Jaswitha Cyber Nest-G
MAHATHI INFRASTRUCTURES COMPANY AND MARKAZ INFRASTRUCTURE PROJECTS · Rangareddy · RERA P02400008390
JASWITHA CYBER NEST-G is a residential apartment project in Kondapur, Serilingampally mandal, Ranga Reddy district. It is being developed by the registered promoters MAHATHI INFRASTRUCTURES COMPANY AND MARKAZ INFRASTRUCTURE PROJECTS. The project has a site area of 446.16 sq.m and one residential building with 1 stilt + 5 upper floors; the TG-RERA record lists 9 3BHK units, each with a saleable area of 149.77 sq.m. It is registered under TG-RERA number P02400008390, and the promoter’s completion undertaking is 01/04/2027.
More from Mahathi Infrastructures Company And Markaz Infrastructure Projects · 17 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | JASWITHA CYBER NEST-G RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Not separately identified; the TG-RERA certificate refers to the project and Survey No. 112/3 |
| TG-RERA registration number | P02400008390 RERA record |
| Registration validity | 22/06/2024 to 01/04/2027, as stated in the certificate |
| Registered promoter | MAHATHI INFRASTRUCTURES COMPANY AND MARKAZ INFRASTRUCTURE PROJECTS RERA record |
| RERA status in supplied record | New Project; registration certificate on file RERA record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | Kondapur; the building-plan extraction also describes the locality as Masjid Banda Road RERA record RERA filing |
| Revenue village | Kondapur RERA record |
| Mandal / district / PIN | Serilingampally / Ranga Reddy / 500084 RERA record |
| Project survey number(s) | Sy. No. 112/3 RERA filing |
| Plot identification | Plot Nos. 102 and 103 RERA filing |
| Site area | 446.16 sq.m; the RERA land record gives total and net area as 446.16 sq.m RERA filing Land records |
| Boundaries recorded in RERA | North: Plot No. 104; south: Plot No. 101; east: 30 feet wide road; west: Plot Nos. 110 and 111 RERA filing |
| Road affected area | RERA filing records 0 sq.m; the building-plan extraction also records a condition concerning surrender of a road-affected portion RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | GHMC Approvals record |
| Principal building approval | Permit No. TS/075121/2022; the drawing extraction gives approval date 26-11-2022 Approvals record |
| Building arrangement | One residential building |
| Sanctioned floor configuration | 1 stilt + 5 upper floors |
| Approved built-up area | Net residential BUA: 1240.25 sq.m; proposed built-up area excluding parking: 1240.25 sq.m; including parking: 1488.35 sq.m. The same drawing extraction separately records “TOTAL BUA: 1505.10” |
| Height recorded on drawing extraction | Total height: 20.44 m; also records 17.94 m from GL, excluding stilt floor |
| Parking | Parking levels/count are not clearly established by the extracted figures: the drawing extraction lists proposed number of parkings as 0, total parking area as 248.10 sq.m, and conditions referring to stilt/cellar parking |
| Approved vs RERA-filed units | Building-plan extraction: 10 units; TG-RERA record: 9 units RERA unit table |
Offering and status
| Item | Record |
|---|---|
| RERA-filed configuration | 3BHK; 9 units RERA unit table |
| RERA-filed saleable area | 149.77 sq.m per unit RERA unit table |
| Booked / available | 0 booked / 9 available, as last read from the TG-RERA portal; no as-of date is supplied for these counts RERA unit table |
| Construction stage | Not established by the supplied records; the vendor describes the project as under construction, which is not a TG-RERA progress certification Promoter website |
| Completion dates | TG-RERA Form B declaration undertakes completion by 01/04/2027; the project header separately lists proposed completion as 01/08/2027 RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project documents; the building approval requires completion notice and an occupancy certificate before occupation |
Registration validity, the declared completion date and the existence of an occupancy certificate are separate matters. The supplied record establishes the certificate’s stated validity and completion undertaking, but does not establish current construction progress or OC issuance. Document index
2. The project story
JASWITHA CYBER NEST-G is registered as a residential apartment project on Plot Nos. 102 and 103 in Sy. No. 112/3, Kondapur village, Serilingampally mandal, Ranga Reddy district. The registered site area is 446.16 sq.m. The filed development is one building, and the GHMC drawing extraction describes a stilt plus five upper floors. RERA record RERA filing
The TG-RERA unit record identifies nine 3BHK homes, with all nine shown as available and none booked in the portal data supplied; those counts have no stated reading date and should be treated as indicative. The building-plan extraction records ten units. The supplied materials do not establish which building portions, if any, have been completed or occupied. The project’s TG-RERA declaration gives a completion undertaking of 01/04/2027; no occupancy certificate is supplied. RERA unit table Document index
3. Master plan, architecture & building design
The available GHMC building-plan extraction describes a single residential building on a 446.16 sq.m plot, with one stilt level and five upper floors. It records a proposed coverage area of 248.05 sq.m (55.6%), vacant plot area of 198.11 sq.m, and net residential BUA of 1240.25 sq.m. The extraction also states proposed built-up area including parking of 1488.35 sq.m and separately lists total BUA of 1505.10 sq.m; these are distinct figures as recorded and are not treated here as interchangeable area measures.
