Jaswitha Cyber Ridge-B
MAHATHI INFRASTRUCTURES COMPANY AND MARKAZ INFRASTRUCTURE PROJECTS · Rangareddy · RERA P02400007403
JASWITHA CYBER RIDGE-B is a residential apartment project in Kondapur, Serilingampally Mandal, Ranga Reddy District, developed by Mahathi Infrastructures Company And Markaz Infrastructure Projects. The project is on a net plot area of 496.73 sq. mtrs and comprises one residential building with 1 Stilt + 5 upper floors and 15 2BHK units, each with a RERA saleable area of 117.0 sq. mtrs. Its TG-RERA registration number is P02400007403, and the proposed completion date recorded in the RERA header is 07/01/2027.
More from Mahathi Infrastructures Company And Markaz Infrastructure Projects · 17 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
12 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | JASWITHA CYBER RIDGE-B RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | The registration is for JASWITHA CYBER RIDGE-B; no separate phase number is disclosed. The sanctioned permit describes one residential building. RERA record |
| TG-RERA registration | P02400007403 |
| Registration validity | 19/12/2023–07/09/2026; the certificate says validity may be extended by the Authority. This is registration validity, not the completion deadline. |
| Registered promoter | Mahathi Infrastructures Company And Markaz Infrastructure Projects |
| TG-RERA status | The supplied record identifies the project as “New Project.” No extension is recorded in the supplied registration certificate. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Kondapur / Kondapur RERA record |
| Mandal / district / PIN | Serilingampally / Ranga Reddy / 500084 RERA record |
| Project survey number(s) and subdivision(s) | 112/1; no further project subdivision is stated. |
| Plot identification | Plot Nos. 31 and 32 |
| Site area | GHMC permit records plot area 498.66 sq. mtrs, road-affected area 0.0, nala-affected area 0.0, and net plot area 496.73 sq. mtrs. The RERA land filing records total/net area as 496.73 sq. mtrs. Land records |
| Boundaries recorded in the RERA land filing | North: Plot No. 30; South: 30 feet wide road; East: Plot Nos. 157 and 158; West: 30 feet wide road. Land records |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building permit | 3311/GHMC/SLP/2023-BP, approved 07 September, 2023; file no. 003924/GHMC/1942/SLP2/2023-BP Approvals record |
| Sanctioned built-up area | 1,340.85 sq. mtrs |
| Building count and form | One residential building; sanctioned configuration is 1 Stilt + 5 upper floors. The permit states building height 14.95; the supplied extraction does not state the unit. |
| Parking information in permit | Total parking area 276.75; unit is not stated in the supplied extraction. The permit identifies the stilt as approved for parking. |
| Unit counts | GHMC sanctioned 15 units; TG-RERA record also lists 15 units. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| Unit type | 2BHK; 15 units, 0 booked and 15 available in the supplied TG-RERA portal snapshot. The snapshot has no as-of date, so counts are indicative. RERA unit table |
| RERA saleable area | 117.0 sq. mtrs per unit as filed. RERA unit table |
| Construction stage | The supplied permit and registration documents do not establish current on-site construction progress; no independently verified site-progress record is supplied. Document index |
| Completion dates | GHMC permit: construction to be completed before 07 September, 2026. Form B declaration: completion undertaking 07/09/2026. The RERA header separately lists proposed completion 07/01/2027; the evidence does not identify that as a revised or approved extension. RERA record |
| Occupancy / completion certificate | No completion certificate is recorded in the supplied permit extraction; no occupancy certificate is supplied. The permit requires an occupancy certificate before occupation. |
2. The project story
JASWITHA CYBER RIDGE-B is registered as a residential apartment project on Plot Nos. 31 and 32 in Survey No. 112/1, Kondapur village, Serilingampally Mandal, Ranga Reddy District. The GHMC permit is for one building with a stilt and five upper floors, and the project record lists 15 two-bedroom apartments. RERA unit table
The supplied permit is an approval to construct, not evidence that construction is complete. The evidence provided does not establish the present physical construction stage or independently verify progress. No occupancy or completion certificate is supplied; accordingly, the record does not establish that any part of the building is ready for occupation. The registration certificate is valid through 07/09/2026 unless extended, while the supplied header also records 07/01/2027 as the proposed completion date. RERA record
3. Master plan, architecture & building design
The GHMC-approved development is one residential building on a net plot area of 496.73 sq. mtrs, with sanctioned built-up area of 1,340.85 sq. mtrs. The permit describes 1 Stilt + 5 upper floors and a building height of 14.95 (unit not stated in the supplied extraction). The available records do not give a verified building footprint, flats-per-floor arrangement, lift or stair count, or a complete description of the building’s circulation and common-area distribution.
