JAYAPRDAS VAIBHAI VIBE is a residential apartment project in Banjara Hills, Hyderabad district; the mandal is not disclosed in the project identity fields. It is being developed by registered promoter VAIBHAVI INFRAA PROJECTS. The project has a land area of 988.66 sq.m, one building with 1 Cellar + Ground + 4 upper floors, and 14 homes, all configured as 3BHK with a filed saleable area of 116.01 m². Its TG-RERA registration is P02500001410, and its proposed completion date is 16/08/2025.

More from Vaibhavi Infraa Projects · 3 projects →

01What we found

Period endedTG-RERA registration ran to 16 Aug 2025 - check its extension on TG-RERA
14documents on file - each fact links to its page
61court cases on this project's land (survey 120, Banjara Hills)
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from commonfloor.com

1. Project at a glance

Project identity

ItemProject record
Registered project nameJAYAPRDAS VAIBHAI VIBE RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionA single registered project is identified; phase details are not separately stated. The GHMC permit covers Building A-1. RERA record
TG-RERA registrationP02500001410 Approvals record
Registration validity25/11/2019 to 16/08/2025; the supplied certificate records no extension. Registration validity is distinct from the construction deadline and from occupancy certification. Approvals record
Registered promoterVAIBHAVI INFRAA PROJECTS RERA record Parties record
RERA statusOn-Going Project in the project record. Registration is recorded as ending 16/08/2025; the supplied record does not establish any later extension or current registration status. RERA record Approvals record

Land and geographic identity

ItemProject record
LocalityBanjara Hills RERA record RERA filing
Revenue village(s)Banjara Hills is the village in the project identity. The GHMC permit describes the site as “BANJARAHILLS -19”; title materials also refer to Shaikpet Village and Hakeempet Village in their parcel/deed descriptions. RERA record RERA filing
MandalNot disclosed in the project identity fields. RERA filing
DistrictHyderabad in the project identity fields. The RERA certificate lists Medchal-Malkajgiri; the project identity table here follows the project record’s Hyderabad entry. RERA record RERA filing
PIN500019 in the project identity and RERA certificate. RERA record
Project survey number(s) and subdivisions120/403/1. The title report and GHMC permit also describe associated land in Survey No. 102/1; the project identity fields identify 120/403/1. RERA filing Land records
Plot identifiers123/A, 117-A and 119A RERA filing
Site extentTotal area 988.66 sq.m; road-affected area 89.09 sq.m; project-record net area 899.57 sq.m. GHMC permit extraction states net area 899.58 sq.m. RERA filing
BoundariesNorth: road; south, east and west: neighbouring plots. RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building permissionPermit No. 1/C18/12443/2019, approved 16 August 2019; file No. 1/HO/09986/2018. Approvals record
Approved buildingBuilding A-1, residential
Sanctioned configuration1 Cellar + Ground + 4 upper floors
Building height15 m
Approved built-up areaThe permit extraction lists ground-floor residential area 334.77 m², upper-floor residential area 1,779.88 m², and cellar parking area 576.90 m². It also contains figures “Proposed Covered builtup area 169,174.00” and “TOTAL: 1,013,514.00”; their formatting/meaning is unclear in the supplied extraction, so they are not treated as confirmed area totals.
Building / tower countOne building is identified in the project record; the permit names Building A-1. RERA filing
Parking provisionGHMC permit identifies the cellar for parking and states cellar and stilt areas approved for parking must remain exclusively for vehicle parking. Parking-space counts are not stated.
UnitsProject record: 14 total units, all recorded as booked. GHMC permit extraction does not give a unit count. RERA unit table

Offering and status

ItemProject record
RERA-filed configuration3BHK; filed saleable area 116.01 m² (1,249 sq.ft as recorded in the project unit data). RERA unit table RERA unit table
Booked / available14 booked; 0 available, as last read from the TG-RERA portal. The portal record has no stated as-of date, so counts are indicative. RERA unit table RERA unit details
Construction stageProject record states 80% completeness; this is a declared/project-record figure, not an independent site measurement. RERA record
Completion timelineOriginal and revised proposed completion date: 16/08/2025. RERA record
Occupancy certificateThe supplied documents do not include an occupancy certificate for Building A-1. The GHMC permit makes an occupancy certificate compulsory before occupation and requires a completion notice after construction. Document index