The drawing extraction records a 20.44 m total height and 17.94 m from ground level, excluding the stilt floor. It also lists setbacks of 2.50 m and 3.00 m and a 1.00 m wide green strip. The approval’s conditions refer to a tot-lot, greenery, a rainwater-harvesting structure, a transformer space and garbage storage.
The supplied drawing-derived records do not establish detailed floor-by-floor layouts, number of flats per floor, lifts, stair counts, building footprint dimensions, or a complete phase/tower organization. The listed areas above are drawing-extracted approval figures, not RERA-filed carpet or saleable areas. Floor plans
4. Homes, configurations & floor plans
The TG-RERA unit record lists nine 3BHK units, with 149.77 sq.m saleable area per unit. The supplied portal counts show 0 booked and 9 available, without an as-of date. RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 9 | 0 | 9 | 149.77 sq.m | 86.5–112.1 sq.m; median 97.7 sq.m | 35% |
The carpet-area figures are software-measured from the approved floor-plan drawing geometry, not RERA-filed measurements; the measurement record says four flat designs were measured and flags one for review. The measured median is also reported as 1052 sq.ft. RERA saleable area and drawing-measured carpet area are different measures: the supplied drawing-measurement note states that saleable area includes a share of common areas and is larger than the measured carpet area. Verify drawing-based measurements against the plan and the specific unit before relying on them. Floor plans RERA unit details
The extracted fifth-floor plan panel for flat 501 labels a master bedroom, child’s bedroom, guest bedroom, hall and toilets. It includes room measurements, but the supplied record does not establish that this panel represents every 3BHK design or the specific unit offered to a buyer. RERA unit details
5. Parking & vehicle circulation
The building-plan extraction records a total parking area of 248.10 sq.m and proposed number of parkings as 0. Its conditions refer to stilt and cellar areas approved for parking, but the supplied extraction does not establish a cellar level, a sanctioned parking-space count, or a unit-by-unit parking allocation. It also requires parking areas to be used for vehicle parking and not partitioned or converted to other use.
No evidence supplied establishes visitor or accessible bays, two-wheeler spaces, mechanical parking, EV charging, ramp design, or pedestrian separation. A drawn or described parking area does not by itself establish exclusive ownership or allocation to a particular apartment.
