Intercontinental Vijaya Park

INTERCONTINENTAL INFRASTRUCTURE LIMITED · Yadadri Bhuvanagiri · RERA P02000007078

INTERCONTINENTAL VIJAYA PARK is a plotted development / residential layout in Alair, Alair Mandal, Yadadri Bhuvanagiri District. The registered promoter is INTERCONTINENTAL INFRASTRUCTURE LIMITED. The tentative layout approval states an extent of 7 Acer 27.04 Gts; 37153 Sq. Yds and identifies 102 residential plots; buildings, floors and plot-size configurations are not disclosed. It is registered under TG-RERA **P02000007078**, with proposed completion **08/08/2025**.

More from Intercontinental Infrastructure Ltd · 2 projects →

01What we found

Period endedTG-RERA registration ran to 8 Aug 2025 - check its extension on TG-RERA
11documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Alair, Alair, Yadadri Bhuvanagiri · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered projectINTERCONTINENTAL VIJAYA PARK RERA record
Project typePlotted development / residential layout RERA record RERA filing
Phase or registered portionNo separate phase name is disclosed; registration is for the project identified by the five survey-number entries below RERA record
TG-RERA registrationP02000007078 RERA record
Registration validity11 October 2023 to 8 August 2025; the certificate states registration is subject to extension by the Authority. The supplied record says it was not extended. Registration validity is distinct from the promoter’s completion undertakings. RERA record
Registered promoterINTERCONTINENTAL INFRASTRUCTURE LIMITED; company RERA record Corporate record
RERA statusNew Project in the project record; registration validity shown above. A current registration status beyond the recorded expiry is not established by the supplied materials. RERA record RERA filing

Land and geographic identity

ItemRecord
LocalityAlair / ALAIR RERA record
Revenue villageAlair Revenue Village; the filed plan also uses “Alair Village”
MandalAlair RERA record
DistrictYadadri Bhuvanagiri; the filed layout document also spells this “Yadadri-Bhuvanagiri” RERA record
PIN508101 RERA record
Project survey numbers25/P, 26/P, 27/P, 28/P and 30/P RERA record
Layout extent as stated on tentative approval7 Acer 27.04 Gts; 37153 Sq. Yds
RERA land-area figuresTotal area 31064.64 sqmts; net area 24733.49 sqmts; area affected in road widening/FTL of tanks/nala widening 6331.15 sqmts RERA filing
Boundaries in RERA recordNorth: 33 WIDE ROAD; south, east and west: OTHERS LAND RERA filing

Development identity

ItemRecord
Principal layout approvalTentative Layout Plan approval 0004/LO/3102/2023, dated 25 August, 2023 Approvals record
Approval authorityAlair Municipality / Municipal Corporation; the RERA record identifies DTCP as the authority name Approvals record RERA record
Application number005561/LO/DTCP/3102/0008/2023 Approvals record
Layout scale102 plots
Approved built-up area24733.49 sqmts is the value entered as “Approved Built up Area” in the RERA project fields; the supplied materials do not provide a building-by-building built-up-area schedule. RERA filing
Buildings / floors / parking levelsNot disclosed in the supplied project record. This is a plotted layout rather than a documented multi-storey building project.

Offering and status

ItemRecord
Unit typeResidential plots; the tentative layout approval identifies 102 plots RERA filing
Plot-size range in RERA recordNot disclosed in the supplied materials
Booked / available plotsNot disclosed in the supplied materials
Declared project progressRERA amenity records show item-specific progress, reported in section 6; these are filed progress figures, not independent site verification. RERA amenities
Completion datesRERA header: proposed completion 08/08/2025. Form B declaration: undertaking to complete by 25/08/2025. RERA record
Occupancy / completion certificateNot disclosed. The available approval is for a tentative layout, not an occupancy or completion certificate.

2. The project story

  • INTERCONTINENTAL VIJAYA PARK is registered as a residential plotted development in Alair Revenue Village, Alair Mandal, Yadadri Bhuvanagiri District. Its registered land identity covers survey numbers 25/P, 26/P, 27/P, 28/P and 30/P. The tentative layout approval describes a 102-plot layout and allocates land to plots, roads, open space, social infrastructure and utilities. RERA record
  • The project is a layout development rather than a set of disclosed apartment blocks: the approval calls for roads, drainage, water-supply infrastructure, street lighting, park development and other layout works. RERA-filed progress entries report different completion percentages for infrastructure items; they do not establish that the works have been independently inspected or completed. RERA amenities
  • The RERA record lists a proposed completion date of 8 August 2025, while the promoter’s Form B declares completion by 25 August 2025. Neither the supplied record nor the submitted documents establish a completion certificate or occupancy certificate. RERA record

