Sign in

Kakatiyas Ranga Sai Enclave

KAKATIYA CONSTRUCTIONS · Hyderabad · RERA P02500000786

KAKATIYAS RANGA SAI ENCLAVE is a residential apartment project in Serilingampally, Hyderabad. The registered promoter developing it is KAKATIYA CONSTRUCTIONS. The project covers 585.14 sq. m and comprises one building with 15 homes: 10 2BHK and 5 3BHK apartments, with RERA-filed saleable areas of 103.72 sq. m and 123.79 sq. m, respectively. It is registered under TG-RERA registration P02500000786, with a proposed completion date of 31/08/2020.

More from Kakatiya Constructions · 6 projects →

01What we found

Period endedTG-RERA registration ran to 31 Aug 2020 - check its extension on TG-RERA
7documents on file - each fact links to its page
2court cases on this project's land (survey 225, Serilingampally)
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameKAKATIYAS RANGA SAI ENCLAVE RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; registration describes plots 35 & 36 and Survey No. 225
TG-RERA registrationP02500000786 RERA record
Registration validity25/05/2019 to 31/08/2020; certificate says the registration was not extended
RERA statusRegistration period recorded above. Current registration status is not established by the supplied material.
Registered promoterKAKATIYA CONSTRUCTIONS, recorded as a partnership RERA filing Corporate record
Project status in registration record“New Project” RERA filing

Land and geographic identity

ItemProject record
LocalitySerilingampally; the title report describes the site as Plots 35 and 36, Madeenaguda Village RERA record RERA filing
Revenue villageSerilingampally in the project identity fields; title-report deeds refer to Madinaguda/Madeenaguda Village. RERA record RERA filing
MandalNot disclosed in the project identity fields. Land records
District / PINHyderabad; 500049 RERA record
Project survey numberSy. No. 225; no subdivision is given in the project registration record. RERA record
Plots35 & 36 RERA filing
Registered site extent585.14 sq. m total and net area in the RERA project fields. The title report describes the site as 700 sq. yds. RERA filing
Boundaries in RERA fieldsEast: Plot No. 37; West: Plot No. 34; North: 30 FT WIDE ROAD; South: Plot Nos. 28 and 29. RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) RERA filing
Principal building permissionGHMC Building Permit Order dated 06-Nov-2018; the permit number is not reliably readable in the supplied extraction.
Approved built-up area1,818.19 sq. m in the RERA project fields. RERA filing
Building countOne building/unit in the project fields; one tower is reported in the unit summary. RERA filing RERA unit table
Sanctioned floor configurationNot reliably disclosed in the available GHMC permit extraction. The five-floor description appears in third-party vendor material, not as a verified sanctioned configuration. Promoter website
Parking levels and sanctioned spacesNot established by the supplied records. RERA filing
Unit count15 units: 10 2BHK and 5 3BHK in the RERA unit record. RERA unit table RERA unit details

Offering and status

ItemProject record
RERA-filed configurations2BHK and 3BHK RERA unit details
RERA-filed saleable areas2BHK: 103.72 sq. m; 3BHK: 123.79 sq. m RERA unit details
Portal booking/availability figures2BHK: 0 booked, 10 available; 3BHK: 0 booked, 5 available. These figures are indicative: the portal record supplies no as-of date. RERA unit table
Construction stageNo independently verified site-progress information is supplied. The RERA record describes a new project; the GHMC permit is for proposed building work. RERA filing
Completion dateThe promoter’s Form B declaration states 31/08/2020 as the undertaking; the RERA certificate also records validity ending 31/08/2020.
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied documents. The GHMC permit states that an occupancy certificate is required before occupation.

2. The project story

KAKATIYAS RANGA SAI ENCLAVE is registered as a residential apartment project on Plots 35 and 36 in Survey No. 225, in the Serilingampally locality. The RERA project fields identify a single building and 15 proposed units: ten 2BHK and five 3BHK apartments. RERA record RERA filing RERA unit details

The RERA certificate records registration from 25/05/2019 to 31/08/2020, and the promoter’s Form B declaration gives 31/08/2020 as the project completion undertaking. Those dates do not establish actual construction progress or completion. The supplied record contains no independently verified site-progress report and no occupancy or completion certificate. The GHMC permit is for proposed building work and requires an occupancy certificate before occupation.

3. Master plan, architecture & building design

The RERA fields give a 585.14 sq. m net and total site area, 1,818.19 sq. m approved built-up area, and a single building with 15 units. The GHMC permit extraction records a proposed building and includes a height figure of 14.95 m, but other extracted plan parameters are corrupted or unclear. The supplied material does not establish a dependable floor-by-floor configuration, parking level arrangement, flats per floor, building footprint, or circulation layout. RERA filing RERA filing

No reliable drawing-derived details are supplied for lifts, stairs, entries, internal circulation or residential/common-area distribution. The floor-plan measurement record reports two drawings reviewed but no measured flat design matching the RERA configurations; the only reported configuration is 1BHK, which is not matched to the filed configurations and was held back as implausible. It therefore cannot be used to describe this project’s homes. Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK10010103.72 sq. mNot establishedNot supplied
3BHK505123.79 sq. mNot establishedNot supplied

RERA configuration counts and saleable areas are from the project unit record. Booking and availability figures are portal figures without an as-of date, so treat them as indicative. RERA unit details RERA unit table

The supplied drawing-measurement record does not provide a reliable carpet-area measurement for either RERA-filed configuration. Carpet area is not interchangeable with saleable area: the record notes that saleable area includes the home’s share of common areas, while carpet area is measured from drawing geometry. No room dimensions, orientation, balcony or utility-area details can be established from the supplied material. Floor plans