2. The project story

JAYAPRDAS VAIBHAI VIBE is a registered residential apartment project in Banjara Hills, on land identified in the project record as Survey No. 120/403/1, with associated title materials also describing Survey No. 102/1. The registered development is one building: GHMC’s permit identifies Building A-1, a residential building with a cellar, ground floor and four upper floors. RERA record RERA filing

The project record lists 14 3BHK homes, all booked at the last portal reading; that portal count has no as-of date. A project-record completeness figure of 80% is supplied, but it is not independently verified site progress. The declared completion date is 16/08/2025. The available documents do not establish that an occupancy certificate has been issued for the building. RERA unit table RERA unit details RERA record Document index

3. Master plan, architecture & building design

The available GHMC permit describes one residential building, A-1, on a site area of 988.66 m², with a net area stated in its extraction as 899.58 m². The building is approved as 1 Cellar + Ground + 4 upper floors, with a stated height of 15 m. The permit extraction lists residential area of 334.77 m² on the ground floor and 1,779.88 m² on upper floors, plus 576.90 m² of cellar parking area. These are separately reported permit figures; the extraction’s additional “Proposed Covered builtup area” and “TOTAL” figures are not sufficiently clear to interpret as reliable totals.

The project record gives the net site area as 899.57 m² and identifies 89.09 m² as road-affected. The GHMC permit states that the road-affected portion is to be surrendered to GHMC without compensation, and records a 63.72 m² tot-lot, one rainwater-harvesting structure and 45 trees. The supplied materials do not establish floor-by-floor apartment counts, lifts, stairs, building footprint, internal circulation, landscaping extent beyond the stated tot-lot, or commercial/common-area distribution. RERA filing

An approved floor-plan document is identified in the project record, but its layout drawing is not reproduced in the supplied extracts. No approved layout plan or further drawing-derived building details are available here. Document index

4. Homes, configurations & floor plans

The TG-RERA unit record lists 14 3BHK apartments, all booked, with a filed saleable area of 116.01 m² each. The filed unit data also lists carpet area 84.8 m², but a separate floor-plan measurement record identifies that carpet figure as software-measured from drawings, not a RERA disclosure. It reports 27% loading. Treat the drawing-derived measurement as indicative and verify it against the drawing. RERA unit table RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK14140116.01 m² (1,249 sq.ft as recorded) RERA unit table RERA unit table84.8 m² (913 sq.ft), software-measured from drawing Floor plans27% Floor plans

The drawing measurement records a typical measured 3BHK with three bedrooms, kitchen, dining, two toilets, utility and two balconies. Room dimensions recorded for the measured design include a 3.0 m × 3.1 m bedroom, 3.61 m × 4.29 m master bedroom, 2.94 m × 3.35 m kitchen and 4.59 m × 4.71 m dining area. These measurements are software-derived from the floor-plan drawing and are not RERA-filed room dimensions. RERA unit details

Carpet area refers to the drawing-measured home area in this record; the RERA-filed saleable area is a separate figure and includes the home’s share of common areas. Balcony and utility spaces are marked excluded from the measured carpet area. Floor plans RERA unit details

5. Parking & vehicle circulation

The GHMC permit identifies 576.90 m² of cellar parking area and requires the cellar and any stilt areas approved for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters and without conversion to another use. The permit extraction does not state the number of car or two-wheeler spaces, visitor or accessible spaces, or a unit-wise parking allocation.

The supplied record does not establish parking bay ownership, an allocation schedule, a separate stilt parking level, parking ramps or driveways, pedestrian separation, mechanical parking or EV charging. A parking area shown or described in the permit does not by itself establish exclusive allocation to a particular apartment.

6. Amenities, recreation & open spaces

The GHMC permit lists project-site provisions including a tot-lot, rainwater-harvesting structure, transformer space and garbage house. The project amenity record reports water supply, sewerage, storm-water drains, green strip/tot-lot/park, street lighting, rainwater harvesting, and electrical meter room/substation/receiving station as available at 100%; these are recorded progress entries, not independent verification of completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot / green strip63.72 m² in GHMC permit; project amenity record lists green strip/tot-lot/parkRERA amenitiesPermit condition requires fencing and maintenance as greenery before OC; amenity record says 100%, not independently verified RERA amenities
Water supplyQuantity/capacity not statedRERA amenitiesRecorded as 100%; not independently verified RERA amenities
SewerageChambers, lines, septic tank/STP listed in project amenity record; capacity not statedRERA amenitiesRecorded as 100%; not independently verified RERA amenities
Storm-water drainsSize/capacity not statedRERA amenitiesRecorded as 100%; not independently verified RERA amenities
Street lightingQuantity/specification not statedRERA amenitiesRecorded as 100%; not independently verified RERA amenities
Rainwater harvestingGHMC permit requires one rainwater-harvesting structure/percolation pitRERA amenitiesProject amenity record says 100%; not independently verified RERA amenities
Transformer space and electrical meter room/substationCapacity not statedRERA amenitiesProject amenity record says 100% for electrical meter room/substation/receiving station; not independently verified RERA amenities
Garbage houseRequired within the premises; size not statedCompletion status not separately established

