Sign in

Lohita Residency

LOHITA CONSTRUCTIONS · Hyderabad · RERA P02500001485

Lohita Residency is a residential apartment project in Bachupally, Bachupally(M) Mandal, Medchal-Malkajgiri District, developed by registered promoter Lohita Constructions. The project covers 3,978.20 Sq. Mt. and comprises two residential blocks, B (A) and B (B): B (A) has 1Cellar + 1Stilt + 5 floors, and B (B) has 1Stilt + 5 floors. It has 65 apartments: 30 “2 BED ROOM FLAT” and 35 “3 BED ROOM FLAT”. Its TG-RERA registration is P02500001485, and the proposed completion date is 08/08/2025.

01What we found

Period endedTG-RERA registration ran to 8 Aug 2025 - check its extension on TG-RERA
14documents on file - each fact links to its page
39court cases on this project's land (survey 148, 149, Bachupally)
12items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

12 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameLohita Residency RERA record
Project typeResidential apartment project RERA record
Phase / registered portionDescribed in the filing as “New Project”; a separate phase name or phase identifier is not disclosed RERA filing
TG-RERA registrationP02500001485
Registration validityCertificate states validity from 27/12/2019 to 08/08/2025, unless extended by the Authority. The supplied certificate says it was not extended; no later extension is evidenced here
Registered promoterLohita Constructions, described in its filing as a partnership firm RERA record RERA filing
RERA status in supplied recordRegistration certificate issued under section 5. Its stated validity ended on 08/08/2025; the supplied record does not establish a subsequent extension or current registration status

Land and geographic identity

FieldProject record
LocalityBachupally RERA record
Revenue villageBachupally (also rendered “Bachpalle” in the HMDA approval) RERA filing
MandalNot disclosed in the project identity record; the HMDA approval identifies Bachupally(M) Land records
DistrictHyderabad in the TG-RERA identity record; the HMDA technical approval identifies Medchal-Malkajgiri District RERA record
PIN500090 in the project header and RERA certificate RERA record
Survey numbers / subdivisions148/B and 149 in the project record and RERA certificate Land records
Registered site extent3,978.20 Sq. Mt. in the HMDA technical approval
RERA land area3,978.20 sq m total and net; affected area is recorded as 0 sq m RERA filing
BoundariesEast: Sy No 148 A; West: 40 Ft Wider Road; North: Sy No 148 B Part; South: Sy No 148 B Part RERA filing

Development identity

FieldProject record
Technical sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); approval states that building plans are to be sanctioned by the Executive Authority in conformity with HMDA’s technical approval
Principal approval017696/MED/R1/U6/HMDA/26112018, dated 08/08/2019 Approvals record
Approved built-up area7,393.6 Sq.mts is stated as total built-up area in the approval parameters. The same document separately records proposed built-up area of 9,051.22 Sq.mts; these are distinct figures in the approval record
BuildingsTwo residential blocks: B (A) and B (B)
Floor configurationB (A): 1Cellar + 1Stilt + 5; B (B): 1Stilt + 5
ParkingApproval identifies cellar and stilt levels for parking; no parking-space count is supplied here
Unit countsRERA-filed: 65 units—30 “2 BED ROOM FLAT” and 35 “3 BED ROOM FLAT” RERA unit table RERA unit table
Approval versus RERA unit countThe supplied approval extraction does not state the sanctioned number of units, so a numerical comparison cannot be made RERA unit table

Offering and status

FieldProject record
RERA-filed configurations2 bedroom: 30 units; 3 bedroom: 35 units RERA unit table
RERA-filed saleable area2 bedroom: 32.3 sq m; 3 bedroom: 47.74 sq m RERA unit table RERA unit table
Booked / availablePortal figures show 0 booked and 30 available 2-bedroom units; 0 booked and 35 available 3-bedroom units. The portal record has no as-of date, so these counts are indicative RERA unit table
Construction stageThe supplied project record labels this a “New Project” and records 80% completeness; no site inspection or independent construction verification is supplied RERA filing RERA record
Completion timelineThe registration certificate and Form B undertaking state 08/08/2025 as the end date / completion undertaking
Occupancy / completion certificateNo project or tower-specific occupancy or completion certificate is included in the supplied evidence Document index

2. The project story

Lohita Residency is registered as a residential apartment development on Survey Nos. 148/B and 149, Bachupally, with a site extent of 3,978.20 Sq. Mt. RERA record Land records The HMDA technical approval describes two residential blocks, B (A) and B (B), with the filed floor arrangements shown in the identity table above.