6. Amenities, recreation & open spaces
The TG-RERA amenities record marks internal roads and footpaths at 100%; several other listed facilities are marked available but at 0% progress. These are portal-declared entries, not independent verification of completed facilities. RERA amenities
| Description / size | No size supplied |
|---|---|
| Evidence source | TG-RERA amenities record |
| Declared progress / verified status | Marked available; 100% declared; not independently verified RERA amenities |
| Description / size | No capacity or source details supplied |
|---|---|
| Evidence source | TG-RERA amenities record |
| Declared progress / verified status | Marked available; 0% declared RERA amenities |
| Description / size | Record lists chamber, lines, septic tank and STP in the facility label; no system details or capacity supplied |
|---|---|
| Evidence source | TG-RERA amenities record |
| Declared progress / verified status | Marked available; 0% declared RERA amenities |
| Description / size | No size or design details supplied |
|---|---|
| Evidence source | TG-RERA amenities record |
| Declared progress / verified status | Marked available; 0% declared RERA amenities |
| Description / size | No area supplied |
|---|---|
| Evidence source | TG-RERA amenities record; GHMC drawing conditions |
| Declared progress / verified status | Marked available; 0% declared; drawing condition calls for a tot-lot and maintained greenery RERA amenities |
| Description / size | No capacity supplied |
|---|---|
| Evidence source | TG-RERA amenities record; GHMC drawing extraction lists a rainwater-harvesting sump |
| Declared progress / verified status | Marked available; 0% declared RERA amenities |
| Description / size | No equipment or capacity details supplied |
|---|---|
| Evidence source | TG-RERA amenities record |
| Declared progress / verified status | Marked available; 0% declared RERA amenities |
| Description / size | No installed-system status or capacity supplied |
|---|---|
| Evidence source | TG-RERA amenities record; GHMC conditions |
| Declared progress / verified status | Marked available; 0% declared; approval conditions specify fire-safety measures RERA amenities |
| Description / size | No capacity supplied |
|---|---|
| Evidence source | TG-RERA amenities record; drawing extraction lists a transformer |
| Declared progress / verified status | Marked available; 0% declared RERA amenities |
| Description / size | No area supplied |
|---|---|
| Evidence source | TG-RERA amenities record |
| Declared progress / verified status | Marked available; 0% declared RERA amenities |
| Description / size | No size or capacity supplied |
|---|---|
| Evidence source | TG-RERA amenities record |
| Declared progress / verified status | Listed without a progress percentage or completed-status evidence RERA amenities |
The vendor lists additional facilities such as a gymnasium, swimming pool, badminton court, indoor games and security. Those are vendor-supplied claims, not established here as TG-RERA-declared, sanctioned or delivered facilities. Promoter website
7. Utilities, building services & safety
The project’s TG-RERA amenities record lists water supply, sewerage, storm-water drainage, rainwater harvesting, energy management, fire protection, electrical-meter/substation facilities and solid-waste management. For most of these entries, the record does not provide capacities, technical designs or verified completion evidence; several are marked at 0% progress. RERA amenities
The GHMC drawing extraction lists a municipal water sump and line, rainwater-harvesting sump, transformer, garbage bin and percolation pit. Its conditions specify a separate underground static water-storage tank of 25,000 litres and a separate residential terrace tank of 25,000 litres; generator backup; emergency lighting in corridors, common passages and staircases; fire extinguishers and a manually operated alarm system; and hose reel/downcomer provisions. These are approval conditions or drawing-listed provisions, not confirmation that the installations are complete or operational.
The approval also requires one entry and one exit with minimum width of 4.5 m and height clearance of 5 m, and calls for a joint open space with neighbouring premises for fire-vehicle manoeuvrability. The supplied evidence does not establish lift numbers or capacities, installed fire systems, water-treatment arrangements, sewage-treatment capacity, waste-segregation arrangements, CCTV, accessible circulation or EV charging. RERA amenities
8. Location, access & connectivity
The registered location is Kondapur village, Serilingampally mandal, Ranga Reddy district, PIN 500084. The building-plan extraction identifies the site as Plot Nos. 102 and 103 in Sy. No. 112/3 and describes the locality as Masjid Banda Road. The recorded east boundary is a 30 feet wide road. RERA record RERA filing
The supplied location record places HITEC City 5.3 km away. A vendor-provided connectivity listing separately names Gachibowli Miyapur Road, Old Mumbai Highway, Jain Heritage A Cambridge School, Gulmohar Park and Sai Neha Hospital with stated distances; these are vendor claims, not independently verified measurements. Location record Promoter website
9. Developer & development status
The registered promoters are Mahathi Infrastructures Company and Markaz Infrastructure Projects. The TG-RERA registration certificate identifies both as promoters and gives the project location as Kondapur, Serilingampally, Ranga Reddy, PIN 500084. The supplied corporate record lists GSTIN 36AATFM7578E1ZL; the legal entity type is recorded as “Others” and the specific entity form is not established. RERA record Corporate record RERA filing
