Sign in

Laxmi Ram Haveli

The DB Group · Rangareddy · RERA P02400007716

Laxmi Ram Haveli is a residential apartment building in Manchirevula, Gandipet mandal, Ranga Reddy district, being developed by the registered promoter The DB Group. The project covers 348.33 sq.m and comprises one building with 1 Stilt + 5 upper floors and 10 2BHK apartments, each with a RERA-filed saleable area of 112.41 sq.m. Its TG-RERA registration number is P02400007716, and the project header records a proposed completion date of 06/03/2027.

More from The DB Group · 5 projects →

01What we found

Period endedTG-RERA registration ran to 6 Nov 2026 - check its extension on TG-RERA
22documents on file - each fact links to its page
2court cases on this project's land (survey 145, Manchirevula)
11items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameLaxmi Ram Haveli RERA record
Project typeResidential apartment building RERA record RERA filing
Phase / registered portionOne building; no separate phase name is disclosed RERA filing
TG-RERA registrationP02400007716 RERA record
Registration validity12/02/2024 to 06/11/2026, as recorded on the certificate
Registered promoterThe DB Group, identified in the filing as a partnership RERA filing Corporate record
RERA statusNew Project; registration certificate on file RERA record

Land and geographic identity

FieldRecord
Locality / revenue villageManchirevula RERA record RERA filing
MandalGandipet RERA record RERA filing
DistrictRanga Reddy RERA record RERA filing
PIN500075 RERA record
Project survey numbers145, 146, 147, 156, 157 and 158; no subdivisions are specified in the project identity record RERA filing
PlotPlot No. 29 RERA filing
Site extent348.33 sq.m; the RERA land record gives total and net area as 348.33 sq.m RERA filing
Boundaries in RERA filingNorth: 50 feet wide road; South: Plot No. 17; East: Plot No. 28; West: Plot No. 30 RERA filing

Development identity

FieldRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA)
Principal building-permit reference006236/BP/HMDA/1335/SKP/2023, dated 06 November, 2023
Approved building arrangementOne residential building; 1 Stilt + 5 upper floors
Building heightThe approval extraction records 15.00 MT. in its floor/height parameters and separately records 20.75mt. total height, 17.75 mt. height from GL, and 15.00 mt. height excluding stilt
Built-up areaApproval records 947.35 sq.m as net residential BUA and 1,151.39 sq.m as total BUA; it also records 1,133.35 sq.m total proposed built-up area including parking. These are separate figures as stated in the extracted approval data
Parking provision in extracted approvalStilt is designated for parking; the extraction records 186.00 sq.m parking area and “PROPOSED NUMBER OF PARKINGS: 0.” No approved car-space count is established in the supplied data
Units10 dwelling units in the approved-plan extraction; the RERA unit record also lists 10 units RERA unit table

Offering and status

FieldRecord
RERA-filed configuration2BHK RERA unit table
RERA-filed saleable area112.41 sq.m per unit RERA unit table
Booked / available0 booked; 10 available in the supplied portal-derived unit record. The record has no as-of date, so counts are indicative RERA unit table
Construction stageNo construction-progress percentage or independently verified site-stage evidence is supplied RERA amenities Document index
Completion timelineThe RERA Form B declaration states completion within three years, by 06th Nov 2026. The project header separately records a proposed completion date of 06/03/2027 RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied; the building-permit extraction records completion certification as false

2. The project story

  • Laxmi Ram Haveli is registered as a residential apartment project on Plot No. 29 at Manchirevula, in Gandipet mandal, Ranga Reddy district. The registered land identity lists survey numbers 145, 146, 147, 156, 157 and 158, and a site extent of 348.33 sq.m. RERA record RERA filing
  • The filed and sanctioned proposal is for one residential building with a stilt level and five upper floors, containing 10 dwelling units. The RERA unit record lists the homes as 2BHK apartments. The building permit states that occupancy requires an occupancy certificate; none is included in the supplied records. RERA unit table
  • The supplied information does not establish the current physical construction stage or independently verified completion progress. The RERA Form B contains the promoter’s completion undertaking, while the project header gives a proposed completion date; these are recorded separately above and should not be read as evidence that construction is complete. RERA record