5. Parking & vehicle circulation

The RERA fields report a mortgage area of 157 sq. m, but do not identify this as a parking allocation or specify its location. The supplied records do not establish sanctioned parking counts, resident or visitor spaces, accessible parking, parking levels, ramps, driveways, EV charging, or unit-wise parking rights. A third-party vendor listing mentions covered car parking, but this is not confirmation of sanctioned provision or a documented allocation to a particular apartment. RERA filing Promoter website

6. Amenities, recreation & open spaces

The RERA amenity schedule marks water supply, sewerage, rainwater harvesting and aggregate recreational open space as available, with 0% progress recorded for every listed item. “Available” in this schedule is a filing entry; completion has not been independently verified. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Community buildingsNo size or further description suppliedRERA amenity schedule0%; completion not verified
Green strip / tot lot / parkNo size suppliedRERA amenity schedule; GHMC permit condition0% in schedule; permit requires a tot lot to be fenced and maintained as greenery before occupancy certificate
Aggregate recreational open spaceSize not suppliedRERA amenity scheduleMarked “YES”; 0%; completion not verified

The third-party vendor listing also names “Indoor,” but does not describe a facility or provide a size; it is not evidence that a specific indoor amenity is sanctioned or delivered. Promoter website

7. Utilities, building services & safety

The RERA amenity schedule marks water supply, sewerage (including chambers, lines, septic tank and STP), and rainwater harvesting as available; each is recorded at 0% progress. It also lists storm-water drains, sewage/sullage treatment and disposal, solid-waste management, energy management, electrical meter room/sub-station/receiving station, and fire protection and fire-safety requirements, each at 0%. The schedule provides no capacities or system specifications, and completion is not independently verified. RERA amenities

The GHMC permit requires a rainwater-harvesting percolation pit, plantation, and maintenance of the tot lot as greenery before issue of an occupancy certificate. It also states that water and electricity connections are to be provided as per rules, and that an occupancy certificate is compulsory before occupation. These are permit conditions, not confirmation that the works or connections have been completed.

The third-party vendor listing mentions 24-hour water supply, backup electricity, CCTV, security personnel, a lift and fire safety; those claims are not confirmed as delivered by the supplied RERA schedule or permit extraction. Promoter website

8. Location, access & connectivity

The registered project location is Serilingampally, Hyderabad, PIN 500049, on Plots 35 and 36 in Survey No. 225. The RERA boundary fields identify a 30 FT WIDE ROAD along the north side; the other boundaries are Plot No. 37 to the east, Plot No. 34 to the west, and Plot Nos. 28 and 29 to the south. RERA record RERA filing

The supplied location record gives the Financial District (Nanakramguda) as 1.2 km from the cadastral parcel centroid. No public-transport details or additional approach-road measurements are supplied. Location record

9. Developer & development status

The registered promoter is KAKATIYA CONSTRUCTIONS, recorded in the RERA fields as a partnership. The listed partners are Srinivas Kura and Gangadhar Madamanchi; Srinivas Kura is also identified as authorized signatory. The promoter’s registered-office address, as recorded, is Levish Park, near Diamond Heights Club, Madeenaguda, Serilingampally, Hyderabad, 500049. No corporate registration identifier or official contact details are established in the supplied material. Corporate record Parties record

The promoter’s Form B declaration states a completion undertaking of 31/08/2020. The registration certificate records validity ending on that date and says registration was not extended. No verified construction-stage update or occupancy/completion certificate is supplied; the completion undertaking and registration-validity date should not be read as proof of completed construction or permission to occupy.

10. Approvals, official records & documents

TG-RERA registration
Supplied evidenceForm C certificate, P02500000786, issued 25/05/2019
What it establishesRegistration of KAKATIYAS RANGA SAI ENCLAVE; validity recorded to 31/08/2020
GHMC building permission
Supplied evidenceBuilding Permit Order dated 06-Nov-2018
What it establishesPermit for proposed building work; the permit number and portions of the project description are not reliably readable in the extraction
Promoter declaration
Supplied evidenceForm B affidavit by K Srinivas, dated as extracted 29/1 2018
What it establishesPromoter-declared title basis, encumbrance statement and completion undertaking; these are declarations, not independent verification
Project title report
Supplied evidenceAdvocate’s report dated 29/01/2019
What it establishesTitle-report material concerning Plots 35 and 36, Survey No. 225, Madeenaguda Village
Encumbrance statement
Supplied evidenceEC statement for 01-01-1983 to 13-07-2017, statement no. 26939106
What it establishesNil EC is stated for the described property and search period only; no current EC is supplied
Floor-plan documentation
Supplied evidenceTwo drawings in the software-measurement record Floor plans
What it establishesNo reliable measured home plan matching the RERA-filed 2BHK or 3BHK configurations is established

The supplied document set does not include an occupancy certificate or completion certificate. The GHMC permit states that an occupancy certificate is compulsory before occupation.

Frequently asked questions

Is KAKATIYAS RANGA SAI ENCLAVE registered with Telangana RERA?

Yes. KAKATIYAS RANGA SAI ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P02500000786; the registration status is New Project.

Who is the developer of KAKATIYAS RANGA SAI ENCLAVE?

The promoter named in the RERA registration is KAKATIYA CONSTRUCTIONS.

Where is KAKATIYAS RANGA SAI ENCLAVE located?

KAKATIYAS RANGA SAI ENCLAVE is in SERILINGAMPALLY, Hyderabad, Telangana (500049).

When will KAKATIYAS RANGA SAI ENCLAVE be completed?

The promoter's proposed date of completion filed with RERA is 31/08/2020. This is the promoter's declaration, not a guarantee.

More projects in Hyderabad