The promoter’s Form B declaration, verified at Hyderabad on 16 May 2024, undertakes completion by 01/04/2027. The project header separately records proposed completion as 01/08/2027. Construction progress is not established by the supplied project evidence, and no occupancy certificate is supplied. The portal’s unit availability counts are indicative and have no stated reading date. RERA record Document index RERA unit table
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for JASWITHA CYBER NEST-G, registration P02400008390; stated validity 22/06/2024–01/04/2027 |
| GHMC building approval | Permit TS/075121/2022; drawing extraction records approval date 26-11-2022 and one stilt plus five upper floors Approvals record |
| Building-plan conditions | The extracted GHMC document includes conditions on commencement notice, completion notice, occupancy certificate, parking, utilities, safety and landscaping |
| Promoter declaration | Form B declaration for the project, verified 16 May 2024; includes the promoter’s completion undertaking and other declarations |
| Occupancy/completion certificate | Not present in the supplied documents Document index |
| Other approval records | No separate commencement certificate, approved-layout certificate, fire clearance or project-specific environmental clearance document is supplied in this overview evidence Document index Approvals record |
1. Project at a glance
Project identity
Registered project name: JASWITHA CYBER NEST-G
Project type: Residential apartment project
Phase / registered portion: Not separately identified; the TG-RERA certificate refers to the project and Survey No. 112/3
TG-RERA registration number: P02400008390
Registration validity: 22/06/2024 to 01/04/2027, as stated in the certificate
Registered promoter: MAHATHI INFRASTRUCTURES COMPANY AND MARKAZ INFRASTRUCTURE PROJECTS
RERA status in supplied record: New Project; registration certificate on file
Land and geographic identity
Locality: Kondapur; the building-plan extraction also describes the locality as Masjid Banda Road
Revenue village: Kondapur
Mandal / district / PIN: Serilingampally / Ranga Reddy / 500084
Project survey number(s): Sy. No. 112/3
Plot identification: Plot Nos. 102 and 103
Site area: 446.16 sq.m; the RERA land record gives total and net area as 446.16 sq.m
Boundaries recorded in RERA: North: Plot No. 104; south: Plot No. 101; east: 30 feet wide road; west: Plot Nos. 110 and 111
Road affected area: RERA filing records 0 sq.m; the building-plan extraction also records a condition concerning surrender of a road-affected portion
Development identity
Sanctioning authority: GHMC
Principal building approval: Permit No. TS/075121/2022; the drawing extraction gives approval date 26-11-2022
Building arrangement: One residential building
Sanctioned floor configuration: 1 stilt + 5 upper floors
Approved built-up area: Net residential BUA: 1240.25 sq.m; proposed built-up area excluding parking: 1240.25 sq.m; including parking: 1488.35 sq.m. The same drawing extraction separately records “TOTAL BUA: 1505.10”
Height recorded on drawing extraction: Total height: 20.44 m; also records 17.94 m from GL, excluding stilt floor
Parking: Parking levels/count are not clearly established by the extracted figures: the drawing extraction lists proposed number of parkings as 0, total parking area as 248.10 sq.m, and conditions referring to stilt/cellar parking
Approved vs RERA-filed units: Building-plan extraction: 10 units; TG-RERA record: 9 units
Offering and status
RERA-filed configuration: 3BHK; 9 units
RERA-filed saleable area: 149.77 sq.m per unit
Booked / available: 0 booked / 9 available, as last read from the TG-RERA portal; no as-of date is supplied for these counts
Construction stage: Not established by the supplied records; the vendor describes the project as under construction, which is not a TG-RERA progress certification
Completion dates: TG-RERA Form B declaration undertakes completion by 01/04/2027; the project header separately lists proposed completion as 01/08/2027
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project documents; the building approval requires completion notice and an occupancy certificate before occupation
Registration validity, the declared completion date and the existence of an occupancy certificate are separate matters. The supplied record establishes the certificate’s stated validity and completion undertaking, but does not establish current construction progress or OC issuance.
2. The project story
JASWITHA CYBER NEST-G is registered as a residential apartment project on Plot Nos. 102 and 103 in Sy. No. 112/3, Kondapur village, Serilingampally mandal, Ranga Reddy district. The registered site area is 446.16 sq.m. The filed development is one building, and the GHMC drawing extraction describes a stilt plus five upper floors.
The TG-RERA unit record identifies nine 3BHK homes, with all nine shown as available and none booked in the portal data supplied; those counts have no stated reading date and should be treated as indicative. The building-plan extraction records ten units. The supplied materials do not establish which building portions, if any, have been completed or occupied. The project’s TG-RERA declaration gives a completion undertaking of 01/04/2027; no occupancy certificate is supplied.