3. Master plan, architecture & building design

The filed tentative layout approval records an extent of 7 Acer 27.04 Gts; 37153 Sq. Yds and identifies 102 plots. Its stated land-use allocation is:

Layout componentArea as statedShare stated
Layout extent7 Acer 27.04 Gts; 37153 Sq. Yds—
Plotted area4 Acer 8.14 Gts; 20345 Sq. Yds63.23%
Road area1 Acer 22.57 Gts; 7572 Sq. Yds23.53%
Open space / park0 Acer 23.93 Gts; 2896 Sq. Yds9%
Social infrastructure0 Acer 6.66 Gts; 806 Sq. Yds2.5%
Utilities0 Acer 2.66 Gts; 322 Sq. Yds1%
Mortgage area within plotted area0 Acer 25.51 Gts; 3087 Sq. Yds15.15% of plotted area
  • The approval lists mortgage plots as Plot No. 1, 96, 97, 98, 99, 100, 101, 102, 87, 88, 89, 90, 91, 92, 93, 94 and 95, under Mortgage Deed No. 14540, dated 7 August 2023.
  • The approval describes required layout works including road formation with black top, storm-water drains, underground drainage lines and a common septic tank / STP, internal water-supply pipelines, an overhead tank, an assured water-supply source, electrical lines and street lights, a transformer, avenue planting, park development and rainwater-harvesting pits. These are approval conditions and work descriptions; they do not establish completed delivery.
  • No detailed plot-by-plot area schedule, dimensioned site-plan measurements, building design or apartment floor plans are available in the supplied evidence. Two drawing records remain unmeasured because scans are pending; no software-measured carpet areas are available. Document index Floor plans

4. Homes, configurations & floor plans

  • This is a plotted development. The tentative layout approval identifies 102 plots, but the supplied TG-RERA materials do not provide a plot-by-plot configuration, plot-size schedule, booked/available inventory or individual saleable areas. RERA unit table
  • Third-party listing data—not the primary RERA record—describes plot sizes from 1530 - 3600 sq.ft and lists individual advertised sizes from 1292 sq.ft to 3608 sq.ft. These are vendor claims and are not treated here as RERA-filed plot areas. Promoter website
  • No software-measured carpet-area figures are available: the two drawing records are scans pending measurement. Carpet area is not an applicable substitute for plot area in this plotted project. Floor plans

5. Parking & vehicle circulation

  • The supplied materials do not establish a parking-space count, visitor or accessible parking provision, parking allotment arrangement, or separate parking facility. The layout approval identifies roads and requires them to remain open for access to neighbouring sites; it does not provide a detailed vehicle-circulation or parking schedule in the extracted record. Document index
  • The approval states that the layout owner/developer shall not construct a compound wall or fencing around the site and that roads shall remain open for accessibility to neighbouring sites.

6. Amenities, recreation & open spaces

The following progress percentages are RERA-filed amenity-record entries, not independent verification of completion. The tentative layout approval separately requires specified layout works and land reservations. RERA amenities

Park / open space
Description / sizeOpen space reserved: 0 Acer 23.93 Gts; 2896 Sq. Yds (9%). RERA item: Green Strip/TOT LOT/Park.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 95%; independent completion verification not supplied.
Internal roads and footpaths
Description / sizeLayout road area: 1 Acer 22.57 Gts; 7572 Sq. Yds (23.53%).
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 80%; independent completion verification not supplied.
Community buildings
Description / sizeSocial-infrastructure reservation: 0 Acer 6.66 Gts; 806 Sq. Yds (2.5%).
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 0%; independent completion verification not supplied.
Water, sewerage and drainage works
Description / sizeApproval describes internal water pipelines, overhead tank, assured water source, underground drainage and common septic tank / STP.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: Water Supply 70%; Sewerage 80%; Treatment and Disposal of Sewage and Sullage Water 80%; Storm Water Drains 90%. Independent verification not supplied.
Street lighting
Description / sizeLayout lighting provision.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 80%; independent completion verification not supplied.
Rainwater harvesting
Description / sizeApproval describes rainwater-harvesting pits.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 90%; independent completion verification not supplied.
Electrical infrastructure
Description / sizeApproval describes electrical supply lines, street lights and transformer. RERA amenity record lists electrical meter room / sub-station / receiving station.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 50%; independent completion verification not supplied.
Solid-waste management
Description / sizeApproval includes solid-waste-management facilities among utilities.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 0%; independent completion verification not supplied.
Energy management
Description / sizeListed in the RERA amenity record.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 0%; independent completion verification not supplied.
  • Vendor-listed items such as fitness centres, swimming pools, indoor play areas, children’s activity zones and gated-community features are third-party marketing claims; the supplied RERA approval and amenity record do not establish them as sanctioned or delivered facilities. Promoter website