The RERA filing records 65 apartments: 30 two-bedroom and 35 three-bedroom units. Its last-read portal inventory shows all 65 as available and none booked, but the record does not give an as-of date RERA unit table RERA unit table. The project record also reports 80% completeness, which is a filed status rather than independently verified progress RERA record. The supplied documents state a completion date of 08/08/2025; no occupancy or completion certificate is included for either building Document index.

3. Master plan, architecture & building design

The HMDA technical approval describes a residential development on 3,978.20 Sq. Mt. and identifies two blocks. Its building schedule lists B (A) as 1Cellar + 1Stilt + 5 and B (B) as 1Stilt + 5. The approval parameters state total built-up area of 7,393.6 Sq.mts and separately state proposed built-up area of 9,051.22 Sq.mts; the supplied material does not explain that distinction further.

The approval lists transformer space, garbage house, rainwater-harvesting structures, tot-lot, septic tank, water supply and sewerage disposal system. It also specifies that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking and not converted to other uses. Detailed floor plans, floor-by-floor apartment arrangements, building footprints, lift and stair counts, landscaping areas, and residential/common-area breakdowns are not available in the supplied drawing-derived records Floor plans Document index.

4. Homes, configurations & floor plans

The RERA filing identifies 30 two-bedroom flats and 35 three-bedroom flats. The portal’s booked and available counts are undated and should be treated as indicative RERA unit table RERA unit table.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK3003032.3 sq mNot suppliedNot supplied
3BHK3503547.74 sq mNot suppliedNot supplied

The supplied floor-plan measurement record reports no measured flat designs for either configuration. The filed saleable areas are RERA figures; no software-measured carpet-area figures, room dimensions, balcony measurements, or typical floor layouts are available in this evidence Floor plans RERA unit details. Saleable area should not be read as carpet area: the supplied measurement guidance notes that saleable area also reflects a home’s share of common areas Floor plans.

5. Parking & vehicle circulation

The HMDA approval identifies a cellar in block B (A), stilt levels in both blocks, and requires the approved cellar and stilt areas to remain exclusively for vehicle parking. The supplied record does not provide the number of car or two-wheeler spaces, visitor or accessible parking provision, parking allocation by apartment, or details of ramps, internal driveways, pedestrian separation, or EV charging Document index. The approval of parking areas does not, by itself, establish exclusive parking rights for any particular apartment.

6. Amenities, recreation & open spaces

The project filing lists infrastructure and common-facility categories, but the supplied record shows 0% progress for each item; no independent completion verification is provided RERA amenities.

Internal roads and footpaths
Description / sizeSize not disclosed
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified statusListed as available “YES”; progress 0%; not independently verified
Water supply
Description / sizeSource, capacity and storage not disclosed
Evidence sourceRERA amenity record RERA amenities; HMDA approval
Declared progress / verified statusListed as available “YES”; progress 0%; not independently verified
Sewerage
Description / sizeRERA record names chambers, lines, septic tank and STP; HMDA approval lists septic tank and sewerage disposal system
Evidence sourceRERA amenity record RERA amenities; HMDA approval
Declared progress / verified statusListed as available “YES”; progress 0%; not independently verified
Storm-water drains
Description / sizeSize and design not disclosed
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified statusListed as available “YES”; progress 0%; not independently verified
Green strip / tot-lot / park
Description / sizeArea and facilities not disclosed; HMDA approval requires a fenced tot-lot maintained as greenery
Evidence sourceRERA amenity record RERA amenities; HMDA approval
Declared progress / verified statusRERA progress 0%; no completion verification
Rainwater harvesting / water conservation
Description / sizeCapacity and system details not disclosed
Evidence sourceRERA amenity record RERA amenities; HMDA approval
Declared progress / verified statusListed as available “YES”; progress 0%; not independently verified
Electrical meter room / sub-station / receiving station
Description / sizeCapacity not disclosed; approval also requires transformer space
Evidence sourceRERA amenity record RERA amenities; HMDA approval
Declared progress / verified statusListed as available “YES”; progress 0%; not independently verified
Street lighting
Description / sizeQuantity and specification not disclosed
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified statusProgress 0%; not independently verified
Community buildings
Description / sizeType and size not disclosed
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified statusProgress 0%; not independently verified
Sewage and sullage treatment/disposal
Description / sizeSystem and capacity not disclosed
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified statusProgress 0%; not independently verified
Solid-waste management and disposal
Description / sizeSystem and capacity not disclosed; HMDA approval requires a garbage house within the premises
Evidence sourceRERA amenity record RERA amenities; HMDA approval
Declared progress / verified statusProgress 0%; not independently verified
Energy management
Description / sizeDetails not disclosed
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified statusProgress 0%; not independently verified
Fire protection and fire-safety requirements
Description / sizeSystems and clearances not detailed in the supplied record
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified statusProgress 0%; not independently verified
Aggregate recreational open space
Description / sizeArea not disclosed
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified statusProgress 0%; not independently verified