3. Master plan, architecture & building design
The available GHMC building-plan extraction describes a single residential building on a 446.16 sq.m plot, with one stilt level and five upper floors. It records a proposed coverage area of 248.05 sq.m (55.6%), vacant plot area of 198.11 sq.m, and net residential BUA of 1240.25 sq.m. The extraction also states proposed built-up area including parking of 1488.35 sq.m and separately lists total BUA of 1505.10 sq.m; these are distinct figures as recorded and are not treated here as interchangeable area measures.
The drawing extraction records a 20.44 m total height and 17.94 m from ground level, excluding the stilt floor. It also lists setbacks of 2.50 m and 3.00 m and a 1.00 m wide green strip. The approval’s conditions refer to a tot-lot, greenery, a rainwater-harvesting structure, a transformer space and garbage storage.
The supplied drawing-derived records do not establish detailed floor-by-floor layouts, number of flats per floor, lifts, stair counts, building footprint dimensions, or a complete phase/tower organization. The listed areas above are drawing-extracted approval figures, not RERA-filed carpet or saleable areas.
4. Homes, configurations & floor plans
The TG-RERA unit record lists nine 3BHK units, with 149.77 sq.m saleable area per unit. The supplied portal counts show 0 booked and 9 available, without an as-of date.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 9 | 0 | 9 | 149.77 sq.m | 86.5–112.1 sq.m; median 97.7 sq.m | 35% |
The carpet-area figures are software-measured from the approved floor-plan drawing geometry, not RERA-filed measurements; the measurement record says four flat designs were measured and flags one for review. The measured median is also reported as 1052 sq.ft. RERA saleable area and drawing-measured carpet area are different measures: the supplied drawing-measurement note states that saleable area includes a share of common areas and is larger than the measured carpet area. Verify drawing-based measurements against the plan and the specific unit before relying on them.
The extracted fifth-floor plan panel for flat 501 labels a master bedroom, child’s bedroom, guest bedroom, hall and toilets. It includes room measurements, but the supplied record does not establish that this panel represents every 3BHK design or the specific unit offered to a buyer.
5. Parking & vehicle circulation
The building-plan extraction records a total parking area of 248.10 sq.m and proposed number of parkings as 0. Its conditions refer to stilt and cellar areas approved for parking, but the supplied extraction does not establish a cellar level, a sanctioned parking-space count, or a unit-by-unit parking allocation. It also requires parking areas to be used for vehicle parking and not partitioned or converted to other use.
No evidence supplied establishes visitor or accessible bays, two-wheeler spaces, mechanical parking, EV charging, ramp design, or pedestrian separation. A drawn or described parking area does not by itself establish exclusive ownership or allocation to a particular apartment.
6. Amenities, recreation & open spaces
The TG-RERA amenities record marks internal roads and footpaths at 100%; several other listed facilities are marked available but at 0% progress. These are portal-declared entries, not independent verification of completed facilities.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | No size supplied | TG-RERA amenities record | Marked available; 100% declared; not independently verified |
| Water supply | No capacity or source details supplied | TG-RERA amenities record | Marked available; 0% declared |
| Sewerage | Record lists chamber, lines, septic tank and STP in the facility label; no system details or capacity supplied | TG-RERA amenities record | Marked available; 0% declared |
| Storm-water drains | No size or design details supplied | TG-RERA amenities record | Marked available; 0% declared |
| Green strip / tot-lot / park | No area supplied | TG-RERA amenities record; GHMC drawing conditions | Marked available; 0% declared; drawing condition calls for a tot-lot and maintained greenery |
| Rainwater harvesting | No capacity supplied | TG-RERA amenities record; GHMC drawing extraction lists a rainwater-harvesting sump | Marked available; 0% declared |
| Energy management | No equipment or capacity details supplied | TG-RERA amenities record | Marked available; 0% declared |
| Fire protection and safety | No installed-system status or capacity supplied | TG-RERA amenities record; GHMC conditions | Marked available; 0% declared; approval conditions specify fire-safety measures |
| Electrical meter room / substation / receiving station | No capacity supplied | TG-RERA amenities record; drawing extraction lists a transformer | Marked available; 0% declared |
| Recreational open space | No area supplied | TG-RERA amenities record | Marked available; 0% declared |
| Community buildings; sewage treatment/disposal; solid-waste management; street lighting | No size or capacity supplied | TG-RERA amenities record | Listed without a progress percentage or completed-status evidence |
The vendor lists additional facilities such as a gymnasium, swimming pool, badminton court, indoor games and security. Those are vendor-supplied claims, not established here as TG-RERA-declared, sanctioned or delivered facilities.
