m and comprises one building with 1 Cellar + 1 Stilt + 5 upper floors. The RERA filing lists 40 3BHK units, each with a saleable area of 145.07 sq. m. Its TG-RERA registration is P02500008858, and its proposed completion date is 23/11/2025.

01What we found

Period endedTG-RERA registration ran to 23 Nov 2025 - check its extension on TG-RERA
37documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

FieldProject record
Registered project nameM G CASTLE RERA record
Project typeResidential apartment project RERA record
Phase / registered portionA single registered building is identified; no separate phase name is disclosed. RERA record
TG-RERA registrationP02500008858 RERA record
Registration validity23/11/2022–23/11/2025, as stated on the Form C certificate; the certificate records no extension. Registration validity is distinct from the construction completion date and from occupancy certification.
Registered promoterM.A. Global (also rendered “M A GLOBAL” in the declaration) RERA record Corporate record
RERA statusListed as On-Going Project in the project record. RERA record
RERA-recorded completion datesProposed and revised proposed completion: 23/11/2025. The Form B declaration is dated 12/09/2024 and undertakes completion by that date. RERA record RERA filing

Land and geographic identity

FieldProject record
LocalitySHIVRAMPALLY JAGIR; the building permit also describes the locality as SHIVARAMPALLY. RERA record
Revenue villageShivrampally Jagir (also rendered Shivarampally Jagir in the permit and title documents). RERA record Land records
MandalRajendranagar, as stated in the GHMC building permit; mandal is not disclosed in the project identity fields. RERA filing
DistrictHyderabad in the project identity record; the building permit states Rangareddy District. RERA record
PIN500052 RERA record
Survey numbers29, 30, 31, 32 and 33. No subdivisions are specified in the project’s survey-number field. RERA record Land records
Plot numbers9, 143, 144 and 145 RERA filing
Site extent1916.91 sq. m total and net area in the project record and permit. Land records
BoundariesEast: “NEIBHOUR LAND”; west: “NEIBHOUR LAND”; north: plots 5, 6, 7 and 8; south: 30-feet-wide road. RERA filing
Road / nala affected area0 sq. m stated for each in the building-permit parameters.

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building permissionPermit 4238/GHMC/CHR/2022-BP, file 003476/GHMC/1768/CHR1/2022-BP, approved 23 November 2022 Approvals record
Approved built-up area4,842.60 sq. m RERA filing
Building count / descriptionOne building, Building Name - A (PROP)
Sanctioned floor configuration1 Cellar + 1 Stilt + 5 upper floors
Parking provision in permitCellar: 1,108.9 sq. m; stilt: 1,145.5 sq. m; total parking area: 2,291.1 (unit not stated in the extracted parameter). The permit requires the cellar and stilt approved for parking to remain exclusively for vehicle parking.
Unit countsThe permit extract does not state a sanctioned unit count. The RERA filing lists 40 3BHK units. RERA unit table

Offering and status

FieldProject record
RERA-filed configuration3BHK, 40 units RERA unit table
RERA-filed saleable area145.07 sq. m per unit RERA unit table
Portal booking / availability0 booked; 40 available, as read from the TG-RERA portal. The record has no booking-count as-of date, so these counts are indicative. RERA unit table
Declared completion80% in the project record; this is a declared project figure, not an independently verified site inspection. RERA record
Construction stageThe supplied evidence does not identify a more specific construction stage. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied in the reviewed project evidence. The GHMC permit requires an occupancy certificate before occupation. Document index

The project story

M G CASTLE is a registered residential apartment development on the project-recorded site in Shivrampally Jagir village, Hyderabad district. The registered land identity covers survey numbers 29, 30, 31, 32 and 33, and plot numbers 9, 143, 144 and 145. The GHMC permit describes the site as being in Shivarampally Jagir, Rajendranagar Mandal, and sanctions one residential building. RERA record Land records

The sanctioned building is described as one cellar, one stilt and five upper floors. The project’s RERA filing lists 40 3BHK apartments, with portal booking figures of zero booked and 40 available; those booking figures have no stated as-of date. The project record reports 80% completeness, but no independent site-progress verification or more detailed construction-stage evidence is supplied. RERA unit table RERA record