7. Utilities, building services & safety

  • The tentative layout approval describes a proposed water-supply source, internal water pipelines, an overhead tank, underground drainage lines, a common septic tank / STP, storm-water drains, rainwater-harvesting pits, electrical supply lines, street lights and a transformer. It also identifies solid-waste management among the utility works. These are stated layout requirements; the materials do not establish their completed condition, capacity or operating status.
  • RERA-filed progress percentages for water supply, sewerage, storm-water drains, treatment and disposal, rainwater harvesting, electrical infrastructure and solid-waste management are set out in section 6. No capacities, independent commissioning records, fire-system details, security specifications or accessibility arrangements are supplied. RERA amenities

8. Location, access & connectivity

  • The registered location is Alair, Alair Mandal, Yadadri Bhuvanagiri District, Telangana, PIN 508101. The RERA land record gives the northern boundary as 33 WIDE ROAD and lists “OTHERS LAND” on the other three sides. RERA record RERA filing
  • A supplied cadastral record places the parcel centroid at 17.648287614332634, 79.05308571145841. A location record lists the nearest sampled Outer Ring Road interchange at approximately 45.3 km; this is a measured map-distance record, not a travel-time estimate. Cadastral map Location record
  • The supplied materials do not identify public-transport links or specific nearby schools, hospitals or supermarkets. A vendor says the project is near schools, hospitals and supermarkets, without providing measured distances. Promoter website

9. Developer & development status

  • The registered promoter is INTERCONTINENTAL INFRASTRUCTURE LIMITED, a company. Its GSTIN is 36AABCI1167J1ZL. The RERA record lists an address at PLOT NO 1267/A, ROAD NO 63/A, ALAIR, Yadadri Bhuvanagiri, Telangana, 508101; the registration certificate separately prints the promoter office as “Village: Mandal: District: Hyderabad, Pin: 500033.” No official contact details or company website are supplied. Corporate record Parties record
  • The promoter’s Form B, signed by authorized signatory CHILAPPAGARI SRIKANTH and dated 06/09/2023, declares a completion date of 25/08/2025 and states that the land is free from encumbrances. This is a promoter declaration. The RERA header separately records proposed completion as 08/08/2025. RERA record
  • The RERA amenity entries report item-by-item progress, but no independent construction inspection or completion certification is supplied. The registration certificate records validity through 08/08/2025 and states it may be extended by the Authority; the supplied record says no extension is recorded. No completion or occupancy certificate is provided. RERA amenities

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationCertificate under section 5 for INTERCONTINENTAL VIJAYA PARK, registration P02000007078, issued 11/10/2023, valid through 08/08/2025; certificate states it may be extended by the Authority.
Tentative layout approvalApproval 0004/LO/3102/2023, dated 25 August, 2023, by Alair Municipality / Municipal Corporation; application 005561/LO/DTCP/3102/0008/2023.
Layout drawing“PROPOSED PLAN SHOWING RESIDENTIAL LAYOUT PATTERN”; the supplied extraction contains no legible approval number or sanction details.
Additional proposed-plan recordProposed residential layout plan on survey numbers 25/P, 26/P, 27/P and 30P; no approval or sanction details are legible in the supplied extraction.
Mortgage deed referenceMortgage Deed No. 14540, dated 07 August, 2023, recorded in the tentative layout approval for specified reserved plots.
Form B declarationPromoter declaration dated 06/09/2023, signed by authorized signatory CHILAPPAGARI SRIKANTH.
Completion / occupancy certificatesNot present in the supplied materials. Document index

Frequently asked questions

Is INTERCONTINENTAL VIJAYA PARK registered with Telangana RERA?

Yes. INTERCONTINENTAL VIJAYA PARK is registered with the Telangana Real Estate Regulatory Authority as P02000007078; the registration status is New Project.

Who is the developer of INTERCONTINENTAL VIJAYA PARK?

The promoter named in the RERA registration is INTERCONTINENTAL INFRASTRUCTURE LIMITED.

Where is INTERCONTINENTAL VIJAYA PARK located?

INTERCONTINENTAL VIJAYA PARK is in ALAIR, Yadadri Bhuvanagiri, Telangana (508101).

When will INTERCONTINENTAL VIJAYA PARK be completed?

The promoter's proposed date of completion filed with RERA is 08/08/2025. This is the promoter's declaration, not a guarantee.

More projects in Alair