7. Utilities, building services & safety
The project’s TG-RERA amenities record lists water supply, sewerage, storm-water drainage, rainwater harvesting, energy management, fire protection, electrical-meter/substation facilities and solid-waste management. For most of these entries, the record does not provide capacities, technical designs or verified completion evidence; several are marked at 0% progress.
The GHMC drawing extraction lists a municipal water sump and line, rainwater-harvesting sump, transformer, garbage bin and percolation pit. Its conditions specify a separate underground static water-storage tank of 25,000 litres and a separate residential terrace tank of 25,000 litres; generator backup; emergency lighting in corridors, common passages and staircases; fire extinguishers and a manually operated alarm system; and hose reel/downcomer provisions. These are approval conditions or drawing-listed provisions, not confirmation that the installations are complete or operational.
The approval also requires one entry and one exit with minimum width of 4.5 m and height clearance of 5 m, and calls for a joint open space with neighbouring premises for fire-vehicle manoeuvrability. The supplied evidence does not establish lift numbers or capacities, installed fire systems, water-treatment arrangements, sewage-treatment capacity, waste-segregation arrangements, CCTV, accessible circulation or EV charging.
8. Location, access & connectivity
The registered location is Kondapur village, Serilingampally mandal, Ranga Reddy district, PIN 500084. The building-plan extraction identifies the site as Plot Nos. 102 and 103 in Sy. No. 112/3 and describes the locality as Masjid Banda Road. The recorded east boundary is a 30 feet wide road.
The supplied location record places HITEC City 5.3 km away. A vendor-provided connectivity listing separately names Gachibowli Miyapur Road, Old Mumbai Highway, Jain Heritage A Cambridge School, Gulmohar Park and Sai Neha Hospital with stated distances; these are vendor claims, not independently verified measurements.
9. Developer & development status
The registered promoters are Mahathi Infrastructures Company and Markaz Infrastructure Projects. The TG-RERA registration certificate identifies both as promoters and gives the project location as Kondapur, Serilingampally, Ranga Reddy, PIN 500084. The supplied corporate record lists GSTIN 36AATFM7578E1ZL; the legal entity type is recorded as “Others” and the specific entity form is not established.
The promoter’s Form B declaration, verified at Hyderabad on 16 May 2024, undertakes completion by 01/04/2027. The project header separately records proposed completion as 01/08/2027. Construction progress is not established by the supplied project evidence, and no occupancy certificate is supplied. The portal’s unit availability counts are indicative and have no stated reading date.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for JASWITHA CYBER NEST-G, registration P02400008390; stated validity 22/06/2024–01/04/2027
GHMC building approval: Permit TS/075121/2022; drawing extraction records approval date 26-11-2022 and one stilt plus five upper floors
Building-plan conditions: The extracted GHMC document includes conditions on commencement notice, completion notice, occupancy certificate, parking, utilities, safety and landscaping
Promoter declaration: Form B declaration for the project, verified 16 May 2024; includes the promoter’s completion undertaking and other declarations
Occupancy/completion certificate: Not present in the supplied documents
Other approval records: No separate commencement certificate, approved-layout certificate, fire clearance or project-specific environmental clearance document is supplied in this overview evidence
Frequently asked questions
Is JASWITHA CYBER NEST-G registered with Telangana RERA?
Yes. JASWITHA CYBER NEST-G is registered with the Telangana Real Estate Regulatory Authority as P02400008390; the registration status is New Project.
Who is the developer of JASWITHA CYBER NEST-G?
The promoter named in the RERA registration is MAHATHI INFRASTRUCTURES COMPANY AND MARKAZ INFRASTRUCTURE PROJECTS.
Where is JASWITHA CYBER NEST-G located?
JASWITHA CYBER NEST-G is in KONDAPUR, Serilingampally, Rangareddy, Telangana (500084).
When will JASWITHA CYBER NEST-G be completed?
The promoter's proposed date of completion filed with RERA is 01/08/2027. This is the promoter's declaration, not a guarantee.