7. Utilities, building services & safety

The HMDA approval lists water supply, sewerage disposal, septic tank, rainwater-harvesting structures, transformer space and a garbage house. It also requires a tot-lot to be fenced and maintained as greenery, and tree planting along the site periphery and frontage. The RERA amenity record separately lists water supply, sewerage, storm-water drains, rainwater harvesting, electrical meter room/sub-station/receiving station, solid-waste management and fire-safety requirements, but records 0% progress for those items RERA amenities.

The supplied evidence does not specify water source or storage capacity, STP capacity or reuse arrangements, electrical supply or backup capacity, lift numbers or capacities, fire-system details, emergency access, CCTV/security arrangements, or accessible routes and ramps. The amenity categories and approval conditions do not establish that these services are complete or that statutory clearances have been issued RERA amenities.

8. Location, access & connectivity

The RERA record places the project in Bachupally, PIN 500090, on Survey Nos. 148/B and 149 RERA record Land records. The HMDA approval refers to Bachupally(M) Mandal and Medchal-Malkajgiri District. The recorded western boundary is a 40 Ft Wider Road RERA filing.

A cadastral parcel-centroid location is supplied at 17.41528, 78.35459 Location record. No verified road-network, public-transport, or landmark-distance information is supplied for this project in the RERA-based location record. The separate vendor listing contains location and connectivity claims, but these are not used here as TG-RERA project evidence Promoter website.

9. Developer & development status

The registered promoter is Lohita Constructions, identified in the RERA material as a partnership firm. Its Form B declaration names Krishna Chaitanya Yarlagadda as an authorised signatory and states that the firm entered into a Development Agreement-cum-GPA with the named landowners for the development. The promoter’s registered-office particulars are not consistently complete in the supplied records; Form B gives a principal place of business at Flat No 302, Gafoor Nagar Colony, Tulip Garden, Madhapur, Hyderabad, Telangana – 500081.

The registration certificate states a completion date of 08/08/2025 and validity through that date, unless extended. Form B also gives a completion undertaking before 8 August 2025. The project record reports 80% completeness, but no independent site-progress verification or tower-specific completion status is supplied RERA record. No occupancy or completion certificate is included Document index.

10. Approvals, official records & documents

RecordWhat the supplied evidence establishes
TG-RERA registration certificateForm C records Lohita Residency, registration P02500001485, granted under section 5, with stated validity from 27/12/2019 to 08/08/2025
HMDA technical approvalApproval 017696/MED/R1/U6/HMDA/26112018, dated 08/08/2019, for a residential apartment development on Survey Nos. 148/B and 149, Bachupally
HMDA approval conditionsThe approval states that building plans are to be sanctioned by the Executive Authority in conformity with HMDA’s technical approval and includes requirements relating to commencement notice, completion notice, occupancy certificate, parking, rainwater harvesting, transformer space, garbage house and greenery
Title/development declarationForm B records the promoter’s declaration concerning its Development Agreement-cum-GPA with the landowners and its completion undertaking
Approved layout/building drawingsThe supplied document index includes an unextracted layout-plan item; no reviewed layout drawing or detailed floor-plan measurements are available in this evidence Document index Floor plans
Occupancy/completion certificateNo project-wide or building-specific occupancy or completion certificate is included in the supplied documents Document index

Frequently asked questions

Is Lohita Residency registered with Telangana RERA?

Yes. Lohita Residency is registered with the Telangana Real Estate Regulatory Authority as P02500001485; the registration status is New Project.

Who is the developer of Lohita Residency?

The promoter named in the RERA registration is LOHITA CONSTRUCTIONS.

Where is Lohita Residency located?

Lohita Residency is in Bachupally, Hyderabad, Telangana (500090).

When will Lohita Residency be completed?

The promoter's proposed date of completion filed with RERA is 08/08/2025. This is the promoter's declaration, not a guarantee.

More projects in Hyderabad