3. Master plan, architecture & building design

  • The filed project is a single-building apartment development on a recorded site of 348.33 sq.m. The extracted plan data identifies 348.33 sq.m as both minimum plot area and net plot area, with 158.87 sq.m vacant plot area and 189.47 sq.m proposed coverage area. These are plan-extraction figures, not independent site measurements.
  • The approval extraction describes one building with 1 Stilt + 5 upper floors. It records net residential built-up area of 947.35 sq.m, total proposed built-up area including parking of 1,133.35 sq.m, and total BUA of 1,151.39 sq.m. The supplied extraction does not define the calculation basis for these separate BUA entries, so they are retained as separately labelled figures rather than treated as interchangeable.
  • The plan extraction lists a 15.00MT WIDE MAINROAD and a 50'-0" WIDE ROAD. The building-permit record also specifies a 4.5-metre minimum approach-road width and a 5-metre height clearance for entry and exit. No verified drawing-derived account of building footprint dimensions, flats per floor, lift count, stair count, internal circulation or open-space arrangement is supplied.

4. Homes, configurations & floor plans

The RERA record lists ten 2BHK units, with none booked and ten available in the supplied portal-derived data; those counts have no stated as-of date. The RERA-filed saleable area is 112.41 sq.m per unit. RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK10010112.41 sq.mSoftware-measured range: 64.3–70.2 sq.m; median 66.8 sq.m41% RERA unit table Floor plans
  • Carpet-area figures are software measurements from the supplied plan drawing, not RERA-filed measurements; the extraction says the geometry needs review. Saleable area and measured carpet area are distinct measures: the supplied floor-plan note states that saleable area includes the home’s share of common areas. A utility area is also shown in the measured flat: 1.22 × 6.92 m, area 8.44 sq.m, excluded from the carpet-area calculation. Floor plans RERA unit details
  • The measured typical-floor-plan sample identifies bedrooms, living/kitchen, dining, toilets and utility. The supplied room dimensions are drawing-derived for one illustrated flat and should be checked against the drawing; they are not RERA disclosures. RERA unit details

5. Parking & vehicle circulation

  • The approval extraction designates the stilt floor for vehicle parking and records a parking area of 186.00 sq.m. It also states “PROPOSED NUMBER OF PARKINGS: 0”; accordingly, a count of sanctioned parking spaces cannot be established from the supplied extraction. The building permit says the stilt/cellar is to be used exclusively for parking and specifies a minimum entry/exit width of 4.5 metres with 5 metres height clearance.
  • No resident, visitor or accessible-space counts, parking-allocation schedule, EV charging installation status, or legally documented exclusive parking allocation to units is supplied. A parking area or drawn bay does not by itself establish a buyer’s exclusive parking entitlement.

6. Amenities, recreation & open spaces

The RERA amenity record lists the following project items. Its progress fields show 0% for the listed items; this is a filed status, not independent verification of site completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsSize not statedRERA amenities0%; not independently verified
Water SupplyListed as available “YES”RERA amenities0%; not independently verified
Sewerage (Chamber, Lines, Septic Tank, STP)Listed as available “YES”RERA amenities0%; not independently verified
Storm Water DrainsNo size or further description statedRERA amenities0%; not independently verified
Green Strip/TOT LOT/ParkListed as available “YES”RERA amenities0%; not independently verified
Street LightingNo further description statedRERA amenities0%; not independently verified
Community BuildingsNo size or further description statedRERA amenities0%; not independently verified
Treatment and Disposal of Sewage and Sullage WaterNo further description statedRERA amenities0%; not independently verified
Solid Waste Management and DisposalNo further description statedRERA amenities0%; not independently verified
Water Conservation, Rain Water HarvestingListed as available “YES”RERA amenities0%; not independently verified
Energy managementNo further description statedRERA amenities0%; not independently verified
Fire Protection and Fire Safety RequirementsNo further description statedRERA amenities0%; not independently verified
Electrical Meter Room, Sub-Station, Receiving StationListed as available “YES”RERA amenities0%; not independently verified
Aggregate area of recreational Open SpaceArea not statedRERA amenities0%; not independently verified

The supplied approval extracts also list a transformer, sump, overhead water tank, rainwater harvesting, septic tank, lift, garbage house and STP. These are approval/document-record items; no delivery or operational status is established here.