No clubhouse, indoor recreation, sports facility or other community-building provision is established by the supplied project-specific documents. RERA amenities

7. Utilities, building services & safety

The project amenity record lists water supply, sewerage, storm-water drainage, rainwater harvesting and electrical meter room/substation/receiving station as available at 100%; it also lists fire protection and fire-safety requirements at 0%. These are filed progress fields and do not independently establish the operational status, capacity or statutory compliance of the services. RERA amenities

The GHMC permit requires one rainwater-harvesting structure/percolation pit, space for a transformer, and a garbage house. It also requires an occupancy certificate before occupation and a completion notice after construction. The supplied materials do not specify water source or storage capacity, STP capacity or treated-water reuse, electrical backup, lift count or capacity, fire equipment, escape-stair arrangement, emergency access, CCTV/security systems, waste segregation, or accessible routes and facilities. RERA amenities

8. Location, access & connectivity

The registered project location is Banjara Hills, Hyderabad, PIN 500019. The project record gives a cadastral-parcel centroid of 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km. RERA record RERA filing Location record

The GHMC permit describes the site as “BANJARAHILLS -19” and refers to an 18 m road frontage condition. The supplied evidence does not provide a detailed approach-road description, public-transport links or measured distances to other landmarks.

9. Developer & development status

The registered promoter is VAIBHAVI INFRAA PROJECTS, recorded as a partnership. The project record lists partners PRAHALAD TAYI and VEDAMBARI TAYI, with PRAHALAD TAYI also identified as authorised signatory. GSTIN: 36AARFV8091P1ZX. Parties record Corporate record

A promoter office address is recorded as PHASE - 2, K P H B COLONY, Banjara Hills, Banjara Hills, Hyderabad, 500019. The promoter website is listed as https://www.vaibhavigroup.com/; no official contact details are supplied. Parties record

The project record gives a completeness figure of 80% and completion date of 16/08/2025. These are project-record declarations; the supplied evidence does not include independent construction verification or an occupancy certificate for Building A-1. The RERA registration certificate records validity through 16/08/2025 and no extension. RERA record Approvals record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationFORM C certificate for JAYAPRDAS VAIBHAI VIBE, registration P02500001410, issued 25/11/2019; validity stated through 16/08/2025.
GHMC building permissionPermit No. 1/C18/12443/2019, file No. 1/HO/09986/2018, approved 16 August 2019; Building A-1.
RERA Form B declarationPromoter declaration by T. PAHALAD for VAIBHAVI INFRAA PROJECTS, including title, encumbrance, completion and fund-use statements; verification date and place are not legible as completed values.
Approved floor-plan recordDocument 78146 is identified as a layout/floor-plan document; supplied drawing-derived measurements include one measured 3BHK design. Floor plans
Occupancy / completion certificateNot present in the supplied documents. The GHMC permit requires completion notice and an occupancy certificate before occupation. Document index
Other project-specific documentDocument 328222 is described as a registered reconveyance deed releasing a mortgage over a stated 219.46 sq.m first-floor built-up area; further details are not included in this Overview.

Frequently asked questions

Is JAYAPRDAS VAIBHAVI VIBE registered with Telangana RERA?

Yes. JAYAPRDAS VAIBHAVI VIBE is registered with the Telangana Real Estate Regulatory Authority as P02500001410; the registration status is On-Going Project.

Who is the developer of JAYAPRDAS VAIBHAVI VIBE?

The promoter named in the RERA registration is VAIBHAVI INFRAA PROJECTS.

Where is JAYAPRDAS VAIBHAVI VIBE located?

JAYAPRDAS VAIBHAVI VIBE is in Banjara Hills, Hyderabad, Telangana (500019).

When will JAYAPRDAS VAIBHAVI VIBE be completed?

The promoter's proposed date of completion filed with RERA is 16/08/2025. This is the promoter's declaration, not a guarantee.