The RERA certificate and Form B undertaking state a completion date of 23/11/2025. That date is separate from the certificate’s registration-validity period, which ended on 23/11/2025; the certificate records no extension. No occupancy or completion certificate is included in the evidence reviewed. Document index

Master plan, architecture & building design

The GHMC building permit sanctions one residential building, Building A, with 1 Cellar + 1 Stilt + 5 upper floors. It states a site extent of 1916.91 sq. m and an approved built-up area of 4,842.60 sq. m. The permit’s separate area parameters list a cellar of 1,108.9 sq. m, a stilt of 1,145.5 sq. m, and total parking area of 2,291.1; the unit for the total-parking-area figure is not stated in the extraction. These are permit figures, not saleable or carpet-area measurements. RERA filing

The permit identifies a tot-lot of 103.02 (unit not stated in the extracted parameter) and requires peripheral greenery and tree planting. It also specifies rainwater-harvesting structures and a transformer space. The supplied evidence does not establish building footprint, flats per floor, lift or stair count, internal circulation layout, or a detailed open-space distribution.

The permit lists LRS/346/CR-6/SOUTHZONE/2008 as the approved layout/LRS/subdivision reference. No approved-layout drawing or detailed site-layout measurements are included in the evidence supplied for this overview. Approvals record

Homes, configurations & floor plans

The TG-RERA filing lists 40 units in one configuration, 3BHK, with a filed saleable area of 145.07 sq. m per unit. The portal record shows zero booked and 40 available, but provides no as-of date for those counts. RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK40040145.07 sq. m81.1–103.9 sq. m; median 92.8 sq. m (software-measured)36% (software-derived)

The carpet-area range and median are software measurements from the approved floor-plan drawings, not RERA-filed area disclosures; the drawing-based measurement record says the measurements need review. The filed saleable area is a separate figure and includes the home’s share of common areas; carpet area is not interchangeable with saleable area. Floor plans RERA unit details

The drawing measurement record describes a measured 3BHK plan with three bedrooms, living/dining, kitchen, toilets and a utility area. In that example, the utility is excluded from the software-measured carpet area. The supplied data does not establish that the example is the sole or standard arrangement for every apartment. RERA unit details

Parking & vehicle circulation

The GHMC permit identifies cellar and stilt parking areas and requires both approved areas to be used exclusively for vehicle parking, without partition walls or rolling shutters and without conversion to another use. It does not provide a count of car or two-wheeler spaces in the supplied extract.

No evidence supplied establishes resident-versus-visitor allocation, accessible bays, mechanical parking, EV charging, ramps, parking-space assignments to individual units, or exclusive ownership of any drawn bay. The permit’s total parking-area parameter is 2,291.1, with no unit stated in the extraction; it should not be treated as a verified parking-space count.

Amenities, recreation & open spaces

Tot-lot / green strip
Description / size103.02 in the permit parameter (unit not stated); permit requires fencing and maintenance as greenery before occupancy certification.
Declared progress / verified statusSanctioned / required by permit; no independent completion verification supplied.
Peripheral greenery and tree planting
Description / sizePlanting along the site periphery and in front of the premises; a strip of greenery is to be maintained.
Declared progress / verified statusPermit condition; completion not independently verified.
Park / central green; children’s play areas / sand pits; yoga areas; indoor games
Description / sizeListed in third-party vendor material; no size or quantity supplied in the RERA evidence.
Evidence sourcePromoter website
Declared progress / verified statusVendor-listed only; not established here as sanctioned or delivered.