7. Utilities, building services & safety

  • The approval records specify an underground static water-storage tank of 25,000 litres and a separate terrace tank of 25,000 litres. The extracted approval also lists a sump and overhead water tank. No water-source details or evidence of installed/operational storage is supplied.
  • For wastewater, the approval extraction lists an STP, while the RERA amenity record lists sewerage facilities and rainwater harvesting as available “YES.” The approval conditions require rainwater-harvesting structures and specify STP provision; the building permit also refers to a garbage house. The records do not establish current installation, capacity or operating performance. RERA amenities
  • The approval extraction lists a transformer and electrical meter room/sub-station/receiving station as available “YES” in the RERA amenity data. The building-permit extraction includes electric-vehicle charging infrastructure as a listed item, but no installation status or charging capacity is supplied. RERA amenities
  • The approved-plan extraction lists a lift, but does not provide its count, capacity or service-lift details. The building permit includes safety and construction conditions, including fire-safety and structural-stability responsibility, and specifies approach clearances; the supplied records do not establish completed systems, inspection results or statutory clearance.

8. Location, access & connectivity

  • The registered location is Manchirevula village, Gandipet mandal, Ranga Reddy district, PIN 500075. The building permit identifies Plot No. 29. The RERA land record gives the north boundary as a 50 feet wide road; the extracted approval also lists a 15.00-metre main road and a 50-foot-wide road. RERA record RERA filing
  • Supplied mapped distances are: Financial District (Nanakramguda), 1.2 km; IndusInd Bank, 0.4 km; unnamed bus station, 2.2 km; Manuu Polytechnic Hyderabad, 1.6 km; Sankaraya Eye Hospital, 1.6 km; ADP, 0.0 km; South India Shopping Mall, 2.6 km; unnamed park, 1.2 km; and Nanakramguda Government Primary School, 0.5 km. These are location-record distances; no travel times are supplied. Location record

9. Developer & development status

  • The registered promoter is The DB Group, identified as a partnership in the RERA promoter information. Its GSTIN is 36AAQFT1806M1ZP. The project record lists Dinesh Gambavanthu as partner and Bhargava Kokkalla as authorized signatory. Corporate record RERA filing Parties record
  • The RERA registration certificate identifies The Db Group as promoter. The supplied certificate gives a promoter address of Gandamguda, Gandipet, Ranga Reddy, PIN 500091; the project header separately records the project PIN as 500075. RERA record
  • The Form B declaration by Bhargava Kokkalla, dated 29 December 2023, states that completion would be within three years, by 06th Nov 2026. The project header records 06/03/2027 as the proposed completion date. No construction-progress percentage or independently verified site-stage evidence is supplied, and no occupancy certificate is included. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Reference / dateP02400007716; valid 12/02/2024–06/11/2026
Scope and evidenceForm C certificate for Laxmi Ram Haveli, identifying The Db Group as promoter
HMDA technical approval / building-permit record
Reference / date006236/BP/HMDA/1335/SKP/2023; dated 06 November, 2023
Scope and evidenceOne residential building at Plot No. 29, Manchirevula; 1 Stilt + 5 upper floors
Earlier approval reference in plan extraction
Reference / dateTS/036809/2023; approved 26-05-2023
Scope and evidenceBuilding-permit plan extraction; lists one building and 10 dwelling units
Layout-plan filing
Reference / dateDocument ID 383786
Scope and evidenceExtracted plan and approval data for the project; the supplied material does not establish a separate layout-permission number
Mortgage record cited in approval
Reference / dateDocument No. 12229/2023; dated 04 October, 2023 in the approval extraction
Scope and evidenceMortgage of 99.73 sq.m built-up area in favour of the Metropolitan Commissioner, HMDA
Promoter declaration
Reference / dateForm B, dated 29 December 2023
Scope and evidencePromoter’s title, encumbrance and completion declarations
Occupancy / completion certificate
Reference / dateNot supplied
Scope and evidenceThe approval extraction records completion certification as false

Frequently asked questions

Is Laxmi Ram Haveli registered with Telangana RERA?

Yes. Laxmi Ram Haveli is registered with the Telangana Real Estate Regulatory Authority as P02400007716; the registration status is New Project.

Who is the developer of Laxmi Ram Haveli?

The promoter named in the RERA registration is The DB Group.

Where is Laxmi Ram Haveli located?

Laxmi Ram Haveli is in Manchirevula, Gandipet, Rangareddy, Telangana (500075).

When will Laxmi Ram Haveli be completed?

The promoter's proposed date of completion filed with RERA is 06/03/2027. This is the promoter's declaration, not a guarantee.

More projects in Manchirevula