The permit also records TDR DRC No. 01293/TDR/2021 and a value of 294.5 29100 in its extracted sanctioned parameters; the relationship or units of those extracted values are not made clear in the supplied material.
4. Homes, configurations & floor plans
The RERA record lists 15 2BHK units, each with a saleable area of 117.0 sq. mtrs. The supplied portal snapshot records 0 booked and 15 available, but has no as-of date. RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 15 | 0 | 15 | 117.0 sq. mtrs | 63.7–79.7 sq. mtrs; median 79.5 sq. mtrs (software-measured from drawings) | 32% (software-derived) |
The carpet-area measurements are software measurements of the supplied approved floor-plan drawing geometry, not RERA-filed figures, and are marked as needing review. The measured drawing set covers five flat designs. One extracted second-floor plan shows a bedroom, master bedroom, kitchen, drawing room, living/dining area, two toilets, wash area and balcony; the balcony is excluded from the measured carpet area. Floor plans RERA unit details
Carpet area represents the measured apartment interior described in the drawing analysis; RERA saleable area is a separate filed measure and includes a share of common areas. The supplied material does not provide a RERA-filed carpet-area figure or a separate balcony/utility area schedule. Floor plans RERA unit details RERA unit table
5. Parking & vehicle circulation
The GHMC permit records 276.75 as total parking area (unit not stated in the supplied extraction) and identifies the stilt as approved for parking. It requires the approved stilt/cellar parking space to be used exclusively for vehicle parking, without partition walls or rolling shutters. No approved car-space or two-wheeler-space count, visitor or accessible-space allocation, ramp details, or unit-wise parking allotment is established by the supplied evidence. The permit also requires parking places to provide electric-vehicle charging infrastructure in accordance with the referenced standards. This is a permit condition; the supplied evidence does not establish installation or completion.
6. Amenities, recreation & open spaces
The RERA amenities record marks the following facilities as available in the project disclosure. Its percentage figures are recorded below; they do not independently verify construction or completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | No size supplied | RERA amenities | Marked available; 100% in the supplied record |
| Water supply | No source, capacity or storage details supplied | RERA amenities | Marked available; 0% recorded |
| Sewerage (chamber, lines, septic tank, STP) | No capacity supplied | RERA amenities | Marked available; 0% recorded |
| Storm-water drains | No size supplied | RERA amenities | Marked available; 0% recorded |
| Green strip / tot-lot / park | No area supplied | RERA amenities | Marked available; 0% recorded |
| Street lighting | No details supplied | RERA amenities | 0% recorded; availability not marked |
| Community buildings | No details supplied | RERA amenities | 0% recorded; availability not marked |
| Treatment and disposal of sewage and sullage water | No capacity supplied | RERA amenities | 0% recorded; availability not marked |
| Solid-waste management and disposal | No details supplied | RERA amenities | 0% recorded; availability not marked |
| Water conservation / rainwater harvesting | No capacity supplied | RERA amenities | Marked available; 0% recorded; permit requires a rainwater-harvesting structure |
| Energy management | No details supplied | RERA amenities | Marked available; 0% recorded |
| Fire protection and fire-safety requirements | No system details supplied | RERA amenities | Marked available; 0% recorded |
| Electrical meter room / sub-station / receiving station | No capacity supplied | RERA amenities | Marked available; 0% recorded; permit requires space for a transformer |
| Aggregate recreational open space | No area supplied | RERA amenities | Marked available; 0% recorded |
The permit requires a fenced tot-lot to be maintained as greenery before issue of the occupancy certificate, along with tree planting and a greenery strip at the site perimeter. No clubhouse or specific indoor or sports facility is documented in the supplied project records.