The project’s RERA amenity-progress record lists green strip/tot-lot/park as 50%, water conservation/rainwater harvesting as 50%, and community buildings as 0%. These are recorded progress figures, not independent verification of completion. The permit separately requires a tot-lot and rainwater-harvesting structure. RERA amenities

Utilities, building services & safety

The GHMC permit requires rainwater-harvesting structures, transformer space and an on-site garbage house. The RERA amenity record marks water supply and sewerage as available, each at 50%, and the electrical meter room/sub-station/receiving station at 100%. These are recorded status fields; the supplied evidence does not give water source or storage capacity, treatment capacity, STP specifications, reuse arrangements, storm-water design, electrical supply or backup capacity. RERA amenities

The permit requires sanitation, plumbing, fire-safety systems, lifts and electrical installations to be carried out under qualified technical supervision. It also requires fire-fighting installations under the cited National Building Code provisions and an occupancy Fire NOC before issue of the occupancy certificate. No Fire NOC, lift specification, escape-stair count, system capacity, or completed-service verification is supplied.

The permit further requires a garbage house and safe transformer space. No supplied project record establishes waste-segregation arrangements, CCTV or access-control systems, accessibility ramps, or accessible circulation.

Location, access & connectivity

The project’s registered location is Shivrampally Jagir, PIN 500052; the GHMC permit identifies Shivarampally Jagir, Rajendranagar Mandal. The project record gives the southern boundary as a 30-feet-wide road. RERA record RERA filing

A supplied location record places the cadastral parcel centroid at 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km. Location record

No project-record evidence supplied here establishes public-transport stops, a wider approach-road route, or additional independently measured connectivity distances. Location record

Developer & development status

The registered promoter is M.A. Global, recorded as a partnership. The project record gives GSTIN 36ABBFM9410E1Z1. The firm-registration document identifies M.A. Global as Firm No. 2544 of 2015 and names Shahid Hussain and Faisal Hussain as partners; a separate authorization document records Shahid Hussain as authorized signatory. RERA record Corporate record

The project record names Mohammed Abdul Mateen and Safia Rabbani as landowner participants under area-share arrangements. The development agreement evidence describes M.A. Global’s development rights and a 50/50 sharing arrangement. Parties record

The RERA record reports 80% project completeness and an undertaking to complete by 23/11/2025. No independent progress inspection or occupancy/completion certificate is supplied. The project identity fields do not disclose a mandal; the GHMC building permit identifies Rajendranagar Mandal. RERA record Document index

Approvals, official records & documents

TG-RERA registration certificate (Form C)
Identifier / dateP02500008858; issued 05/10/2024; validity 23/11/2022–23/11/2025
What the supplied record establishesProject registration and stated validity; the certificate records no extension.
GHMC building permit
Identifier / date4238/GHMC/CHR/2022-BP; file 003476/GHMC/1768/CHR1/2022-BP; 23 November 2022
What the supplied record establishesPermit for one residential building with 1 cellar, 1 stilt and 5 upper floors, subject to permit conditions.
Layout / LRS reference
Identifier / dateLRS/346/CR-6/SOUTHZONE/2008
What the supplied record establishesReference listed in the permit extraction.
Form B declaration
Identifier / dateDated 12/09/2024
What the supplied record establishesPromoter declaration including a completion undertaking for 23/11/2025.
Title-search report
Identifier / dateDated 04-11-2022
What the supplied record establishesAdvocate’s title opinion filed with RERA concerning the scheduled land; the report is a filed opinion, not an independent verification for this overview.
Building-plan drawing record
Identifier / date487129
What the supplied record establishesDrawing record used for software measurements; drawing-based carpet-area figures are not RERA-filed disclosures.

The GHMC permit states that its permission does not itself confer ownership rights, requires construction to follow the sanctioned plan, and requires an occupancy certificate before occupation. No occupancy or completion certificate is included in the supplied project evidence.

Frequently asked questions

Is M G CASTLE registered with Telangana RERA?

Yes. M G CASTLE is registered with the Telangana Real Estate Regulatory Authority as P02500008858; the registration status is On-Going Project.

Who is the developer of M G CASTLE?

The promoter named in the RERA registration is M.A. GLOBAL.

Where is M G CASTLE located?

M G CASTLE is in SHIVRAMPALLY JAGIR, Hyderabad, Telangana (500052).

When will M G CASTLE be completed?

The promoter's proposed date of completion filed with RERA is 23/11/2025. This is the promoter's declaration, not a guarantee.

More projects in Hyderabad