7. Utilities, building services & safety
The RERA amenities record includes water supply, sewerage, storm-water drainage, sewage/sullage treatment, rainwater harvesting, energy management, fire protection and an electrical meter room/sub-station/receiving station. It does not provide capacities, system designs or evidence of completed installation. RERA amenities
The GHMC permit requires a rainwater-harvesting percolation pit, space for a transformer, an on-site garbage house, and electric-vehicle charging infrastructure in parking areas. It also states that sanitation, plumbing, fire-safety systems, lifts and electrical installations are to be executed under qualified technical supervision. These are permit requirements, not evidence that the systems have been installed or certified.
The permit requires an occupancy certificate before occupation and an occupancy fire NOC before issue of the occupancy certificate. It also requires CCTV installation under the cited government order and sets conditions concerning construction-worker safety and dust mitigation. The supplied evidence does not include a fire NOC, occupancy certificate, CCTV completion confirmation, or accessibility design details.
8. Location, access & connectivity
The registered location is Kondapur, Serilingampally Mandal, Ranga Reddy District, Telangana, PIN 500084. The supplied location record gives a project-parcel centroid of 17.471220394128924, 78.33699643345822. RERA record Location record
GHMC’s permit extraction records the site as abutting 30-foot-wide roads on the north/south boundaries in the RERA land filing; the permit also refers to an 18-metre road-width condition. The supplied evidence does not map the permit’s road-width reference to a particular boundary. Land records
HITEC City is listed at 5.3 km in the supplied location data. No public-transport route or other verified travel distance is supplied. Location record
9. Developer & development status
The registered promoter is Mahathi Infrastructures Company And Markaz Infrastructure Projects. The supplied records identify the organization type as “Others”; a more specific legal-entity form, registered office address, official contact details and promoter website are not established here. The registration certificate gives the promoter office location as Kondapur, Serilingampally, Ranga Reddy District, PIN 500084. Corporate record
The Form B declaration, signed by authorized signatory Mr. Ramprasad Reddy Arani on behalf of the promoter, undertakes completion by 07/09/2026 and declares that the project land is free from encumbrances. These are promoter declarations. The supplied permit also gives a completion-before date of 07 September, 2026; the RERA header separately records proposed completion as 07/01/2027. The available material does not establish an approved extension or current construction progress. RERA record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C registration certificate for JASWITHA CYBER RIDGE-B, P02400007403, valid 19/12/2023–07/09/2026 unless extended. |
| GHMC building permit | Building Permit Order 3311/GHMC/SLP/2023-BP, file no. 003924/GHMC/1942/SLP2/2023-BP, dated 07 September, 2023; identifies Survey No. 112/1 and the sanctioned building configuration. |
| Layout reference | LRS/15064/G/CR-11/WESTZONE/GHMC/2008 appears in the permit extraction. |
| TDR reference | TDR DRC No. 01293/TDR/2021 appears in the permit extraction. |
| Form B declaration | Promoter affidavit records the encumbrance and project-fund declarations and completion undertaking. |
| Occupancy / completion certificate | Not supplied; the permit states that an occupancy certificate is compulsory before occupation. |
| Approved floor-plan drawing | Drawing document 355078 was used for software measurement of five 2BHK designs; measurements are drawing-derived, not RERA disclosures. Floor plans |
The permit is conditional and expressly states that it does not confer ownership rights. A complete schedule of all approval documents and a current occupancy/completion record are not present in the supplied material.
1. Project at a glance
Project identity
Registered project name: JASWITHA CYBER RIDGE-B
Project type: Residential apartment project
Phase / registered portion: The registration is for JASWITHA CYBER RIDGE-B; no separate phase number is disclosed. The sanctioned permit describes one residential building.
TG-RERA registration: P02400007403
Registration validity: 19/12/2023–07/09/2026; the certificate says validity may be extended by the Authority. This is registration validity, not the completion deadline.
Registered promoter: Mahathi Infrastructures Company And Markaz Infrastructure Projects
TG-RERA status: The supplied record identifies the project as “New Project.” No extension is recorded in the supplied registration certificate.
Land and geographic identity
Locality / revenue village: Kondapur / Kondapur
Mandal / district / PIN: Serilingampally / Ranga Reddy / 500084
Project survey number(s) and subdivision(s): 112/1; no further project subdivision is stated.
Plot identification: Plot Nos. 31 and 32
Site area: GHMC permit records plot area 498.66 sq. mtrs, road-affected area 0.0, nala-affected area 0.0, and net plot area 496.73 sq. mtrs. The RERA land filing records total/net area as 496.73 sq. mtrs.
Boundaries recorded in the RERA land filing: North: Plot No. 30; South: 30 feet wide road; East: Plot Nos. 157 and 158; West: 30 feet wide road.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building permit: 3311/GHMC/SLP/2023-BP, approved 07 September, 2023; file no. 003924/GHMC/1942/SLP2/2023-BP
Sanctioned built-up area: 1,340.85 sq. mtrs
Building count and form: One residential building; sanctioned configuration is 1 Stilt + 5 upper floors. The permit states building height 14.95; the supplied extraction does not state the unit.
Parking information in permit: Total parking area 276.75; unit is not stated in the supplied extraction. The permit identifies the stilt as approved for parking.
Unit counts: GHMC sanctioned 15 units; TG-RERA record also lists 15 units.
Offering and status
Unit type: 2BHK; 15 units, 0 booked and 15 available in the supplied TG-RERA portal snapshot. The snapshot has no as-of date, so counts are indicative.
RERA saleable area: 117.0 sq. mtrs per unit as filed.
Construction stage: The supplied permit and registration documents do not establish current on-site construction progress; no independently verified site-progress record is supplied.
Completion dates: GHMC permit: construction to be completed before 07 September, 2026. Form B declaration: completion undertaking 07/09/2026. The RERA header separately lists proposed completion 07/01/2027; the evidence does not identify that as a revised or approved extension.
Occupancy / completion certificate: No completion certificate is recorded in the supplied permit extraction; no occupancy certificate is supplied. The permit requires an occupancy certificate before occupation.
2. The project story
JASWITHA CYBER RIDGE-B is registered as a residential apartment project on Plot Nos. 31 and 32 in Survey No. 112/1, Kondapur village, Serilingampally Mandal, Ranga Reddy District. The GHMC permit is for one building with a stilt and five upper floors, and the project record lists 15 two-bedroom apartments.
The supplied permit is an approval to construct, not evidence that construction is complete. The evidence provided does not establish the present physical construction stage or independently verify progress. No occupancy or completion certificate is supplied; accordingly, the record does not establish that any part of the building is ready for occupation. The registration certificate is valid through 07/09/2026 unless extended, while the supplied header also records 07/01/2027 as the proposed completion date.
3. Master plan, architecture & building design
The GHMC-approved development is one residential building on a net plot area of 496.73 sq. mtrs, with sanctioned built-up area of 1,340.85 sq. mtrs. The permit describes 1 Stilt + 5 upper floors and a building height of 14.95 (unit not stated in the supplied extraction). The available records do not give a verified building footprint, flats-per-floor arrangement, lift or stair count, or a complete description of the building’s circulation and common-area distribution.
The permit also records TDR DRC No. 01293/TDR/2021 and a value of 294.5 29100 in its extracted sanctioned parameters; the relationship or units of those extracted values are not made clear in the supplied material.
4. Homes, configurations & floor plans
The RERA record lists 15 2BHK units, each with a saleable area of 117.0 sq. mtrs. The supplied portal snapshot records 0 booked and 15 available, but has no as-of date.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 15 | 0 | 15 | 117.0 sq. mtrs | 63.7–79.7 sq. mtrs; median 79.5 sq. mtrs (software-measured from drawings) | 32% (software-derived) |
The carpet-area measurements are software measurements of the supplied approved floor-plan drawing geometry, not RERA-filed figures, and are marked as needing review. The measured drawing set covers five flat designs. One extracted second-floor plan shows a bedroom, master bedroom, kitchen, drawing room, living/dining area, two toilets, wash area and balcony; the balcony is excluded from the measured carpet area.
Carpet area represents the measured apartment interior described in the drawing analysis; RERA saleable area is a separate filed measure and includes a share of common areas. The supplied material does not provide a RERA-filed carpet-area figure or a separate balcony/utility area schedule.
5. Parking & vehicle circulation
The GHMC permit records 276.75 as total parking area (unit not stated in the supplied extraction) and identifies the stilt as approved for parking. It requires the approved stilt/cellar parking space to be used exclusively for vehicle parking, without partition walls or rolling shutters. No approved car-space or two-wheeler-space count, visitor or accessible-space allocation, ramp details, or unit-wise parking allotment is established by the supplied evidence. The permit also requires parking places to provide electric-vehicle charging infrastructure in accordance with the referenced standards. This is a permit condition; the supplied evidence does not establish installation or completion.
6. Amenities, recreation & open spaces
The RERA amenities record marks the following facilities as available in the project disclosure. Its percentage figures are recorded below; they do not independently verify construction or completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | No size supplied | Marked available; 100% in the supplied record | |
| Water supply | No source, capacity or storage details supplied | Marked available; 0% recorded | |
| Sewerage (chamber, lines, septic tank, STP) | No capacity supplied | Marked available; 0% recorded | |
| Storm-water drains | No size supplied | Marked available; 0% recorded | |
| Green strip / tot-lot / park | No area supplied | Marked available; 0% recorded | |
| Street lighting | No details supplied | 0% recorded; availability not marked | |
| Community buildings | No details supplied | 0% recorded; availability not marked | |
| Treatment and disposal of sewage and sullage water | No capacity supplied | 0% recorded; availability not marked | |
| Solid-waste management and disposal | No details supplied | 0% recorded; availability not marked | |
| Water conservation / rainwater harvesting | No capacity supplied | Marked available; 0% recorded; permit requires a rainwater-harvesting structure | |
| Energy management | No details supplied | Marked available; 0% recorded | |
| Fire protection and fire-safety requirements | No system details supplied | Marked available; 0% recorded | |
| Electrical meter room / sub-station / receiving station | No capacity supplied | Marked available; 0% recorded; permit requires space for a transformer | |
| Aggregate recreational open space | No area supplied | Marked available; 0% recorded |
The permit requires a fenced tot-lot to be maintained as greenery before issue of the occupancy certificate, along with tree planting and a greenery strip at the site perimeter. No clubhouse or specific indoor or sports facility is documented in the supplied project records.
7. Utilities, building services & safety
The RERA amenities record includes water supply, sewerage, storm-water drainage, sewage/sullage treatment, rainwater harvesting, energy management, fire protection and an electrical meter room/sub-station/receiving station. It does not provide capacities, system designs or evidence of completed installation.
The GHMC permit requires a rainwater-harvesting percolation pit, space for a transformer, an on-site garbage house, and electric-vehicle charging infrastructure in parking areas. It also states that sanitation, plumbing, fire-safety systems, lifts and electrical installations are to be executed under qualified technical supervision. These are permit requirements, not evidence that the systems have been installed or certified.
The permit requires an occupancy certificate before occupation and an occupancy fire NOC before issue of the occupancy certificate. It also requires CCTV installation under the cited government order and sets conditions concerning construction-worker safety and dust mitigation. The supplied evidence does not include a fire NOC, occupancy certificate, CCTV completion confirmation, or accessibility design details.
8. Location, access & connectivity
The registered location is Kondapur, Serilingampally Mandal, Ranga Reddy District, Telangana, PIN 500084. The supplied location record gives a project-parcel centroid of 17.471220394128924, 78.33699643345822.
GHMC’s permit extraction records the site as abutting 30-foot-wide roads on the north/south boundaries in the RERA land filing; the permit also refers to an 18-metre road-width condition. The supplied evidence does not map the permit’s road-width reference to a particular boundary.
HITEC City is listed at 5.3 km in the supplied location data. No public-transport route or other verified travel distance is supplied.
9. Developer & development status
The registered promoter is Mahathi Infrastructures Company And Markaz Infrastructure Projects. The supplied records identify the organization type as “Others”; a more specific legal-entity form, registered office address, official contact details and promoter website are not established here. The registration certificate gives the promoter office location as Kondapur, Serilingampally, Ranga Reddy District, PIN 500084.
The Form B declaration, signed by authorized signatory Mr. Ramprasad Reddy Arani on behalf of the promoter, undertakes completion by 07/09/2026 and declares that the project land is free from encumbrances. These are promoter declarations. The supplied permit also gives a completion-before date of 07 September, 2026; the RERA header separately records proposed completion as 07/01/2027. The available material does not establish an approved extension or current construction progress.
10. Approvals, official records & documents
TG-RERA registration: Form C registration certificate for JASWITHA CYBER RIDGE-B, P02400007403, valid 19/12/2023–07/09/2026 unless extended.
GHMC building permit: Building Permit Order 3311/GHMC/SLP/2023-BP, file no. 003924/GHMC/1942/SLP2/2023-BP, dated 07 September, 2023; identifies Survey No. 112/1 and the sanctioned building configuration.
Layout reference: LRS/15064/G/CR-11/WESTZONE/GHMC/2008 appears in the permit extraction.
TDR reference: TDR DRC No. 01293/TDR/2021 appears in the permit extraction.
Form B declaration: Promoter affidavit records the encumbrance and project-fund declarations and completion undertaking.
Occupancy / completion certificate: Not supplied; the permit states that an occupancy certificate is compulsory before occupation.
Approved floor-plan drawing: Drawing document 355078 was used for software measurement of five 2BHK designs; measurements are drawing-derived, not RERA disclosures.
The permit is conditional and expressly states that it does not confer ownership rights. A complete schedule of all approval documents and a current occupancy/completion record are not present in the supplied material.
Frequently asked questions
Is JASWITHA CYBER RIDGE-B registered with Telangana RERA?
Yes. JASWITHA CYBER RIDGE-B is registered with the Telangana Real Estate Regulatory Authority as P02400007403; the registration status is New Project.
Who is the developer of JASWITHA CYBER RIDGE-B?
The promoter named in the RERA registration is MAHATHI INFRASTRUCTURES COMPANY AND MARKAZ INFRASTRUCTURE PROJECTS.
Where is JASWITHA CYBER RIDGE-B located?
JASWITHA CYBER RIDGE-B is in KONDAPUR, Serilingampally, Rangareddy, Telangana (500084).
When will JASWITHA CYBER RIDGE-B be completed?
The promoter's proposed date of completion filed with RERA is 07/01/2027. This is the promoter's declaration, not a guarantee.